Loading...
HomeMy WebLinkAbout8.1_03_C 1.1_Sub Improv Plans_2019-06-10H YDH YDHYD CAMPUS BLVD SOUTH 11TH AVESOUTH 11TH AVESTUDENT DRIVESOUTH 14TH AVESUD PHASE 1 HC HC HC HC HC HC HC HC HC HC HC HCHCHCHCHCHCY4 Y4 Y3 Y3 Y3 Y3 Y3 Y4 Y3 Y3 Y3 Y2 Y2 Y3 Y3 Y3 Y3 Y3 Y3 Y3 Y3 Y3 Y3 Y3 Y3 Y3 Y3 Y3 Y3 Y3 Y3 Y3 P3 P3 P3 P3P3 P3P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3P3 P3P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 HCHC HCHCP3 P3 Y3 P3P3 Y3 Y3 Y3 Y3 CAMPUS BLVDCAMPUS BLVD SOUTH 14TH AVEEXISTING TRAILS (TYP) EXISTING TRAIL MODIFICATION CONNECT TO EXISTING WATER CONNECT TO EXISTING ROUNDABOUT FUTURE ARNOLD ST(35' WIDTH - 70' ROW) Proposed Restricted Block 4 Lot 1 14.18 Acres (Gross) 11.89 Acres (Net) FUTURE S 14TH AVESOUTH 13TH AVESOUTH 12TH AVEEXISTING 70' PUBLIC STREET AND UTILITY EASEMENT EXISTING 35' PUBLICSTREET AND UTILITYEASEMENTPROPOSED 10' UTILITY EASEMENT (TYP) EXISTING SUD PHASE 1 EXISTING SUD PHASE 2 ProposedCity Park 41.84 AcresREV: ADDED TEXT C 1.1SUBDIVISIONIMPROVEMENTSPLANPROFESSIONALENGINEERS &SURVEYORSSUD PHASE 3 STAHLYENGINEERING& ASSOCIATESRTR HOLDINGS II, LLC