Loading...
HomeMy WebLinkAbout19- Early Work Amendment 1 to GC-CM Agreement - Langlas & Associates, Inc. - Guaranteed Maximum Price for the Bozeman Public Safety Center EARLY WORK AMENDMENT(EWA)NO. 1 TO AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER Pursuant to Subparagraphs 3.7.1-3.7.3 and 4.12 of the Preconstruction Services Conditions Agreement between Owner and Construction Manager this amendment dated the 28th day of August, 2019,between City of Bozeman("Owner") and Langlas &Associates, Inc. ("Contractor") for the Bozeman Public Safety Center, hereby establishes a Guaranteed Maximum Price and Contract Time for the portion of the Project as set forth below: GUARANTEED MAXIMUM PRICE The Construction Manager's Guaranteed Maximum Price (GMP)for the Work, including the Cost of the Work and the Construction Manager's Fee is as follows: Bid Package 2A—Demolition of Existing Structures $ 158,000 Deduct Demo of Building "B" Foundation by MDT <$ 4,500> Bid Package 2B —Asbestos Abatement $ 46,950 SWPPP Engineered Plan&Permit Fees, Phase 1, only $ 5,500 Temporary Construction Fencing, Phase 1, only $ 9,962 General Conditions, Phase 1, only $ 11,758 Subtotal $ 227,670 General Liability Insurance $ 1,423 Subtotal $ 229,093 Construction Manger's Fee (3.2%) $ 7,331 Subtotal $ 236,424 100% Payment and Performance Bonds $ 2,364 TOTAL GUARANTEED MAXIMUM PRICE $ 238,788 CONTRACT TIME The date of Substantial Completion for the Work outlined above is: November 1, 2019. EWA#I—Bozeman Public Safety Center Page 1 OWNER: CONTRACTOR: City of Bozeman Langlas &Associates, Inc. 121 N. Rouse Ave. 1019 E. Main St. Suite 101 Bozeman, MT 59715 Bozeman, MT 59715 B • By: Andrea Surratt, City anager Steve T. Langlas, resident EWA 01—Bowman Public Safety Center Page 2