Loading...
HomeMy WebLinkAbout04- Wastewater Treatment Plant 2003 Modifications, Amendment No. 1 to Professional Services Agreement . . '" AMENDMENT NO.1 TO PROFESSIONAL SERVICES AGREEMENT FOR BOZEMAN WASTEWATER TREATMENT PLANT (WWTP) 2003 MODIFICATIONS MMI. No. 417.041 THIS IS AN AGREEMENT made as of January 5 ,~~, between THE CITY OF BOZEMAN, a Municipal Corporation, P.O. Box 1230, Bozeman, Montana, 59771-1230 (OWNER) and Morrison-Maierle, Inc., P.O. Box 1113, Bozeman, Montana, 59771-1113 (ENGINEER). WHEREAS the parties previously entered into a Professional Services Agreement dated February 3, 2003, herein referred to as the Original Agreement, for professional engineering services for the "Bozeman Wastewater Treatment Plant (WWTP) 2003 Modifications" project; and WHEREAS, the parties desire to amend provisions of the Original Agreement to include design and construction engineering services for replacement of existing building roofs under the current project. NOW, THEREFORE, IN CONSIDERATION OF THE MUTUAL COVENANTS CONTAINED HEREIN, the parties agree as follows: The conditions and provisions set forth in the attached EXHIBIT A - ENGINEERING FEE ESTIMATE (BUILDINGS ROOFING DESIGN & BID DOCUMENTS), is hereby incorporated in and made part of this Agreement. Article 1 - Enqineerinq Services Section 1.1 of the Original Agreement is amended by adding the following: BUILDINGS ROOF REPLACEMENT . Incorporate design and construction engineering services for the replacement of exiting roofs on the Blower, Thickener and Administration Buildings into the Wastewater Treatment Plant Project. Article 6 - Compensation For Enqineerinq Service Article 6 of the original agreement is replaced with the following: 6.1. LUMP SUM AGREEMENT FOR BASIC SERVICES AND EXPENSES OF ENGINEER 6.1.1. Payment. The OWNER shall for design phase services performed as Basic Engineering Services under sections 4.1 through 4.3 of this agreement pay a total sum in the amount of $234,288 for such services. 6.1.2. Payment Schedule. Total cumulative payments for the design phase engineering services (sections 4.1 through 4.3) shall not exceed the following ceilings: 1 - . $54,943 until the Pre-design Investigation and Preliminary Design Report have been submitted to the OWNER. $212.809 until the Preliminary Plans and Specifications have been submitted to the OWNER and review authorities. $234,288 until the Final Plans and Specifications have been submitted to the OWNER and review authorities. 6.1.3. General. Engineer shall submit monthly statements for services rendered. The statements shall be based upon Engineer's estimate of the proportion of the total services actually completed at the time of billing, subject to any limitations on payments based on completion of tasks or specific retainage requirements pursuant to the payment provisions of the Agreement. 6.1.4 Reimbursable Expenses. Only those expenses specifically identified for payment under section 6.2 of this Agreement are reimbursable. All other design related expenses are included in the Lump Sum Payment for the Basic services (4.1 through 4.3) and are not separately reimbursable. Additional Services specifically identified under the scope of design services for payment under 6.1 are not separately reimbursable 6.2 DIRECT LABOR COST PAYMENT FOR BASIC SERVICES AND EXPENSES OF ENGINEER. Bidding or negotiating, construction, and project documentation services performed as Basic Engineering Services under sections 4.4 through 4.7 including Bidding, General Administration of Construction Contract, Resident Project Representation, Project Documentation, and Construction Testing, shall be compensated in accordance with the following: 6.2.1. The OWNER shall pay for Bidding or Negotiating Phase, Construction Phase, and Project Documentation/Testing Services an amount not to exceed $246,267 except as provided under 6.2.1.2 and 6.2.4. 6.2.1.1. Costs Compensation. Compensation for these services shall be based on the ENGINEER's Direct Labor Cost times a factor of 3.00 for services rendered which shall cover Direct Labor, Direct Labor Overhead, General & Administrative Overhead and Profit. 6.2.1.2. Notification. At any time during the construction that it becomes apparent that the Construction Phase and Project Documentation Services rendered under this Agreement will exceed the negotiated compensation for these services, and prior to performing services in excess of the contract ceiling, the ENGINEER shall give OWNER written notice thereof. Promptly thereafter OWNER and ENGINEER shall review the scope and progress of the project work. ENGINEER shall obtain written authorization from OWNER, prior to any additional costs being incurred under paragraph 6.2.1.3. If it is determined that due to a change in project scope under paragraph 5.2.1, the ENGINEER is entitled to additional compensation, OWNER and ENGINEER may negotiate terms as provided under 6.2.1.1. The amount and terms of any additional compensation under 6.2.1.1 or 6.2.1.3 shall be negotiated and agreed in writing pursuant to 9.16. 2 . 6.2.1.3. Costs Exceedinq Estimated Compensation. Except as allowed under 5.2.1, when the total cost of the original scope Construction Phase and Project Documentation Services exceeds the negotiated compensation for these services, the OWNER shall pay only for the direct costs incurred in excess of the estimated compensation. These costs consist of an amount equal to the ENGINEER'S Direct Labor Cost times a factor of 2.61 for services rendered which shall include Direct Labor, the federally audited payroll Direct Labor Overhead, and General & Administrative Overhead costs, but shall not include any allowance for profit. 6.2.2. Reimbursable Expenses, as defined in section 7.4 of this Agreement, for Basic Services and Approved Additional Services shall be paid to the ENGINEER by the OWNER in the actual amount of the costs incurred up to an amount not to exceed $4,240 which includes $3.795 for consultants employed by the Engineer and $445 for all other reimbursable expenses. The estimated reimbursable expenses are identified in Exhibit "A ". 6.2.3. Failed Test Expenses. The ENGINEER shall maintain and provide to the OWNER, a record of the costs associated with failing quality control tests performed for the OWNER during the course of the construction of the project and recommend an amount the OWNER deduct from the contractor(s) payments. 6.2.4. The OWNER shall pay an amount for Additional Services rendered by the ENGINEER and approved in writing by the OWNER on the basis of the ENGINEER'S Direct Labor Costs times a factor of 3.00 , or an amount otherwise negotiated at the time such services are requested and approved by the OWNER. Except as specifically amended herein, the Original Agreement shall remain in full force and effect and the parties shall be bound by all terms and conditions therein. In witness whereof, the Parties hereto do make and execute this Agreement. CITY OF BOZEMAN, MONTANA MORRISON-MAIERLE, INC. I~ 1 C' .'---:;. LI!/ /.' ) '". ""' .// ( BY:-- --.... BY: (:':',c~.<_ 4..-- .../::, C;/ .,'.... ,-..,..., (City Manager) c:::>- (Vice-President) DATE: January 5,2004 DATE: r)c,coc, \2 zC'c:,'~ ) ATTEST: By:{Jj: ;I ~ H:I04171041 l[)ocslPSA IPSA Arncndlllent II]. lootlng,doc 3 . . . . . EXHIBIT A PAGE 1 OF 2 ENGINEERING FEE ESTIMATE ............... ..... ....... ...E!9ZEM~tII~F'..... ....\ ........ ......<....\..............., .BUILDINGS ROOFING DESIGN{BIDOOCUMENTS & CONSTRUCTION SERVICES STAFF HOUR ESTIMATE TOTAL SUPERVISING SENIOR DESIGN CADD STAFF TASK HOURS PRINCIPAL ENGINEER I ENGINEER ENGINEER II DRAFTER ENGINEER CLERICAL 4.1.4.2,4.3 - DESIGN PHASE 24 4 16 4 Hours SlJlltotal 24 4 16 4 ~,__R Cost Subtotal $1,768,00 $3fJ2.00 $1,248,00 $128,00 SUBTOTAL OF STAFF HOURS REQUIRED 24 4 16 4 HOURLY LABOR COST $12000 $98,00 $78.00 $73,00 $52 00 $63,00 $32.00 LABOR COST BY POSITION $1.768.00 $392 $1,248 $128 TOTAL COST OF LABOR: $1,768,00 NUMBER UNIT TOTAL DIRECT EXPENSE DESCRIPTION UNITS UNITS COST COST Subsistence Per Diem days $23,00 $2300 Automollile Transportation Mileage miles 25 $0.67 $16.75 SubcontrcH.:ted Services Tt)ylor H~nson K<1ne Arcllitects Is 1 $3,795.00 $3,795.00 GenerJI Printing sheets 625 $0,10 $62,50 Plan Printing st 300 $O,~)5 $165.00 T~chniCJI Support hours 24 $3,00 $72,00 Postage/Freight Bacll 1 $1000 $10.00 Miscellaneous Is 1 $75000 $750.00 TOTAL DIRECT EXPENSES $4,394.25 LABOR LABOR EXPENSE COST TABLE / DESCRIPTION EXPENSE FACTOR FACTOR CEILING Direct Labor $1,788 1.00 $1,768 Direct Expenses $4,394 1.10 $4,834 4.1,4.2 & 4.3 - DESIGN PHASE SUBTOTAL $6,602 . ^ EXHIBIT A PAGE 2 OF 2 ENGINEERING FEE ESTIMATE i>,~~~EM:AN'..WWTP BUILDINGS ROOFING DESic3N;EhoDOCUMENTS & CONSTRUCTION SERVICES STAFF HOUR ESTIMATE TOTAL SUPERVISING SENIOR DESIGN RESIDENT STAFF TASK HOURS PRINCIPAL ENGINEER I ENGINEER ENGINEER II REP. ENGINEER CLERICAL 4.4 - BIDDING PHASE 8 2 2 4 Hours Subtotal 8 2 2 4 Cost Subtotal $480,00 $196.00 ..!l?_~~_ $128,00 -.. 4.5.4,6 & 4.7 - CONSTRUCTION PHASE, PROJECT DOCUMENTATION & CONSTRUCTION TESTING 16 4 8 4 Hours SUbtOt~11 1G 4 8 4 Cost SUb.!.~ll"J 1,144,00 _,.J~9200 $624.00 $12802__ SUBTOTAL OF STAFF HOURS REQUIRED 24 n 2 8 8 HOURLY LABOR COST $480.00 $120,00 $98,00 $78.00 $73.00 $78,00 $63,00 $32.00 LABOR COST BY POSITION $588 $156 $624 $256 TOTAL COST OF LABOR: $1,624 NUMBER UNtT TOTAL DIRECT EXPENSE DESCRIPTION UNITS UNITS COST COST Subsistence Per Diem days $23.00 $23,00 Automobile Transportation Mile~ge miles $0,67 Subcontracted Services T~ylor Htlnson K<1ne Architects Is t $3,795.00 $3,795.00 General PrintinQ sheets 100 $OlO $1000 PI3n PrintinQ sf IO() $0.55 $55.00 Photos Is 1 $25.00 $2500 Technical Support hours 24 $300 $72.00 Postage/Freight each 1 $10,00 $lO.OO Miscellc1neous Is 1 $250,00 $250 00 TOTAL DIRECT EXPENSES $4,240.00 LABOR LABOR EXPENSE COST TABLE' DESCRIPTION EXPENSE FACTOR FACTOR CEILING Direct Labor $1,624 1.00 $1 ,62~ Direct Expenses $4,240 1QQ $4.240 4.4, 4.5, 4,6 & 4.7 PHASES SUBTOTAL $5,864 H:\Q4 '17\Q41 \Docs\PSJ\Roofing Psa Amendment Exhibit