Loading...
HomeMy WebLinkAbout19- Amendment 5 to PSA - Robert Peccia and Associates - 5.3 Million Gallon Water Storage Reservoir Amendment No. 5 to Professional Services Agreement for 5.3 Million Gallon Water Storage Reservoir Bidding and Construction for 48-inch Transmission Pipeline THIS AGREEMENT is made as of this Ott" day of S< , 2019, between THE CITY OF BOZEMAN, a Municipal Corporation, Bozeman, Montana,herein referred to as OWNER and Robert Peccia and Associates, an Engineering Consulting Firm of Helena, Montana, herein referred to as ENGINEER. WHEREAS,the parties have entered into a Professional Services Agreement dated January 5, 2015, herein referred to as Original Agreement for professional engineering services; and WHEREAS,the parties desire to further amend the provisions of this Agreement. NOW, THEREFORE, IN CONSIDERATION OF THE MUTUAL COVENANTS CONTAINED HEREIN, the parties agree as follows: The conditions and provisions set forth in the attached exhibits to this AMENDMENT FIVE to the Original Agreement; EXHIBIT A (Fee Proposal), EXHIBIT B (Schedule of Reimbursable Expenses) are hereby incorporated in and made part of this Agreement. ARTICLE 1 -ENGINEERING SERVICES 1.1. The detailed description of the specific project components is described as follows: This engineering project components are the engineering bid and construction phases for the new 48-inch transmission pipeline approximately 2,865 feet in length. The pipeline will be connected to the City's existing 30-inch transmission pipeline on Nash and Sourdough Roads. Major work tasks for the bid phase include bid advertisement, conducting a pre-bid conference, distribution of bid documents and plan holders list, answering bidder questions, preparation of addenda, attending bid opening, preparation of certified bid tabulations and make recommendation for award to the City and related items. Major work tasks for the construction phase include conducting a pre-construction conference, providing project survey control points for the construction contractor, review of contractor submittals,preparation of progress reports, preparation of work orders and change orders, construction inspection, preparation of as-built drawings and project closeout services. 1.2. The scope of services under this contract is set forth in the Original Agreement and this Amendment Five to the Original Agreement and the attached EXHIBITS. 1 � ARTICLE 6— COMPENSATION FOR ENGINEERING SERVICES Except as specifically amended herein, the original agreement shall remain in full force and effect and the Parties shall be bound by all terms and conditions therein. 6.2 DIRECT LABOR COST PAYMENT FOR BASIC SERVICES AND EXPENSES OF ENGINEER. Construction and project documentation services performed as Basic Engineering Services under sections 4.4 and 4.5 shall be compensated in accordance with the following: 6.2.1 The OWNER shall pay for Bidding and Construction Phase Services an amount not to exceed $231 142.00 except as provided under 6.2.1.2 and 6.2.4. See attached Exhibit to this Amendment Five: Exhibit A Engineering Fee Proposal for Bidding and Construction Phase Services costs. 6.2.1.1 Costs Compensation. Compensation for these services shall be based on the ENGINEER's Direct Labor Cost times a factor of 3.0475 for services rendered which shall cover Direct Labor, Direct Labor Overhead, General & Administrative Overhead and Profit. 6.2.1.2 Notification. At any time during the construction that it becomes apparent that the Construction Phase and Project Documentation Services rendered under this Agreement will exceed the negotiated compensation for these services, and prior to performing services in excess of the contract ceiling, the ENGINEER shall give OWNER written notice thereof. Promptly thereafter OWNER and ENGINEER shall review the scope and progress of the project work. ENGINEER shall obtain written authorization from OWNER, prior to any additional costs being incurred under paragraph 6.2.1.3. If it is determined that due to a change in project scope under paragraph 5.2.1, the ENGINEER is entitled to additional compensation, OWNER and ENGINEER may negotiate terms as provided under 6.2.1.1. The amount and terms of any additional compensation under 6.2.1.1 or 6.2.1.3 shall be negotiated and agreed in writing pursuant to 9.16 of the original agreement. 6.2.1.3 Costs Exceeding Estimated Compensation. Except as allowed under 5.2.1, when the total cost of the original scope Bidding and Construction Phase Services exceeds the negotiated compensation for these services, the OWNER shall pay only for the direct costs incurred in excess of the estimated compensation. These costs consist of an amount equal to the ENGINEER'S Direct Labor Cost times a factor of 2.7152 for services rendered which shall include Direct Labor, the federally audited payroll Direct Labor Overhead, and 2 General & Administrative Overhead costs, but shall not include any allowance for profit. 6.2.2. Reimbursable Expenses, as defined in section 7.4 of this Agreement, for Basic Services and Approved Additional Services shall be paid to the ENGINEER by the OWNER in the actual amount of the costs incurred up to an amount not to exceed $31,795.00 for reimbursable expenses. The estimated reimbursable expenses are identified in the attached Exhibit to this Amendment: Exhibits "A (Bidding and Construction Phases), and B (Schedule of Reimbursable Expenses)". Except as specifically amended herein, the original agreement shall remain in full force and effect and the Parties shall be bound by all terms and conditions therein. 3 IN WITNESS WHEREOF, the parties hereto do make and execute this Agreement on the day and year first above written. CITY OF B ZEMAN ATTEST: Robin Crough •. '` \� •.'�o City Clerk c ' • ' • giL•ATIN APPROV D AS T By: inAttorney ENGINEER ROBERT PECCIA AND ASSOCIATES By: President ATTEST: By: 4 AMENDMENT FIVE EXHIBIT A FEE PROPOSAL FOR BIDDING AND CONSTRUCTION PHASE SERVICES ROBERT PECCIA&ASSOCIATES City,of Bozeman 5,3 MG Concrete Water Storage Reservoir CIVIL ENGINEERING SERVICES CONTRACT Bozeman,Montana SCHEDULE OF ESTIMATED COSTS BIDDING&CONSTRUCTION PHASE City of Bozeman 48-Inch Transmission Pipeline RPA Project No. 14702.000 Date:August 26th,2019 Person Days President Project Project Project `'I Survey ` Surveyor Survey Crew Accountant CADD CADD Admin. s Total Work Rem/Subtask Manager Engineer 'Inspector 'Manager 'Chief Manager `:Operator Person .� .. .. _ . .. n_$60.14. $54.13.,, ,-„�$43.65 $33.00_ $40,67,j; $40.67 $33.32, $38.51 $36.11 $29.01 $24.66 , ;Hours CONSTRUCTION PHASE Project Management 40.00 18.00 58,00 Pre-Construction Meeting 10.00 10.00 10,00 30,00 Construction Administration 40.00 180.00 220,00 Submittal Review 40.00 60.00 100,00 Construction Progress Meetings 30,00 30.00 60.00 Construction Staking 2.00 16,00 16.00 4.00 38.00 Construction Inspection 660.00 660.00 Process Pay Applications 40.00 40,00 Prepare Change Orders 8.00 40.00 2000. 68.00 As-Built Drawings 40,00 40.00 40.00 40.00 2000. 180,00 Project Closeout 16,00 40.00 4,00 60.00 Warranty Inspection 10,00 10,00 10.00 30.00 TOTAL PERSON-HOURS: 0.0 194.01 450.0 720.0 2.0 160 i16.0 22.0 '. 40.0 ".0 40.0 ;:1,544.0 LABOR COST PER EMPLOYEE: - ,_, p$0.00 $10,501;22 ,, _$19,642.50- „;$23,760.00 $K34 $650.72'.. $533.12 ,,, $847,22 $1.444.40 $1,27e.44, $986.40 $59,723.38 7, DIRECT EXPENSES Assumptions/Exclusions: Equipment(Survey OPS$400/day) S1,200.00 Equipment(Computers) S1,545.00 Nuclear Densometer $1,950.00 Per Diem-Day $3,600.00 Per Diem-Overnight $12.000,00 Mileage $6,000.00 Telephone and Fax $1,500.00 Printing $3.500.00 Miss.Supplies $500,00 Total: $31,795.00 SUMMARY OF ENGINEERING SERVICES Bidding Services S17,339.62 Loaded Labor Cost $182.006.94 Direct Expenses $31,795.00 Total Engineering Fee: ::5231,142 ROBERT PECCIA&ASSOCIATES, INC. SCHEDULE OF REIMBURSABLE EXPENSES January 1, 2019 EXHIBIT B TRAVEL EXPENSES: Standard Mileage Rate(Required on Government projects) $0.58 per mile or Federally Allowable Rate Regular Mileage Rate $0.63 per mile SUE Truck-Mileage $1.00 per mile Per Diem State or Federally Allowable Rates Cessna 172 $100.00perhour Other $at actual cost REPRODUCTION EXPENSES: Plain Paper Photocopies $0.10 per copy Color Photocopies $0.75 per copy All Other Outside Printing Expenses $at actual cost Photographic Developing Charges $at actual cost CONSTRUCTION ENGINEERING&SURVEYING EQUIPMENT: 4-Wheeler $100.00 per day Confined Space Entry Equipment $100.00 per day Controlotron Ultrasonic Flow Meter $15.00 per hour/$100.00 per day Digital Level $75.00 per day/$350 per weeW$1000 per month Flow Recorder $10.00 per day/$30 per week/$100 per month GPS-Rover $225.00 per day GPS-RTK System $400.00 per day Laser Level $20.00 per day/$75 per weeW$225 per month Line Locator $75.00 per day Nonsubmersible Transducers(with data logger) $100.00 per day Nuclear Densometer $100.00 per day/$200 per weeW$650 per month Structural Rebar Locator/Cover Meter $150.00 per day Robo-5600 $225.00 per day Robot S6 $325.00 per day Sewer Flow Meter $25.00 per day/$50 per week/$150 per month Submersible Transducers(with data logger) $120.00 per day Wind Recorder $75.00 per month SUE-Vacuum Truck Usage $150.00 per hour Trimble Juno GPS/GIS Hand Held $50.00 per day Troll 9500(Water Quality Sampler) $560.00 per month Turbidimeter $20.00 per day TRAFFIC&TRANSPORTATION EQUIPMENT: Traffic Counters/Miovision Scout $100.00 per day OFFICE EQUIPMENT&SUPPLIES: Computers: Word Processing/Accounting $2.50 per hour Computers: CADD/Microstation/Corel Draw $7.00 per hour Fax Machine $1.00 per page Long Distance Telephone Charges $at actual cost Postage Costs $at actual cost Federal Express Services $at actual cost Other Office Supplies(Specifically purchased for project) $at actual cost SUBCONTRACTORS: Invoiced at actual cost incurred by Consultant plus administrative charges. OTHER EQUIPMENT: All other equipment is included in the hourly rate charge,and the client will not be charged separately for such items. This policy is subject to change in the future. The above equipment list may be amended as necessary for future equipment purchases. APPROVED BY:RPA BOARD OF DIRECTORS Date: 01/29/19 FAAW9WDM1WVdeimbursab1e Expenses\REIMBEXP 2019.As