HomeMy WebLinkAbout09-16-19 City Commission Packet Materials - C7. PSA with Clanton and Associates for a Street Lighting Evaluation
Commission Memorandum
REPORT TO: Honorable Mayor and City Commission
FROM: Kellen Gamradt, Engineer II Shawn Kohtz, City Engineer
SUBJECT: Professional Services Agreement for Street Lighting Evaluation
MEETING DATE: September 16th, 2019
AGENDA ITEM TYPE: Consent
RECOMMENDATION: Authorize the City Manager to sign a Professional Services
Agreement with Clanton & Associates for street lighting evaluation.
BACKGROUND: The City Commission added a strategic plan priority at the April 1, 2019 Commission Meeting to evaluate the City’s new street light standard and lights installed since that standard was implemented in 2017. Upon receiving direction from the City Commission,
the City Engineer met with the Director Team on April 3, 2019 and with the internal project team
on May 2, 2019 consisting of: the City Manager, Assistant City Manager, Strategic Services
Director, Planning Director, Economic Development Director, IT Director, and representatives from Northwestern Energy to develop a scope of work for a street light evaluation. As a result, we advertised a request for proposals on June 20, 2019. Proposals were received from three
firms. A selection committee of three city staff selected Clanton & Associates as the most
qualified firm to perform the work. A detailed breakdown of the services provided under this
agreement are included in the attached scope and fee proposal. The evaluation will consist of an audit of street lights installed since the new street light standard
was adopted in 2017, an evaluation of the new standard for any further possible improvements to
limit light intrusion, and a presentation of findings to the City Commission.
UNRESOLVED ISSUES: None
ALTERNATIVES: Disapprove
FISCAL EFFECTS: The cost of these services total $48,020. After reviewing the project with
the Finance Director, the cost of the study is proposed to be applied 75% to lighting districts and
25% to the Street Maintenance Fund.
Attachments: Professional Services Agreement, Scope of Services
Report compiled on: 09/05/19
143
Professional Services Agreement for [Street Light Audit]
FY 2019 – FY 2020
Page 1 of 10
PROFESSIONAL SERVICES AGREEMENT
THIS AGREEMENT is made and entered into this _____ day of ____________, 201__, by
and between the CITY OF BOZEMAN, MONTANA, a self-governing municipal corporation
organized and existing under its Charter and the laws of the State of Montana, 121 North Rouse Street,
Bozeman, Montana, with a mailing address of PO Box 1230, Bozeman, MT 59771, hereinafter
referred to as “City,” and, _Clanton & Associates____, hereinafter referred to as “Contractor.”
In consideration of the mutual covenants and agreements herein contained, the receipt and
sufficiency whereof being hereby acknowledged, the parties hereto agree as follows:
1. Purpose: City agrees to enter this Agreement with Contractor to perform for City
services described in the Scope of Services attached hereto as Exhibit “A” and by this reference made
a part hereof.
2. Scope of Services: Contractor will perform the work and provide the services in
accordance with the requirements of the Scope of Services. For conflicts between this Agreement and
the Scope of Services, unless specifically provided otherwise, the Agreement governs.
3. Payment: City agrees to pay Contractor the amount specified in the Scope of
Services. Any alteration or deviation from the described services that involves additional costs above
the Agreement amount will be performed by Contractor after written request by the City, and will
become an additional charge over and above the amount listed in the Scope of Services. The City
must agree in writing upon any additional charges.
4. Contractor’s Representations: To induce City to enter into this Agreement,
Contractor makes the following representations:
a. Contractor has familiarized itself with the nature and extent of this Agreement, the
Scope of Services, and with all local conditions and federal, state and local laws, ordinances, rules,
and regulations that in any manner may affect cost, progress or performance of the Scope of Services.
b. Contractor represents and warrants to City that it has the experience and ability to
perform the services required by this Agreement; that it will perform said services in a professional,
competent and timely manner and with diligence and skill; that it has the power to enter into and
144
Professional Services Agreement for [Street Light Audit]
FY 2019 – FY 2020
Page 2 of 10
perform this Agreement and grant the rights granted in it; and that its performance of this Agreement
shall not infringe upon or violate the rights of any third party, whether rights of copyright, trademark,
privacy, publicity, libel, slander or any other rights of any nature whatsoever, or violate any federal,
state and municipal laws. The City will not determine or exercise control as to general procedures or
formats necessary to have these services meet this warranty.
6. Independent Contractor Status/Labor Relations: The parties agree that Contractor
is an independent contractor for purposes of this Agreement and is not to be considered an employee
of the City for any purpose. Contractor is not subject to the terms and provisions of the City’s
personnel policies handbook and may not be considered a City employee for workers’ compensation
or any other purpose. Contractor is not authorized to represent the City or otherwise bind the City in
any dealings between Contractor and any third parties.
Contractor shall comply with the applicable requirements of the Workers’ Compensation Act,
Title 39, Chapter 71, MCA, and the Occupational Disease Act of Montana, Title 39, Chapter 71,
MCA. Contractor shall maintain workers’ compensation coverage for all members and employees of
Contractor’s business, except for those members who are exempted by law.
Contractor shall furnish the City with copies showing one of the following: (1) a binder for
workers’ compensation coverage by an insurer licensed and authorized to provide workers’
compensation insurance in the State of Montana; or (2) proof of exemption from workers’
compensation granted by law for independent contractors.
In the event that, during the term of this Agreement, any labor problems or disputes of any
type arise or materialize which in turn cause any services to cease for any period of time, Contractor
specifically agrees to take immediate steps, at its own expense and without expectation of
reimbursement from City, to alleviate or resolve all such labor problems or disputes. The specific
steps Contractor shall take shall be left to the discretion of Contractor; provided, however, that
Contractor shall bear all costs of any related legal action. Contractor shall provide immediate relief
to the City so as to permit the services to continue at no additional cost to City.
Contractor shall indemnify, defend, and hold the City harmless from any and all claims,
demands, costs, expenses, damages, and liabilities arising out of, resulting from, or occurring in
connection with any labor problems or disputes or any delays or stoppages of work associated with
such problems or disputes.
7. Indemnity/Waiver of Claims/Insurance: For other than professional services
rendered, to the fullest extent permitted by law, Contractor agrees to release, defend, indemnify, and
145
Professional Services Agreement for [Street Light Audit]
FY 2019 – FY 2020
Page 3 of 10
hold harmless the City, its agents, representatives, employees, and officers (collectively referred to
for purposes of this Section as the City) from and against any and all claims, demands, actions, fees
and costs (including attorney’s fees and the costs and fees of expert witness and consultants), losses,
expenses, liabilities (including liability where activity is inherently or intrinsically dangerous) or
damages of whatever kind or nature connected therewith and without limit and without regard to the
cause or causes thereof or the negligence of any party or parties that may be asserted against,
recovered from or suffered by the City occasioned by, growing or arising out of or resulting from or
in any way related to: (i) the negligent, reckless, or intentional misconduct of the Contractor; or (ii)
any negligent, reckless, or intentional misconduct of any of the Contractor’s agents.
For the professional services rendered, to the fullest extent permitted by law, Contractor
agrees to indemnify and hold the City harmless against claims, demands, suits, damages, losses, and
expenses, including reasonable defense attorney fees, to the extent caused by the negligence or willful
misconduct of the Contractor or Contractor’s agents or employees.
Such obligations shall not be construed to negate, abridge, or reduce other rights or obligations
of indemnity that would otherwise exist. The indemnification obligations of this Section must not be
construed to negate, abridge, or reduce any common-law or statutory rights of the indemnitee(s)
which would otherwise exist as to such indemnitee(s).
Contractor’s indemnity under this Section shall be without regard to and without any right to
contribution from any insurance maintained by City.
Should any indemnitee described herein be required to bring an action against the Contractor
to assert its right to defense or indemnification under this Agreement or under the Contractor’s
applicable insurance policies required below the indemnitee shall be entitled to recover reasonable
costs and attorney fees incurred in asserting its right to indemnification or defense but only if a court
of competent jurisdiction determines the Contractor was obligated to defend the claim(s) or was
obligated to indemnify the indemnitee for a claim(s) or any portion(s) thereof.
In the event of an action filed against City resulting from the City’s performance under this
Agreement, the City may elect to represent itself and incur all costs and expenses of suit.
Contractor also waives any and all claims and recourse against the City or its officers, agents
or employees, including the right of contribution for loss or damage to person or property arising
from, growing out of, or in any way connected with or incident to the performance of this Agreement
except “responsibility for his own fraud, for willful injury to the person or property of another, or for
violation of law, whether willful or negligent” as per 28-2-702, MCA.
146
Professional Services Agreement for [Street Light Audit]
FY 2019 – FY 2020
Page 4 of 10
These obligations shall survive termination of this Agreement and the services performed
hereunder.
In addition to and independent from the above, Contractor shall at Contractor’s expense secure
insurance coverage through an insurance company or companies duly licensed and authorized to
conduct insurance business in Montana which insures the liabilities and obligations specifically
assumed by the Contractor in this Section. The insurance coverage shall not contain any exclusion
for liabilities specifically assumed by the Contractor in subsection (a) of this Section.
The insurance shall cover and apply to all claims, demands, suits, damages, losses, and
expenses that may be asserted or claimed against, recovered from, or suffered by the City without
limit and without regard to the cause therefore and which is acceptable to the City and Contractor
shall furnish to the City an accompanying certificate of insurance and accompanying endorsements
in amounts not less than as follows:
Workers’ Compensation – statutory;
Employers’ Liability - $1,000,000 per occurrence; $2,000,000 annual aggregate;
Commercial General Liability - $1,000,000 per occurrence; $2,000,000 annual
aggregate;
Automobile Liability - $1,000,000 property damage/bodily injury per accident; and
Professional Liability - $1,000,000 per claim; $2,000,000 annual aggregate.
The above amounts shall be exclusive of defense costs. The City of Bozeman, its officers,
agents, and employees, shall be endorsed as an additional or named insured on a primary non-
contributory basis on both the Commercial General and Automobile Liability policies. The insurance
and required endorsements must be in a form suitable to City and shall include no less than a sixty
(60) day notice of cancellation or non-renewal. The City must approve all insurance coverage and
endorsements prior to the Contractor commencing work. Contractor shall notify City within two (2)
business days of Contractor’s receipt of notice that any required insurance coverage will be terminated
or Contractor’s decision to terminate any required insurance coverage for any reason.
The City must approve all insurance coverage and endorsements prior to the Contractor
commencing work.
8. Termination for Contractor’s Fault:
147
Professional Services Agreement for [Street Light Audit]
FY 2019 – FY 2020
Page 5 of 10
a. If Contractor refuses or fails to timely do the work, or any part thereof, or fails
to perform any of its obligations under this Agreement, or otherwise breaches any terms or
conditions of this Agreement, the City may, by written notice, terminate this Agreement and
the Contractor’s right to proceed with all or any part of the work (“Termination Notice Due
to Contractor’s Fault”). The City may then take over the work and complete it, either with its
own resources or by re-letting the contract to any other third party.
b. In the event of a termination pursuant to this Section 8, Contractor shall be
entitled to payment only for those services Contractor actually rendered.
c. Any termination provided for by this Section 8 shall be in addition to any other
remedies to which the City may be entitled under the law or at equity.
d. In the event of termination under this Section 8, Contractor shall, under no
circumstances, be entitled to claim or recover consequential, special, punitive, lost business
opportunity, lost productivity, field office overhead, general conditions costs, or lost profits
damages of any nature arising, or claimed to have arisen, as a result of the termination.
9. Termination for City’s Convenience:
a. Should conditions arise which, in the sole opinion and discretion of the City,
make it advisable to the City to cease performance under this Agreement City may terminate
this Agreement by written notice to Contractor (“Notice of Termination for City’s
Convenience”). The termination shall be effective in the manner specified in the Notice of
Termination for City’s Convenience and shall be without prejudice to any claims that the City
may otherwise have against Contractor.
b. Upon receipt of the Notice of Termination for City’s Convenience, unless
otherwise directed in the Notice, the Contractor shall immediately cease performance under
this Agreement and make every reasonable effort to refrain from continuing work, incurring
additional expenses or costs under this Agreement and shall immediately cancel all existing
orders or contracts upon terms satisfactory to the City. Contractor shall do only such work as
may be necessary to preserve, protect, and maintain work already completed or immediately
in progress.
c. In the event of a termination pursuant to this Section 9, Contractor is entitled
to payment only for those services Contractor actually rendered on or before the receipt of the
Notice of Termination for City’s Convenience.
148
Professional Services Agreement for [Street Light Audit]
FY 2019 – FY 2020
Page 6 of 10
d. The compensation described in Section 9(c) is the sole compensation due to
Contractor for its performance of this Agreement. Contractor shall, under no circumstances,
be entitled to claim or recover consequential, special, punitive, lost business opportunity, lost
productivity, field office overhead, general conditions costs, or lost profits damages of any
nature arising, or claimed to have arisen, as a result of the termination.
10. Limitation on Contractor’s Damages; Time for Asserting Claim:
a. In the event of a claim for damages by Contractor under this Agreement,
Contractor’s damages shall be limited to contract damages and Contractor hereby expressly
waives any right to claim or recover consequential, special, punitive, lost business
opportunity, lost productivity, field office overhead, general conditions costs, or lost profits
damages of any nature or kind.
b. In the event Contractor wants to assert a claim for damages of any kind or
nature, Contractor shall provide City with written notice of its claim, the facts and
circumstances surrounding and giving rise to the claim, and the total amount of damages
sought by the claim, within thirty (30) days of the facts and circumstances giving rise to the
claim. In the event Contractor fails to provide such notice, Contractor shall waive all rights
to assert such claim.
11. Representatives:
a. City’s Representative: The City’s Representative for the purpose of this
Agreement shall be __Kellen Gamradt_____ (Project Engineer) or such other individual as
City shall designate in writing. Whenever approval or authorization from or communication
or submission to City is required by this Agreement, such communication or submission shall
be directed to Kellen Gamradt as the City’s Representative and approvals or authorizations
shall be issued only by such Representative; provided, however, that in exigent circumstances
when City’s Representative is not available, Contractor may direct its communication or
submission to other designated City personnel or agents as listed above and may receive
approvals or authorization from such persons.
b. Contractor’s Representative: The Contractor’s Representative for the
purpose of this Agreement shall be _____________________ or such other individual as
Contractor shall designate in writing. Whenever direction to or communication with
Contractor is required by this Agreement, such direction or communication shall be directed
149
Professional Services Agreement for [Street Light Audit]
FY 2019 – FY 2020
Page 7 of 10
to Contractor’s Representative; provided, however, that in exigent circumstances when
Contractor’s Representative is not available, City may direct its direction or communication
to other designated Contractor personnel or agents.
12. Permits: Contractor shall provide all notices, comply with all applicable laws,
ordinances, rules, and regulations, obtain all necessary permits, licenses, including a City of Bozeman
business license, and inspections from applicable governmental authorities, and pay all fees and
charges in connection therewith.
13 Laws and Regulations: Contractor shall comply fully with all applicable state and
federal laws, regulations, and municipal ordinances including, but not limited to, all workers’
compensation laws, all environmental laws including, but not limited to, the generation and disposal
of hazardous waste, the Occupational Safety and Health Act (OSHA), the safety rules, codes, and
provisions of the Montana Safety Act in Title 50, Chapter 71, MCA, all applicable City, County, and
State building and electrical codes, the Americans with Disabilities Act, and all non-discrimination,
affirmative action, and utilization of minority and small business statutes and regulations.
14. Nondiscrimination: The Contractor agrees that all hiring by Contractor of persons
performing this Agreement shall be on the basis of merit and qualifications. The Contractor will have
a policy to provide equal employment opportunity in accordance with all applicable state and federal
anti-discrimination laws, regulations, and contracts. The Contractor will not refuse employment to a
person, bar a person from employment, or discriminate against a person in compensation or in a term,
condition, or privilege of employment because of race, color, religion, creed, political ideas, sex, age,
marital status, national origin, actual or perceived sexual orientation, gender identity, physical or
mental disability, except when the reasonable demands of the position require an age, physical or
mental disability, marital status or sex distinction. The Contractor shall be subject to and comply
with Title VI of the Civil Rights Act of 1964; Section 140, Title 2, United States Code, and all
regulations promulgated thereunder. The Contractor shall require these nondiscrimination terms of
its sub-Contractors providing services under this agreement.
15. Intoxicants; DOT Drug and Alcohol Regulations/Safety and Training: Contractor
shall not permit or suffer the introduction or use of any intoxicants, including alcohol or illegal drugs,
by any employee or agent engaged in services to the City under this Agreement while on City property
or in the performance of any activities under this Agreement. Contractor acknowledges it is aware of
and shall comply with its responsibilities and obligations under the U.S. Department of Transportation
(DOT) regulations governing anti-drug and alcohol misuse prevention plans and related testing. City
shall have the right to request proof of such compliance and Contractor shall be obligated to furnish
such proof.
150
Professional Services Agreement for [Street Light Audit]
FY 2019 – FY 2020
Page 8 of 10
The Contractor shall be responsible for instructing and training the Contractor's employees
and agents in proper and specified work methods and procedures. The Contractor shall provide
continuous inspection and supervision of the work performed. The Contractor is responsible for
instructing his employees and agents in safe work practices.
16. Modification and Assignability: This Agreement may not be enlarged, modified or
altered except by written agreement signed by both parties hereto. The Contractor may not
subcontract or assign Contractor’s rights, including the right to compensation or duties arising
hereunder, without the prior written consent of City. Any subcontractor or assignee will be bound by
all of the terms and conditions of this Agreement.
17. Reports/Accountability/Public Information: Contractor agrees to develop and/or
provide documentation as requested by the City demonstrating Contractor’s compliance with the
requirements of this Agreement. Contractor shall allow the City, its auditors, and other persons
authorized by the City to inspect and copy its books and records for the purpose of verifying that the
reimbursement of monies distributed to Contractor pursuant to this Agreement was used in
compliance with this Agreement and all applicable provisions of federal, state, and local law. The
Contractor shall not issue any statements, releases or information for public dissemination without
prior approval of the City.
18. Non-Waiver: A waiver by either party any default or breach by the other party of any
terms or conditions of this Agreement does not limit the other party’s right to enforce such term or
conditions or to pursue any available legal or equitable rights in the event of any subsequent default
or breach.
19. Attorney’s Fees and Costs: That in the event it becomes necessary for either Party of
this Agreement to retain an attorney to enforce any of the terms or conditions of this Agreement or to
give any notice required herein, then the prevailing Party or the Party giving notice shall be entitled
to reasonable attorney's fees and costs, including fees, salary, and costs of in-house counsel to include
City Attorney.
20. Taxes: Contractor is obligated to pay all taxes of any kind or nature and make all
appropriate employee withholdings.
21. Dispute Resolution:
a. Any claim, controversy, or dispute between the parties, their agents,
151
Professional Services Agreement for [Street Light Audit]
FY 2019 – FY 2020
Page 9 of 10
employees, or representatives shall be resolved first by negotiation between senior-level
personnel from each party duly authorized to execute settlement agreements. Upon mutual
agreement of the parties, the parties may invite an independent, disinterested mediator to assist
in the negotiated settlement discussions.
b. If the parties are unable to resolve the dispute within thirty (30) days from the
date the dispute was first raised, then such dispute may only be resolved in a court of
competent jurisdiction in compliance with the Applicable Law provisions of this Agreement.
22. Survival: Contractor’s indemnification shall survive the termination or expiration of
this Agreement for the maximum period allowed under applicable law.
23. Headings: The headings used in this Agreement are for convenience only and are not
be construed as a part of the Agreement or as a limitation on the scope of the particular paragraphs to
which they refer.
24. Severability: If any portion of this Agreement is held to be void or unenforceable, the
balance thereof shall continue in effect.
25. Applicable Law: The parties agree that this Agreement is governed in all respects by
the laws of the State of Montana.
26. Binding Effect: This Agreement is binding upon and inures to the benefit of the heirs,
legal representatives, successors, and assigns of the parties.
27. No Third-Party Beneficiary: This Agreement is for the exclusive benefit of the
parties, does not constitute a third-party beneficiary agreement, and may not be relied upon or
enforced by a third party.
28. Counterparts: This Agreement may be executed in counterparts, which together
constitute one instrument.
29. Integration: This Agreement and all Exhibits attached hereto constitute the entire
agreement of the parties. Covenants or representations not contained therein or made a part thereof
by reference, are not binding upon the parties. There are no understandings between the parties other
than as set forth in this Agreement. All communications, either verbal or written, made prior to the
date of this Agreement are hereby abrogated and withdrawn unless specifically made a part of this
Agreement by reference.
152
Professional Services Agreement for [Street Light Audit]
FY 2019 – FY 2020
Page 10 of 10
**** END OF AGREEMENT EXCEPT FOR SIGNATURES ****
IN WITNESS WHEREOF, the parties hereto have executed this instrument the day and year
first above written.
CITY OF BOZEMAN, MONTANA ____________________________________
CONTRACTOR (Type Name Above)
By________________________________ By__________________________________
Andrea Surratt, City Manager
Print Name:
Print Title: ____________________________
APPROVED AS TO FORM:
By_______________________________
Greg Sullivan, Bozeman City Attorney
153
4699 Nautilus Court South, Suite 102 303-530-7229
Boulder, CO 80301 www.clantonassociates.com
September 6, 2019
Kellen Gamradt
City of Bozeman
121 Rouse Ave
Bozeman, MT 59715
406-582-2283 | kgamradt@bozeman.net
Re: Bozeman LED Street Lighting Evaluation
Lighting Design Consulting Proposal
Clanton and Associates proposes to undertake the lighting consulting for the Bozeman LED Street
Lighting Evaluation in Bozeman, MT.
Estimated labor: $ 43,020
Estimated expenses: $ 5,000
Total Fee (labor and expenses): $ 48,020
The scope of work includes:
1. Street Lighting Evaluation at up to twelve (12) locations throughout the City.
2. Coordination with Northwestern Energy
Design services shall include the following:
LED Street Lighting Evaluation
• Kickoff meeting
• Site visit to photograph (day & night) and measure existing lighting conditions (3 people, 2
days). Measurements will include:
• Roadway Luminance
• Luminaire Luminance
• Sidewalk Illuminance
• Light Trespass Illuminance
• Evaluate recently installed LED street lighting in relation to the Bozeman Standard
Specifications for Street Lighting
• Review and compare installed LED luminaire product information (provided by the City
1-week prior to Site Visit) to Bozeman Standards
• Compare lighting measurements to Bozeman Standards
• Prepare an LED Street Lighting Evaluation Report summarizing the findings and proposed
recommendations for improving the LED street lighting, review process, and/or the Standard
Specifications
• Develop a light trespass standard to the Bozeman Street Lighting Specification
• Preliminary update of the Bozeman Street Lighting Specification based on the LED Street
Lighting Evaluation Report
• Up to two (2) submittals (Preliminary and Final)
154
Bozeman LED Street Lighting Evaluation September 6, 2019
City of Bozeman Page | 2
4699 Nautilus Court South, Suite 102 303-530-7229
Boulder, CO 80301 www.clantonassociates.com
• Up to two (2) design meetings by phone/web conference
• Present findings and recommendations at two (2) City Commission meetings in Bozeman (2
trips for 1 person, 2 days each)
Coordination with Northwestern Energy
• Determine where Northwestern Energy has installed new street lighting and what standards
were used
• Coordinate with Northwestern Energy to discuss their street lighting standards and design
process
This scope of work is based upon normal project progress and within the time schedule agreed
upon, without major redesign or change order work. Additional fees will be required if project
timing is extended or project is put on hold and restarted at later date. If the project timing exceeds
one year, additional services rates may increase.
Not included in this scope of work but is available for extra services:
• Additional site visits, meetings, or conference calls
• Lighting/electrical plan development
• GIS mapping of existing street and public lighting facilities
• Evaluation of electrical distribution system
• Development of “smart pole” prototype
• Renewable energy integration into poles
• Electric vehicle charging
• Ongoing support for City staff
• Sky glow measurements
• Drafting on non-digital backgrounds such as *.pdf or *.jpg files.
Not included in this scope of work:
• Any development, design, or detailing of custom luminaires
• Equipment procurement
• Commissioning
• Structural engineering
• Electrical engineering
• Survey control map or Right-of-Way plans
• Subsurface Utility Engineering
Client will supply Clanton and Associates with review materials and backgrounds in AutoCAD or
Micro Station format. Reimbursable expenses shall include printing costs, overnight delivery and
travel expenses associated with the project and shall be charged in addition to the compensation
for professional services. Payment for services is expected within 30 days of invoice unless other
arrangements are made in writing.
155
Bozeman LED Street Lighting Evaluation September 6, 2019
City of Bozeman Page | 3
4699 Nautilus Court South, Suite 102 303-530-7229
Boulder, CO 80301 www.clantonassociates.com
Additional services shall be charged at the following hourly rates:
Title Hourly Rates
Chief Executive Officer $280
President $265
Principal $195
Associate $175
Senior Engineer II $175
Senior Engineer I $135
Engineer II $125
Engineer I $105
Senior Designer II $155
Senior Designer I $135
Designer II $115
Designer I $100
Intern $85
Production Manager $155
Senior CADD Technician $105
CADD Technician $80
Office Manager $75
This agreement is valid for 60 days.
09/06/2019
_____________________________________ __________________
CLANTON & ASSOCIATES DATE
_____________________________________ __________________
CITY OF BOZEMAN DATE