HomeMy WebLinkAbout09-16-19 City Commission Packet Materials - C5. Agreement with USGS for Operation of Real-Time Streamflow Gaging Station
Commission Memorandum
REPORT TO: Honorable Mayor and City Commission
FROM: Brian Heaston, Senior Engineer
SUBJECT: Authorize the City Manager to sign a Joint Funding Agreement with the U.S. Geological
Survey for the continued operation of the real-time streamflow gaging station on the East Gallatin River.
MEETING DATE: September 16, 2019
AGENDA ITEM TYPE: Consent
RECOMMENDATION: Authorize the City Manager to sign a Joint Funding Agreement with the U.S. Geological Survey for the continued operation of the real-time streamflow gaging station on the East
Gallatin River.
BACKGROUND: The U.S. Geological Survey operates a real-time streamflow gaging station on the
East Gallatin River near the city’s water reclamation facility on Springhill Road. The gage records continuous real-time streamflow data which is made publicly available on the USGS website. Real-time
flow data on the East Gallatin River is important to the city for many reasons: flood warnings, tracking
long-term water availability trends, and wastewater discharge permit compliance. The City and USGS have historically partnered on funding the annual maintenance and operations expenses of the gage. The
Joint Funding Agreement attached sets forth the cost-share between the parties for the 2020 federal fiscal
year.
UNRESOLVED ISSUES: None ALTERNATIVES: As suggested by the City Commission.
FISCAL EFFECTS: The city’s cost share per the federal FY20 Joint Funding Agreement is $9,910. The approved FY20 Wastewater Reclamation Facility budget includes a $10,500 line item to cover this
annual expenditure.
Attachments: Joint Funding Agreement
Report compiled on: September 4, 2019
52
Form 9-1366
(May 2018)
U.S. Department of the Interior
U.S. Geological Survey
Joint Funding Agreement
FOR
Water Resource Investigations
Customer #: 6000001514
Agreement #: 20RSJFA004
Project #: RS00FN6
TIN #: 81-6001238
Fixed Cost Agreement YES[ X ] NO[ ]
THIS AGREEMENT is entered into as of the October 1, 2019, by the U.S. GEOLOGICAL SURVEY, Wyoming-
Montana Water Science Center, UNITED STATES DEPARTMENT OF THE INTERIOR, party of the first part, and the
City of Bozeman party of the second part.
1. The parties hereto agree that subject to the availability of appropriations and in accordance with their respective
authorities there shall be maintained in cooperation Water Resource Investigations (per attachment), herein called
the program. The USGS legal authority is 43 USC 36C; 43 USC 50, and 43 USC 50b.
2. The following amounts shall be contributed to cover all of the cost of the necessary field and analytical work
directly related to this program. 2(b) include In-Kind-Services in the amount of $0.00
(a) $6,740 by the party of the first part during the period
October 1, 2019 to September 30, 2020
(b) $9,910 by the party of the second part during the period
October 1, 2019 to September 30, 2020
(c) Contributions are provided by the party of the first part through other USGS regional or national programs,
in the amount of: $0
Description of the USGS regional/national program:
(d) Additional or reduced amounts by each party during the above period or succeeding periods as may be
determined by mutual agreement and set forth in an exchange of letters between the parties.
(e) The performance period may be changed by mutual agreement and set forth in an exchange of letters
between the parties.
3. The costs of this program may be paid by either party in conformity with the laws and regulations respectively
governing each party.
4. The field and analytical work pertaining to this program shall be under the direction of or subject to periodic review
by an authorized representative of the party of the first part.
5. The areas to be included in the program shall be determined by mutual agreement between the parties hereto or
their authorized representatives. The methods employed in the field and office shall be those adopted by the party of
the first part to insure the required standards of accuracy subject to modification by mutual agreement.
6. During the course of this program, all field and analytical work of either party pertaining to this program shall be
open to the inspection of the other party, and if the work is not being carried on in a mutually satisfactory manner,
either party may terminate this agreement upon 60 days written notice to the other party.
7. The original records resulting from this program will be deposited in the office of origin of those records. Upon
request, copies of the original records will be provided to the office of the other party.
8. The maps, records or reports resulting from this program shall be made available to the public as promptly as
possible. The maps, records or reports normally will be published by the party of the first part. However, the party of
the second part reserves the right to publish the results of this program, and if already published by the party of the
first part shall, upon request, be furnished by the party of the first part, at cost, impressions suitable for purposes of
reproduction similar to that for which the original copy was prepared. The maps, records or reports published by
either party shall contain a statement of the cooperative relations between the parties. The Parties acknowledge that
scientific information and data developed as a result of the Scope of Work (SOW) are subject to applicable USGS
review, approval, and release requirements, which are available on the USGS Fundamental Science Practices
website (https://www.usgs.gov/about/organization/science-support/science-quality-and-integrity/fundamental-science-
practices).
53
9. Billing for this agreement will be rendered annually. Invoices not paid within 60 days from the billing date will bear
Interest, Penalties, and Administrative cost at the annual rate pursuant the Debt Collection Act of 1982, (codified at
31 U.S.C. § 3717) established by the U.S. Treasury.
USGS Technical Point of Contact
Name: Kirk Miller
Supervisory Hydrologist - Hydrologic
Data Section Chief
Address: 521 Progress Circle Ste 6
Cheyenne, WY 82007-9660
Telephone: (307) 775-9168
Fax: (307) 778-2764
Email: kmiller@usgs.gov
Customer Technical Point of Contact
Name: Brian Heaston
Project Engineer
Address: City Of Bozeman P.O. Box 1230
Bozeman, MT 59771-1230
Telephone: (406) 582-2924
Fax:
Email:
USGS Billing Point of Contact
Name: Jennifer Walgrave
Budget Analyst
Address: 3162 Bozeman Ave
Helena, MT 59601
Telephone: (406) 457-5916
Fax: (406) 457-5990
Email: jwalgrave@usgs.gov
Customer Billing Point of Contact
Name: Brian Heaston
Project Engineer
Address: City Of Bozeman P.O. Box 1230
Bozeman, MT 59771-1230
Telephone: (406) 582-2924
Fax:
Email:
U.S. Geological Survey
United States
Department of Interior
Signature
By_______________________ Date: 09/03/2019
Name: John M Kilpatrick
Title: Director
City of Bozeman
Signatures
By_______________________ Date: _________
Name:
Title:
By_______________________ Date: _________
Name:
Title:
By_______________________ Date: _________
Name:
Title:
Form 9-1366
(May 2018)
U.S. Department of the Interior
U.S. Geological Survey
Joint Funding Agreement
FOR
Water Resource Investigations
Customer #: 6000001514
Agreement #: 20RSJFA004
Project #: RS00FN6
TIN #: 81-6001238
54