Loading...
HomeMy WebLinkAboutA301 - Exterior Elevations_2019-07-23T.O. SLAB 100' -0" T.O. FOOTING 95' -10" T.O. PLATE (L2) 123' -7 1/8" OE PE T.O. PLATE (L1) 113' -6" T.O. SUBFLOOR LEVEL 2 114' -6" T.O. PLATE (L3) 134' -4 1/2" T.O. SUBFLOOR LEVEL 3 125' -1 7/8" T.O. PLATE (L4) 145' -1 7/8" T.O. SUBFLOOR LEVEL 4 135' -11 1/4" T.O. PLATE (L5) 156' -11 1/4" T.O. SUBFLOOR LEVEL 5 146' -8 5/8" T.O. ROOF DECK 158' -6" LE QE ME JE HE AE SE 1 A401 T.O. PARAPET 161' -0" T.O. ELEV. PENTHOUSE 164' -6" 3' - 6 " 2' - 6 " 1' - 7 " 10 ' - 3 " 1' - 7 " 9' - 3 " 1' - 7 " 9' - 3 " 1' - 7 " 9' - 1 " 1' - 0 " 13 ' - 6 " 4' - 2 " 1 A402 1 A400 2 A402 2 A401 RE EE BE 115 5 5 4 8 5 5 6 GE DE NE IE CE KE FE W1 W1 W2 W1 W1 W2 W2 W2 SF-9 SF-9 SF-9 SF-9 108Eb 3 61 ' - 0 " LOUVER - SEE MEP MECH. VENTS - SEE MEP AWNING 160' - 5 1/4" 2 A400 2 2 T.O. SLAB 100' -0" T.O. FOOTING 95' -10" T.O. PLATE (L2) 123' -7 1/8" OE PE T.O. PLATE (L1) 113' -6" T.O. SUBFLOOR LEVEL 2 114' -6" T.O. PLATE (L3) 134' -4 1/2" T.O. SUBFLOOR LEVEL 3 125' -1 7/8" T.O. PLATE (L4) 145' -1 7/8" T.O. SUBFLOOR LEVEL 4 135' -11 1/4" T.O. PLATE (L5) 156' -11 1/4" T.O. SUBFLOOR LEVEL 5 146' -8 5/8" T.O. ROOF DECK 158' -6" LE QE ME JE HE AE SE 1 A401 T.O. PARAPET 161' -0" T.O. ELEV. PENTHOUSE 164' -6" 3' - 6 " 2' - 6 " 1' - 7 " 10 ' - 3 " 1' - 7 " 9' - 3 " 1' - 7 " 9' - 3 " 1' - 7 " 9' - 1 " 1' - 0 " 13 ' - 6 " 4' - 2 " 1 A402 1 A400 2 A402 2 A401 RE EE BE 1 3 2 5 55 4 5 5 5 5 8 GE DE NE IE CE KE FE 109Ec SF-1 SF-3 SF-9 SF-9 SF-9 SF-9 W1 W1 W1 W1 W1 W1 W1 W1 61 ' - 0 " AWNING 160' - 5 1/4" 160' - 5 1/4" E-19F E-19F E-19F 2 A400 METAL DRIP EDGE TRIM @ EACH FLOOR LEVEL COLOR TO MATCH ADJACENT METAL SIDING STAGGER STANDING SEAM SIDING JOINTS AT EACH LEVEL, TYP @ ALL METAL SIDING E-19F 2 2 1 EXTERIOR FINISH LEGEND STANDING SEAM METAL SIDING (CONCEALED FASTENERS) FINISH: SILVER METALLIC 22GA. 2 STANDING SEAM METAL SIDING (CONCEALED FASTENERS) FINISH: WEATHERED ZINC 22GA. 3 DRI-DESIGN WEATHERED STEEL PANEL FINISH: TRUTEN 22GA. 4 BOX CORRUGATED METAL PANEL FINISH: ASH RAWHIDE 5 CEMENTITOUS PANEL SIDING FINISH: SHERWIN WILLIAMS BLACK MAGIC (6991) 7 BRICK VENEER FINISH: COAL CREEK 6 1"X4" CEDAR SHIPLAP SIDING FINISH - NATURAL 8 CAST-IN-PLACE CONCRTE FINISH: NATURAL W/ SMOOTH FINISH 9 PERFORATED METAL RAILING s h e e t pr o j e c t c o d e a d d r e s s © 2 0 1 9 I N T R I N S I K re v i s i o n s PRELIMINARY NOT FOR CONSTRUCTION 11 1 N o r t h T r a c y Bo z e m a n , M o n t a n a 59 7 1 5 Fa x : 4 0 6 . 5 8 2 . 8 9 1 1 Ph : 4 0 6 . 5 8 2 . 8 9 8 8 C: \ U s e r s \ m m a s e k \ O n e D r i v e - I n t r i n s i k A r c h i t e c t u r e \ _ C4 6 BA C K U P \ D o c u m e n t s \ A W B _ C e n t r a l _ m m a s e k 3 2 1 . r v t A301 AWB WEST BABCOCK - MIXED USE EXTERIOR ELEVATIONS - BUILDING (E) TBD W. BABCOCK BOZEMAN, MT. 59715 CD PROGRESS SET 07.22.2019 1/8" = 1'-0" A301 1 BUILDING (E) - EAST ELEVATION 1/8" = 1'-0" A301 2 BUILDING (E) - WEST ELEVATION N o . D e s c r i p t i o n D a t e 2 S I T E P L A N R E V I E W #1 9 0 6 1 R E V . 2 0 7 /2 3 /2 0 1 9 2 2 2