Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
ES-1.0 SITE OVERALL PLAN 05-21-2019
REF. UP 3 3 R T R A S H T R A S H T R A S H APPROX. UTILITY POLE LOCATION, EAST 200' 1 1 1 11 2 1 GENERAL NOTES (THIS SHEET ONLY) WORK NOTES (THIS SHEET ONLY) 1. SEE ARCHITECTURAL AND LANDSCAPE ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION. 2. CONDUIT AND CONDUCTOR SIZE SHOWN FOR HOMERUN SHALL BE CONTINUED THROUGHOUT THE ENTIRE CIRCUITING UNLESS 3. SEE CIVIL DRAWINGS FOR EXACT UTILITY LOCATIONS, ROUTING AND ADDITIONAL REQUIREMENTS. 4. SEE FINAL UTILITY COMPANY DESIGN DRAWINGS FOR EXACT CONDUIT AND CABLING REQUIREMENTS. PROVIDE ANY ADDITIONAL CONDUIT, CABLING OR OTHER DEVICES AS REQUIRED BY LOCAL UTILITIES. 5. ALL PULLBOXES AND JUNCTION BOXES TO BE GRADE MOUNTED PRECAST CONCRETE WITH BOLT-DOWN CONCRETE COVER, UNLESS 6. PROVIDE PULLBOXES AND JUNCTION BOXES AS REQUIRED FOR 7. PROVIDE 4" CONCRETE COLLAR AROUND ALL PULLBOXES WITHIN SPECIFICALLY NOTED OTHERWISE. ALL COSTS TO BE INCLUDED IN BASE BID. RESOLVE ALL CONFLICTS AND QUESTIONS REGARDING UTILITIES PRIOR TO SUBMITTING BID. NOTED OTHERWISE. SIZE AS REQUIRED PER NEC AND LOCAL UTILITY. CONDUIT ROUTING AND CONNECT CONDUCTORS AS REQUIRED TO ENTER INTO FIXTURE HOUSINGS FROM CIRCUIT RUNS WHERE CONDUCTORS AND CONDUIT FITTINGS ARE LARGER THAN HOUSING WILL ACCEPT. THE SCOPE OF WORK FOR THIS PROJECT. VERIFY REQUIREMENTS WITH LOCAL UTILITY. Ar c h i t e c t u r e E n g i n e e r i n g P l a n n i n g I n t e r i o r s © , D L R G r o u p i n c . o f M o n t a n a , a M o n t a n a c o rp o r a t i o n , A L L R I G H T S R E S E R V E D BEN J A M I N T A L P O S RE V I S I O N S 5/ 2 0 / 2 0 1 9 4 : 3 8 : 3 5 P M C: \ U s e r s \ l p l e i t e z \ D o c u m e n t s \ A C B o z e m a n _ A R _ 2 0 1 8 _ F E A _ E L V_ l p l e i t e z . r v t FE A J N : 1 8 1 5 1 . 0 0 20 1 9 -02 -15 AC H o t e l B o z e m a n 10 0 % S I T E RE V I E W SI T E O V E R A L L P L A N ES -1. 0 5 E A S T M E N D E N H A L L S T BO Z E M A N , M O N T A N A 5 9 7 1 5 20 1 9 1/8" = 1'-0" 1 SITE OVERALL PLAN 1 PROVIDE WITH SITE LIGHT AS DIRECTED BY BOZEMAN CITY REQUIREMENTS. UNLESS STATED OTHERWISE, THE CITY SHALL DICTATE. BASIS OF DESIGN INCLUDES A 'SIGNIFY LUMEC - S56 -55W46LED -4K -R-LE3,' 335W TOTAL. TIE CIRCUIT INTO EXISTING STREET LIGHT POWER SOURCE LOCATED AT THE NORTH EAST AS SHOWN, APPROXIMATELY 200' EAST ON THE CORNER OF MENDENHALL ST. AND N. BLACK AVE. VERIFY EXISTING CIRCUIT VOLTAGE AND PHASE. CONFIRM WITH THE CITY OF BOZEMAN THAT ASSOCIATED LIGHTS DO NOT EXCEED LISTED OVERCURRENT PROTECTION DEVICE UPSTREAM. REFER TO ES -0.0 FOR DETAILED INFORMATION OF AVAILABLE DISTANCES FOR VOLTAGE DROP PER AVAILABLE VOLTAGE ON -SITE. PROVIDE AS REQUIRED PER FIELD CONDITIONS AND REPORT ANY DISCREPANCIES TO ENGINEER OF RECORD. LOCATIONS SHOWN FOR REFERENCE ONLY, REFER TO CIVIL PLANS FOR MORE INFORMATION. TO EXISTING STREET LIGHT CIRCUIT ABOVE, CONFIRM WITH FIELD CONDITIONS. 2 1 1 1 S I T E P L A N R E V . 1 0 5 /2 1 /2 0 1 9 05-20-2019 05 - 2 8 - 2 0 1 9