Loading...
HomeMy WebLinkAboutC620 Pipe Details_22x34_201908018"6" MIN12" MAX 4'-0"2" THICK SANDCUSHIONGRANULAR BEDDINGMATERIAL (TYP)WATER ORSEWER LINETRENCH BOTTOM TRENCH WALLTRENCH WALL ALT. "B" INSTALLATION(TOP & BOTH SIDES):4" THICK INSULATIONBOARD - 8' MIN LENGTHALONG WATER OR SEWER LINEALT. "A" (TOP ONLY)INSTALLATION (TOP ONLY):4" THICK x 8' WIDEINSULATION BOARDCENTERED OVER WATEROR SEWER LINE - 8' MINLENGTH ALONG WATEROR SEWER LINE *FOR CULVERT CROSSINGS,PROVIDE 18" MIN VERTICALSEPARATION BETWEENCULVERT AND WATEROR SEWER LINE *NOTES:1.INSTALL INSULATION OVER ALL WATER AND/OR SEWER LINES WITH LESS THAN 6'-6" COVER TO FINISHED GRADE ORWITHIN 2' BELOW A CULVERT. NOTIFY ENGINEER PRIOR TO PLACING INSULATION.2.INSTALL INSULATION IN TWO, 2" THICK LAYERS. ROTATE ORIENTATION OR STAGGER JOINTS TO PROVIDE 2' MINOVERLAP BETWEEN JOINTS. INSULATION SHALL EXTEND A MINIMUM OF 4' BEYOND THE OUTER WALLS OF THECULVERT.3.INSULATION BOARD SHALL BE 2" THICK EXTRUDED POLYSTYRENE INSULATION BOARD PER AASHTO M230-70.4.SAND MAY BE USED TO PROVIDE THE BASE. INSULATION SHALL BE COVERED WITH 12" OF SAND OR OTHER OTHERSUITABLE GRANULAR BASE PRIOR TO COMPACTION OR ADDITIONAL BACKFILLING.1/4" BELOW TOP OFNEW PAVEMENT SURFACE3'-0"(MIN)HEAVY DUTY MONUMENT BOX, SIMILARTO CAIRD ENG. NO. 50608-1PAVING & GRAVELAS REQUIREDSEAL JOINT WITH RAM-NEK8" x 3' ROUNDCONCRETE SLABSLIP HUB TO THREADED ADAPTERTHREADED PLUGFROSTEXPANSIONSLEEVECLEANOUT PIPE -4" Ø PVC45° BEND NON-SHRINKBACKFILLEND OFTRENCHVERIFY PIPESIZE PER PLANDIMENSIONSEND OF LINE CLEANOUT(IF REQUIRED) USE PLUG © 2 8 8 0 T e c h n o l o g y B l v d . W . B o z e m a n , M T 5 9 7 1 8 P h o n e : ( 4 0 6 ) 5 8 7 - 0 7 2 1 F a x : ( 4 0 6 ) 9 2 2 - 6 7 0 2 S H E E T N U M B E R P R O J E C T N U M B E R D R A W I N G N U M B E R D R A W N B Y : C H K ' D . B Y : A P P R . B Y : D A T E : Q . A . R E V I E W D A T E : B Y : C O P Y R I G H T M O R R I S O N - M A I E R L E , I N C . , 2 0 1 9 VERIFY SCALE!THESE PRINTS MAY BEREDUCED. LINE BELOWMEASURES ONE INCH ONORIGINAL DRAWING. MODIFY SCALE ACCORDINGLY!REVISIONSDATEDESCRIPTIONNO.BYN:\5305\005\ACAD\Sheets\Civil\5305005-C620-Details.dwg Plotted by cooper krause on Jul/15/2019 e n g i n e e r s s u r v e y o r s p l a n n e r s s c i e n t i s t s 5 3 0 5 . 0 0 5 C 6 2 0 B O Z E M A N M O N T A N A T E E K D J M E E 1 0 / 2 0 1 8 1SITE REVISIONS01/25/2019CPK3SITE REVISIONS06/07/2019KDJ P I P E D E T A I L S R E S I D E N C E I N N - B O Z E M A N K n o w w h a t ' s b e l o w . b e f o r e y o u d i g . C a l l R NOT TO SCALE PIPE INSULATIONNOT TO SCALE SANITARY SEWER AND STORM DRAIN CLEAN OUT 1 0 / 1 7 / 2 0 1 8