Loading...
HomeMy WebLinkAbout2019-07-23_MASTER SITE PLAN SS CONSTRUCTION =�` 59" =-z� LIMITS 'o ANAL� Op W TAMARACK ST (CITY R/W) \ CONSTRUCTION \ \ PHASING C Y PROPOSED DUMPSTER C EXISTING MUTUAL -Fool s T 3-FEET TE ASEMENT QDATIQN FOR PHASE 2 P _P _____P \ ®Q Pueuc unutt BE DEDICATED EASEMENT ®� ACCESS EASEMENT "=°I'YR"" �✓ DOCUMENT #2000578 �PR PO PHAS 2 LOCATION FOR S OILS AdD 40 /AR]IN (F NCEND SE URED,SPOILS TO BE REMO\ED FR M L�.IWI HIN 30 DAYS;.KEEP ALL D BRIS E CLOS D.CON RAR TO MAIIT IN DRI/E AISLE ACC SSIBLE FOR S E CIR ULA A. PROPOSED PHASE 1 LOCATION PROPOSED PHASE 1 LOCATION I PHASE 2 EXISTING FOR CONSTRUCTION MATERIAL FOR SPOILS AND 40 YARD BIN Fq I \� ZT1 P C PROPERTY STAGING(FENCED AND FENCED AND SECURED,SPOILS W SECURED).KEEP ALL TO BE REMOVED FROM SITE \ \ III 3 0, MATERIALS AND EQUIPMENT WITHIN 30-DAYS).KEEP ALL LINES ENCLOSED. DEBRIS ENCLOSED. I III \III I ADDITIONAL POTENTIAL \ CONSTRUCTION STAGING AREA FOR PHASE I 1 CONSTRUCTION LIMITS (TOPSOILS, . SPOILS, ERIALS,EQUIPM ENT, PHA E 1 ETC \ \III CONSTRUCTION PHASING ROPOSED LOT \ L / II _ SITE BOUNDARY II PROPOSED LOT LINES ALLEY-TO BE DEDICATED1�iL EXISTING PROPERTY LINES AS - II IIII w CITY ROW titIII NOTE: APPLICANT SHALL SUBMIT TO a I II III THE DEPARTMENT, SEQUENTIAL Cn SITE BOUNDARY INDIVIDUAL SITE PLANS FOR SPECIFIC Z CONSTRUCTION \ \ \ \ © II III AREAS WITHIN THE MASTER SITE PLAN. Z LIMITS I II III n > �II O a Am= Q III i" ~ z �ttt � II 0 0- GO i�tt \ F I ' Ill EXISTING 20—FOOT ° 24—FOOT PUBLIC II o � \p UTILITY EASEMENT ACCESS/UTILITY EASEMENT II I I III I project# 18058 o O II revision date PROPOSED MIDTOWN © ASPEN BUILDING III I I I III I II II I SITE BOUNDARY II phase I � II II I I I III I I \ I III I = I I I II I � JI u NORTN II J _------------- — SCALE:1"=20' o _ ___= ��\a =__ ___ _� _ ====0 =__ El T �� — �� NOTE: ut W -EXISTING UNDERGROUND INSTALLATIONS&PRIVATE UTILITIES SHOWN ARE o \ INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE \/ --ASPEN CONSTRUCTION ENGINEER.THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH W ST (CITY R/W) LIMITS / INFORMATION.SERVICE LINES(WATER,POWER,GAS,STORM,SEWER, TELEPHONE&TELEVISION)MAY NOT BE STRAIGHT LINES OR AS INDICATED U ON THE PLANS.STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. a o _~ ———— —— ___�——— —- ——— —— ___ _ —J/// \ -ALL IMPROVEMENTS SHALL BE PERFORMED IN ACCORDANCE WITH 10,AND ———— —————— ——— /— � � I PUBLIC WORKS STANDARD SPECIFICATIONS 6TH EDITION,APRIL,2010,AND —— ——————— THE CITY OF BOZEMAN STANDARD MODIFICATIONS AND RELATED n� N ———�——— llI T ADDENDUMS,APPROVED MARCH 31,2011. U -———————————————— — ————— ———— ——————————— �I I -UNLESS OTHERWISE SPECIFIED,ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN THE STATE C D I NC NA AND BY A PARTY CHIEF OR ENGINEEANDING LNG TECHNNIQUE CLAN EXPERIENCED IN THES SPECIFIC LAYOUT AND �I \ STAKING TECHNIQUESA$ARE REQUIRED BY THE SPECIFIC TYPE OF WORK ISSU0 date BEING PERFORMED. 07.23.19 MSP 2.0