Loading...
HomeMy WebLinkAbout2019_08-08 Aspen G0-1 - GENERAL ARCHITECTURAL INFORMATIONPUBLIC PARK LAND DEDICATION TRACKING TABLE PROJECT NAME: NUMBER OF RES. UNITS PER PHASE / LOT / SITE PLAN: ACREAGE PARK LAND AND / OR CIL REQUIRED:** VALUE OF IMPROVEMENTS IN LIEU PROPOSED: $___0___ VS. VALUE OF CODE- REQD. BASIC PARK IMPROVEMENTS: TOTAL FOR SUBDIVISION THIS PROPOSAL ACREAGE PARK LAND PREVIOUSLY DEEDED TO COB: ACREAGE PARK LAND YET TO BE CONVEYED: PARK MASTER PLAN APPROVAL DATE: * INDICATE ADDITIONAL PHASES AS APPLICABLE ** SHOW ACTUAL CALCULATIONS PHASE / LOT 1 PARK DED AC CIL & / OR IIL PHASE 2 PARK DED AC CIL & / OR IIL CURRENT PHASES 0 UNITS BEING ADDED ASPEN CROSSING 23 CONDO UNITS AFFORDABLE HOUSING PER 38.380.030 - PROJECT DOES NOT APPLY 23 CONDO UNITS TBD AT LATER DATE 0 UNITS* .03 = 0 AC REQUIRED: $0 NONE NONE EXISTING 24 DWELLING UNITS 0 AC * $1.50 = $0 SEC. 38.380.040 - 'G' FOR THE PURPOSES OF 38.380, 'MARKET RATE HOME' DOES NOT INCLUDE CONDOMINIUM UNITS. ASPEN CROSSING PROJECT: ADDRESS: USE ZONE: OCCUPANCY: BUILDING TYPE: ALLOWABLE AREA: ACTUAL GROSS AREA: MAXIMUM HEIGHT: OCCUPANT LOAD: REQUIRED EXITS: ASPEN CROSSING 515 W. ASPEN ST, BOZEMAN, MT 59715 USE ZONE: B2 -M BASEMENT: S 1st FLOOR: A-2 (1 ST & 2 ND 2nd FLOOR: B UNSEPARATED) 3rd FLOOR: R-2 TYPE III -B, SPRINKLERED 186,000 S.F. BASEMENT: 3,915 S.F. 1st FLOOR: 20,825 S.F. 2nd FLOOR: 20,625 S.F. 3rd FLOOR: 21,361 S.F. 3RD LOFT: 5,055 S.F. TOTAL AREA: 71,781 S.F. ALLOWABLE: 50 FT or 6 STORIES ACTUAL: 49'-8" (ASPEN FRONTING) 55'-8" (BACK OF BUILDING) BASEMENT: 13 1st FLOOR: 1,179 2nd FLOOR: 134 3rd FLOOR: 138 REQUIRED EXITS: BASEMENT: 1 1st FLOOR: 5 2nd FLOOR: 2 3rd FLOOR: 2 VICINITY MAP Image Courtesy of Google Maps ASPEN CROSSING IN MIDTOWN LOCATION PROJECT OWNER ASPEN LAND CO. 515 W. ASPEN ST BOZEMAN, MT 59715 CIVIL SANDERSON STEWART 106 E. BABCOCK ST BOZEMAN, MT 59715 (406) 522 -9876 LANDSCAPE ARCHITECT DESIGN 5 37 EAST MAIN STREET, SUITE 10 BOZEMAN, MT 59715 (406) 587 -4873 ARCHITECT A&E 428 EAST MENDENHALL BOZEMAN, MT 59715 (406) 451 -7310 ELECTRICAL CDSi ENGINEERING 7540 CHURCHILL ROAD MANHATTAN, MT 59741 (406) 282 -7082 MECHANICAL CDSi ENGINEERING 7540 CHURCHILL ROAD MANHATTAN, MT 59741 (406) 282 -7082 21,000 SF 5,000 SF 34,675 SF 32,325 SF PROPOSED BUILDING SF: ASPEN CROSSING FOOTPRINT: FUTURE BUILDING PAD: DRIVEWAY CIRCULATION & PARKING AREAS SF: LANDSCAPED & HARDSCAPED AREAS SF: SF % OF SITE (93,000 SF) 22.6% 5.4% 37.3% 34.7% EXPLANATION OF SYMBOLS A1.# : A5.# 15 BUILDING SECTION WALL SECTION ELEVATION GRID LINE DETAIL REFERENCE WINDOW TAG INTERIOR ELEVATION ROOM TAG DOOR TAG EXTERIOR ELEVATION DETAIL SECTION SHEET WHERE VIEW APPEARS POSITION OF VIEW ON SHEET SHEET OF ORIGIN KEYNOTE TAG ASSEMBLY TAG (WALLS & OTHER) TYPICAL SHEET LAYOUT 1 5 9 13 DETAIL NAME 1 1/2" = 1'-0" VIEW SCALE VIEW NAME A3.# 1 A3.# 1 A3.# 1 A3.# 1 ARCH D (24"x36") 2 6 10 14 3 7 11 15 4 8 12 16 101.1 A4.# 1 A6.# 1 1 1 1 0 #1 #2 #3 #4 ### 1i ?MATERIAL TAG G6S NORTH LOCATION OF NORTH ARROW IN PLANS A3.# 1 A5.# A5.# A5.# A5.# A5.# A B KEY PLAN SHADED AREA INDICATES PLAN REGION SHOWN ON SHEET project # phase issue date sh e e t pr o j e c t ow n e r 8/ 6 / 2 0 1 9 1 1 : 0 2 : 3 1 A M GE N E R A L A R C H I T E C T U R A L I N F O R M A T I O N G0.1 18058 07.08.2019 100% CONSTRUCTION DOCUMENTS AS P E N C R O S S I N G As p e n L a n d C o . 10 0 % C O N S T R U C T I O N D O C U M E N T S MIDTOWN AT ASPEN LOCATION SITE STATISTICS 515 W. ASPEN STREET, BOZEMAN, MT 59715 & 726 N. 7TH AVENUE, BOZEMAN, MT 59715 LEGAL DESCRIPTION: NORTH 7TH ADD, S01, T02 S, R05 E, BLOCK 2, LOT 6A 10A, PLAT E-21-A & NORTH 7TH ADD, S01, T02 S, R05 E, BLOCK 2, LOT 11 - 15, 310'X150' PROJ 94-307 PLUS VAC ALLEY LESS RW PARCEL 3 ZONING: B2-M COMMUNITY PLAN DESIGNATION: BUSINESS PARK MIXED USE OCCUPANCY: MIXED USE GROSS BUILDING AREA: 71,781 SF PARCEL SIZE: 93,000 SF (2.134 ACRES) F.A.R.= TOTAL: 1:1.3 (.772) RESIDENTIAL: 1:3.5 (26,416 SF:93,000 SF) COMMERCIAL: 1: 2.1 (46,365 SF:93,000 SF) HEIGHT: 4 STORIES + MECHANICAL PENTHOUSE PARKING SPACES 1. NO PARKING IS REQUIRED FOR B2-M ZONING, SO ALL PARKING SPACES PROVIDED EXCEED REQUIRED AMOUNT IN ANTICIPATION OF MARKET DEMAND AND PART OF THE MASTER SITE PLAN FOR THE FUTURE PLANNED BUILDING. 2. OFF-SITE PARKING SPACES PROVIDED = 85 3. ON-SITE PARKING SPACES PROVIDED = 25 4. TOTAL PARKING FOR SITE: 110 5. PARKING PROVIDED IS ALL IN EXCESS OF REQUIRED AMOUNT, WHICH IS 0. 6. BIKE PARKING REQUIRED/PROVIDED = 65 REQUIRED & PROVIDED NORTH UDC Departure Requests: Sec. 38.510.030 – Landscaped block frontage standards – Parking Location Seeking departure for “surface parking areas are limited to no more than 50% of façade width.”The reason for this departure is based on the nature of the site and inherent difficulty of the slope. The future building pad is located perpendicular to slope gradient in order to respond to the site – this is to combat the building from jutting up from sidewalk level along 5 th or being sunken into the ground on the parking lot side. However, by orienting the building this way, it creates the problem of a linear dimension of parking being greater than allowed by code. We believe this is the best option and to ameliorate concern of parking facing the streetscape, we propose the solution of screening with trees and other vegetation in the 10’-0” buffer between the sidewalk and parking lot that exceeds the requirements. Sec. 38.510.030 – Landscaped block frontage standards – Façade Transparency Seeking departure for, “buildings designed with ground level non-residential uses, at least 25% of the ground floor between 4’-8’ above the sidewalk.” The reason for this departure is that the building fronting Aspen cannot physically adhere to this requirement. The building’s finish floor is above the sidewalk by roughly 6-7’. Windows along that portion (where it isn’t stairs leading to patio) would land at the floor structure and is obviously not the intent of the code. For this departure we propose the code to be interpreted as above the finish floor elevation – which the proposed design exceeds the façade transparency requirements (proposed transparency: 52%, requirement: 25%). Furthermore, we propose making a more inviting space and overall better design by implementing landscaping between the sidewalk and the building on the Northern portion – including a logo and name of the building - and on the southern portion of Aspen – which is divided by stairs – would be planters that stair step up to the patio, creating an inviting space and holistically linked to the entrance as an event and bringing people in with an experience. RESIDENTIAL OPEN SPACE (SEE PLANS) REQUIRED: 2,300 SF (23 1-BED UNITS) IN PROJECT: 2,398 SF ROOF DECK: 1,710 SF 3RD FLOOR COMMUNITY ROOM (INSIDE): 292 SF 1ST FLOOR COMMUNITY ROOM (INSIDE): 396 SF COMMERCIAL OPEN SPACE REQUIRED: 883 SF (2% OF BUILDING DEVELOPMENT, 44,138 SF) IN PROJECT: 994 SF NET RESIDENTIAL DENSITY 23 1-BEDROOM UNITS / 2.134 ACRES = 10.8 DU/AC (SEE AREA PLANS) NORTH CONSTRUCTION ROUTE MAP MIDTOWN AT ASPEN LOCATION No Description Date 1 SITE PLAN COMMENTS 6/21/2019 5 SITE PLAN COMMENTS #2 08/06/2019 1 1 5