Loading...
HomeMy WebLinkAbout2019_04-15 MSP Narrative Aspen Crossing Master Site Plan Supporting Document April 16, 2019 Master Site Plan - Aspen Crossing - Midtown P a g e | 1 ASPEN CROSSING I – Master Site Plan Narrative I – Master Site Plan Narrative A Master Site Plan is proposed for the half-block containing the Aspen Crossing building (Site Plan Application being processed concurrently), fronting Tamarack, Aspen, and 5th. The Master Site Plan consists of a site that is zoned B2-M, 93,000 square feet and proposes a mixed use building (roughly 72,000 square feet) fronting Aspen St, with an area for a future building (footprint roughly 5,000 square feet) on the Northeast corner, and the remainder of the site being for parking and circulation. The following is in direct response to the Master Site Plan Checklist: 1- The proposed entitlement period is 3 years 2- a. Phase lines are shown on the master site plan. b. Phase 1 will consist of infrastructure and parking and buildout of Aspen crossing. Phase 2 will consist of the second future building, which at the time will go through a separate Site Plan Application through the City. c. Staging and phasing of construction will be contained on site and will be easily manageable through the access points on site and the ample parking lot. After Aspen Crossing building is built and the second building goes through the Site Plan Application and has a building permit, a construction staging plan will be submitted as part of the Site Plan Application, but it is planned that the said staging grounds will be located on the parking lot adjacent to the Northeast building pad site. d. No infrastructure or site plan elements are proposed for financial guarantee. e. There are only 2 phases and there is no other foreseeable way this could proceed other than as proposed. 3- No other design guidelines are proposed other than what is stated in the Bozeman Unified Development Code 4 – It is understood that subsequent phases will go through the specific Site Plan Application and related applications per the City process. It is also understood that the second phase will conform to, and will be consistent with, this Master Site Plan.