Loading...
HomeMy WebLinkAbout009 - A4-2 - EXTERIOR ELEVATIONS 040219T. O . S U B .   F L R   @   M A I N   F L R 10 0 '   ‐ 0" T. O . S U B   F L R   @   S E C O N D   F L R 11 1 '   ‐ 0" T. O .   P L   @   M A I N   F L R 11 0 '   ‐ 0" T. O . P L .   @   S E C O N D   F L R 11 9 '   ‐ 1  1 / 8 " 8 '   ‐   1   1 / 8 " 1 0 '   ‐   0 " 1 0 '   ‐   0 " 1 '   ‐   0 " 1 5 0 4 3 2 8'   ‐   9 " 1'   ‐   6 " 1'   ‐   6 " 11 '   ‐   3 " 24 '   ‐   1 1 " 16 '   ‐   1 " 8'   ‐   6 " 72 '   ‐   6 " 3 " / 1 2 " 1'   ‐   6 " 1' ‐ 6"ASPHALT SHINGLES CEMENTIOUS PANEL AND 1X4 BATTENS 18" O.C.CEDAR TIMBERS ‐SEMI TRANSPARENT STAIN CAST STONECEMENTIOUS WD GRAIN LAP BD ‐8" EXPOSUREALUM CLAD LOW E WDW ‐BRONZE OR EQ (NO COLORED GLAZINGS OR FILM)STANDING SEAM METAL ROOFING 18" SEAMS, 24 GAUGE MIN I O F P Q Q Q I O D 8 " / 1 2 " 8 " / 1 2 " 1 2 3 4 6 2 3 4 112741 3 10 10 10 1X 1 2   T R I M   B D 1X 1 0   T R I M   B D 1X 6   H E A D   T R I M   W /   1 "   E X T E N S I O N 1X 4   R A I L   A N D   S I L L   T R I M   T Y P   A L L   W D W S 2 4 '   ‐   7   1 9 / 3 2 " SIGNAGE AREA CALCULATIONS PER P.U.D LINEAR FEET OF BUILDING FRONTAGE=61' LF 1.5sf x 1' =91.5 SF (NOT TO EXCEED 250 SF PER PUD)PROPOSED SIGNAGE AREA CALCULATIONS:NORTH ENTRY = 8 SF MAIN CORNER ENTRY =13  SFSIGNAGE AREA CALCULATIONS FRONTAGE ELEVATION NOTES MIXED BLOCK FRONTAGE DESIGNATION ‐ELECTED LANDSCAPE FRONTAGE TRANSPARENCY 1. 15' FRONT SETBACK GOVERNED BY RO ZONING.2. TABLE 38.510.030.C ‐BUILDING WITHIN 20' OF SIDEWALK=25% OF GROUND FLR BETWEEN 4 ‐8' TRANSPARENT.  A. TOTAL SF 262 SF.  TRANSPARENCY PROVIDED 88SF=36 % TRANSPARENCY PROVIDED.3. BLDG ENTRANCE ACCESSIBLE FROM STREET ‐YES 5' SIDEWALK PROVIDED FROM RAVALLI ST.4. 3' WEATHER PROTECTION OVER PRIMARY ENTRY. YES PROVIDED 10' 5. PARKING ‐PROVIDED FOR IN P.U.D.6. AREA IN FRONT TO BE LANDSCAPED, PRIVATE PATIO, AND/OR PED SPACE . PROVIDED LOW LEVEL LANDSCAPING. A. YES. FRONT COVERED PATIO 244 SF. FRONT LANDSCAPE BEDS PROVIDED. LANDSCAPING SHRUBS BELOW 48".7. 5' MIN SIDEWALK ‐PROVIDED FROM ENTRY TO RAVALLI ST. T. O . S U B .   F L R   @   M A I N   F L R 10 0 '   ‐ 0" T. O . S U B   F L R   @   S E C O N D   F L R 11 1 '   ‐ 0" T. O .   P L   @   M A I N   F L R 11 0 '   ‐ 0" T. O . P L .   @   S E C O N D   F L R 11 9 '   ‐ 1  1 / 8 " 9'   C L G 10 9 '   ‐ 0" A H B G 3 '   ‐   0 " D E B . O . B M 9 '   ‐   0 " 7 '   ‐   0 " 1 '   ‐   6 " 10 '   ‐   6 " 9'   ‐   6 " 12 '   ‐   6 " 12 '   ‐   6 " 9'   ‐   6 " 10 '   ‐   6 " 9 '   ‐   0 " 1 '   ‐   0 " 1 '   ‐   0 " 8 '   ‐   1   1 / 8 " 6 " / 1 2 " 3 " / 1 2 " 6 " / 1 2 " S F 10 8 A D D N 8X 1 0   O U T L O O K E R   W/   6 X 6   B R A C E   T Y P 8X 1 0 6X 6 10 X 1 0 8X 8   B R A C E S   T Y P   @   1 0 X   T I M B E R S 2 4 '   ‐   9   2 7 / 3 2 " C F RE C E S S E D   L I G H T I N G 4 '   ‐   0 " 4 '   ‐   0 " FR O N T A G E   T R A N S P A R E N C Y LI N E S   4 ' ‐8' BA C K   L I T ,   A N O D I Z E D   B R O N Z E   L E T T E R S AN O D O Z I E D   B R O N Z E   S T A N D   O F F   L E T T E R I N G AD D R E S S   M I N   4 "   T A L L   L E T T E R I N G 1 2 4 10 3 3 3 11 5 EL E V A T I O N   L E G E N D CE M E N T I O U S   S I D I N G   W D   G R A I N CO L O R ‐ WO O D S T O C K   B R O W N OR   E Q U A L 8  1 / 4 "   W I D T H ,   7 "   E X P AS P H A L T   R O O F I N G AR C H I T E C T U R A L   G A F   S H I N G L E CO L O R ‐BA R K W O O D   O R   E Q U A L TIMBER ACCENTS CEDAR OR DOUG FIR STAIN ‐  MESSIMERS' OR EQUALCAST STONE MFR ‐ELDORADO OR EQ COLOR ‐ROUGH CUT 'AUTUMN LEAF' AL U M   C L A D   W D   W D W ME T A L   C L A D   C O L O R ‐BR O N Z E   O R   E Q U A L DB L   P A N E ,   L O W e ,   C L E A R   G L A Z I N G ME T A L   G A L V   F L A S H I N G CO L O R ‐BR O N Z E EN T R Y   D O O R SO I L I D   W O O D ST A I N       O R   E Q U A L AL U M   C L A D   S I D E L I G H T S   M A T C H   WD W S 1 2 3 4 5 987 6 ME T A L   S T A N D I N G   S E A M   R O O F 12 "   P A N E L S CO L O R ‐ OR   E Q U A L 24   G A U G E   M I N CE M E N T I O U S   S I D I N G   W D   G R A I N CO L O R ‐ CO B B L E S T O N E   O R   E Q U A L PA N E L   W /   1 X 4   B A T T E N S CE M E N T I O U S   S H I N G L E     S I D I N G   W D   GR A I N CO L O R ‐ TI M B E R B A R K   O R   E Q U A L SQ U A R E   C U T CE M E N T I O U S   T R I M   B D S WD   G R A I N CO L O R ‐ TI M B E R B A R K   O R   E Q U A L 10 11DRAWN BY:PROJECT #:REVDESCDATEPHASEPRE SD DD CDDATE 1 2 3 4 A4‐2 04.02.19EXTERIOR ELEVATIONSSAYRE ORTHODONTICS OFFICE 4350 RAVALLI ST BOZEMAN, MT 59718 SITE PLAN REVIEW‐2.26.19‐‐Author‐‐‐‐‐‐‐ 1/ 4 "   =   1 ' ‐ 0 " A4 ‐ 22 EA S T   E L E V A T I O N 1/ 4 "   =   1 ' ‐ 0 " A4 ‐ 21 N O R T H   E L E V A T I O N 1" = 20'‐0"A4‐23MATERIALS LEGEND