HomeMy WebLinkAboutA0-3 CONSTRUCTION SITE MANAGEMENT PLAN 08-05-2019CONSTRUCTION TRAFFIC WILL USE 191/MAIN STREET AS THE PRIMARY ROUTE THROUGH THE CITY TO ACCESS THE PROJECT SITE. FROM MAIN ST REET DRIVERS SHALL TURN ON NORTH ROUSE AVENUE AND THEN
WEST ONTO EAST LAMME STREET DUE TO THE AVAILABILITY OF TRAFFICE SIGNALS AT MAINT STREET AND THE EAST OF TRUCK ACCESS ON ROUSE . DELIVERY TRUCKS WILL UTILIZE EAST LAMME STREET ALONG THE
PROJECT SITE TO TEMPORARILY PARK AND OFF -LOAD MATERIALS AND EQUIPMENT. AFTER MAKING DELIVERIES OR PICK -UP, VEHICLES WILL CONTINUE SOUTH ON NORTH BOZEMAN AVENUE TOWARDS MAIN STREET.
MISC. NOTES: THE PERIMETER OF THE SITE WILL BE BARRICADED FROM THE PUBLIC WITH A 6' TALL CONSTRUCTION FENCE. ACCESS WILL BE THROUGH GATES. CONSTRUCTION WILL BE STAGED ON EAST LAMME STE
BIM FILE PATH:
SHEET NO.:
TITLE:
copyright 2017 SMA, P.C.
REVISIONS:
KEYMAP:
HELENA HELENA HELENA HELENA
2625 Winne Avenue | Suite 1
Helena | MT | 59601
P| 406/442.4933
www.architects-sma.com
ARCHITECT SEAL:
PROJECT:
PROJECT LOCATION:
PREPARED FOR:
LOGO:
CONSULTANT:
PROJECT NUMBER:
DRAWN BY: DRAWN BY: DRAWN BY: DRAWN BY:
CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY:
TEAM:
PHASE:
DATE:
PROJECT NUMBER:
Plo
t
D
a
t
e
:
BOZEMAN BOZEMAN BOZEMAN BOZEMAN
109 East Oak Street | Suite 2E
Bozeman | MT | 59715
P| 406/219.2216
www.architects-sma.com
NOT FOR CONSTRUCTION
C:\Users\nicoles\Documents\1804 - The Merin-R19_nicolesYZYN3.rvt
A0-3
1804 1804 1804 1804
08/05/2019 08/05/2019 08/05/2019 08/05/2019
CONSTRUCTION SITE CONSTRUCTION SITE CONSTRUCTION SITE CONSTRUCTION SITE
MANAGEMENT PLAN MANAGEMENT PLAN MANAGEMENT PLAN MANAGEMENT PLAN
NS
CF
THE MERIN THE MERIN THE MERIN THE MERIN
1804 1804 1804 1804
116 N BOZEMAN AVE 116 N BOZEMAN AVE 116 N BOZEMAN AVE 116 N BOZEMAN AVE
BOZEMAN, MT 59715 BOZEMAN, MT 59715 BOZEMAN, MT 59715 BOZEMAN, MT 59715
HomeBase Partners HomeBase Partners HomeBase Partners HomeBase Partners
05
/
1
4
/
2
0
1
9
RC SITE PLAN SUBMITTAL RC SITE PLAN SUBMITTAL RC SITE PLAN SUBMITTAL RC SITE PLAN SUBMITTAL
NO. DATE REVISION DESCRIPTION
N
SITE MANAGEMENT PLAN
CONSTRUCTION ROUTE MAP
N
GENERAL NOTES: GENERAL NOTES: GENERAL NOTES: GENERAL NOTES:
1. THE STREET VISION TRANGLES MAY NOT BE IMPEDED DURING CONSTRUCTION, ACCORDING TO THE LOCATION INDICATED IN THE CIVIL DRAWIN 1. THE STREET VISION TRANGLES MAY NOT BE IMPEDED DURING CONSTRUCTION, ACCORDING TO THE LOCATION INDICATED IN THE CIVIL DRAWIN 1. THE STREET VISION TRANGLES MAY NOT BE IMPEDED DURING CONSTRUCTION, ACCORDING TO THE LOCATION INDICATED IN THE CIVIL DRAWIN 1. THE STREET VISION TRANGLES MAY NOT BE IMPEDED DURING CONSTRUCTION, ACCORDING TO THE LOCATION INDICATED IN THE CIVIL DRAWIN GS. GS. GS. GS.
2. CONSTRUCTION AND ROAD CLOSURES MUST BE COORDINATED WITH STREAMLINE BUS SERVICE TO NOT DISRUPT ESSENTIAL SERVICES. 2. CONSTRUCTION AND ROAD CLOSURES MUST BE COORDINATED WITH STREAMLINE BUS SERVICE TO NOT DISRUPT ESSENTIAL SERVICES. 2. CONSTRUCTION AND ROAD CLOSURES MUST BE COORDINATED WITH STREAMLINE BUS SERVICE TO NOT DISRUPT ESSENTIAL SERVICES. 2. CONSTRUCTION AND ROAD CLOSURES MUST BE COORDINATED WITH STREAMLINE BUS SERVICE TO NOT DISRUPT ESSENTIAL SERVICES.
1