Loading...
HomeMy WebLinkAboutL600-Irrigation-07-19-2019UP IRRIGATION SLEEVING, TYP. IRRIGATION SLEEVING, TYP. IRRIGATION SLEEVING, TYP. EXISTING TURF TO REMAIN, REPAIR AND REPLACE TURF AND IRRIGATION COMPONENTS DAMAGED DURING CONSTRUCTION ACTIVITIES VERIFY IRRIGATION CONNECTION POINTIN FIELD, UTILIZE EXISTING SYSTEM WHERE POSSIBLE IRRIGATION TYPE IRRIGATION SCHEDULE TOTAL AREA / QTY ANNUAL ET RATE TOTAL ANNUAL H2O 17 TREES 281 GAL / WEEK 5,050 GAL 52 SHRUBS 390 GAL / WEEK 7,020 GAL 274 PERENNIALS 548 GAL / WEEK 9,864 GAL TOTAL ANNUAL H2O REQUIRED: 21,993 GAL TOTAL ACRE FEET PER YEAR: 0.07 ACRE FEET H.E. TREE BUBBLER H.E. SHRUB DRIP IRRIG. H.E. PERENN. DRIP IRRIG. *NOTE: WATER USE CALCULATIONS ARE FOR ADDITIONS TO SITE. EXISTING TURFGRASS AND IRRIGATION ARE TO BE REPAIRED AND REPLACED IF DAMAGED DURING CONSTRUCTION ACTIVITY. VERIFY CURRENT IRRIGATION LAYOUT IN FIELD, UTILIZE EXISTING CONNECTION AND HOOKUP IF POSSIBLE TO ADD ADDITIONAL PLANTING ZONES TO SYSTEM. IRRIGATION NOTES AND SPECIFICATIONS 1.ALL VALVE BOXES TO BE STANDARD SIZE OR LARGER 2.IRRIGATION MAIN LINE TO BE 1.5" SCH 40 PVC PIPE OR 150 PSI POLY PIPE 3.ALL TREES TO BE IRRIGATED THROUGH DEDICATED BUBBLERS EVENLY DISTRIBUTED AROUND BASE OF TREE WITH FOUR (4) EVENLY SPACED 1 GPH BUBBLER EMITTERS. 4.TREES AND SHRUBS PLACED WITHIN PLANTING BEDS MAY UTILIZE DRIP IRRIGATION ADJUSTED PER INDIVIDUAL PLANT REQUIREMENTS. 5.ALL SHRUBS OUTSIDE OF DEDICATED PLANTING BEDS TO HAVE DEDICATED BUBBLERS EVENLY DISTRIBUTED AROUND BASE, WITH TWO (2) EVENLY SPACED 1 GPH EMITTER. 6.BUBBLERS TO TREES MAY BE OMITTED WHERE OVERHEAD IRRIGATION WILL PROVIDE ADEQUATE WATER. 7.ALL MIXED SHRUB AND PERENNIAL PLANTINGS TO BE IRRIGATED WITH DEDICATED DRIP TUBING W/ EMITTERS ADJUSTED PER INDIVIDUAL PLANT REQUIREMENTS. 8.LAWN AND SEED AREAS TO BE IRRIGATED WITH SPRAY OR ROTOR OVERHEAD IRRIGATION AS INDICATED PER PLAN. 9.ALL HEADS MUST ACHIEVE HEAD-TO-HEAD COVERAGE FOR SOD AREAS. 10.SYSTEM SHALL UTILIZE WEATHER / MOISTURE MONITOR. 11.BACKFLOW ASSEMBLY AND BLOWOUT ASSEMBLY SHALL BE LOCATED IN MECHANICAL ROOM OR APPROVED EXTERNAL GRADEBOX, AND IS THE RESPONSIBILITY OF THE LANDSCAPE CONTRACTOR TO COORDINATE INSTALLATION PER LOCAL CODES AND ORDINANCES, WITH ARCHITECTURE AND WITH ALL OTHER TRADES. 12.POWER SOURCE FOR IRRIGATION CONTROLLER TO BE COORDINATED WITH ELECTRICAL ENGINEERING AND ELECTRICAL CONTRACTOR BY LANDSCAPE CONTRACTOR. 13.DO NOT INSTALL IRRIGATION SYSTEM WHEN OBVIOUS OBSTRUCTIONS OR GRADE CHANGES ARE PRESENT. 14.ALL INFORMATION TO BE FIELD VERIFIED BY CONTRACTOR PRIOR TO INSTALLATION. 15.THE CONTRACTOR SHALL MAINTAIN AN ACCURATE & CURRENT 'AS-BUILT' IRRIGATION PLAN ON SITE AT ALL TIMES. 16.USE EXISTING IRRIGATION SYSTEM IF POSSIBLE TO ADD ZONES FOR DRIP AROUND BUILDING, CONTRACTOR TO VERIFY LOCATION OF EXISTING HOOK UP AND TIMER IN FIELD. 17.IRRIGATION SLEEVES PER PLAN ARE TO BE 4" SCH 40 PVC. modify as needed per plan* 40200 80 N 1 L600 1"=20'-0" Irrigation Water Useage Irrigation Water Use Plan L 600 design5la.com 406.587.4873 date issue dr a w n b y : ch e c k e d b y : fi l e n a m e : z: \ b s w b \ a u t o c a d \ 0 1 _ s h e e t s \ l 6 0 0 _ b s w b _ i r r i g a t i o n . d w g 10 6 E a s t B a b c o c k Ad a p t i v e R e - U s e Bo z e m a n , M o n t a n a KH M / H U TM S 05/07/19 SP1 07/19/19 REV 1 CCOA REVIEW CORRECTIONS