Loading...
HomeMy WebLinkAboutA303-SOUTH BUILDING ELEVATIONS-7-19-19MAIN LEVEL SUBFLOOR (EX.) 100' -0" PARAPET 149' -2 1/4" GROUND LEVEL SUBFLOOR (EX.) 96' -0" 76 9 1 2 MAIN LEVEL PLATE (EX.) 112' -2 1/8" LEVEL 3 SUBFLOOR 128' -10 1/4" LEVEL 2 SUBFLOOR 113' -10 1/4" T.O. ROOF DECK 143' -10 1/8" 5 8 3 4 PROPOSED GAS METER LOCATION 29 ' - 2 " + / - 19 ' - 8 " + / - PROPOSED ELECTRICAL METER LOCATION 20' - 0" 8' - 0 " 7' - 6 " PROPOSED GAS LINES TO ROOFTOP UNITS 20' - 0" 3.5 1 MAIN LEVEL SUBFLOOR (EX.) 100' -0" T.O. BASEMENT SLAB (EX.) 88' -0" T.O. FOOTING (EX.) 87' -8" GROUND LEVEL SUBFLOOR (EX.) 96' -0" 76 91 BASEMENT PLATE (EX.) 99' -10 7/8" TELLER PLATE (EX.) 114' -4 1/2" 2 MAIN LEVEL PLATE (EX.) 112' -2 1/8" GAS METER LOCATION ELECTRICAL METER LOCATION LEVEL 3 SUBFLOOR 128' -10 1/4" LEVEL 2 SUBFLOOR 113' -10 1/4" 5 834 24 ' - 5 " 26 ' - 7 " 29 ' - 3 " 17 ' - 1 0 " 26 ' - 1 0 " 7" 12" 7" 12" ENTRY VESIBULE SLAB (NEW) 94' -6 3/8" T.O. LW CONC. LEVEL 2 113' -11 3/4" T.O. LW CONC. LEVEL 3 128' -11 3/4" T.O. LW CONC. LEVEL 1 100' -1 1/2" EAST STAIR 96' -6 1/4" WEST STAIR 97' -3 3/4" 3.5 s h e e t p r o j e c t c o d e ad d r e s s © 2 0 1 9 I N T R I N S I K revisions 11 1 N o r t h T r a c y Bo z e m a n , M o n t a n a 59 7 1 5 Fa x : 4 0 6 . 5 8 2 . 8 9 1 1 Ph : 4 0 6 . 5 8 2 . 8 9 8 8 C: \ _ R E V I T \ S B B C E N T R A L _ h f m t c 3 . r v t .A303 SBB 106 EAST BABCOCK ADAPTIVE RE -USE SOUTH BUILDING ELEVATION BEFORE & AFTER 106 E. BABCOCK ST. BOZEMAN, MT 59715 2019 -05 -27 1/8" = 1'-0" .A303 1 z-SOUTH BUILDING ELEVATION - NEW 1/8" = 1'-0" .A303 2 SOUTH ELEVATION EXISTING 1 No. Description Date 1 CITY SITE PLAN/ CCOA REVEIW CORRECTIONS 7/19/2019 2019-07-19