Loading...
HomeMy WebLinkAboutA301-EAST BUILDING ELEVATIONS-7-19-19ENTRY VESTIBULE SLAB (EX.) 95' -0" MAIN LEVEL SUBFLOOR (EX.) 100' -0" PARAPET 149' -2 1/4" E C GROUND LEVEL SUBFLOOR (EX.) 96' -0" HMK LEVEL 3 SUBFLOOR 128' -10 1/4" LEVEL 2 SUBFLOOR 113' -10 1/4" T.O. ROOF DECK 143' -10 1/8" A D FJ B 19 ' - 8 " T.O. LW CONC. LEVEL 2 113' -11 3/4" D.1 3.6 1 1 1 54 ' - 0 " + / - 1 ENTRY VESTIBULE SLAB (EX.) 95' -0" MAIN LEVEL SUBFLOOR (EX.) 100' -0" T.O. BASEMENT SLAB (EX.) 88' -0" T.O. FOOTING (EX.) 87' -8" E C GROUND LEVEL SUBFLOOR (EX.) 96' -0" ENTRY VESTIBULE PLATE (EX.) 111' -9" HML G BASEMENT PLATE (EX.) 99' -10 7/8" MAIN LEVEL PLATE (EX.) 112' -2 1/8" K ADFB 16 ' - 1 0 " 28 ' - 3 " 5" 12" 5" 12" 5" 12" ENTRY VESIBULE SLAB (NEW) 94' -6 3/8" T.O. LW CONC. LEVEL 2 113' -11 3/4" T.O. LW CONC. LEVEL 3 128' -11 3/4" T.O. LW CONC. LEVEL 1 100' -1 1/2" EAST STAIR 96' -6 1/4" WEST STAIR 97' -3 3/4" D.1 3.6 LANDSCAPE FRONTAGE: PRIMARY FACADE TRANSPARENCY PERCENTAGE BETWEEN 4'-0"- 8'-0": TOTAL FACADE AREA: 222 SF TRANSPARENT AREA: 100 SF REQUIRED FACADE TRANSPARENCY: MIN. 40% TRANSPARENCY PERCENTAGE = 45% MA I N L E V E L 4' - 8 ' GREATER THAN 20' FROM SIDEWALK LANDSCAPE FRONTAGE WITHIN 10' FROM SIDEWALK LANDSCAPE FRONTAGE s h e e t p r o j e c t c o d e ad d r e s s © 2 0 1 9 I N T R I N S I K revisions 11 1 N o r t h T r a c y Bo z e m a n , M o n t a n a 59 7 1 5 Fa x : 4 0 6 . 5 8 2 . 8 9 1 1 Ph : 4 0 6 . 5 8 2 . 8 9 8 8 C: \ _ R E V I T \ S B B C E N T R A L _ h f m t c 3 . r v t .A301 SBB 106 EAST BABCOCK ADAPTIVE RE -USE EAST ELEVATION BEFORE & AFTER 106 E. BABCOCK ST. BOZEMAN, MT 59715 2019 -05 -27 1/8" = 1'-0" .A301 1 z-EAST BUILDING ELEVATION - NEW 1/8" = 1'-0" .A301 2 EAST ELEVATION EXISTING 1" = 20'-0" .A301 3 EAST BUILDING ELEVATION TRANSPARENCY 1 No. Description Date 1 CITY SITE PLAN/ CCOA REVEIW CORRECTIONS 7/19/2019 2019-07-19