Loading...
HomeMy WebLinkAbout07-15-19 City Commission Packet Materials - A3. Bridger View Redevelopment Zone Map AmendmentPage 1 of 22 19105, Staff Report for the Bridger View Redevelopment Zone Map Amendment (ZMA) Public Hearing Date: Zoning Commission public hearing will be held on July 2, 2019 at 6:00pm in the City Commission room, City Hall, 121 North Rouse. City Commission public hearing will be held on July 15, 2019 at 6:00pm in the City Commission room, City Hall, 121 North Rouse. Project Description: Bridger View Redevelopment zone map amendment requesting amendment of the City Zoning Map for an existing lot consisting of approximately 8.025 acres / 349,569 square feet and the accompanying adjacent right-of way from B-1 (Neighborhood Business), R-2 (Residential Single Household, Low Density), and R-4 (Residential High Density) to R-3 (Medium Density Residential District). Project Location: The property is located at the southwest corner of Bridger Drive and Story Mill Road. The property is legally described as a tract of land known as the Bridger View Mobile Home Court as shown on Certificate of Survey 2547, and a portion of the adjacent Bridger Drive lying south of said centerline, located within the SW ¼ of Section 31, Township 1 South, Range 6 East, Principal Meridian, Gallatin County, Montana. Recommendation: Approval Recommended Zoning Commission Motion: Having reviewed and considered the staff report, application materials, public comment, and all information presented, I hereby adopt the findings presented in the staff report for application 19-105 and move to recommend approval of the Bridger View Redevelopment Zone Map Amendment, with contingencies required to complete the application processing. Recommended City Commission Motion: Having reviewed and considered the staff report, application materials, public comment, and all information presented, I hereby adopt the findings presented in the staff report for application 19-105 and move to adopt the findings presented in the staff report and to approve the Bridger View Redevelopment zone map amendment, with contingencies required to complete the application processing. Report Date: June 24, 2019 Staff Contact: Tom Rogers, Senior Planner Agenda Item Type: Action - Legislative 467 19105, Staff Report for the Bridger View Redevelopment ZMA Page 2 of 22 EXECUTIVE SUMMARY Unresolved Issues None identified at this time. Project Summary The Trust for Public Land (landowner) and HRDC (applicant), request rezoning of an existing lot totaling 8.025 acres and the accompanying adjacent right-of way from B-1 (Neighborhood Business), R-2 (Residential Single Household, Low Density), and R-4 (Residential High Density) to R-3 (Medium Density Residential District). The subject property is currently undeveloped with no buildings or structures on-site. The property is surrounded by land zoned residential and commercial. The ZMA is accompanied by a required Growth Policy Amendment (GPA) to adjust the underlying future land use map, Figure 3-1 designation from Residential (3.46 acres) and Community Commercial Mixed Use (4.56 acres) to Residential Emphasis Mixed Use. The site is adjacent to the Story Mill Community Park to the west and is part of the larger vision of the area’s redevelopment in conjunction with the park. The intention of the land use designation change is to allow the development of a mixed-income residential neighborhood on property owned by a community land trust. This would provide affordable housing options on a portion of the site and serve to reestablish a residential neighborhood after a trailer park was removed in 2008. The application proposes a designation of “Residential Emphasis Mixed Use” (REMU) on the entire property and half (1.35 acres) of the adjacent Bridger Drive right-of-way. There is a GPA application submitted concurrently that proposes to change the future land use map in the Bozeman Community Plan from Community Commercial Mixed-Use and Residential to Residential Emphasis Mixed Use. Planning Board Summary The Bozeman Planning Board held a public hearing on the associated Growth Policy Amendment on Tuesday, June 18, 2019. No public comment was heard. The Planning Board voted unanimously to recommend that the City Commission modify the Future Land Use map to accommodate the proposed zoning classification. Zoning Commission Summary 468 19105, Staff Report for the Bridger View Redevelopment ZMA Page 3 of 22 On July 2, 2019 the Bozeman Zoning Commission held a public hearing to consider the request to amendment of the City Zoning Map for an existing lot consisting of approximately 8.025 acres / 349,569 square feet and the accompanying adjacent right-of way from B-1 (Neighborhood Business), R-2 (Residential Single Household, Low Density), and R-4 (Residential High Density) to R-3 (Medium Density Residential District). No public comment was heard on the application. In conclusion, the Zoning Commission voted 3:0 to recommend that the City Commission change the City’s zoning map as described in the application. Meeting minutes have not been prepare at the time of production of this report. A full video recording of the proceedings can be viewed at the following link. Hearing begins at 0:43.0. https://media.avcaptureall.com/session.html?sessionid=a070e6d9-9924-4303-bcef- 8ce1e47b2607&prefilter=654,3835 Alternatives 1. Approve the application with contingencies as presented; 2. Deny the application based on findings of non-compliance with the applicable criteria contained within the staff report; or 3. Open and continue the public hearing, with specific direction to staff or the applicant to supply additional information or to address specific items. 469 19105, Staff Report for the Bridger View Redevelopment ZMA Page 4 of 22 TABLE OF CONTENTS EXECUTIVE SUMMARY ...................................................................................................... 2 Unresolved Issues ............................................................................................................... 2 Project Summary ................................................................................................................. 2 Planning Board Summary ................................................................................................... 2 Zoning Commission Summary ........................................................................................... 2 Alternatives ......................................................................................................................... 3 SECTION 1 - MAP SERIES .................................................................................................... 5 SECTION 2 - RECOMMENDED CONTINGENCIES OF ZONE MAP AMENDMENT..... 8 SECTION 3 - RECOMMENDATION AND FUTURE ACTIONS ........................................ 8 SECTION 4 - ZONE MAP AMENDMENT STAFF ANALYSIS AND FINDINGS ............. 9 Section 76-2-304, MCA (Zoning) Criteria ......................................................................... 9 PROTEST NOTICE FOR ZONING AMENDMENTS ......................................................... 13 APPENDIX A - DETAILED PROJECT DESCRIPTION AND BACKGROUND .............. 13 APPENDIX B - NOTICING AND PUBLIC COMMENT .................................................... 14 APPENDIX C - PROJECT GROWTH POLICY AND PROPOSED ZONING ................... 14 APPENDIX D - OWNER INFORMATION AND REVIEWING STAFF............................ 21 FISCAL EFFECTS ................................................................................................................. 21 ATTACHMENTS ................................................................................................................... 22 470 19105, Staff Report for the Bridger View Redevelopment ZMA Page 5 of 22 SECTION 1 - MAP SERIES Future Land Use Map 471 19105, Staff Report for the Bridger View Redevelopment ZMA Page 6 of 22 Current Zoning Map 472 19105, Staff Report for the Bridger View Redevelopment ZMA Page 7 of 22 Current Land Use Map 473 19105, Staff Report for the Bridger View Redevelopment ZMA Page 8 of 22 SECTION 2 - RECOMMENDED CONTINGENCIES OF ZONE MAP AMENDMENT Please note that these contingencies are necessary for the City to complete the process of the proposed amendment. Recommended Contingencies of Approval: 1. The Ordinance for the Zone Map Amendment must not be approved until the Bridger View Redevelopment Growth Policy Amendment is executed. If the Bridger View Redevelopment Growth Policy Amendment is not approved, the Zone Map Amendment application is null and void. 2. That all documents and exhibits necessary to establish an initial municipal zoning designation shall be identified as the “Bridger View Redevelopment Zone Map Amendment.” All required documents must be returned to the City within 60 days of the City Commission action to annex the property or the preliminary approval shall be null and void. 3. The applicant must submit a zone amendment map, titled “Bridger View Redevelopment Zone Map Amendment”, on a 24” by 36” mylar, 8 ½” by 11”, or 8 ½” by 14” paper exhibit, and a digital copy of the area to be zoned, acceptable to the Director of Public Works, which will be utilized in the preparation of the Ordinance to officially amend the City of Bozeman Zoning Map. The map must contain a metes and bounds legal description of the perimeter of the subject properties, zoning district, and total acreage of the property. 4. The Ordinance for the Zone Map Amendment shall not be drafted until the applicant provides an editable metes and bounds legal description prepared by a licensed Montana surveyor. SECTION 3 - RECOMMENDATION AND FUTURE ACTIONS Having considered the criteria established for a zone map amendment, the Staff recommends approval as submitted. The Development Review Committee (DRC) considered the amendment on April 3, 2019. The DRC did not identify any infrastructure or regulatory constraints that would impede the approval of the application. The Zoning Commission held a public hearing on this zone map amendment on July 2, 2019 and will forward its recommendation to the City Commission on the zone map amendment. The hearing will be held at 121 N. Rouse Avenue, Bozeman. The meeting will began at 6 p.m. The City Commission will hold a public hearing on the zone map amendment on July 15, 2019. The hearing will be held at 121 N. Rouse Avenue, Bozeman. The meeting will begin at 6 p.m. 474 19105, Staff Report for the Bridger View Redevelopment ZMA Page 9 of 22 SECTION 4 - ZONE MAP AMENDMENT STAFF ANALYSIS AND FINDINGS In considering applications for approval under this title, the advisory boards and City Commission shall consider the following criteria (letters A-K). As an amendment is a legislative action, the Commission has broad latitude to determine a policy direction. The burden of proof that the application should be approved lies with the applicant. In considering the criteria the analysis must show that the amendment accomplishes criteria A-D. Criteria E-K must be considered and may be found to be affirmative, neutral, or negative. A favorable decision on the proposed application must find that the application meets all of criteria A-D and that the positive outcomes of the amendment outweigh negative outcomes for criteria E-K. Section 76-2-304, MCA (Zoning) Criteria A. Be in accordance with a growth policy. Yes, pending the approval of the concurrent GPA. An application to amend the Community Plan Future Land Use Map has been submitted concurrently with the ZMA Application. The property currently has two different land use designations - the east portion (4.56 acres) is designated “Community Commercial Mixed Use” and the west portion (approximately 3.46 acres) is designated “Residential.” The Growth Policy Amendment application proposes a designation of “Residential Emphasis Mixed Use” on the entire property. Table C-16: “Zoning Correlation with Land Use Categories” in Appendix C of the Community Plan (and shown below) allows R-3 (Residential Medium Density) District to be the smallest scale zoning district that can implement this land use designation. Additionally, the proposed zone map amendment advances multiple objectives of the growth policy: Land Use Objective 1.4: “Provide for and support infill development and redevelopment which provides additional density of use while respecting the context of the existing development which surrounds it. Respect for context does not automatically prohibit difference in scale or design.” Land Use Objective 4.3: “Encourage the creation of well-defined residential neighborhoods. Each neighborhood should have a clear focal point, such as a park, school, other open space or community facility, and shall be designed to promote pedestrian convenience.” Community Quality Objective 1.3: “Support compatible infill within the existing area of the City rather than developing land requiring expansion of the City’s area.” 475 19105, Staff Report for the Bridger View Redevelopment ZMA Page 10 of 22 Housing Objective 1.1 “Encourage and support the creation of a broad range of housing types in proximity to services and transportation options.” Housing Objective 1.3 “Promote the provision of a wide variety of housing types in a range of costs to meet the diverse residential needs of Bozeman residents.” No conflicts with the Growth Policy have been identified. B. Secure safety from fire and other dangers. Yes. The subject property is currently served by City of Bozeman Fire and Police Departments. Future development of the property will be required to conform to all City of Bozeman public safety, building and land use requirements, which will ensure this criterion is met. The change to R-3 is not likely to adversely impact safety from fire and other dangers. C. Promote public health, public safety, and general welfare. Yes. Future development of the site will require site plan review and compliance with the City’s Unified Development Code which ensures the promotion of public health, safety and general welfare. The proposed amendment will not put undue burden on municipal services, emergency response capability, or similar existing requirements. Placing a residential neighborhood adjacent to Story Mill Community Park will promote health, safety, and general welfare of residents. D. Facilitate the provision of transportation, water, sewerage, schools, parks and other public requirements. Yes. The subject property is currently served by City water and sewer services in the right- of-way of Bridger Drive. Any development of the property will be required to meet city standards in regards to water, sewer, or transportation system upgrades or restrictions resulting from proposed future development. These would be addressed as a part of the development review process. Any proposed development would be serviced by the existing school system and the proposed change in zoning to R-3 does not increase the intensity of use and is not anticipated to overburden the school district. The owner (The Trust for Public Land) is concurrently developing the adjacent land into the Story Mill Community Park which will provide recreational opportunities to serve future residents on the subject property, as well as the larger community. 476 19105, Staff Report for the Bridger View Redevelopment ZMA Page 11 of 22 E. Reasonable provision of adequate light and air. Yes. Bozeman’s Unified Development Code includes requirements for providing adequate light and air including maximum building height, lot coverage, and setback requirements. Future redevelopment of the property will be subject to these provisions. The subject property is adjacent to Story Mill Community Park and the Spur Trail to the east and a multi- use trail to the north. F. The effect on motorized and non-motorized transportation systems. Neutral. Potential future development within a zoning district of R-3 will likely affect the City’s motorized and non-motorized transportation system with increased traffic. Future development may require a Traffic Impact Study to identify the extent of increased traffic volumes and specify required infrastructure improvements to serve the development. For non-motorized transportation systems, future residential development on the property will benefit from Story Mill Community Park which includes extensive public trails, the Story Mill Spur Trail which connects to the Northeast Neighborhood, the trail in the open space to the east which heads north to the East Gallatin Recreation Area, and the Main Street to the M route along Bridger Drive. This will have a positive effect on the neighborhood and any proposed future development. G. Promotion of compatible urban growth. Yes. The Growth Policy supports residential development near parkland. Additionally, the proposed R-3 zoning is compatible with the types of developments and densities in the surrounding area, as an appropriate transition from Downtown through the Northeast Neighborhood and industrial areas to the larger lot single-family subdivisions up Bridger Drive. The properties are bordered by existing residential and neighborhood business designations making the proposed amendment compatible with surrounding zoning uses and intents. H. Character of the district. Yes. The proposed amendment to R-3 would allow for residential uses on the site which provide a similar character to existing land uses surrounding the property. The newly developed Story Mill Community Park has changed the character of the district and the addition of an adjacent residential neighborhood is compatible and appropriate to this area. The proposed zone map amendment would not significantly alter the character of the district. I. Peculiar suitability for particular uses. Yes. A wide variety of zoning designations surrounding the properties including R-1, R-2, R- 4, B-1, B-2, M-1 (City and County designation), and undeveloped County A-S zoning (one dwelling per 20-acres). A change to R-3 would be compatible with adjacent zoning and provide for further development of compatible residential land uses which is suitable for the area as that is the current surrounding development pattern. Previously the Bridger View 477 19105, Staff Report for the Bridger View Redevelopment ZMA Page 12 of 22 Trailer Park was hosted on the subject property, and the intent of the applicant is to provide for mixed-income housing which would be suitable for the area and benefit the community as whole. J. Conserving the value of buildings. Yes. There are no existing buildings on the site currently, therefore the proposed zoning amendment would not affect any on-site building values. The proposed R-3 zoning district would allow for additional residential development in the area, which is compatible with existing land uses, and is not anticipated to negatively impact nearby building values. K. Encourage the most appropriate use of land throughout the jurisdictional area. Yes. The proposed R-3 zoning will encourage a variety of housing types to serve the diverse needs of the community, helping address affordability challenges. The R-3 zone is an appropriate use of land throughout the jurisdictional area because it will complement the park, be compatible to surrounding existing neighborhoods, and will support future development on commercially zoned land to the south and southeast. Spot Zoning Criteria Rezoning may, in certain factual circumstances, constitute impermissible “spot zoning.” The issue of whether a rezoning constitutes spot zoning was discussed by the Montana Supreme Court in Plains Grains LP v. Board of County Comm’rs of Cascade County and Little v. Bd. Of County Comm’rs, in which the Court determined that the presence of the following three conditions generally will indicate that a given situation constitutes spot zoning, regardless of variations in factual scenarios. 1. Is the proposed use significantly different from the prevailing land uses in the area? No. The subject property is surrounded by residential and light commercial and industrial uses. The proposed zoning would allow residential uses that are similar to adjacent residential development patterns. As a result, the proposed R-3 zoning designation would not result in primary uses of the site which are significantly different from prevailing land uses in the area. 2. Is the area requested for the rezone rather small in terms of the number of separate landowners benefited from the proposed change? Neutral. The proposed R-3 zoning designation is being requested by one landowner and would apply to one lot totaling 8.025 acres. The proposed R-3 zoning designation may invigorate development on the site which would benefit property values for residential properties and nearby commercial properties. 3. Would the change be in the nature of “special legislation” designed to benefit only one or a few landowners at the expense of the surrounding landowners or the general public? 478 19105, Staff Report for the Bridger View Redevelopment ZMA Page 13 of 22 No. No substantial negative impacts to the surrounding landowners or the general public have been identified due to this amendment. As discussed in the various review criteria above, the proposed R-3 zoning designation will allow for additional residential development in an appropriate area, and will help meet the projected demand for this use. PROTEST NOTICE FOR ZONING AMENDMENTS IN THE CASE OF WRITTEN PROTEST AGAINST SUCH CHANGES SIGNED BY THE OWNERS OF 25% OR MORE OF THE AREA OF THE LOTS WITHIN THE AMENDMENT AREA OR THOSE LOTS OR UNITS WITHIN 150 FEET FROM A LOT INCLUDED IN A PROPOSED CHANGE, THE AMENDMENT SHALL NOT BECOME EFFECTIVE EXCEPT BY THE FAVORABLE VOTE OF TWO-THIRDS OF THE PRESENT AND VOTING MEMBERS OF THE CITY COMMISSION. The City will accept written protests from property owners against the proposal described in this report until the close of the public hearing before the City Commission. Pursuant to 76-2-305, MCA, a protest may only be submitted by the owner(s) of real property within the area affected by the proposal or by owner(s) of real property that lie within 150 feet of an area affected by the proposal. The protest must be in writing and must be signed by all owners of the real property. In addition, a sufficient protest must: (i) contain a description of the action protested sufficient to identify the action against which the protest is lodged; and (ii) contain a statement of the protestor's qualifications (including listing all owners of the property and the physical address and legal description of the property), to protest the action against which the protest is lodged, including ownership of property affected by the action. Signers are encouraged to print their names after their signatures. A person may in writing withdraw a previously filed protest at any time prior to final action by the City Commission. Protests must be delivered to the Bozeman City Clerk, 121 North Rouse Ave., PO Box 1230, Bozeman, MT 59771-1230. APPENDIX A - DETAILED PROJECT DESCRIPTION AND BACKGROUND A zone map amendment requesting amendment of the City Zoning Map for an existing lot consisting of approximately 8.025 acres and the accompanying adjacent right-of way from B-1 (Neighborhood Business), R-2 (Residential Single Household, Low Density), and R-4 (Residential High Density) to R-3 (Medium Density Residential District). The proposal is part of a larger vision of redevelopment for the area which includes Story Mill Community Park. A portion of the subject property formerly housed a trailer park that was removed for a larger housing and commercial development proposal that failed to move 479 19105, Staff Report for the Bridger View Redevelopment ZMA Page 14 of 22 forward. The Trust for Public Land acquired the property as part of the larger Story Mill Community Park purchase to explore the option of returning some affordable homes on a portion of the site. If the GPA and proposed ZMA are approved, the applicant intends to submit a Preliminary Planned Unit Development (PUD) that would include a mixed-income residential development and possibly some light complementary commercial uses. The concurrent Growth Policy Amendment (GPA) application that proposes a future land use designation of REMU has also been submitted by the applicant. The addition of a residential neighborhood in this area is compatible with adjacent uses and would serve to activate the edge of Story Mill Community Park, while providing the opportunity for residents to live near a great community resource and enhance livability. APPENDIX B - NOTICING AND PUBLIC COMMENT Notice was sent via US first class mail to all owners of property located inside the site and within 200 feet of the perimeter of the site. The project site was posted with a copy of the notice. The notice was published in the Legal Ads section of the Bozeman Daily Chronicle on May 26 and June 2, 2019. The Zoning Commission is scheduled for July 2, 2019 and the City Commission public hearing is scheduled for July 15, 2019. There have been no comments as of the date this report was written. APPENDIX C - PROJECT GROWTH POLICY AND PROPOSED ZONING Adopted Growth Policy Designation: The property is designated as residential and community commercial mixed use in the Bozeman Community Plan future land use map – see descriptions below. “Residential.” The growth policy states, “This category designates places where the primary activity is urban density dwellings. Other uses which complement residences are also acceptable such as parks, low intensity home based occupations, fire stations, churches, and schools. High density residential areas should be established in close proximity to commercial centers to facilitate the provision of services and employment opportunities to persons without requiring the use of an automobile. Implementation of this category by residential zoning should provide for and coordinate intensive residential uses in proximity to commercial centers. The residential designation indicates that it is expected that development will occur within municipal boundaries, which may require annexation prior to development…All residential housing should be arranged with consideration of compatibility with adjacent development, natural constraints such as watercourses or steep slopes, and in a fashion which advances the overall goals of the Bozeman growth policy. The residential 480 19105, Staff Report for the Bridger View Redevelopment ZMA Page 15 of 22 designation is intended to provide the primary locations for additional housing within the planning area.” “Community Commercial Mixed Use.” The growth policy states that, “activities within this land use category are the basic employment and services necessary for a vibrant community. Establishments located within these categories draw from the community as a whole for their employee and customer base and are sized accordingly. A broad range of functions including retail, education, professional and personal services, offices, residences, and general service activities typify this designation. In the “center-based” land use pattern, Community Commercial Mixed Use areas are integrated with significant transportation corridors, including transit and non-automotive routes, to facilitate efficient travel opportunities. The density of development is expected to be higher than currently seen in most commercial areas in Bozeman and should include multi-story buildings…High density residential areas are expected in close proximity. Including residential units on sites within this category, typically on upper floors, will facilitate the provision of services and opportunities to persons without requiring the use of an automobile… Mixed use areas should be developed in an integrated, pedestrian friendly manner and should not be overly dominated by any single land use. Higher intensity employment and residential uses are encouraged in the core of the area or adjacent to significant streets and intersections. As needed, building height transitions should be provided to be compatible with adjacent development.” There is a concurrent GPA for the subject property that proposes to change the future land use designation to “Residential Emphasis Mixed Use.” The Bozeman Community Plan describes REMU as the following: “The Residential Mixed-Use category “promotes neighborhoods with supporting services that are substantially dominated by housing. A diversity of residential housing types should be built on the majority of any area within this category. Housing choice for a variety of households is desired and can include attached and small detached single-household dwellings, apartments, and live-work units. Residences should be included on the upper floors of buildings with ground floor commercial uses…The category is appropriate near commercial centers and larger areas should have access on collector and arterial streets. Multi-household higher density urban development is expected. Any development within this category should have a well integrated transportation and open space network which encourages pedestrian activity and provides ready access within and to adjacent development.” 481 19105, Staff Report for the Bridger View Redevelopment ZMA Page 16 of 22 As Table C-16 from the Bozeman Community Plan shows, the proposed zoning of R-3 is an implementing district for the future land use designation of “Residential Emphasis Mixed Use”. Proposed Zoning Designation and Land Uses: The applicant has requested zoning of R-3 (Residential Medium Density District). The intent of the R-3 residential office district is “to provide for the development of one- to five-household residential structures near service facilities within the city. This purpose is accomplished by: 1. Providing for minimum lot sizes in developed areas consistent with the established development patterns while providing greater flexibility for clustering lots and mixing housing types in newly developed areas. 482 19105, Staff Report for the Bridger View Redevelopment ZMA Page 17 of 22 2. Providing for a variety of housing types, including single household dwellings, two to four household dwellings, and townhouses to serve the varied needs of households of different size, age and character, while reducing the adverse effect of non-residential uses. Use of this zone is appropriate for areas with good access to parks, community services and/or transit.” Table 38.310.030.A Permitted general and group residential uses in residential zoning districts Table clarifications: 1. Uses: P = Principal uses; C = Conditional uses; S = Special uses; A = Accessory uses; — = Uses which are not permitted. 2. If a * appears after the use, then the use is defined in article 7. 3. Where a code section is referenced after the use, then the use is subject to the additional standards specific to the subject use in that code section. 4. If a number appears in the box, then the use may be allowed subject to development condition(s) described in the footnotes immediately following the table. Uses Zoning Districts R-S R-1 R-2 R-3 R-4 R-5 R-O 1 RMH General residential Accessory dwelling units* - attached (38.360.040) P P P P P P P — Accessory dwelling units* - detached (38.360.040) S S P P P P P — Apartments/apartment building* — — — — P P P — Cottage housing (38.360.110)* P P P P P P P P Manufactured homes on permanent foundations(38.360.160)* P P P P P P P P Manufactured home communities* — — — — — — — P 483 19105, Staff Report for the Bridger View Redevelopment ZMA Page 18 of 22 Single-household dwelling (38.360.210) P P P P P P P P Two-household dwelling (38.360.210) — — P P P P P — Three household dwelling or four- household dwelling (38.360.210) — — — P P P P — Townhouses* & rowhouses* (two attached units)(38.360.240) P 2 P2 P P P P P P 3 Townhouses* & rowhouses* (five attached units or less) (38.360.240) — — — P 3 P P P — Townhouses* & rowhouses* (more than five attached units) (38.360.240) — — — — P P P — Group residential Community residential facilities* with eight or fewer residents P P P P P P P P Community residential facilities* serving nine or more residents — — — S P P P — Cooperative household* S S S P P P P S Family day care home* P P P P P P P P Group day care home* P P P P P P P P Group living (38.360.150)* P P P P P P P P Lodging houses* — — — S P P P — Transitional and emergency housing (38.360.135)* and related services S S S S S S S S 484 19105, Staff Report for the Bridger View Redevelopment ZMA Page 19 of 22 Notes: 1. The primary use of a lot, as measured by building area, permitted in the R-O district is determined by the underlying growth policy land use designation. Where the district lies over a residential growth policy designation the primary use shall be non-office uses; where the district lies over a non-residential designation the primary use shall be office and other non-residential uses. Primary use shall be measured by percentage of building floor area. 2. In the R-S, R-1, and RMH district townhomes are only allowed when utilized to satisfy the requirements of division 38.380, Affordable Housing. May only be utilized in developments subject to division 38.380 of this article. 3. In the R-3 district, townhouse groups must not exceed 120 feet in total width. Table 38.310.030.B Permitted accessory and non-residential uses in residential zoning districts Uses Zoning Districts R-S R-1 R-2 R-3 R-4 R-5 R-O 1 RMH Accessory uses Essential services Type I* A A A A A A A A Guest house* A A A A A A A — Home-based businesses (38.360.140) * A/S A/S A/S A/S A/S A/S A/S A/S Other buildings and structures typically accessory to authorized uses A A A A A A A A Private or jointly owned recreational facilities A A A A A A A A Signs*, subject to article 5 of this chapter A A A A A A A A 485 19105, Staff Report for the Bridger View Redevelopment ZMA Page 20 of 22 Temporary buildings and yards incidental to construction work A A A A A A A A Temporary sales and office buildings A A A A A A A A Non-residential uses Agricultural uses* on 2.5 acres or more (38.360.260) P — — — — — — — Agricultural uses* on less than 2.5 acres (38.360.260) C — — — — — — — Bed and breakfast* C C C C P P P — Commercial stable (38.360.220) C — — — — — — — Community centers* C C C C C C P C Day care centers* S S S P P P P S Essential services Type II* P P P P P P P P Essential services Type III* 2 C C C C C C C C Short Term Rental (Type 1)* P P P P P P P — Short Term Rental (Type 2)* — — P P P P P — Short Term Rental (Type 3)* — — — — — — — — Golf courses C C — — — — — — Offices* — — — — S 3 S 3 P — Public and private parks P P P P P P P P 486 19105, Staff Report for the Bridger View Redevelopment ZMA Page 21 of 22 Medical offices, clinics, and centers* — — — — C C 3 P — Recreational vehicle parks (38.360.200)* C — — — — — — P Restaurant — — — — — P 4 — — Retail — — — — — P 4 — — Uses approved as part of a PUD per division 38.380 of this article C C C C C C C C Veterinary uses S — — — — — — — Notes: 1. The primary use of a lot, as measured by building area, permitted in the R-O district is determined by the underlying growth policy land use designation. Where the district lies over a residential growth policy designation the primary use shall be non-office uses; where the district lies over a non-residential designation the primary use shall be office and other non-residential uses. Primary use shall be measured by percentage of building floor area. 2. Only allowed when service may not be provided from an alternative site or a less intensive installation or set of installations. 3. Only when in conjunction with dwellings. 4. Subject uses are limited to 2,500 square feet of gross floor area and only allowed on street corner sites within a mixed-use building featuring residential units next to and/or above subject uses. APPENDIX D - OWNER INFORMATION AND REVIEWING STAFF Owner: Trust for Public Land, 901 5th Ave, Suite 1520, Seattle, WA 98164 Applicant: HRDC, 32 South Tracy Ave, Bozeman MT 59715 Representative: Groundprint, LLC, 1262 Stoneridge Drive, Bozeman MT 59718. Report By: Tom Rogers, Senior Planner FISCAL EFFECTS No unusual fiscal effects have been identified. No presently budgeted funds will be changed by this zone map amendment. 487 19105, Staff Report for the Bridger View Redevelopment ZMA Page 22 of 22 ATTACHMENTS The full application and file of record can be viewed at the Community Development Department at 20 E. Olive Street, Bozeman, MT 59715. Bridger View Redevelopment Zone Map Amendment application materials. Application materials 488 A1 DEVELOPMENT REVIEW APPLICATION PROJECT IMAGE PROJECT INFORMATION Project name: Project type(s): Description: Street address: Zip code: Zoning: Gross lot area: Block frontage: Number of buildings: Type and Number of dwellings: Non-residential building size(s): (in stories) Non-residential building height(s): Number of parking spaces: Afordable housing (Y/N): Cash in lieu of parkland (Y/N): VICINITY MAP CITY USE ONLY Submittal date: Application fle number: Planner: DRC required (Y/N): Revision Date: Development Review Application A1 Page 1 of 3 Revision Date: 5.16.18 REQUIRED FORMS: Varies by project type, PLS Bridger View Redevelopment ZPA Zone Map Amendment Amend the zoning designation on the subject property from R-4 + B1 + R2 to R-3 (Residential Medium Density District) Approximately 920 Bridger Drive, Bozeman, Montana 59715 Existing: B1 + R4 + R2; Proposed: R3 349,569 SF / 8.025 acres Landscaped (Story Mill Rd & W 1/2 Bridger Drive) + Mixed (E 1/2 Bridger Drive) 0 0 0 0 0 Yes No PROPOSEDSpur TrailBRIDGER DRIVEBIRDIE DRStory Mill Historic District GRIFFIN DRIVE STORY MILL ROADStory Mill Community Park HILLSIDE LANE Subject Property 8 acres R-3 proposed Subject Property 489 DEVELOPMENT REVIEW APPLICATION 1. PROPERTY OWNER Name: Full address (with zip code): Phone: Email: 2. APPLICANT Name: Full address (with zip code): Phone: Email: 3. REPRESENTATIVE Name: Full address (with zip code): Phone: Email: 4. SPECIAL DISTRICTS Overlay District: Neighborhood Conservation None Urban Renewal District: Downtown North 7th Avenue Northeast North Park None 5. CERTIFICATIONS AND SIGNATURES This application must be signed by both the applicant(s) and the property owner(s) (if diferent) for all application types before the submittal will be accepted. The only exception to this is an informal review application that may be signed by the applicant(s) only. As indicated by the signature(s) below, the applicant(s) and property owner(s) submit this application for review under the terms and provisions of the Bozeman Municipal Code. It is further indicated that any work undertaken to complete a development approved by the City of Bozeman shall be in conformance with the requirements of the Bozeman Municipal Code and any special conditions established by the approval authority. I acknowledge that the City has an Impact Fee Program and impact fees may be assessed for my project. Further, I agree to grant City personnel and other review agency representative’s access to the subject site during the course of the review process (Section 38.34.050, BMC). I (We) hereby certify that the above information is true and correct to the best of my (our) knowledge. Certifcation of Completion and Compliance – I understand that conditions of approval may be applied to the application and that I will comply with any conditions of approval or make necessary corrections to the application materials in order to comply with municipal code provisions. Statement of Intent to Construct According to the Final Plan – I acknowledge that construction not in compliance with the approved fnal plan may result in delays of occupancy or costs to correct noncompliance. continued on next page Development Review Application A1 Page 2 of 3 Revision Date: 5.16.18 REQUIRED FORMS: Varies by project type, PLS The Trust for Public Land (contact: Maddie Pope) 901 5th Ave, Suite 1520, Seattle, WA 98164-2013 (406) 522-7450 maddy.pope@tpl.org HRDC (contact: Tracy Menuez) 32 South Tracy Avenue, Bozeman, MT 59715 (406) 585-4890 tmenuez@thehrdc.org Groundprint, LLC (contact: Susan Riggs, AICP) 1262 Stoneridge Drive, Bozeman, MT 59718 (406) 579-5844 sriggs@groundprint.com 490 DEVELOPMENT REVIEW APPLICATION Applicant Signature: Printed Name: Owner Signature: Printed Name: Owner Signature: Printed Name: If signing as a corporation or LLC, please provide the title and position of the individual signing on behalf of the corporation/LLC. Attach separate sheets for additional owner signatures. 6. APPLICATION TYPES Check all that apply, use noted forms. 1. Pre-application Consultation 2. Master Site Plan 3. Site Plan 4. Subdivision pre-application 5. Subdivision preliminary plan 6. Subdivision fnal plan 7. Subdivision exemption 8. Condominium Review 9. PUD concept plan 10. PUD preliminary plan 11. PUD fnal plan 12. Annexation and Initial Zoning 13. Administrative Interpretation Appeal 14. Administrative Project Decision Appeal . Commercial Non-residential COA 16. Historic Neighborhood Conservation Overlay COA 17. Informal Review 18. Zoning Deviation/Departure . Zoning or Subdivision Variance . Conditional Use Permit 21. Special Temporary Use Permit 22. Special Use Permit 23. Regulated Activities in Wetlands 24. Zone Map Amendment (non-Annexation) 25. UDC Text Amendment 26. Growth Policy Amendment 27. Modifcation/Plan Amendment . Extension of Approved Plan . Reasonable Accommodation 30. Comprehensive Sign Plan 31. Other: CONTACT US FORM FORM None INF MSP None SP 19 Z/SVAR PA 20 CUP PP STUP FP SUP SE WR CR ZMA PUDC ZTA PUDP GPA PUDFP MOD ANNX 28 EXT AIA 29 RA APA CSP 15 CCOA NCOA Alfred M. Stif Professional Building 20 East Olive Street 59715 (FED EX and UPS Only) PO Box 1230 Bozeman, MT 59771 phone 406.582.2260 fax 406.582.2263 planning@bozeman.net www.bozeman.net Development Review Application A1 Page 3 of 3 Revision Date: 5.16.18 REQUIRED FORMS: Varies by project type, PLS Heather Grenier, President/CEO, HRDC Maddy Pope, Project Manager, The Trust for Public Land 491 Bridger View Redevelopment Zone Map Amendment Narrative Summary: The Human Resource Development Council (HRDC) and The Trust for Public Land, together, propose to amend the zoning designation for an 8-acre property located on Bridger Drive (between Story Mill Community Park and Story Mill Road) from R-4 (Residential High Density District), R-2 (Residential Moderate Density District) and B-1 (Neighborhood Business District) to R-3 (Residential Medium Density District). This proposal to change the zoning stands on its own merits by meeting the required criteria (a-k) for a Zone Map Amendment (ZMA). While individual planned projects are not considered within the criteria for a ZMA, the proposed zoning change will enable these non-profit entities to continue to pursue and invest in the creation of a mixed-income residential neighborhood offering modest, high performing homes that residents can afford to purchase and a community land trust to ensure the investment and affordability are maintained. This innovative, model neighborhood will meaningfully address Bozeman’s community housing needs, complement the adjacent park, and benefit future commercial development to the south in the Story Mill Historic District. The idea to reestablish a residential neighborhood on this property grew out of The Trust for Public Land’s work to create the adjacent Story Mill Community Park in partnership with the City of Bozeman. A portion of the larger site formerly housed a 92-family trailer park that was removed in 2008 to make way for a 1,200-unit housing and commercial development proposal that failed to move forward. The current zoning designations are the direct result of that failed plan. The Trust for Public Land acquired the property in 2012 as part of the adjoining Story Mill Community Park property purchase. The 8-acre parcel was retained to explore the feasibility of returning some affordable homes on a portion of the site – honoring the history and complementing the new park. In 2017, the Bridger View Concept Planned Unit Development (PUD) was informally reviewed by the City. Submittal of a Preliminary PUD is contingent upon approval of this application and the corresponding Growth Policy Amendment (GPA) Application. Three different zoning designations are currently assigned to the property: the east portion (4.56 acres) is zoned B-1 (Neighborhood Business District); the northwest portion (1.53 acres) is zoned R-2 and the remaining southwest portion (1.93 acres) is zoned R-4. It is important to note that the entire property had previously been zoned R-MH (Residential Manufactured Housing) but was changed in 2006 to match prior development plans. This application proposes a zoning designation of R-3 (Residential Medium Density District) on the entire property. As required, half of the adjacent right-of-way (1.35 acres) is included in the mapping to allow the zoning boundaries to run down the centerline of the roadway. The concurrent GPA application proposes a land use designation of “Residential Mixed Use.” The requested R-3 zoning is the smallest scale zoning allowed under this land use classification. The underlying principles of the R-3 zoning designation are described in the Unified Development Code (UDC) as follows: 492 The graphics on the next page show the existing and proposed zoning maps for the subject property. This is followed by a detailed narrative addressing the required review criteria for Zone Map Amendments. Note that the required engineering exhibits which include more site-specific detail are included at the end of the application materials. Aerial view of the neighborhood (image: kestrelaerial.com) The intent of the R-3 residential medium density district is to provide for the development of one- to five-household residential structures near service facilities within the city. This purpose is accomplished by: 1. Providing for minimum lot sizes in developed areas consistent with the established development patterns while providing greater flexibility for clustering lots and mixing housing types in newly developed areas. 2. Providing for a variety of housing types, including single household dwellings, two to four household dwellings, and townhouses to serve the varied needs of households of different size, age and character, while reducing the adverse effect of non-residential uses. Use of this zone is appropriate for areas with good access to parks, community services and/or transit. Unified Development Code (UDC) 493 Data Source: Bozeman GIS Department EXISTING PROPOSEDSpur TrailBRIDGER DRIVEBIRDIE DRGRIFFIN DRIVE STORY MILL ROADStory Mill Community Park Spur TrailBRIDGER DRIVEBIRDIE DRStory Mill Historic District GRIFFIN DRIVE STORY MILL ROADStory Mill Community Park Story Mill Historic District Subject Property 8 acres HILLSIDE LANE HILLSIDE LANE Subject Property 8 acres 1.35 acres (right-of-way) 1.35 acres (right-of-way) 494 Application Narrative a. Is the new zoning designed in accordance with the growth policy? How? Yes (with approval of the concurrent GPA). An application to amend the Community Plan Future Land Use Map is being submitted concurrently with this ZMA Application. The property currently has two different land use designations - the east portion (4.56 acres) is designated “Community Commercial Mixed Use” and the west portion (approximately 3.46 acres) is designated “Residential.” The Growth Policy Amendment application proposes a designation of “Residential Mixed Use” on the entire property. Table C-16: “Zoning Correlation With Land Use Categories” in Appendix C of the Community Plan (and shown below) allows R-3 (Residential Medium Density) District to be the smallest scale zoning district that can implement this land use designation. While the Residential Emphasis Mixed Use growth policy designation is commonly associated with the Residential Emphasis Mixed Use (REMU) zoning district due to the matching names, the proposed combination with the R-3 district will allow a more appropriate scale of development for this property. The expected density is comparable to neighborhoods north of Downtown. 495 b. Will the new zoning secure safety from fire and other dangers? How? Yes. the subject property is located within the jurisdiction of the City of Bozeman Fire and Police Departments. The subject site is located approximately 2 miles from the Rouse Avenue Bozeman Fire Station and approximately 0.7 miles from the American Medical Response base. Any subsequent applications will also be reviewed for compliance with the City of Bozeman standards and regulations in terms of fire, safety and other emergency services standards. c. Will the new zoning promote public health, public safety and general welfare? How? Yes. The proposed zoning designation of R-3 (Residential Medium Density District) will promote health, safety and general welfare. The addition of the Story Mill Community Park changed the land use dynamics of this area although the underlying zoning did not change (note that parks are permitted uses in all zoning districts). The amount of land available for residential uses was reduced, while the amount of land dedicated to recreational uses and resource protection was increased. The Trust for Public Land always envisioned some residential use adjacent to the park to honor the history of the Bridger View Mobile Home Park and to ensure that everyone lives within a 10 minute walk of a quality park, which is shown to increase public health outcomes. A residential neighborhood will improve the adjacent park by increasing daily users and the opportunities for informal surveillance. Similar to an “eyes on the street” approach to planning, a neighborhood in this location will establish more “eyes on the park” and create an active edge along the park’s western boundary. Development of this parcel, in combination with the ongoing improvements to the Story Mill Community Park will continue to incrementally improve this overall area of town by creating a customer and employee base within walking distance to zoned commercial areas to the south and southeast in the Story Mill Historic District. d. Will the new zoning facilitate the adequate provision of transportation, water, sewerage, schools, parks, and other public requirements? How? Yes. The development of public infrastructure improvements to serve the property will be required to conform to the City of Bozeman’s adopted standards which require properties to construct public infrastructure relating to transportation, water, sewer and other public needs. Many of these items were discussed in detail for this particular property as part of the Concept PUD application. In addition, The Trust for Public Land, as part of its vision for residential use on this property, dedicated a sewer easement and a pathway easement along the northern property boundary. This allowed the city to increase its sewer capacity and enabled the construction of a multi-use sidewalk while preserving the mature spruce trees along Bridger Drive. In terms of schools, any proposed development would be serviced by the existing school system. The proposed change in zoning from a combination of R-4, R-2, and B-1 to R-3 does not increase the intensity of use and is not anticipated to overburden the school district. In terms of parks, The Trust for Public Land spearheaded the amazing efforts to transform the adjacent land into a unique city park which includes opportunities for active recreation, outdoor community gathering spaces, a 40-acre nature sanctuary, community center, new trails and trail connections, and natural and cultural interpretive programs. The new Story Mill Community Center (former Boys & Girls Club structure) provides a recreational center to serve the larger community. 496 Story Mill Park (under construction) looking north (image: kestrelaerial.com) e. Will the new zoning provide reasonable provision of adequate light and air? How? Yes. The proposed R-3 zoning designation is a medium density district with standards to assure the provision of adequate light and air. In addition, the property is surrounding on three sides by public amenities offering ample light and air including the 60- acre Story Mill Community Park to the west, the Spur Trail to the east and a multi-use trail running along the northern boundary. f. Will the new zoning have an effect on motorized and non-motorized transportation systems? How? Yes. The proposed R-3 zoning will allow the subsequent development of a medium density residential neighborhood which will impact both the motorized and non-motorized transportation systems. In terms of cars, future development applications will require an analysis of impacts which will be proportionally tied to mitigation requirements by conditions of approval. Note the recent improvements to Bridger Drive (arterial) and planned improvements to Story Mill Road (collector) as well as the planned improvements to the intersection of these two roads. The Trust for Public Land and HRDC will determine how best to coordinate the Streamline bus routes with the park and any future neighborhood. In terms of non-motorized transportation systems, this property is extremely fortunate to be so well connected to the trail system. It is close to the Story Mill Community Park which includes extensive public trails, the Story Mill Spur Trail which connects to the Northeast Neighborhood, the trail in the open space to the east which heads north to the East Gallatin Recreation Area, and the Main Street to the M route along Bridger Drive. Future residents will have unmatched opportunities to walk and bike for recreation and commuting. The proposed R-3 zoning is a good underlying designation to lay a framework for a future pedestrian-oriented and pedestrian-scaled neighborhood that will add to the greater system with public internal trails and sidewalk connections. 497 g. Does the new zoning promote compatible urban growth? How? Yes. The existing zoning designations (R-4, R-2 and B-1) are the direct products of a failed and long expired mixed use development plan which counted on a large number of residences (1,200 units) to support the acreage originally planned for commercial uses. The presence of a dedicated city park increases the amount of visitors to the area but reduces the potential residential density to support a neighborhood commercial node. The proposed R-3 zoning promotes a more compatible urban growth pattern with medium densities and diversity of product types creating an appropriate transition from Downtown through the Northeast Neighborhood and industrial areas to the larger- lot single-family subdivisions up Bridger Drive. Compatible development is defined in the Unified Development Code, Section 38.700.040, as “The use of land and the construction and use of structures which is in harmony with adjoining development, existing neighborhoods, and the goals and objectives of the city’s adopted growth policy. Elements of compatible development include, but are not limited to, variety of architectural design; rhythm of architectural elements; scale; intensity; materials; building siting; lot and building size; hours of operation; and integration with existing community systems including water and sewer services, natural elements in the area, motorized and non-motorized transportation and open spaces and parks. Compatible development does not require uniformity or monotony of architectural or site design, density or use.”1 All of these elements are essential components of a quality neighborhood and will be considered as part of any subsequent development application. h. Does the new zoning promote the character of the district? How? Yes. The Story Mill Community Park has changed the character of the district and set a high standard of development for this entire redevelopment area. As previously noted, the addition of a residential neighborhood will improve the park by increasing daily users and creating a more active edge along the park’s western boundary. The Story Mill Historic District, located to the south and southeast of this property, provides a unique historic character for the area. R-3 zoning on the subject property will provide a framework for compatible new construction with an appropriately scaled residential neighborhood that can support any future redevelopment plan for the Mill properties. i. Does the new zoning address the affected area’s peculiar suitability for particular uses? How? Yes. For many years (until 2008), this property has been used for residential purposes. The zoning was changed to accommodate a project that never came to fruition. Returning to the historic residential use in a time when housing, and particularly a variety of housing types for different income levels, is greatly needed will help our community. The subject property is suitable for uses allowed in the R-3 zoning district. j. Was the new zoning adopted with a view to conserving the values of buildings? How? Neutral. There are no remaining buildings on this property. Unfortunately, the Bridger View Trailer Park was removed in 2008 to make way for a development proposal that never occurred. In terms of the buildings on adjacent properties, the new zoning will not have any measurable impacts on values. 1 Unified Development Code, 38.700.040 498 k. Does the new zoning encourage the most appropriate use of land throughout the jurisdictional area? Yes. The 2018 Demographic and Real Estate Market Assessment (EPS Report) discusses the need for long-term affordable housing because most of the job growth in Bozeman is at wage levels less than $16 per hour which further increases the demand for income restricted affordable and market rate attainable housing. Conversely, on the retail growth side, the report states that: “retail development does not need to be a priority for the City.” 2 The proposed R-3 zoning will encourage a variety of housing types to serve the diverse needs of households, helping address affordability challenges. R-3 is the most appropriate use of land throughout the jurisdictional area because it returns the property to an appropriately scaled residential neighborhood that complements the park, is respectful to surrounding existing neighborhoods and will support future development on commercially zoned land to the south and southeast. 2 2018 Demographic and Real Estate Market Assessment (EPS Report), Page 3 and Page 5 499 Glen Lake Park MANLEY ROADStory Mill Community Park Community Center Future Food Bank Homeless Shelter Resource Hub Gas/ Convenience Store GRIFFIN DRIVE NORTH ROUSE AVENEIGHBORHOOD Miniwarehouses Coffee Offices, Services, Restaurant Brewery I-90 Rail road Headlands PUD HILLSIDE LANE Lawson'sGreenhouse Story Mill Spur TrailL STREETStory Hills Trail System Filling Station Legends Mount Baldy Subdivision BRIDGER DRIVE Cannery District Fairgrounds BIRDIE DRBRIDGER CENTER DRStory Mill Historic District Bridger View Redevelopment GRIFFIN DRIVE STORY MILL ROADPath to the "M" BOND STREET GOLD STREET10-MINUTE WALK Vet Gym- nasitics Linear Park/TrailAMR Mergen- thalther NW Energy Bus Barn Cross Fit Food Bank Hillside Lane Neighborhood 500 PLS Plans and Specifications PLS Page 1 of 4 Revision Date 5-1-17 Required Forms: Applies to all applications Other Forms: None. PLANS AND SPECIFICATIONS INTRODUCTION In order for city staff to efficiently review your project in a timely manner, the application materials and the plan sets submitted must be clear, complete and thorough. This handout provides additional details for the application requirements outlined in the project checklists. If the requirements of this handout are met with your application it will minimize the delays that can occur when an application is unclear, incomplete or not formatted correctly. These requirements are mandatory. If the application materials do not meet these standards they will require correction, which will delay your project. GENERAL PLAN REQUIREMENTS 1. All plans and drawings must be accurately drawn, using a conventional scale such as 1:20 or 1:1/4, and with only one scale per sheet. Details may contain a separate scale if clearly labeled. 2. All text and annotations should be at a font size to enable it to be easily read – 10 point or more. Many plan sets require that 11” x 17” plan sizes be submitted. The text and annotations on plans that size must be readable when printed at that size. If plans are unreadable at the 11” x 17” size, they will not be accepted for review. 3. Plan sizes must meet minimum and maximum size requirements. No plans outside of the stated sizes will be accepted. 4. Plans/drawings must not contain disclaimers such as “Not to Scale” and “Do Not Scale.” (perspectives excepted) and drawings must be drawn true to the stated scale(s). 5. Plans must not contain disclaimers such as “Preliminary” and “Not for Construction.” 6. Provide all relevant measured dimensions annotated on the plans/drawings. For example label typical dimensions of parking spaces, drive accesses, drive aisles and sidewalks. 7. Consistent detailing. All existing and proposed site plan elements (e.g., sidewalks, parking spaces, fire lanes, building foot prints, etc.) must be labeled (unless a legend is provided) and dimensioned (unless a detail is provided). 8. The clearest way to present proposals is to group “existing” and “proposed” drawings side by side, using the same scale for both. 9. Each sheet and/or drawing must have a title box with the drawing name, sheet number and date clearly visible in bold. If sheets are updated or revised a new date must be applied to the sheet. For example, the civil utility plans might be labeled: C2.0 Utilities 05-01-2017. This is important as this will also be the digital file name. See naming protocol below. 10. The use of a title sheet for all general information, project team, data, calculations (parking, parkland, open spaces, and table of contents is required. The title must appear in bold letters across the top of the cover sheet. If the site plan includes a conditional use include the words “and Conditional Use.” 11. If the project is part of an existing development the name of the existing development must appear in the title. For example, “Arbys at Bozeman Gateway” or “Building K at the Cannery District.” 12. The vicinity map with zoning must be on the cover page. 13. A table of contents or plan schedule for all sheets in the plan set must be included on the title sheet with a date for each sheet. If revisions are required, the title sheet must be updated to reflect all revised sheets with a new date. 14. Fully annotated plans and drawings are more understandable, e.g. if a line is shown on the plan between two properties or other conditions such as easements, it must be annotated by adding descriptors to clarify the site condition. 501 Plans and Specifications PLS Page 2 of 4 Revision Date 5-1-17 Required Forms: Applies to all applications Other Forms: None. 15. A legend for all line types and symbols must be included on plan sets. 16. The plan sheets must not be overly congested with line types. When in doubt produce an extra sheet that separates the information. For example, produce a separate utility and easement sheet for utilities to clarify that information if the overall site plan contains too many lines and line types. 17. In general, the plan sheets are where most project information must be included. Separate cut sheets, exhibits, and summary tables on 8 1/2” by 11” will not be accepted. The only exception is for project narratives, property owners’ association documents, SID documents, easements, agreements, maintenance plans, water rights information, payback district information, contracts, deeds, weed plans, and standalone technical reports such as traffic studies, wetland reports, sewer and water reports, environmental, etc. PARKLAND TRACKING REQUIREMENTS 1. Parkland tracking on plans is required in 38.27.020BMC. This only applies to projects with residential development or residential units. 2. Documentation of compliance with the parkland dedication requirements of Section 38.27.020, UDC must be provided with the final plat, preliminary plat layout (park site plan) or individual development site plan (if previously subdivided). A parkland dedication tracking table showing the parkland requirements for the overall subdivision and the method of meeting the parkland dedication shall be included on the site plan. The table shall explicitly state how much parkland acreage, cash-in-lieu, or value of improvements-in-lieu was approved and allocated, as well as what is being proposed, for each lot of the subdivision or site development. 3. If residential development, each phase, lot or individual site plan of the development must have a copy of the parkland dedication tracking table provided below included on the site plan. Contact the Parks Department if you have questions on how to fill out the table. 4. If improvements in lieu are proposed for an existing park within the subdivision, a detailed park improvement site plan, including layout and product manufacturer cut sheets with a cost estimate for all improvements must be provided for Parks Department review. The Parks Department will provide a comparison chart indicating the value of code-required basic improvements versus proposed improvements. 5. Unless previously provided, provide the appropriate waiver of protest for future park maintenance district statement on the plat or site plan. Contact the Parks Department if you are uncertain if a waiver has been granted. 6. The parkland dedication tracking table that must be included on plans is as follows. If you have questions on how to fill out this table contact the Parks Department. PUBLIC PARK LAND DEDICATION TRACKING TABLE CURRENT PREVIOUS PHASES SUBDIVISION NAME: _______________________ PROJECT NAME: ___________________________ TOTAL FOR SUBDIVISION THIS PROPOSAL PHASE / LOT ___________ PARK DED AC CIL &/OR IIL PHASE / LOT __________ PARK DED AC, CIL &/OR IIL PHASE/LOT* __________ PARK DED AC CIL &/OR IIL NUMBER OF RES. UNITS PER PHASE / LOT / SITE PLAN: ACREAGE PARK LAND AND / OR CIL REQUIRED: ** VALUE OF IMPROVEMENTS IN LIEU PROPOSED: $___________________ VS. VALUE OF CODE-REQD. BASIC PARK IMPROVEMENTS: $___________________ (ATTACH COMPARISON CHART SPREADSHEET) ACREAGE PARK LAND PREVIOUSLY DEEDED TO COB: 502 Plans and Specifications PLS Page 3 of 4 Revision Date 5-1-17 Required Forms: Applies to all applications Other Forms: None. COLOR AND MATERIAL PALETTE 1. Color and material palettes are required for all new buildings and structures. A color and material palette must include all the proposed exterior building materials for all structures and site details. 2. The exterior building materials must include all siding, trim, roofing, windows, stairways, doors, balconies, railings windows, storefront, glass/glazing, walls, mechanical screening, trash enclosures, accessory equipment enclosures (generator, etc.), awnings and other architectural elements. 3. For smaller less complex projects that are using readily known building materials, a color and material palette may be presented in color on an 11” x 17” sheet that includes a color picture of the material and the specification. Each material must be keyed to the building elevations. 4. For larger, more complex projects the palette must be presented on a physical board with samples of the proposed building materials in their proposed color. Each sample must have a specification and be keyed to the building elevations. 5. Color perspectives that depict the building accurately and with the proposed building materials are encouraged to be submitted with each application. The color perspective does not satisfy the color and materials palette requirement. APPLICATION SETS 1. Application sets are independent sets of information that include one copy of all information submitted with the application. 2. Application sets that include legal documents, letters, technical reports, narratives, studies and other documentation in addition to plan sheets must include a copy of each item in each application set. All documentation of this type must have a visible and clear date of preparation on the front sheet of the document or study. 3. Three total sets of all information are required with most applications. Two of the sets must include full size plans, one set may include 11” x 17” plans. Full size plan set sizes must not exceed 24” x 36.” 4. Application sets must be bound and two hole punched at the top of the page. Three ring binders with three hole punch are not accepted. 5. If 11” x 17” plans are included, do not trifold them. Fold them in half, then fold the right half back on itself at a 45 degree angle in order to accommodate a two hole punch at the top. Plans must be accessible to be unfolded when bound in a two hole file. 6. Application sets should be organized and collated in the following general order 1) cover sheet/routing sheet 2) applications and checklists; 3) narratives/responses/photographs; 4) legal docs: CC&R’s, easements, deeds, agreements, CIL water rights, etc.; 5) plans; 6) appendices: standalone technical reports 7. Project narratives and responses must not be overwritten or provided on the application checklists. If responding to a checklist item provide a response on a separate document. 8. Plans must be grouped by discipline: Civil, Architectural, Landscape and Electrical/Lighting. 9. All plans must be stapled together and folded to a final size of 8 ½” x 11” or 8 ½” x 14”.If the plan set is large the plans must be stapled into sets by discipline and folded independently. State law requires us to keep a full size paper copy of all plans in our files. The plan sets must be folded so that they can be filed in the project archives. ACREAGE PARK LAND YET TO BE CONVEYED: PARK MASTER PLAN APPROVAL DATE: ______________ * INDICATE ADDITIONAL PHASES AS APPLICABLE **SHOW ACTUAL CALCULATIONS 503 Plans and Specifications PLS Page 4 of 4 Revision Date 5-1-17 Required Forms: Applies to all applications Other Forms: None. DIGITAL COPIES AND NAMING PROTOCOL The city requires digital copies of all planning applications in order to produce cost savings, eliminate paper waste and enhance the flow of information between the city, external agencies, neighborhoods and the applicant. The digital copy must include a copy of all documents and plan sheets submitted as part of the application. The following requirements apply to digital copies. 1. Two digital copies are required with most applications. The copies may be on CD or on a USB drive. 2. The digital copies must be separated into three categories: Documents, Plans and Appendices. 3. Naming protocol. Each individual document or plan sheet must have a proper name and date. The name should be easily understandable. Groups of plan sheets or document sets with multiple types of documents will not be accepted. Plan sheets must include the sheet number. For example a document might be labeled “A1 Development Review application 05-01-2017” or “City Parkland Deed 05-01-17.” Plan sheets are required to be listed individually. For example a plan sheet might be labeled “A300 Floor Plan level 1 and 2 05-01-2017” or “PM Photometric Plan 05-01-17.” Do not include other tab, section or other references in the digital file names. 4. No individual files will be accepted that are larger than 5 mb. Files that are larger must be broken down into smaller files. 5. Label all CD’s with the project name and date. Attach a small tag to all USB drive with the project name and date. CONTACT US Alfred M. Stiff Professional Building 20 East Olive Street 59715 (FED EX and UPS Only) PO Box 1230 Bozeman, MT 59771 phone 406-582-2260 fax 406-582-2263 planning@bozeman.net www.bozeman.net 504 505