Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
008.4-A1-03 - TRIPLEX ROOF PLAN 4-1-2019
13 D C B A 4 2 3" / 1 2 " 3 " / 1 2 " 3 " / 1 2 " 3 " / 1 2 " 3 " / 1 2 " 3 " / 1 2 " 3 " / 1 2 " 3 " / 1 2 " 3" / 1 2 " 3" / 1 2 " 3" / 12" 3" / 1 2 " 3" / 1 2 " 3" / 1 2 " 3" / 1 2 " 3 " / 1 2 " 3" / 1 2 " 3" / 1 2 " 3" / 12"3" / 12" 3 " / 1 2 " 3" / 1 2 " 3" / 12" 3" / 1 2 " dzyn2architectscopyright 2018 dzyn2 architects, pllc drawings shall not be modified, copied, or used for purposes other than their intended use, without prior written consent from dzyn2 architects, pllc verify scale noted on drawings, as size reduction will affect scale of drawings REV:PROJECT NAME:Michael E. Pentecost, AIA P.O. Box 10866 Bozeman, mt. 59719 Ph −406 −586 −5896 Fax −406 −566 −5782ADDRESS:OWNER:LEGAL:A1.03ROOF PLAN2338 GALLATIN GREEN BLVD BAXTER MEADOWS GALLATIN GREEN TRIPLEX − BLDG. 2 DESIGN REVIEWDUCK CREEK, LLC & TJ HOLDINGS, LLC BAXTER MEADOWS SUB., BLOCK14, LOTS 3 & 4, PHASE 2C 8−20−18 TRIPLEX 1/ 4 " = 1 ’ − 0 " 1 RO O F P I T C H P L A N