Loading...
HomeMy WebLinkAboutSht C2.1 - Civil Details 03-05-19 w ti ¢ I � I REGULATORY SIGN 3 PER MUTCD m 1 SIGN BLANKS MOUNTED STANDARDS, z BACK TO BACK ON POST SIZE = 24%24" 0 2"-4" CLEAN ROUND ROCK SPLASH PAD OVER NON-WOVEN 2' (MIN) POST(144 GAUGE) QUARE TUBE GEOTEXTILE FABRIC FASTEN POST TO SLEEVE WITH %6" CORNER BOLT(A325) 1 J¢" ABOVE FINISH GRAGE. z FINISH GRADE INSERT BOLT HEAD FROM OPPOSITE SIDE OF g r2' EXPECTED IMPACT. INSERT DRIVE RIVET INTO > 2" PREFORATED L OPPOSITE SIDE. I POST DETAIL SQUARE TUBE 4" (TELSPAR 7' (MIN)C2.1 RIP RAP SWALE OR APPROVED 2 Ya" X 30" 12 GAUGE NTS EQUAL) NON-SLEEVE (TEDLSPARARQU K BE SIGN POST BACK OF CURB PUNCH" OR APPROVED EQUAL) 24" o VARIES 12' FLOWLINE INSERT SIGN POST 18" INTO SLEEVE 1-1 SOLID COVER L EXPANSION JOINT ' NTq,y SIDEWALK �9"� M-4000 CONCRETE ANCHOR CHRIG G. w eUaers � a z SIGN POST FOUNDATION DETAIL R PE U 0�J ASS/ONAL E.' z x 0 w ATTACH SIGNS TO POST WITH �" DRIVE RIVETS (MIN. 2 PER SIGN) w � a o x DRAWN BY: CGB w a EXPANSION JOINTS 3 DETAIL REVIEWED BY: BLB 1.5Al I C2.1 TYPICAL STOP SIGNAGE PROJECT ENGINEER:CGB n� 6" N.T.S. DESIGNED BY:CGB VARIES 10' CONCRETE DROP CURB NORMAL CONCRETE SLOPE BOTTOM 6" TOP SOIL CHANNEL HEAD GUTTER LINE TOWARDS OUTLET. SEE 4 GRASSED SLOPE GRADING PLAN FOR I� DETAIL IIII-11I-11I-_-_ 1 4 - I=11I-'IIIIII-I b -III-III- VARIES =III=III=III=III_'I I�111I III II III I II II I I I1=1 11=1 11=1 11= � -I 11=1 11=1 11=1 11=1I 1=_ -III-III=1I1=1I1=1 I1=1 I I-I- I-I I 1=1 -111-11-L=L=III=III-I' =1I1=1 I1=1 1=1 1=1 1=1 1=1 1=1I1=1I1= -I I1=1I1=1I I-III-III-III-I 1=1I 1= IFCO STYLES (SOLID COVER) TRENCH GRATING '1=III=III=III=III=III=III=III=III=III=III=III- WITH S -III=III=III=III=III=11 III=III=III=III=III-1'STYLE B FRAME, D&L FOUNDRY"J SERIES" -IILIII;III=III=III=III=III=III=III=III=III=III= -III=III=III=III=III=III=111 -III=III=111J11= WITH SOLID, BOLT DOWN COVERS OR APPROVED EQUAL -111i III=III=III=III=III=III=III=III=III=11KI1111111111111111111111111111111111111111111�11-III-III=III=III=III=III=III=III- --11 -- ( ) 11-I 1=1 1=1 1=1 1=1 1=1 I1=1 1=1 1=1 1= -- =1 1=1 1=1 1=1 1=1I1=1 1=1 I�I- - =1 I1=1 1=1 1=1 1=1 1=1 1=1I1=1I1=1I K 1 I 1== = 1I I I I-III-I 1 1=1I1=1I-1I1=1I1=1 1=1 1=1 1=1I1=1' �a =I I-III=1I1=1I1=1 I1=1 11=1 11=1 11= I I II I II I II I111 II 111I111 II 111 I II I I I I 1=1 11=1 I I-1=1 11=1 11=1 I =1 1=1 1=1 1=1 1=1I1=1I1=1I K-=-= _ _ =1I1=1I1=1I Iq 1=1I1=1I IIf� 111=111-111-111-�-L- —AI-III=III=III=III=III=III-I_I11=ll=ll=ll=lll=lll=L=ll NATIVE MATERIAL I11-111-1I p1 11=1 11=1 11=1 11=1 11=1I1=1I1=1I Iq 11=1I I-III-I I1=1I I-III-III-III, IFCO STYLES (SOLID COVER) TRENCH GRATING III11111111111111111111111II11=III=III=11-III=III=III=III=III=III=III-1=III=III=III- I-III-III-III- WITH STYLE B FRAME, D&L FOUNDRY% SERIES" _=III=III=11�111=III=11 KI11=III=III=III=III=III=III=111q 11=III=III=11111 AI=III=III=11 op3 WITH SOLID, BOLT DOWN COVERS (OR APPROVED EQUAL) I�d MPX• FLOWLINE 0 0 0 0 0 0 0 0 0 0 o do GRAVELS NATIVE C� 4 1 h �I .5%MIN. 6„ I I I�I4" BASE COURSE DETAIL�- AS REQUIRED-{--T.5' F�5' BOULEVARD�2'-0"-i SIDEWALK CURB & GUTTER czJ STORM WATER]BASIN DETAIL PER STD. DRAWING N.T.S. 02528-1 SECTION B - N.T.S. OUTLET CHASE 4" THICK P.C.C. SEE SITE PLAN SIDEWALK IFCO STYLE S (SOLID COVER) TRENCH GRATING EXPANSION WITH STYLE B FRAME, D&L FOUNDRY"J SERIES" JOINT WITH SOLID, BOLT DOWN COVERS (OR APPROVED EQUAL) b r SIDEWALK 3" COMPACTED CRUSHED 16 5„ -e M � I� i�ROCK BASE o o4y 6 14 6 6' 1 IIII COMPACTED SUBGRADE C7 BASE COURSE O `� 6" NOTES. a _ CONCRETE SHALL BE M-4000 1. CONCRETE DEPTH FOR STD. SIDEWALKS SHALL BE 4" MIN. BASE 2. SIDEWALKS SHALL SLOPE TO BACK OF WALK AT 2%. - �" COURSE COVERS MUST BOLT DOWN TO FRAME 3. CONCRETE SHALL BE 4,000 PSI ®28 DAYS. - 4" MIN. 4. CONTRACTION JOINTS SHALL BE PLACED PER O.O.B.STDS. ® H 5. EXPANSION JOINT MATERIAL SHALL BE PLACED PER C.O.B.STDS. oc SECTION A - N.T.S. _ c DETAIL � cz.l CONCRETE SIDEWALK z DETAIL NTS cz.l CONCRETE STORM DRAINAGE SIDEWALK CHASE SHEET C2.1 CIVIL DETAILS LITTLE COTTAGE PROJECT:17-106 DATE:03-05-19