Loading...
HomeMy WebLinkAboutSht C2.0 - Civil Details 03-05-19 SPILL CURB o AND GUTTER CATCH CURB -� VARIES. SEE SITE PLAN AND GUTTER / - - -L J� \4 )1 24" DIA. FRAME AND o 0 3 GRATE CAST INTO LID OVERFLOW. 4826.25 00 00 KITi ul�ll9 u�lr ---- - b ` \ _ \ AND CENTERED IN TOP F o0 00 F W III�IT ThTI W °;y� ' FUTURE RIM. 4827.75 00 c (n III�II TI -II II 111i TrIT IT I IF � .' SIDEWALK o0 00 w u -u-uTninl u I ala aT!=_T -�Te elT-IT�I 3" ASPHALT FUTURE o 0 -- CONCRETE BOULEVARD a o 6" CRUSHED v �� ROCK BASE 6" MIN. II DETAIL9" PIT RUN r 4.• SUBGRADE C2.0 TYPICAL DRIVE LANE CROSS SECTION COMPACTED 60" DIAM. 24" DIA. FRAME AND NTS SUBGRACE NON-SHRINK GRATE CAST INTO LID FLOW GROUT(TYP) AND CENTERED IN TOP WEIR TOP VIEW 12"W X 18H CREST GRATED OPENING. INVERT F W 10 4824.1 GRATED INVERT 4824.3 18" SUMP z 5.4" (0.45') ° o>" ° REINFORCED 24" - 6 24" OUTLET PIPE. WEIR WALL y" INV OUT 4821.4 � 2" DEPRESS CURB TO THIS LINE REINFORCED ONTANq FOR CURB DROP. WEIR WALL a e= 4•• TOPSOIL a 3"R SPILL CURB L (TYP.) _K 4"R CATCH CURB 4.5" SECTION VIEW FLOW PE w F W Ho. �Ss�avn� 5 - 3/4":1' + 12"W X 18H +/z's.oae 1.5" �� GRATED 12" - - - - - �" " OPENING. DRAWN BY: CGB 24" OUTLET 7.5 PIPE em REVIEWED Y: BILE E IEWED B " STEEL POST MARKER PROJECT ENGINEER:CGB III __------- --- BLUE PAINT WEIR WIDTH. 0.75" DESIGNED BY:CGB 0_0 o_� - - - - PLAN VIEW CRUSHED GRAVEL •) BASE - 3" MIN. " ': '' ': '°' ` FUTURE F DETAIL POND OUTLET]FLOW CONTROL STRUCTURE STREET BOULEVARD 4' NTS SUB BASE COURSE SURFACE FUTURE GROUND I I AS REQUIRED SIDEWALK SURFACE COMPACTED SUBGRADE - ' CURB BOX )� � NOTES: 1. SUBGRADE AND SUB BASE COURSE COMPACTION SHALL CONFORM TO SECTION 02234 (MPWSS) PROVIDE 5' STATIONARY VARIES-7DETECTABLE ROD IN ALL CURB BOXES WARNING 2. CONTRACTION JOINTS SHALL BE PLACED AT 10' INTERVALS AND SHALL HAVE A MINIMUM DEPTH OF 3/4" SURFACE / \ AND MINIMUM WIDTH OF 1/8". 6 1/2' MIN. NO LIP / 7: 2� \\ COVER 3. 1/2' EXPANSION JOINT MATERIAL SHALL BE PLACED AT ALL P.C.S, P.T.S, CURB RETURNS AND AT NOT - / \ ® 0 b MORE THAN 300' INTERVALS. THE EXPANSION MATERIAL SHALL EXTEND THROUGH THE FULL DEPTH OF THE - - / ;p::'E[;;;;;[;;;[[ \ CURB AND GUTTER. SEE DETAIL 8' C� �+ MIN. 3" OF 1" ..................... (TYPICAL EXCEPT IN SPECIAL 18"I- 4. CONCRETE SHALL BE CLASS M-4000. BELOW SECTION THROUGH RAMP CRUSHED ROCK BASE CIRCUMSTANCES WHERE CITY HAS CURB STOP TAP BY APPROVED ALTERNATE LOCATION) 6' 5. CRUSHED GRAVEL BASE SHALL MEET THE REQUIREMENTS OF SECTION 02235 (MPWSS). CONTRACTOR NOTES: NOTE,. 1. TEXTURE TO MEET LOCAL CODE WINGS AT 18" FOR RAMPS IN r�r� 2. ALL RAMPS AND ACCESSWAYS SHALL CONFORM TO LINE WITH SIDEWALK, 6' FOR DETAIL THE AMERICANS WITH DISABILITIES ACT(ADA). V RAMPS IN LINE WITH WALK Cz.O INTEGRAL CONCRETE CURB&GUTTER WATER MAIN r - PARALLEL RAMP ON TANGENT C.O.B. STD. DWG. NO. 02528-1 N.T.S. NO COUPLINGS OR OTHER JOINTS ALLOWED ON SERVICE PIPE FROM BASE p~'q CORP. STOP TO CURB STOP FOR 3/4" AND 1" SERVICES. STRAIGHT MATERIAL ���AI� kd COPPER PIPE SHALL BE USED FOR 1 1/2" AND 2" SERVICES / V cz.o ADA ACCESSIBIILITY RAMP NTS DETAIL OF A CORPORATION o PROPERLY STOP SELECT MATERIAL BACKFILL AREA �1 INSTALLED (SEE SPECIFICATIONS) b GREEN STEEL CORPORATION FUTURE POST AT END 4. STOP 7 . TAP TOOLED JOINT(1" DEEP) BOULEVARD OF SERVCIE STREET MAIN AT ,i% 1" DIA. MIN. CONCRETE SIDEWALK AND SURFACE FUTURE GROUND SPRINGLINE. SERVICE PIPE CURB BROOM FINISH SIDEWALK SURFACE SEE SITE PLAN SIDEWALK THICK P.C.C. SIDEWALK 1' r COMPACTED BACKFILL 2.5' 1 3 6" IN. JII (SEE SPECS.) - ° 8 BOTTOM " (TYPICAL EXCEPT IN SPECIAL ��� /_�� i / � 3" COMPACTED CRUSHED W .. ACIRCUMSTANCES PPROVED ALTERNATE LOCATIONS 2" X 2 ���i ����\��������� ���� ���� ��'- - ROCK BASE 3" COMPACTED F-� non ' ✓i��/ / /ice/ice CRUSHED A�� `�,, - ROCK BASE b [� WOOD GENERAL NOTES: -' - COMPACTED SUBGRADE MARKER II I I I I II I I � COMPACTED SUBGRADE 1. WATER SERVICE LINES SHALL HAVE A MINIMUM 6 1/2 FOOT COVER MEASURED FROM THE EXISTING GROUND SURFACE, NOTE; o 45* SERVICE LINE. SLOPE = 1/4" PER EXCEPT THAT COVER SHALL BE MEASURED FROM CENTER LINE STREET GRADE WHEN SERVICE LINES ARE LAID TO A - - -III-III-III-III-III-IIh ELBOW FOOT MIN., 1/2" PER FOOT MAX STREET SIDE WHICH HAS AN UPHILL SLOPE. WATER SERVICE LINES SHALL HAVE A MAXIMUM 7 1/2 FOOT COVER AT REFER TO LANDSCAPE PLAN(A-002)FOftJOINT LAYOUT - cq CURB STOP. �y� W SEWER 2. WATER SERVICE LINES SHALL BE INSTALLED WHERE SHOWN ON THE DRAWINGS OR AS SPECIFIED. cq TOOLED CONTROL JOINT DETAIL - U N o 3. BEDDING SHALL BE 1" DIA. MAXIMUM WITHIN 6" OF SERVICE PIPE. NOTES: AIN 4. INSTALL CURB STOP SO THAT OPERATING KEY IS PARALLEL TO STREET IN OFF-POSITION. 1. CONCRETE DEPTH FOR STD. SIDEWALKS SHALL BE 4" MIN. _ DETAIL 2. SIDEWALKS SHALL SLOPE AWAY FROM STRUCTURES AND BUILDINGS AS PLUG S 1L9JL',�!"r,IIL SHOWN ON GRADING PLAN. MAXIMUM CROSS SLOPE- 2% o b 3. CONCRETE SHALL BE 4,000 PSI 0 28 DAYS. IN LINE WYE FITTING FOR NEW INSTALLATIONS. Cz.O WATER SERVICE LINE 4. CONTRACTION JOINTS SHALL BE PLACED AT 5' INTERVALS SADDLE FITTINGS ALLOWED FOR EXISTING C.O.B. STD. DWG. NO. 02660-6 5. EXPANSION JOINT MATERIAL SHALL BE PLACED AT 50' INTERVALS INSTALLATIONS ONLY UPON APPROVAL OF CITY �I OF BOZEMAN SEWER DEPARTMENT. a �q SERVICE INVERT NO LOWER THAN SPRING r ' 'DETAIL a LINE OF SEWER MAIN FOR WYE FITTINGS. c2.o CONCRETE SIDEWALK r SHEET DETAIL N.T.S. cz.o SANITARY SEWER SER'I,ICE LINE CIVIL DETAILS C.O.B. STD. DWG. NO. 02730-2 LITTLE COTTAGE PROJECT:17-106 DATE:03-05-19