Loading...
HomeMy WebLinkAboutSht A2.4 - Heron Sections 05-23-19 ?SSD ARCS l� .�, TREVOR P.M. n 30YR.ASPHALT SHINGLES(PRE-FINISHED METAL ROOFING AT SOME LOCATIONS,SEE .4 PIERSON ELEVATIONS) • SYNTHETIC ROOFING UNDERLAYMENT over ARC CT • 5/8"058 over N 9 Q' ENGINEERED WOOD TRUSSES w/12"ENERGY HEEL @ 24"o.c.w/R-49INSULATION PROVIDE ICE&WATER SHIELD 2FEET FROM THE INSIDE OF THE EXTERIOR WALL AT ALL 9r Al EAVES 8,18'EACH SIDE OF EACH VALLEY O MOB BAFFLE TO MAINTAIN I"MIN.CLEAR VENT @ UNDERSIDE OF SHEATHING 2X BLOCKING EA.TRUSS BAY, HOLD DOWN 2'FOR ATTIC VENTILATION C9p PIE-FINISHED METAL DRIP O 1 X8 MIRATEC FASCIA W/ 1 X4 SHADOW BOARD,TYP, W 2'-0' 30'-0" 2'-0" _ SEISMICCLIP(SIMPSONHI, N w z ' or SIM)AT EA TRUSS-TYP Q z (2)2X10 HEADERS,U.N.O. W J Lu V l7 m Z m g 1/2'GWBover 12" Q - z VAPOR BARRIER 10"D a V O N m WINDOW,SEE FLOOR PLAN FOR TYPE&OPERATION, _J m 0 OWNER TO SELECT WINDOW BRAND&MATERIALS Z O m PREFABRICATED ROOF TRUSSES J O _ T_O.UPP�fl V'LL r 3/4"PLYWOOD SUBFLOORGLUED&NAILED _ _ T.O.UPPEfl WALL n �1 �TO 11-7/8'I-JOISTS @ 16'o.c:TYP I I F 2 7/8" v _ uj SPRAY FOAM URETHANE INSULATION AT RIM JOISTS,TYPICAL ALL FLOORS,31/4" MAX.THICKNESS BED NOTE:FOR MATERIALS 11-2 X 11.3 A, AND ASSEMBLIES,SEE BED 1 u-z x n 3 BED � DETAIL 2/A2.4 13-6X 11-4 117/8'RIM BOARD M _ UPPER LEVEL t1 u 44 111'-1 3/4" UPPER LEVEL I\ 111'-11 3/4"v - -- - _ LO.WALL T.O.WALL 110'-11/8" 110'-11/8" 1/2'GWB (2)2X10 HEADERS,U.N.O. 5 a WINDOWTRIM-TYP GARAGE GARAGE n-o x z3-6 t t-o x 23-6 KITCHEN MAIN LEVEL I� MAIN LEVEL _ _ 1-� 0v I=III =1 =1 =1 I=III=III 11 M 11: _ _ _ _ -III-I III-III-III-III-III CRAWL SPACE I= III T.O.FOOTING 95'-93/4�" T—°9n34 r $ WINDOW,SEE FLOORSELECT BRTYPEM AERIALS `x..�y..1 9 � OWNER TO SELECT WINDOW BRAND&MATERIALS I� o t/zGwBover nUPPERDECKSECTION I/2'GVAPOR Bover 1/4"=1'-0" 1 BUILDING SECTION 1/4"=1'-0" g SIDING(SEE EXT.ELEVATIONS)on `o AIR INFILTRATION BARRIER on d a 1/2'OSB SHEATHING on 2x6 WOOD STUDS @ 16"oc.w/ R-21 INSULATION ~ 31C PLYWOOD SUBFLOOR GLUED&NAILED TO 11J/8"I-JOISTS @ 16'o TYP W SET DOOM THRESHOLD IN MASTIC av 2X P.T.SILL PLATE W/SILL SEAL METAL FLASHING 2X6 STAINED REDWOOD, 42'MIN.GUARDRAIL $ SPACED TO DRAIN 2X6 STAINED REDWOOD,SPACED TO DRAIN LLI TAPERED P.T.SLEEPERS TAPERED P.T.SLEEPERS @ 16'Or- CA 1/2"c ia.ANCHOR BOLT w/3x3x1/4 PLATE UPPER LEVEL UPPER LEVEL ~ >E '� WASHER @ 48"o.c:TYP(BOLTS TO BE LOCATED NOT MORE THAN 12"OR LESS THAN 111'-1 3/4" F 7 BOLT DIAMETERS FROM PLATE SECTIONS)- EM BED III—III— EMBED 7'MIN EPDM MEMBRANE BRANE,EXTEND UP LLI BITUMINOUS DAMPPROOFING TO GRADE OR THRESHOLDHORIZONTAL 44 REBAR;(1)WIN 12"OF TOP AND(1) T..WA -v110' WAL@MID-HEIGHTOF WALLNOTE: METALGUTTER YWOOD,GLUE& -15MIN.INSUUTIONw/CONT.VAPOA VERTICAL WALL REINFORCEMENT.Y4 REBAR@48"O.C.UP 2X10DECK101ST OISTS BARRIER TO I.5'FROM TOP OF WALL. 1X4MIRATEC FOOTING TO WALL JOINT REINFORCEMENT:a4 REBAR@2' SC EWSWl 24"O.CN I'. EXTENDS UP INTO STEM WALL 14"MIN. SDS25312 SCREWS@ 24"O.C. ...I _ EVE BY OTHER JOINT REINFORCEMENT BAR MAY BE —III- REPLACED BY THE LONGER WALL VERTICAL REBAR, __ _ �CUPPER DETAILDETAIL n LEDGER DETAIL SECTIONS I III RESULTING INVERTS EVERY 24'FOR 110NTREINFORCEMENT. v , VAPOR BARRIER,OVERLAP "I. MAINTAIN SUPPORT ANDCOVER PER IRC R400217A. 1"=1'-G" 1° 1-� a F. III- REINFORCEMENT SHALL BE SECURED IN PLACE TO PREVENT JOINTS 6'MIN.&SEAL, _ DISPLACEMENT DURING CONCRETE PLACEMENT. EXTEND UP WALL 6"AND � I` -- ATTACHTOWALL '•° u.. 0. 16"x8'CONIC.FOOTING w/(2)a4CONT:TYP,VERIFY I IT _ III—III- WITH GEOTECHNICAL REPORT _���_��� = COMPACTED STHUCNRAL FILL UNDER a FOOTINGS PER GEOTECHNICAL RECOMMENDATIONS&REQUIREMENTS 2 WALL SECTION-2-STORY MAY 23,2019