HomeMy WebLinkAbout07-01-19 City Commission Packet Materials - C11. Res 5083, CO 4 with Williams Brother Construction for WRF Small Works Project Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Brian Heaston, Senior Engineer SUBJECT: Resolution 5083 Authorizing Change Order No. 4 to the WRF Small Works Construction Project MEETING DATE: July 1, 2019 AGENDA ITEM TYPE: Consent RECOMMENDATION: Approve Resolution 5083 authorizing Change Order No. 4 to the WRF Small Works Construction Project. BACKGROUND: Attached is Resolution 5083 and Change Order No. 4 for the above referenced project. The change order modifies the construction contract by adding in additional work necessary to complete the installation of the new condensing boiler on the WRF heat loop which was approved through Change Order No. 3. The approved FY19 budget includes a CIP project for the wastewater fund at $250,000 for the boiler addition (Project WW89 - ‘Heat Loop Optimization’. Change Order No. 3 increases the contract price by $11,689.00. FISCAL EFFECTS: The FY19 wastewater fund CIP includes project WW89 – Heat Loop Optimization, which is allocated $250,000. Change Order No. 3 amended the contract price for the WRF Small Works Construction project to $1,192,874.63, which added in $147,400 for the heat loop work. Change Order No. 4 amends the total contract price to $1,204,563.63, increasing the heat loop component of the contract to $159,089, which is less than the $250,000 funding available for CIP project WW89. Sufficient capital funding exists in the WRF budget to cover the total amended contract price. ALTERNATIVES: As suggested by the Commission ATTACHMENTS: Resolution 5083 Change Order No. 4 86 RESOLUTION NO. 5083 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, APPROVING ALTERATION/MODIFICATION OF CONTRACT WITH WILLIAMS BROTHER CONSTRUCTION, LLC, SPOKANE, WASHINGTON WHEREAS, The City Commission did, on the August 28, 2017, authorize award of the bid for the WRF Small Works Construction Project to Williams Brother Construction, LLC, Spokane, Washington; and WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such alterations or modifications of the specifications and/or plans of the contract be made by resolution; and WHEREAS, it has become necessary in the prosecution of the work to make alterations or modifications to the specifications and/or plans of the contract. NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana, that the proposed modifications and/or alterations to the contract between the City of Bozeman, a municipal corporation, and Williams Brother Construction, LLC, as contained in Change Order No. 4, attached hereto, be and the same are hereby approved; and the City Manager is hereby authorized and directed to execute the contract change order for and on behalf of the City; and the City Clerk is authorized and directed to attest such signature. 87 PASSED, ADOPTED, AND APPROVED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 1st day of July, 2019. ___________________________________ CYNTHIA L. ANDRUS Mayor ATTEST: _________________________________ ROBIN CROUGH City Clerk APPROVED AS TO FORM: ___________________________________ KAREN STAMBAUGH Acting City Attorney 88 89 90 91