HomeMy WebLinkAbout06-24-19 City Commission Packet Materials - C7. DURB TO DTN20-001 with Sanderson Stewart for Engineering and Design Services
CITY COMMISSION MEMORANDUM
TO: Mayor Andrus and City Commission FROM: Chris Naumann, Downtown URD Director
Downtown Bozeman Partnership SUBJECT: Downtown URD Term Contract Task Order DTN20-001 for planning, engineering, analysis and design services. MEETING DATE: June 24, 2019
AGENDA ITEM TYPE: Consent
RECOMMENDATION: Authorize the City Manager to Sign the URD Term Contract Task Order
DTN20-001.
TERM CONTRACT BACKGROUND: Following a competitive RFQ process, a team led by
Sanderson Stewart, also including A&E Architects, DCI Engineers, Walker Consultants, and CTC Technology and Energy, was awarded a term contract for urban renewal district
professional services on October 22, 2018. TASK ORDER BACKGROUND: The scope for this task order shall include miscellaneous
planning, engineering, analysis and design services to be provided on an as-needed basis at the request of the Downtown URD.
This scope aligns with the FY2020 Downtown URD Work Plan:
Professional Services Term Contract $75,000 budgeted
The intent of this term contract is to allow the URD to nimbly respond to needs for
professional services to implement this work plan and the Downtown Improvement Plan.
It will also allow the URD to respond to unanticipated issues. The professional services
will include but not be limited to engineering, architecture, urban planning, parking and
fiber consulting.
FISCAL EFFECTS: Sanderson Stewart will bill for its services on a time and materials basis according to the provided rate sheets. Funding to support this effort is included in the
Downtown Urban Renewal District’s FY 2020 work plan and budget that was approved by the
Downtown URD Board on May 29, 2019 and presented to the City Commission on June 3,
2019.
UNRESOLVED ISSUES: None.
ATTACHMENTS: The following documentation is included as a single attachment:
• Downtown URD Task Order DTN20-001
• Sanderson Stewart Term Contract Team Rate Sheets
Prepared by Chris Naumann and uploaded by David Fine.
47
Downtown Bozeman Urban Renewal District Term Contract
Task Order Number #DTN20-001
PROJECT: On-Call Miscellaneous Professional Services
Issued under the authority of Urban Renewal District Term Contract Professional Services Agreement with Sanderson Stewart for Architectural and Engineering Services.
This Task Order is dated June 12, 2019 between the City of Bozeman Downtown Urban
Renewal District (URD) and Sanderson Stewart (Contractor). The following representatives have been designated for this Task Order:
Downtown URD: Chris Naumann, Director
Contractor: Danielle Scharf, Sanderson Stewart
SCOPE OF WORK: The scope for this task order shall include miscellaneous planning, engineering, analysis and design services to be provided on an as-needed basis at the request
of the Downtown URD.
This scope aligns with the FY2020 Downtown URD Work Plan:
Professional Services Term Contract $ 75,000 budgeted
The intent of this term contract is to allow the URD to nimbly respond to needs
for professional services to implement this work plan and the Downtown
Improvement Plan. It will also allow the URD to respond to unanticipated issues.
The professional services will include but not be limited to engineering,
architecture, urban planning, parking and fiber consulting.
COMPENSATION: Sanderson Stewart will bill for its services on a time-and-materials basis
not to exceed $75,000.00. Sanderson Stewart shall submit invoices to the Downtown URD for
work accomplished during each calendar month. The amount of each monthly invoice shall be
determined on the “time-and-materials basis” according to the attached standard rate sheets for Sanderson Stewart and it’s subconsultants. Monthly invoices shall include, separately
listed, any charges for services for which time charges and/or unit costs shall apply. The
provisions of the Professional Services Agreement shall govern the Work.
IN WITNESS WHEREOF, the parties authorized to commit resources of the parties have executed this Task Order:
City of Bozeman Sanderson Stewart
Andrea Surratt, City Manager Danielle Scharf, Principal
Downtown URD
Chris Naumann, Director
48
CHARGE OUT RATES EFFECTIVE AUGUST 2018
At Sanderson Stewart, we strive to provide great customer service and value. While we can offer the
traditional method of billing by hourly charge rates, we strongly encourage our current and
prospective clients to consider a lump sum arrangement in determining your overall project
compensation. Fixed-fee projects can result in substantial savings over our posted hourly billing
rates and provide a level of certainty at the outset of your project.
STAFF PERSONNEL SERVICES
Expert Witness/Special Consultant $ 265.00 /hour
Principal $ 190.00 /hour
Senior Engineer $ 170.00 /hour
Project Engineer $ 115.00 /hour
Staff Engineer $ 90.00 /hour
Engineer Intern $ 65.00 /hour
Senior Land Planner $ 135.00 /hour
Land Planner $ 130.00 /hour
Right-of-Way Agent $ 135.00 /hour
Landscape Architect $ 125.00 /hour
Landscape Designer $ 80.00 /hour
Senior Professional Land Surveyor $ 130.00 /hour
Professional Land Surveyor $ 110.00 /hour
Staff Surveyor $ 95.00 /hour
Field Survey Technician $ 80.00 /hour
Marketing Director $ 125.00 /hour
Graphic Artist $ 100.00 /hour
Photographer $ 180.00 /hour
Web Developer $ 90.00 /hour
49
Sanderson Stewart
Charge Out Rates Effective August 2018
Page 2
Senior Designer $ 100.00 /hour
Designer $ 90.00 /hour
CADD Technician $ 80.00 /hour
Senior Construction Engineering Technician $ 110.00 /hour
Construction Engineering Technician $ 85.00 /hour
Construction Inspector $ 80.00 /hour
Project Administrator $ 70.00 /hour
Administrative/Clerical $ 65.00 /hour
SURVEY CREW SERVICES
1-man Crew/2-man Crew $ Per Job
OUTSIDE CONSULTANTS
1)At cost if independently billed direct to client.2)Cost plus 5% if billed through us.
INDEPENDENT LABORATORIES
1)At cost if independently billed direct to client.
2)Cost plus 5% if billed through us.
ADMINISTRATIVE EXPENSES
Administrative expenses (including copies, prints, phone, 3.5% *
postage, materials, and travel) based on professional services only
* unless modified by contract
9-7-18
50
2018 HOURLY RATES
Senior Principal $199
Principal $155
Senior Preservation Architect $155
Preservation Architect $125
Project Architect $120
Architect/Project Manager $105
Senior Construction Administrator $120
Construction Administration $105
Interior Designer $125
Designer $100
Interior Designer Intern $85
Intern Designer $85
Project Manager Assistant $75
Clerical $50
http://www.gsa.gov/portal/content/104877
Mileage 0.545 mile or government allowable rate
Per Diem $51 day or governement allowable rate
Printing - outsourced At Cost
Printing - in-house plotter $2.00 24 x 36 B/W
$3.00 30 x 42 B/W
$15.00 24 x 36 Color
$20.00 30 x 42 Color
$1.00 1/2 sized B/W (12 x 18)
$7.50 1/2 sized Color (12 x 18)
Printing - in-house copier $0.10 Page B/W Letter sized
$2.00 Page Color Letter sized
$0.25 Page B/W Ledger sized
$5.00 Page Color Ledger sized
Lodging At Cost
51
February 2018
SCHEDULE OF EXPENSES
DCI ENGINEERS
PROFESSIONAL SERVICES
Clerical and Administrative 1000 $50/hr Project Manager 3100 $100/hr Clerical and Administrative 1010 $60/hr Project Manager 3110 $120/hr Project Manager 3120 $140/hr Technical Designer 2000 $60/hr Project Manager 3130 $160/hr
Technical Designer 2010 $70/hr Technical Designer 2020 $80/hr Senior Project Manager 3200 $120/hr Technical Designer 2030 $90/hr Senior Project Manager 3210 $140/hr
Technical Designer 2040 $100/hr Senior Project Manager 3220 $160/hr Senior Project Manager 3230 $180/hr Senior Technical Designer 2100 $80/hr
Senior Technical Designer 2110 $100/hr Associate 4000 $140/hr Senior Technical Designer 2120 $120/hr Associate 4010 $160/hr Senior Technical Designer 2130 $140/hr Associate 4020 $180/hr Senior Technical Designer 2140 $160/hr Associate Principal 4110 $160/hr Project Engineer 3010 $80/hr Associate Principal 4120 $180/hr Project Engineer 3020 $90/hr Associate Principal 4130 $200/hr Project Engineer 3030 $100/hr Project Engineer 3040 $110/hr Principal Engineer 4200 $160/hr Project Engineer 3050 $120/hr Principal Engineer 4210 $200/hr Project Engineer 3060 $130/hr Principal Engineer 4220 $250/hr
Project Engineer 3070 $140/hr Principal Engineer 4230 $300/hr Principal Engineer 4240 $300/hr REIMBURSABLE SERVICES
Original Plots and Architectural Plotting with Drawing Files
Copies and Architectural Plotting with Plot Files
Media Bond
Size A,B+C Size
Fee $4.00/Plot
Media Bond
Size A+B Size
Fee $0.20/Plot Bond D,E+E1 Size $7.75/Plot Bond C+D Size $1.50/Plot
Bond E+E1 Size $2.50/Plot Vellum A,B+C Size $6.00/Plot
Vellum D,E+E1 Size $11.50/Plot Color A Size $1.00/Plot Color B Size $1.50/Plot
Mylar A,B+C Size $10.00/Plot Color Scan to File $5.00 Mylar D,E+E1 Size $19.00/Plot
Out of Office Services/Expenses $1.10x Direct Cost Personnel Transportation $0.58/mile
52
STANDARD BILLING RATES
FOR BASIC SERVICES
Subject to annual adjustment on January 1 each year.
PRINCIPALS
Senior Principal ............................................................................................................................................. $305.00
Principal ......................................................................................................................................................... $255.00
PROJECT MANAGEMENT
Senior Project Manager ................................................................................................................................. $245.00
Project Manager ............................................................................................................................................ $210.00
Assistant Project Manager............................................................................................................................. $170.00
CONSULTANTS
Senior Consultant .......................................................................................................................................... $245.00
Consultant ..................................................................................................................................................... $210.00
Analyst / Planner .......................................................................................................................................... $170.00
RESTORATION CONSULTANTS
Senior Restoration Consultant ...................................................................................................................... $245.00
Restoration Consultant .................................................................................................................................. $210.00
Assistant Restoration Consultant .................................................................................................................. $175.00
Restoration Specialist ................................................................................................................................... $170.00
DESIGN
Senior Engineer / Senior Architect ................................................................................................................ $205.00
Engineer / Architect ....................................................................................................................................... $180.00
Designer ......................................................................................................................................................... $170.00
TECHNICAL
Senior Technician .......................................................................................................................................... $155.00
Technician ...................................................................................................................................................... $140.00
SUPPORT
Senior Administrative Assistant / Business Manager .................................................................................... $115.00
Administrative Assistant ................................................................................................................................. $95.00
53
CTC Labor Rates
CTC proposes to perform tasks for the City of Bozeman on a time-and-materials basis at the hourly rates
listed below.
Labor Category Contract
Rate
Director of Business Consulting $200
Principal Analyst $180
Senior Project Analyst $160
Senior Analyst $145
Staff Analyst $135
Communications Aide $80
Chief Technology Officer $200
Principal Engineer $180
Senior Project Engineer $160
Senior Engineer $145
Staff Engineer $135
Engineer Aide $80
Local travel is billed at current standard mileage rates. Non-routine expenses and long-distance travel are
recovered at direct cost with no mark-up.
54