Loading...
HomeMy WebLinkAboutC1.0 OVERALL SITE PLAN_05-10-19 LEGEND x EXISTING SPOT ELEVATION LP LOW—POINT x(100.00) PROPOSED SPOT ELEVATION FL FLOWLINE © EXISTING UG POWER BOX TBC TOP BACK OF CURB Q EXISTING TELEPHONE BOX SW SIDEWALK ❑U EXISTING UTILITY BOX FF FINISH FLOOR LS LANDSCAPE ® EXISTING SANITARY SEWER MANHOLE TOW TOP OF WALL © EXISTING STORM SEWER MANHOLE EP EDGE OF PAVEMENT O`0 EXISTING SANITARY SEWER CLEANOUT BOW BOTTOM OF WALL EXISTING FIRE HYDRANT Sheet 1 Of 3 EXISTING WATER VALVE EXISTING CURB STOP O m m E EXISTING POWER POLE [ c ° �mm b: EXISTING LIGHT POLE TO RAG Q EXISTING WATER WELL N W PROPOSED SANITARY SEWER CLEANOUT L �� _ m o TRAFFIC FLOW 10 C PROPERTY BOUNDARY LINE .� E ID o7 $ —SURROUNDING PROPERTY LINE e,. g..w g..w o g..w g..w g..w 1, C - Tn m SETBACK LINE m EASEMENT LINE 1V S S T �T e wgT ST T N u a x x xEXISTING FENCE hsiQ a Cm o a oeE EXISTING OVERHEAD ELECTRIC LINE N W = UGE EXISTING UNDERGROUND ELECTRIC LINE cns EXISTING GAS LINE ucr EXISTING UNDERGROUND PHONE LINE B w EXISTING WATER MAIN � 0'(TY.) LOC 4 ° EXISTING SANITARY SEWER MAIN -- ss — sr EXISTING STORM SEWER vvv sr PROPOSED STORM SEWER o ucE PROPOSED UNDERGROUND ELECTRIC LINE 5' m 45' a Gas PROPOSED GAS LINE Scale In Feet coMM PROPOSED COMMUNICATIONS LINE 30 0 30 �z� °� EXISTING CURB AND GUTTER BUILDING 9 0 9 J FUTURE BUILDING Scale In Meters n Contour Intervals: 1 Foot ,1 BL 3 LOT 1 Ln LEGAL DESCRIPTION m a LOT 4,BLOCK 3,FERGUSON FARM SUBDIVISION, CJl1L7 -- SE 1/4,SEC.10,T.2 S.,R.5 E.OF P.M.M., LLL �A CITY OF BOZEMAN,GALLATIN COUNTY,MONTANA co �a rn co co co co � SPECIFICATIONS EXISTING STORMWATER RETENTION PONDS 3QN� O ALL CONSTRUCTION SHALL CONFORM THE FOLLOWING SPECIFICATIONS WHICH ARE v a EXISTING PARKING AREA ... HE INCORPORATED BY REFERENCE: N s 1. MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS,SIXTH EDITION(APRIL 2010) 2. CITY OF BOZEMAN MODIFICATIONS TO MPWSS SIXTH EDITION INCLUDING O E AC PER PLAT. Ess,AND y1 ADDENDUMS(2017) DRAINA EASEMNT P • N f PARKING CALCULATION SHARED PARKING,ACCESS,AND N m DRAINAGE EASEMENT PER PLAT. O "O SEE MASTER PARKING TRACKING MECHANISM FOR CURRENT PARKING Z J SOIL STOCKPILE AREA CALCULATIONS/REQUIREMENTS. 4A MINOR `� FUTURE BUILDING BUILDING EXISTING SUBD. N0. 340 ^ H N BUILDING ACKNOWLEDGEMENT OF ACCESS REQUIREMENTS UNDER FEDERAL AND STATE OT 4 gSCRIMINATION LAWS(ARM 24301.9021 ti I/ 49 757 Sq. 1. ,, ,� KNOWLEDGE THIS ACKNOWLEDGES THETCATY OF BOZEMAN BUILT THE FOLLOWING DING DIVISION WECT WAS ILL ENOT REVIEW D WITH FOR �/ 1�1423 Acres 41 on LOT 2 COMPUANCE WITH,NOR IS RESPONSIBLE FOR ENFORCEMENT OF THE FEDERAL SECONDARY EQUIPMENT STAGING AREA I cP O AMERICANS WITH DISABILITIES ACT OF 1990,THE REHABILITATION ACT OF 1973,THE FAIR HOUSING AMENDMENTS ACT OF 1988,TITLE 49,CHAPTER 2,COMMONLY KNOWN U 10 $ 1 P`� $ ,� TRAFFIC FLOW 1 w LA THE MONTAND HUMAN RIGHTS ACT,OR OTHER SIMILAR FEDERAL,STATE,OR LOCAL D MP R - --- � \ �N LAWS THAT MANDATE ACCESSIBILITY TO COMMERCIAL CONSTRUCTION OR MULTIFAMILY HOUSING. m O EXISTING DUMPSTER ENCLOSURE PRIOR TO INITIATING CONSTRUCTION,AN EROSION AND SEDIMENT CONTROL PLAN SHALL BE APPROVED BY THE CITY OF BOZEMAN. GENERAL NOTES CONSTRUCTION DUMPSTER "T M A LOT 3 1. NO CHANGE OR MODIFICATION OF THE APPROVED PLANS AND SPECIFICATIONS SHALL BE MADE WITHOUT THE E%ISTING PRIOR WRITTEN APPROVAL OF THE ENGINEER AND THE CITY OF BOZEMAN ENGINEERING DEPARTMENT. _ PROPOSED BUILDING BUILDING 4 FUTURE BUILDING Vl O 2. THE CONTRACTOR SHALL VERIFY THE LOCATION OF ALL BURIED UTILITIES PRIOR TO THE BEGINNING OF EQUIPMENT STAGING AREA 5\ �J CONSTRUCTION. 3. THE ENGINEER SHALL BE NOTIFIED AT LEAST 24 HOURS PRIOR TO BEGINNING CONSTRUCTION. 4. SITE WORK TO BE PERFORMED ACCORDING TO THE RECOMMENDATIONS OUTLINED IN THE GEOTECHNICAL 10EN UTILITY INVESTIGATION REPORT. 10'(TY 1 ttP.... 0 EASEMENT PER PLAT \ O 5 \ i 5. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR ENSURING THAT THE PROJECT MEETS ALL OSHA SAE- SAE- U cns ucE Gas�cE oas �cE cns V REQUIREMENTS AND THAT THE SITE MEETS ALL APPLICABLE SAFETY REQUIREMENTS FOR HIS EMPLOYEES AND ANY SITE INSPECTION WORK PERFORMED BY THE ENGINEER. ucE UCE c UCE UCE— 6. PROPOSED GAS,ELECTRICAL AND COMMUNICATION LINE LOCATIONS ARE APPROXIMATE.FINAL SERVICE LINE O LOCATIONS ARE TO BE COORDINATED WITH SERVICE PROVIDER AT THE TIME OF APPLICATION FOR SERVICE. N ICI O7. ELEVATION OF ALL CONCRETE WALKS AT BUILDING DOORS TO BE WITHIN 1/8"OF FINISH FLOOR ELEVATIONS. a"w a"w 'w- s'w a"w' " VISION RIANGLE VALLE COMMONS ..ss e..ss e'ss ..ss e'ss �� a'ss ..ss a'ss a"ss a A v 87.5' � UGE UGE R-O ZONING LOT 5A MINOR W SUB BLOC O. � N � BLOC 1 m EXISTING BUILDING FUTURE BUILDING 11 SITE ? UMU ZONING SITE �5' 45 m < a CONSTRUCTION TRAFFIC(TYP.) MOWS DR. A MOWS DR. 1 OVERALL SITE B-2 OWING C1 A SCALE:1"=30' Issue Date:511012019 ciso z VICINITY MAP 2 CONSTRUCTION ROUTE MAP C1.0 #190122 SCALE:1"=500' C1.0 SCALE:1°=500'