Loading...
HomeMy WebLinkAbout19- Amendment 1 to PSA - Sanderson Stewart - Oak Street and 27th Avenue Intersection Improvements FIRSTAMENDMENT TO PROFESSIONAL SERVICES AGREEMENT THIS FIRST AMENDMENT TO THE PROFESSIONAL SERVICES AGREEMENT FOR Oak and 27th Intersection Improvements dated December 17,2018,(the"Agreement")is made and entered into this � day of j c,c,6S, 2019, by and between the CITY OF BOZEMAN, MONTANA, a self governing municipal corporation organized and existing under its Charter and the laws of the State of Montana, 121 North Rouse Street,Bozeman,Montana,with a mailing address of PO Box 1230, Bozeman, MT 59771, hereinafter referred to as "City," SANDERSON STEWART, hereinafter referred to as "Contractor." In consideration of the mutual covenants and agreements herein contained, the receipt and sufficiency whereof being hereby acknowledged,the parties hereto agree to amend the Agreement as follows: 1. Extension of Term. Section 2 of the Agreement is extended until completion of construction services. 2. Scope of Services. Contractor will perform the work and provide the services in accordance with the Scope of Services attached hereto as Exhibit A and by this reference made a part hereof. 3. Payment. City agrees to pay Contractor the amount specified in the Scope of Services. Any alteration or deviation from the described services that involves additional costs above the Amendment amount will be performed by Contractor after written request by the City, and will become an additional charge over and above the amount listed in the Scope of Services. The City must agree in writing upon any additional charges. 4. Agreement still valid.All remaining terms and provisions of the Agreement remain valid. **** END OF AGREEMENT EXCEPT FOR SIGNATURES **** 1st Amendment to Professional Services Agreement for Oak&27th Intersection Improvements FY 2018—FY 2019 Page 1 of 2 IN WITNESS WHEREOF, the parties hereto have executed this instrument the day and year first above written. CITY OF BOZEMAN, MONTANA SANDERSON STEWART By By Andrea Surratt, Ci M pager Prin ame: Danielle Scharf Title: Principal APPROVED AS TO FORM By Greg Ltivan, Bozeman City Attorney 1st Amendment to Professional Services Agreement for Oak&27th Intersection Improvements FY 2018—FY 2019 Page 2 of 2 SAN D E RSO N (&,,, STEW ART Exhibit A— Scope of Services Oak and 27th Intersection Improvements Bidding and Construction Contract Administration 5/7/19 Sanderson Stewart is pleased to provide this scope of work for the Oak Street and North 27th Avenue Intersection Improvements project. This phase of the project will consist of bidding services, construction contract administration and observation, and construction staking. A detailed scope of services for these tasks is outlined below. Phase 1—Project Initiation This phase of the project includes preparation of the scope of work and amendment. Phase 2—Construction/Contract Administration This phase of the project will consist of construction bidding services, contract administration and construction observation tasks,including the following: • Prepare bid advertisement • Contractor coordination throughout bidding,prepare up to two addenda if needed • Facilitate pre-bid meeting,prepare agenda and distribute minutes • Attend bid opening,prepare bid tabulation and recommendation of award letter • Process contract documents for a single contract (four copies) • Facilitate pre-construction meeting,prepare agenda and distribute minutes • Shop drawing review • Construction observation and documentation (assume observation for 8 hours each day and a 30-calendar day construction contract) • Respond to Contractor RFI's • Construction materials testing coordination and review • Process pay applications submitted by Contractor and any necessary work change directives, verify material quantities on all contractor pay requests • Process the Certificate of Substantial Completion,coordinate final inspection,prepare punch lists and verify completion • Prepare as-built (record) drawings • Prepare City of Bozeman close-out submittal • Conduct two-year warranty walkthrough,prepare punch list and verify completion Phase 3—Construction Staking This phase of the project consists of the construction layout, anticipated to include the following: • Stake demolition limits • Stake subgrade cuts for streets one time;25-foot spacing;2 to 3-foot offset from back of curb • Stake curb and gutter one time; 25-foot spacing, PC's and PT's • Stake back of curb at storm inlet relocations • Stake horizontal layout of curb ramps with vertical benchmark for grade one time • Stake signs one time • Stake signal poles one time • Layout striping one time The following items are not expected to be needed for this project and are therefore specifically excluded from this scope of work: • Materials testing(By Contractor or City Term Contract) • SWPPP permitting and operation (By Contractor) Fees and Billing Arrangements: Phase Fee 1. Project Initiation $950 I2. Construction Observation/Contract Administration $41,470 3. Construction Staring $9,100 Total $51,520 Sanderson Stewart will bill for its services on a time and materials basis with a not to exceed amount of$51,520. Sanderson Stewart shall submit invoices to the Client for work accomplished during each calendar month. Schedule The anticipated schedule for this project will be based on the anticipated 30-calendar day construction contract. SANDERSON ` Oak & 27th Intersection Improvements - S T E WA R T 54 Bidding and Construction Administration Plan Name:Oak&27th Intersection Improvements-Bidding and Construction Administration Phase:Project Initiation Task:Project scoping Senior Engineer I 2.00 1 340.00 Senior Professional Land Surveyor I 1.00 1 130.00 Task:Project planning Project Administrator 2.00 140.00 Senior Engineer 2.00 340.00 Subtotal 950.00 Expenses 0.00 Total for Project Initiation 7.00 1 950.00 Phase:Construction/Contract Admin Task:PM&coordination Project Administrator 10.00 1 700.00 Senior Engineer 32.00 1 5,440.00 Task:Contractor bid assistance,addenda Project Engineer 12.00 1 1,380.00 Senior Engineer 8.00 1 1,360.00 Task:Pre-bid meeting,agenda&minutes Project Engineer 4.00 1 60.00 Senior Engineer 2.00 340.00 F1 Task:Bid opening,award,contracts Project Administrator 2.00 140.00 Project Engineer 4.00 460.00 Senior Engineer 2.00 340.00 Task:Pre-con meeting,agenda&minutes Project Engineer 4.00 460.00 Senior Engineer 2.00 340.00 Staff Surveyor/Inspector 2.00 190.00 Task:Shop_ drawing review Project Engineer 4.00 460.00; Senior Engineer 2.00 340.00 Staff Surveyor/Inspector 4.00 380.00 Task:Construction inspection&documentation Project Engineer 10.00 1 1,150.00 Staff Surveyor/inspector 172.00 1 16,340.00 1] Task:Change orders/contract mods Project Engineer 8.00 920.00 Senior Engineer 2.00 340.00 Staff Surveyor/Inspector 4.00 380.00 Task:Pay estimate review Project Administrator 6.00 420.00 Senior Engineer 4.00 680.00 Staff Surveyor/Inspector 4.00 380.00 Page 1 of 3 Task:Substantial completion walk-thru&admin Project Engineer 1 4.00 460.001 i Senior Engineer 2.00 340.00 Staff Surveyor/Inspector 2.00 190.00 Task: Final walk-thru&admin _. Project Engineer 4.001,_ i 460.001 Staff Surveyor/Inspector 2.001 190.001 Task:Two-year warranty walk-thru&admin Project Engineer 4.001, 460.001 (Staff Surveyor/Inspector 2.001 1 190.001 Task:As-builts Designer 8.001 [ 720 001 . w �.. _e. . .. Project Engineer 2.001 230.001 Staff Surveyor/Inspector 4.00 380.00 Task:Project close-out I Project Engineer 4.00 460.00 Senior Engineer 2.00 340.0W d.. . Staff Surveyor/Inspector 4.001 380.001 Subtotal 38,200.001 Expenses 500.00 Subconsultant(Marvin&Associates) 2,770.001 Total for Construction/Contract"Ad min 348.001 41,470.00 Phase:Construction/Propety Staking Task:PM&coordination S enio r Engineer 2.00 340.00 ISenior Professional Land Surveyor 4.001 520.001 Task:Demolition limits staking be i 1.001 i 90.00, Staff Surveyor/Inspector ( 6.001 J 570.001 s Task:Storm drain features staking Designer 1.001 1 90.001 Staff Surveyor/Inspector 6A0 570.00 Task:Subgrade curb/asphalt Designer 2.001 1 180.00 Staff Surveyor/Inspector { 16.001 1,520.001 Task:Signal Features staking _ Designer ! 1.00 1 90.001 _ Staff Surveyor/Inspector 4.001 380.001 Task:Finsh grade curb/asphalt Designer 2.001 180.00 . ..... _.. Staff Surveyor/Inspector 16.00� 1,520.001 Task:Finish grade sidewalks and ramps _ . - (Designer 1.001 90.00, Staff Surveyor/Inspector 1 12.00' 11140.00 1_...._ Task:Striping _ _. .. Designer 1.00 l 90.001 Staff Surveyor/Inspector ( 6.001 570.001 Task:Signage _ Designer 1.001 90.00 Staff Surveyor/Inspector 6.001 570.001 Page 2 of 3 Subtotal i 8,600.00 Expenses 500.00 Total for Construction/Propety Staking 88.00 9,100.00 Total for Oak&27th Intersection Improvements-Bidding and Construction Administration 443.00 51,520.00 Page 3 of 3 Oak Street & N 27th Avenue Traffic Signal Construction Services p 5/7/2019 Marvin&Associates Manhours Labor Direct Total Construction Service Tasks Engr Tech Cost Costs Costs $130 $75 1 Project Administration &Scoping 3 0 $ 390.00 $ 10.00 $ 400.00 2 Contractor Coordination & Information 8 2 $ 1,190.00 $ - $ 1,190.00 3 Shop Drawing Reviews 6 0 $ 780.00 $ - $ 780.00 4 Final Inspection Coordination 2 0 $ 260.00 $ 10.00 $ 270.00 5 As-Constructed Plan Drawings 1 0 $ 130.00 $ - $ 130.00 Total Construction Services = 20 2 $ 2,750.00 $ 20.00 $ 2,770.00