HomeMy WebLinkAbout19- Modification 1 to Project Funding and Maintenance Agreement - Montana Department of Transportation - North 7th Avenue and Griffin Drive N 7T"AVE&GRIFFIN DRIVE-BOZ
CONTROL NO.9312
PROJECT FUNDING AND MAINTENANCE AGREEMENT MODIFICATION #1
The City of Bozeman (City) and the State of Montana through its Department of Transportation
(State) entered into the attached Project Funding and Maintenance Agreement on June 17,
2018 to develop and construct ADA compliant sidewalks in Bozeman along the east side of
North 7th Avenue from the entrance to Midwest Welding and Machine (mid-block north of
Griffin Drive) southward to just beyond Nickles Drive, and along the west side of North 7th
Avenue between Mandeville Drive and Wheat Drive. This TA-funded project will be
incorporated into UPN 9312 N 7th Ave & Griffin Drive-Boz (CMDP-TA 118-1(2)1 & CMDP-TA 118-
1(3)1), a project managed by the State.
The State is requesting to limit the City's financial contribution toward the TA-funded portion of
the project's Preliminary Engineering (PE) and Construction Engineering (CE) phases. The
Construction (CN) portion will continue to be based on actual project costs as described below
and in the original agreement. This change necessitates an amendment to the 2018 Project
Funding and Maintenance Agreement. Accordingly, the parties agree to modify that
Agreement as set forth below.
After NOW, THEREFORE, ... will be modified to read:
8. The Parties understand that it is possible that the estimated cost of the Project may be
exceeded once the Project has begun. For the PE and CE phases, the City agrees to pay the
amounts as shown under City Funds in Table 1.
For the construction (CN) phase,the State agrees to award the Project using TA funds provided
the lowest responsive bid does not exceed the allowable overrun percentage listed in Table 2.
The City agrees to pay the requisite 13.42% local matching share and associated indirect costs
up to the allowable overrun percentage. The State will contact the City if the lowest responsive
bid exceeds the allowable overrun percentage listed in Table 2 to determine a funding solution
agreeable to both Parties. If both Parties agree to recommend awarding the contract, MDT will
fund the overrun using TA funds and the City agrees to pay the additional 13.42% local
matching funds and the associated indirect costs for the overruns for the CN phase.
If both Parties don't agree to fund the overrun,the State will recommend the Commission not
award the Project. The State will work with the City to identify scope changes to bring the
Project into a fundable level and re-advertise for letting. If scope changes cannot be agreed to
by both Parties,then the Project may either be re-advertised and both Parties agree to fully
fund it in accordance with this agreement or the Project may be withdrawn and the City agrees
to reimburse the State for all TA funds expended to date.
The State's Project Manager will inform the City's point of contact beforehand, and as early as
possible, of anything that appears will result in a cost increase, and will discuss the need for any
N 7T"AVE&GRIFFIN DRIVE-BOZ
CONTROL NO.9312
possible additional costs, alternative designs, or a reduction in the Project's scope with the City
and will consider the City s comments and concerns for that additional cost or alteration in
scope or design. None of this will prevent, delay, or excuse the City from paying for any
additional costs deemed necessary by the State.
TABLE 1 will be modified to read:
TABLE 1
TRANSPORTATION ALTERNATIVESS PROJECT COST ESTIMATE
UPN 9312 N 7T"AVE & GRIFFIN DRIVE-BOZ
January 2019
Project Phases Total Project TA Funds City Funds
Cost 86.58/0 13.42/
Preliminary Engineering $39,750 $34,416 $5,334
(PE)
Construction Engineering $26,501 $22,945 $3,556
(CE)
Construction(CN) $132,501 $114,719 1 $17,782
Total $198,752 $172,080 $26,672
Estimate includes 10.96%IDC. PE and CE amounts are capped. CN amounts are subject to change per the
June 2018 Agreement.
All other terms of the original agreement will remain in full force.
N 7T"AVE&GRIFFIN DRIVE-BOZ
CONTROL NO.9312
IN WITNESS WHEREOF, the Department's authorized representative has signed on behalf of the
State of Montana, and the Mayor of the City of Bozeman has signed and affixed hereto the seal
of the City.
STATE OF MONTANA, DEPARTMENT OF TRANSPORTATION
BY "e/ 12019
Nt Department of Transportation
APPROVED FOR LEGAL CONTENT
('QJQh6- � ,2 ! /t.//F
MDT Legal Counsel
APPROVED FOR CIVIL RIGHTS
ALL Se�W—dAA111— �I lfo'!
CITY OF BOZEMAN
Mayor
BY
I, 1V1 GVDLA , Bozeman City Clerk, hereby certify that this agreement
was regularly adopted by the City Council at a meeting held on the_�t 7day of
avl , 20 , and that the Council authorized the Mayor to sign this agreement
on behalf of the City.
J'� O♦ •�� J
[OFFICIAL SPA
rJ,.9�t. ��g3 .•�,
��IN cots ..