Loading...
HomeMy WebLinkAboutC1.2 DETAILS 04-22-19 MARK A. CHANDLER No. 9518ES o? Sheet 3 of 3 U C E m I � m `or SIDEWALK WIDTH PER PLAN J `� W 2%SLOPE 0 0 c D O 4"THICK P.C.0 SIDEWALK m m C MIN.3"OF 1"CRUSHED AGGREGATE BASE ` m Ul � 20•-0•• COMPACTED SUB-GRADE a W 8 NOTES: 1. CONCRETE DEPTH FOR STD. SIDEWALKS SHALL BE 4" MIN. 2. SIDEWALKS SHALL SLOPE AWAY FROM STRUCTURES AND BUILDINGS AT 2%. 3. CONCRETE SHALL BE 4,000 PSI ® 28 DAYS. 4. CONTRACTION JOINTS SHALL BE PLACED AT 5' CI� INTERVALS, EXPANSION JOINTS AT 20' INTERVALS. IQJ�1 ` TYPICAL SIDEWALK CROSS-SECTION A C1.2 SCALE:Nis 4' TOP OF SWALE:4710.80 4.1 E Mqk SRO 6"DEPTH MPy sa N yn FINISH GRADE SWALE WITH 6"TOPSOIL AND SEED W BOTTOM OF SCALE:4710.30 a � 3 STORMWATER SWALE SECTION VIEW w C12 SCALE:NTS loci POND WIDTH VARIES �T Li 30 CUBIC YARD DUMPSTER W/ COVERED ROLL-OFF TOP TOP OF POND:4710.80 h+l �r/ 4 J M DEPTH VARIES:0.92'MAX POND DEPTH pPE CONSTRUCTION DUMPSTER DETAIL ax S40P &MAX WATER STORAGE DEPTH 1 MNX s f q; C1.2 SCALE:NTS L FINISH GRADE WITH 6" TOPSOIL AND SEED BOTTOM OF POND a APPROXIMATELY Q Q Q r, 4'-6' \/ OVER-EXCAVATE 20'LONG x 3'WIDE SECTION AT U Q Q BOTTOM OF RETENTION PONDS DOWN TO NATIVE GRAVEL LAYER(APPROXIMATELY 4'-6'BELOW EXISTING GRADE) _ AND BACKFILL WITH WELL DRAINING GRAVEL 3 ESTIMATED SEASONAL HIGH GW ELEVATION IS AT THE TOP OF p p THE NATIVE GRAVEL L4YER O O O NATIVE GRAVEL LAYER n TYPICAL RETENTION POND SECTION VIEW C1.2 SCALE:NTS Issue Date:411812019 Clm2 �181315