HomeMy WebLinkAboutC1.1 SITE GRADING AND DRAINAGE PLAN 05-23-19 MARK A. CHANDLER No. 9518ES ems- o� G/CENSEO P20 NEER � I Sheet 2 of 3 — — — — — _ — — — — — — — — m E CABALLO AVENUE m Igo v w w w w w w w w w w w w w w w w w w w w w w w�® w w wow w ` (0 m!'P TO EXISTING TREE GRATE P. EXISTING 10"DIP WATER MAIN a 1O (TM ) ` d m°2 INSTALL NEW 8 WIDE 4 THICK CONCRETE WALKWAY MATCH EXISTING SIDEWALK ELEVATIONS SHOWN. NW � a WV V �p y� EXISTING SIDEWALK 165.00[SO 179'41'57' EXISTING ADA SIGN • EXISTING ENTRANCE 10 FRONT a 3 SETBACK r , , FRONT J L SETBACK 5 REAR(A SETBACKO� �tiO^ I � I ROOF EAVE PROPOSED BUILDING ADDITION F.F.ELEV. 4711.59 OP ^wm r a w _j�N - o I � N 2 W) O O^o N EXFF.F. ELEV. 4711.59 ATHLETIC FACILITM 0 N a M u n d 1�1 rn RELOCATE EXISTING TRASH 0 N N r ENCLOSURE ONTO 4'x4'CONCRETE PAD ADJACENT TO SIDEWALK ROOF EAVE 96 6.0'SEPARATION BETWEEN EXISTING m TRANSFORMER PAD AND PROPOSED c� BUILDING NON-COMBUSTIBLE WALL. EXISTING ALLEY EDGE OF PAVEMENT �j GUTTER EXISTING ROOF AND INSTALL W 5.0'SEPARATION BETWEEN EXISTING 6"DOWNSPOUTS.DRAIN TO PROPOSED w w W 9J J TRANSFORMER PAD AND PROPOSED 1' RETENTION SWALE AS SHOWN. 11 07 ————— 12.07 J NON-COMBUSTIBLE ROOF OVERHANG. w 1.98 SW J _ �, r��o b - J Q �o (11.07)s of---- w ss UGE W W 96 L —_ pGE--`—— 4"SS 4"SS �a ss � - �I � ao `r/y — — ---- B.O.P.�4709.68 �94 E uGE — (1100)s n.47 SW. ——————— ------ G cas Gas Gns —=_ m\_ — — - li 16.4' 77 UGE UGE UGE .0 ��- ������I�' — — — — — — —-— — — —— - —. —. -- 0.80) 11.78 SW w TIE INTO EXISTING ALLEY ELEVATIO � '``• ' rT� EXISTING GAS AND ELECTRIC SERVICES TO BE [NT18'03"W] 74' V RELOCATED AROUND NEW ADDITION.SERVICE METERS TO 165.00 359'41'57" 5.0'SIDE LV BE RELOCATED TO WESTERN SIDE OF EXISTING SETBACK MECHANICAL ROOM.CONTRACTOR TO COORDINATE RELOCATION WITH NW ENERGY. I INSTALL 4"THICK 5'WIDE SIDEWALK SIDE 4'WIDE 6"DEEP RETENTION SWALE ALONG WEST E OF BUILDING TO TIE INTO PROPOSED RETENTION POND AT SW CORNER OF BUILDING.FINISH GRADE SWALE AND POND WITH 6"TOPSOIL AND SEED.SEE DETAIL LOPES' Top (H:V)SIDE SLOPES. 1(SJII TOP ELEVATION: 4710,30 EXISTING 10"DIP WATER MAIN SWALE BOTTOM ELEVATION: 4701.88 POND BOTTOM ELEVATION: 165 C8 REQUIRED VOLUME:282 CF � PROVIDED VOLUME:282 CF WATE IX STINLAN ARE G WATER AND SEWERD SEWER S PLUMBING TO SHOWN ON�NIEWPADDITION TO BE EXTENDED WITHIN BUILDING.SEE MECHANICAL EXISTING 8"PVC SANITARY SEWER MAIN EXISTING TRANSFORMER AND CONCRETE PAD.COORDINATE PLANS FOR DETAILS ON INTERNAL CONNECTIONS. C\J o PRIVATE UTILITY HOOKUP WITH NORTHWESTERN ENERGY. a EXCAVATE 20'LONG x 3'WIDE TRENCH AT BOTTOM OF RETENTION POND DOWN z TO NATIVE GRAVEL SUBGRADE.BACKFILL TRENCH WITH WELL DRAINING GRAVEL 0 Y TO ENSURE PERCOLATION OF STORMWATER.REFER TO DETAIL 4/C1.2 _J a i n SITE GRADING AND DRAINAGE PLAN C1.1 SCALE:1"=10' Issae Date:05/23/2019 c 1.1 1181315