HomeMy WebLinkAboutA-205 TRANSPARENCY CALCULATIONS 05-23-191243
T.O. PLATE 1
(ADDITION)
109' -0"
T.O. SLAB
100' -0"
T.O. PLATE 2
(ADDITION)
111' -6"
13'-4" x 4'-0" = 53 SF of Transparency
36'-5" x 4'-0" = 146 SF of Non -Transparent Material
53 SF of Transparency
146 SF of Non-Transparent Material = 36% Facade Transparency
4 ' - 0 "
4 ' - 0 "
8 ' - 0 "
36' - 5"
BOZEMAN MUNICIPAL CODE
Expand Existing Footpring 38% Level II Improvement
Building Massing and Articulation
Facade Articulation (features located every 60')
North Facade 1) Windows
6) Material
7) Articulation
West Facade 1) Windows
7) Articulation
*3 features not required per Exception 10
East Facade 2) Entry
6) Material
10) Modulation
Max Facade Width
Any facade exceeding 150'-0" requires a massing break
North - South Facade = 55'-0" (+/-)
East - West Facade = 37'-0" (+/-)
No massing break is required for these facades
Landscape Block Frontage Standards
Facade Transparency 150 sf between 4'-0" and 8'-0"
37.5 sf required
53 sf provided
Weather Protection 3' deep weather protection required
3'-6" provided
SIGNAGE
Maximum sq. ft. area 400 sf per lot
Allowed per linear ft of building frontage first 25 ft 75 sf
Allowed per linear ft of building frontage >25ft 181 sf
Total Allowed Signage sf (lesser of the two) 256 sf
EIFS, LIGHT GREY
WALL MATERIAL LEGEND
EIFS, DARK GREY (1)
EIFS, DARK GREY (2)
24-GAUGE CORRUGATED METAL
CONCRETE MASONRY
2X4 WOOD SIDING
*ALL FINISHES TO MATCH EXISTING
Date
Drawn By
Checked By:
Project Number
Sheet Name
Copyright:
ALL DRAWN AND WRITTEN INFORMATION
APPEARING SHALL NOT BE DUPLICATED,
DISCLOSED OR OTHERWISE USED
WITHOUT THE WRITTEN CONSENT OF
NE45 ARCHITECTURE
Issued
CONSTRUCTION DRAWINGS
A-205
TRANSPARENCY
CALCULATIONS
TH
E
P
I
T
T
T
R
A
I
N
I
N
G
FA
C
I
L
I
T
Y
-
A
D
D
I
T
I
O
N
NE45
NE45
05-23-19
18017
37
1
7
E
Q
U
E
S
T
R
I
A
N
L
N
.
BO
Z
E
M
A
N
,
M
T
5
9
7
1
8
1 DESCRIPTION DATE
SITE PLAN REVIEW 4/22/19
1/4" = 1'-0"
EAST EXTERIOR ELEVATION - TRANSPARENCY CALCULATIONS 1
1