Loading...
HomeMy WebLinkAbout04-22-19 City Commission Packet Materials - A3. Res 5030, Approving a Project in the NURD as an Urban Renewal Project - SUPPLEMENTAL MATERIALS BOZ E MAN MT Economic Development Resolution 5030 There is an error in the Eligible Cost amount for the Project, which persists throughout the Resolution and the Development Agreement. The correct Eligible Cost amount is $21F129,215.68 Due to an error in the Eligible Cost figure for the Project, Staff recommends the following revised motion: Revised suggested motion: Incorporating the information and findings in the staff memorandum to the City Commission, oral findings made by the Commission during the public hearing, information and findings contained in the proposed resolution, and after considering public comment, I hereby move to adopt Resolution 5030, amended to correct all references to the Eligible Costs of the Project in the Resolution and the Development Agreement attached as ExhibitA to $2,129,215.68. ® ® P.O. i 1 1 .� • y® North 121 1 1 • • 41• 44 /1 1 : 1 1 ' 1 TDD: 406-582-2301 THE MOST LIVABLE PLACE. EXHIBIT C ELIGIBLE COSTS Summary Description of the Infrastructure Improvements: Improvements to East Cottonwood Street, including replacing water and sewer mains, new diagonal parking on the north side of Cottonwood Street, new concrete sidewalk, gravel base and asphalt paving patch for new water and sewer mains $544,842.12 Improvements to Ida Avenue, including new 31-foot asphalt street section with 1 1/2-inch base course gravel and curb and cutter, new sidewalk on west side 279,987.35 Improvements to East Aspen Street, including new water, sewer and storm drain mains; new water, sewer and fire service lines; new manholes; new sidewalks on the north and south sides; new 35-foot asphalt street section with 1 1/2-inch base course gravel and curb and gutter 590,950.05 Improvements for Front Street parking, including new 31-foot asphalt parking section with 1 %2-inch base course gravel and curb and gutter 191,316.16 Total Costs of Infrastructure Improvements $ 1,607,095.68 Summary Description of the Project Fees and Charges: Transportation Impact Fees $ 420,395 Water Impact Fees 73,459 Fire Impact Fees 28,266 Total Project Fees and Charges $ 522,120 Total Eligible Costs $2,129,215.68 C-1 EXHIBIT C ELIGIBLE COSTS Summary Description of the Infrastructure Improvements: Improvements to East Cottonwood Street, including replacing water and sewer mains, new diagonal parking on the north side of Cottonwood Street, new concrete sidewalk, gravel base and asphalt paving patch for new water and sewer mains $544,842.12 Improvements to Ida Avenue, including new 31-foot asphalt street section with 1 'h-inch base course gravel and curb and cutter, new sidewalk on west side 279,987.35 Improvements to East Aspen Street, including new water, sewer and storm drain mains; new water, sewer and fire service lines; new manholes; new sidewalks on the north and south sides; new 35-foot asphalt street section with 1 'h-inch base course gravel and curb and gutter 590,950.05 Improvements for Front Street parking, including new 31-foot asphalt parking section with 1 'h-inch base course gravel and curb and gutter 191,316.16 Total Costs of Infrastructure Improvements $ 1,607,095.68 Summary Description of the Project Fees and Charges: Transportation Impact Fees $ 420,395 Water Impact Fees 73,459 Fire Impact Fees 28,266 Total Project Fees and Charges $ 522,120 Total Eligible Costs $2,129,215.68 C-1 EXHIBIT C ELIGIBLE COSTS Summary Description of the Infrastructure Improvements: Improvements to East Cottonwood Street, including replacing water and sewer mains, new diagonal parking on the north side of Cottonwood Street, new concrete sidewalk, gravel base and asphalt paving patch for new water and sewer mains $544,842.12 Improvements to Ida Avenue, including new 31-foot asphalt street section with 1 1/2-inch base course gravel and curb and cutter, new sidewalk on west side 279,987.35 Improvements to East Aspen Street, including new water, sewer and storm drain mains; new water, sewer and fire service lines; new manholes; new sidewalks on the north and south sides; new 35-foot asphalt street section with 1 1/2-inch base course gravel and curb and gutter 590,950.05 Improvements for Front Street parking, including new 31-foot asphalt parking section with 1 %2-inch base course gravel and curb and gutter 191,316.16 Total Costs of Infrastructure Improvements $ 1,607,095.68 Summary Description of the Project Fees and Charges: Transportation Impact Fees $ 420,395 Water Impact Fees 73,459 Fire Impact Fees 28,266 Total Project Fees and Charges $ 522,120 Total Eligible Costs $2,129,215.68 C-1 EXHIBIT C ELIGIBLE COSTS Summary Description of the Infrastructure Improvements: Improvements to East Cottonwood Street, including replacing water and sewer mains, new diagonal parking on the north side of Cottonwood Street, new concrete sidewalk, gravel base and asphalt paving patch for new water and sewer mains $544,842.12 Improvements to Ida Avenue, including new 31-foot asphalt street section with I '/2-inch base course gravel and curb and cutter, new sidewalk on west side 279,987.35 Improvements to East Aspen Street, including new water, sewer and storm drain mains; new water, sewer and fire service lines; new manholes; new sidewalks on the north and south sides; new 35-foot asphalt street section with 1 %2-inch base course gravel and curb and gutter 590,950.05 Improvements for Front Street parking, including new 31-foot asphalt parking section with 1 '/2-inch base course gravel and curb and gutter 191,316.16 Total Costs of Infrastructure Improvements $ 1,607,095.68 Summary Description of the Project Fees and Charges: Transportation Impact Fees $ 420,395 Water Impact Fees 73,459 Fire Impact Fees 28,266 Total Project Fees and Charges $ 522,120 Total Eligible Costs $2,129,215.68 C-1