Loading...
HomeMy WebLinkAbout06-03-19 City Commission Packet Materials - C7. NOA to Knife River-Belgrade for Cottonwood Road Project Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Bob Murray, Project Engineer Shawn Kohtz, City Engineer SUBJECT: Cottonwood Road from Babcock Street to Durston Road – Notice of Award MEETING DATE: June 3rd, 2019 AGENDA ITEM TYPE: Consent RECOMMENDATION: Authorize the City Manager to sign the Notice of Award to Knife River - Belgrade for the Standard Bid Price and Alternate 1 in the amount of $5,207,849.50, and final contract documents once received. BACKGROUND: Attached is a copy of the Notice of Award for the above referenced project. The project is for the construction of Cottonwood Road between Babcock Street and just north of Durston Road. It includes roadway widening and reconstruction, new corridor lighting with LED luminaires, new sidewalk, new storm drain infrastructure, new water main, signalization of the intersection of Cottonwood and Bacbcock, adjustment of the signal at Cottonwood and Durston, and utility adjustments. Bids for the above-referenced project were opened on May 14, 2019 with 2 bids being submitted. The low bid was submitted by Knife River - Belgrade for the Standard Bid Price of $4,875,559.00, and Alternate #1 Bid Price of $332,290.50. The Standard Bid Price includes construction of all of the east half of the road including 378 feet north of Durston which was the agreed upon match point between the City and School District. It also include all of the signal work at Durston and Babcock as well as all of the trunk sewer main installation. Alternate #1 is for the reconstruction of the west half of the road which has now failed. The funding is included in the Capital Improvement Plan (CIP) in 4 different projects. All of the sewer main work is included in project WWIF36 which had a total budget of $640,000. For the street work, there is $2,556,000 in project SIF036 ($1,278,000 in Arterial and Collector (A&C) funds and same in Street Impact Fee (SIF) funds), $1,435,336 in project SIF104 ($287,067 A&C and $1,148,269 SIF), and $1,250,000 in project SIF105 all from SIF funds. The combination of the various CIP items for work totals $5,881,336.00. There is also a short amount of widening on Babcock east of Cottonwood that is included in this project. The cost of this widening will be 68 reimbursed by the developers adjacent to Babcock under the cash in lieu of infrastructure provisions of the development code. The Notice of Award, Award Recommendation from our consultant, and Bid Tabulation are attached. UNRESOLVED ISSUES: None ALTERNATIVES: Disapprove FISCAL EFFECTS: The project will be paid from the Street Impact Fee Fund, the Arterial and Collector District Fund, the Wastewater Impact Fee Fund, and developer payback. Attachments: Notice of Award, Award Recommendation, Bid Tabulation Report compiled on: 5/23/19 69 NOTICE OF AWARD Page 1 of 1 NOTICE OF AWARD Dated: __________________ TO: Knife River - Belgrade ADDRESS: PO Box 9, Belgrade, MT 59714 PROJECT: Cottonwood Road from Babcock St. to Durston Rd. CONTRACT FOR: Base bid and Alternate #1 bid You are notified that your Bid opened on May 14, 2019, for the above Contract has been considered. You are the apparent Successful Bidder and have been awarded a Contract for the: Cottonwood Road Project from Babcock to Durston. The Contract Price of your Contract is: Written Amount Dollars $5,207,849.50 (includes Base bid of $4,875,559.00 with Alternate #1 bid of $332,290.50) Five Million Two Hundred Seven Thousand Eight Hundred Forty-Nine Dollars and 50 Cents. Five (5) copies of each of the proposed Contract Documents (except Drawings) accompany this Notice of Award. Three (3) sets of the Drawings will be delivered separately or otherwise made available to you immediately. You must comply with the following conditions precedent within fifteen (15) days of the date of this Notice of Award, that is, by June 18, 2019. 1. You must deliver to the OWNER Five (5) fully executed counterparts of the Agreement including all the Contract Documents and Drawings. 2. You must deliver with the executed Agreement the Contract Security (Bonds) as specified in the Instruction to Bidders (Articles 8-10), and the General Conditions (paragraph 5.01). 3. List other conditions precedent: You must deliver with the executed Agreement the Certificates of Insurance as specified in the General Conditions (Article 5) and Supplementary Conditions (Article 1). Failure to comply with these conditions within the time specified will entitle OWNER to consider your Bid abandoned, to annul this Notice of Award, and to declare your Bid Security forfeited. Within ten (10) days after you comply with these conditions, OWNER will return to you two fully signed counterpart of the Agreement with the Contract Documents attached. CITY OF BOZEMAN, MONTANA ATTEST: BY: __________________________________ BY: ____________________________ (CITY MANAGER) (CITY CLERK) DATE: _______________________________ 70 May 23, 2019 Robert Murray, P.E. City of Bozeman Engineering Department 20 East Olive Street Bozeman, MT 59715 Subject: Cottonwood Road Improvements Project – from Babcock to Durston Recommendation of Award for Construction Dear Mr. Murray, Bids for the Cottonwood Road Improvements Project were received and opened on May 14th, 2019. RPA has reviewed those bids, and are furnishing the accompanying Certified Bid Tabulations. RPA has also conducted an engineering check of the bids for conformance to the Contract Document requirements, including the following: • Mathematical verification of the bid amounts, extensions, and totals. Any mathematical errors are shown or noted on the Bid Tabulations. • Review of bid forms from the apparent low bidder for proper signature and acknowledgments. No irregularities were noted in the low bid. • Acknowledgement of receipt of all Addenda. • Low bidder included the Montana Contractor’s license number and the required executed certifications in the Official Bid Proposal and a signed Non-Discrimination Affirmation Form. • Review of bid bond from the low bidder. Bid bond appears proper and duly executed. The low Base Bid received is $4,875,559.00. The low Alternate #1 Bid (resurfacing of the existing Cottonwood Road) received is $332,290.50. The low Alternate #2 Bid (new irrigation well for future median island landscaping) received is $8,300.00. Based on the review of the Bidder’s documentation, RPA recommends award of the construction contract for the Cottonwood Road Improvements Project from Babcock to Durston to the following Contractor, based on them providing the lowest responsible bid, contingent on review and/or concurrence from the City Attorney: Knife River PO Box 9, Belgrade, MT 59714 Phone: (406) 388-6832 Email: Steve.Baeth@KnifeRiver.com Montana Contractor’s Registration #: 10089 Base Bid Amount: $4,875,559.00 Alt. #1 Bid Amount: $332,290.50 Total of Base Bid and Alt. #1 Bid: $5,207,849.50 71 Alternate #2 will not be included in this Contract. Enclosed are the Certified Bid Tabulations and the Official Bid Proposal. Please contact me at (406) 580-4438 with any questions. Sincerely, ROBERT PECCIA AND ASSOCIATES Staci Venner, P.E. Project Manager 72 CERTIFIED BID TABULATIONS (BID DATE: May 14, 2019 - 4PM) COTTONWOOD ROAD FROM BABCOCK ST. TO DURSTON RD. CITY OF BOZEMAN Robert Peccia & Associates, Inc.3810 Valley Commons Drive #4, Bozeman, MT 59718 Item Unit No.Quantity Unit Description BASE BID 1 1 LS Mobilization, Bonding, and Submittals (5% Max)$218,620.00 $218,620.00 $200,000.00 $200,000.00 $250,000.00 $250,000.0021LSConstruction Surveying, Staking, and Testing $75,000.00 $75,000.00 $67,250.00 $67,250.00 $88,076.00 $88,076.0031LSTraffic Control $175,000.00 $175,000.00 $140,000.00 $140,000.00 $190,000.00 $190,000.0041LSErosion Control and Permits $75,000.00 $75,000.00 $40,000.00 $40,000.00 $17,620.00 $17,620.00 5 1 LS Dewatering $100,000.00 $100,000.00 $282,500.00 $282,500.00 $285,000.00 $285,000.00635EARemove Tree $300.00 $10,500.00 $300.00 $10,500.00 $150.00 $5,250.00715EATrim Tree $90.00 $1,350.00 $125.00 $1,875.00 $100.00 $1,500.0082,420 CY Topsoil-Strip, Salvage, and Reuse $14.00 $33,880.00 $39.00 $94,380.00 $12.00 $29,040.00 9 200 CY Topsoil-Imported $22.00 $4,400.00 $42.00 $8,400.00 $25.00 $5,000.0010400CYImported Trench Backfill $35.00 $14,000.00 $45.00 $18,000.00 $40.00 $16,000.0011289LFRemove Sanitary Pipe $15.00 $4,335.00 $14.00 $4,046.00 $15.00 $4,335.0012288.8 LF 12" PVC SDR-35 Pipe $75.00 $21,660.00 $62.00 $17,905.60 $67.00 $19,349.60 13 2,746.5 LF 18" PVC PS-46 Pipe $90.00 $247,185.00 $78.00 $214,227.00 $82.00 $225,213.00149EA60" Sanitary Manhole $7,000.00 $63,000.00 $6,500.00 $58,500.00 $7,000.00 $63,000.00151EA60" Sanitary Interior Drop Manhole $12,000.00 $12,000.00 $12,800.00 $12,800.00 $14,000.00 $14,000.00161EA60" Sanitary Exterior Drop Manhole $12,000.00 $12,000.00 $16,250.00 $16,250.00 $17,000.00 $17,000.00 17 7 EA Modify Manhole $1,400.00 $9,800.00 $2,240.00 $15,680.00 $2,400.00 $16,800.001810EAAdjust Manhole $500.00 $5,000.00 $375.00 $3,750.00 $500.00 $5,000.001921EAAdjust Water Valve $300.00 $6,300.00 $275.00 $5,775.00 $250.00 $5,250.002028EAAdjust Curb Stop $350.00 $9,800.00 $175.00 $4,900.00 $200.00 $5,600.00 21 1 EA Adjust Cleanout $1,000.00 $1,000.00 $425.00 $425.00 $1,050.00 $1,050.00225EAAdjust Water Main $7,500.00 $37,500.00 $7,750.00 $38,750.00 $8,200.00 $41,000.002328EAAdjust Water Service $1,000.00 $28,000.00 $1,050.00 $29,400.00 $1,100.00 $30,800.00241EARemove and New Hydrant Assembly $8,000.00 $8,000.00 $8,500.00 $8,500.00 $9,000.00 $9,000.00251LSRemove Drainage $5,000.00 $5,000.00 $2,500.00 $2,500.00 $2,400.00 $2,400.00 26 115.7 LF 12" PVC Storm Pipe $60.00 $6,942.00 $80.00 $9,256.00 $87.00 $10,065.902716.0 LF 15" PVC Storm Pipe $65.00 $1,040.00 $160.00 $2,560.00 $160.00 $2,560.0028189.0 LF 12" RCP Class 5 Storm Pipe $70.00 $13,230.00 $63.00 $11,907.00 $67.00 $12,663.0029147.5 LF 15" RCP Class 5 Storm Pipe $75.00 $11,062.50 $63.00 $9,292.50 $75.00 $11,062.50 30 34 LF Concrete Inlet Chase $200.00 $6,800.00 $375.00 $12,750.00 $475.00 $16,150.00314EASquare Storm Drain Inlet $3,200.00 $12,800.00 $3,050.00 $12,200.00 $3,200.00 $12,800.00321EADouble Storm Drain Inlet $5,000.00 $5,000.00 $5,250.00 $5,250.00 $5,500.00 $5,500.00333EA48" Combination Manhole and Curb Inlet $4,200.00 $12,600.00 $4,270.00 $12,810.00 $4,600.00 $13,800.00 34 4 EA 48" Standard Straight Manhole $3,500.00 $14,000.00 $3,500.00 $14,000.00 $3,700.00 $14,800.00351LSSubsurface Detention System $35,000.00 $35,000.00 $104,000.00 $104,000.00 $100,000.00 $100,000.003637SYDrainage Geotextile $3.00 $111.00 $29.00 $1,073.00 $10.00 $370.003719CYPipe Bedding Type 2 $35.00 $665.00 $50.00 $950.00 $131.00 $2,489.00 38 5,456 SF Rigid Board Insulation $10.00 $54,560.00 $5.00 $27,280.00 $10.00 $54,560.003947CYFlowable Fill $220.00 $10,340.00 $130.00 $6,110.00 $180.00 $8,460.004024,000 CY Street Excavation (Above Subgrade)$22.00 $528,000.00 $18.00 $432,000.00 $24.00 $576,000.00412,000 CY Imported Borrow $25.00 $50,000.00 $65.00 $130,000.00 $27.00 $54,000.00 42 4,250 CY Subexcavation and Replacement Below Subgrade (Imported 6" Minus)$47.00 $199,750.00 $60.00 $255,000.00 $47.00 $199,750.00 43 1,457 SY Separation Geotextile $1.50 $2,185.50 $2.20 $3,205.40 $1.50 $2,185.504423,775 SY Geosynthetic $5.00 $118,875.00 $4.50 $106,987.50 $5.12 $121,728.004512,822 CY Sub-Base Course (6" Minus)$25.00 $320,550.00 $27.00 $346,194.00 $26.00 $333,372.00 46 3,754 CY Crushed Base Course (1.5" Minus)$32.00 $120,128.00 $32.00 $120,128.00 $34.00 $127,636.00475,711 TON Asphalt Pavement, PG 58-28 $70.00 $399,770.00 $72.00 $411,192.00 $76.00 $434,036.004818,681 SY Asphalt Seal and Chip Coat $2.50 $46,702.50 $2.00 $37,362.00 $2.90 $54,174.9049908SYConcrete Sidewalk 6" Thick (With 3" Thick Gravel Base)$55.00 $49,940.00 $60.00 $54,480.00 $95.00 $86,260.00 50 15.0 SY Detectable Warning Panels $400.00 $6,000.00 $265.00 $3,975.00 $330.00 $4,950.00518,125 LF Concrete Curb and Gutter $16.00 $130,000.00 $13.00 $105,625.00 $17.00 $138,125.005260SYConcrete Double Gutter (7" Thick)$90.00 $5,400.00 $86.00 $5,160.00 $106.00 $6,360.005378SYConcrete Apron Fillets (7" Thick)$90.00 $7,020.00 $75.00 $5,850.00 $92.00 $7,176.00 54 622 SY Concrete Median Cap (4" Thick)$55.00 $34,210.00 $34.00 $21,148.00 $42.00 $26,124.00550SFConcrete Stairs $100.00 $0.00 $0.00 $0.00 $0.00 $0.00560LFHandrail$140.00 $0.00 $0.00 $0.00 $0.00 $0.005716LFRetaining Wall $150.00 $2,400.00 $140.00 $2,240.00 $193.00 $3,088.00 58 1 LS Remove Pavement Markings $20,000.00 $20,000.00 $18,500.00 $18,500.00 $19,277.00 $19,277.00591LSPavement Markings $165,000.00 $165,000.00 $235,000.00 $235,000.00 $275,000.00 $275,000.00601LSSigning$70,000.00 $70,000.00 $50,000.00 $50,000.00 $54,000.00 $54,000.006113,000 SY Hydraulic Seeding $4.50 $58,500.00 $0.80 $10,400.00 $0.70 $9,100.006214EAAdjust Sprinkler System $5,000.00 $70,000.00 $3,125.00 $43,750.00 $5,400.00 $75,600.00 63 120 LF 4" PVC Schedule 40 Pipe (Irrigation Sleeve)$8.00 $960.00 $6.00 $720.00 $7.50 $900.0064820LF6" PVC Schedule 80 Pipe (Irrigation Sleeve)$20.00 $16,400.00 $9.50 $7,790.00 $14.00 $11,480.00652EAMonument Box $600.00 $1,200.00 $350.00 $700.00 $625.00 $1,250.00662EAProperty Pin $500.00 $1,000.00 $250.00 $500.00 $500.00 $1,000.00 67 1 LS Buried Electrical (Concrete foundations, conduits, pull boxes, borings, cables, wires, conductors)$250,000.00 $250,000.00 $385,000.00 $385,000.00 $450,000.00 $450,000.00 68 1 EA Emergency Preemption System $5,000.00 $5,000.00 $5,200.00 $5,200.00 $6,000.00 $6,000.00691EARadar Detection System $12,000.00 $12,000.00 $48,000.00 $48,000.00 $45,000.00 $45,000.00 70 32 EA Colored Luminaire Standard (25' Tall with 6' Mast Arm)$3,000.00 $96,000.00 $2,600.00 $83,200.00 $2,800.00 $89,600.00719EAColored Luminaire Standard (35' Tall with 10' Mast Arm)$3,800.00 $34,200.00 $4,400.00 $39,600.00 $3,000.00 $27,000.007243EAColored LED Assembly (for Signal and Luminaire)$900.00 $38,700.00 $450.00 $19,350.00 $500.00 $21,500.00732EAService Assembly (30 AMP and 60 AMP)$3,000.00 $6,000.00 $3,875.00 $7,750.00 $5,100.00 $10,200.007418EASignal Indications - Traffic $1,900.00 $34,200.00 $1,800.00 $32,400.00 $1,500.00 $27,000.00 75 10 EA Signal Indications - Pedestrian $1,800.00 $18,000.00 $1,500.00 $15,000.00 $1,800.00 $18,000.00761EAController, Cabinet, and Concrete Pedestal $50,000.00 $50,000.00 $51,000.00 $51,000.00 $43,800.00 $43,800.00777EAColored Signal Standard - Type 1 $1,000.00 $7,000.00 $1,200.00 $8,400.00 $1,400.00 $9,800.00782EAColored Signal Standard - Type 2 (35' Mast Arm with 15' Luminaire)$25,000.00 $50,000.00 $15,000.00 $30,000.00 $12,800.00 $25,600.00 79 1 EA Colored Signal Standard - Type 3 (55' Mast Arm)$16,000.00 $16,000.00 $18,000.00 $18,000.00 $15,000.00 $15,000.00801EAColored Signal Standard - Type 3 (60' Mast Arm)$19,000.00 $19,000.00 $18,000.00 $18,000.00 $16,000.00 $16,000.00811LSRemove and Reset Signal $25,000.00 $25,000.00 $18,000.00 $18,000.00 $18,000.00 $18,000.00 82 10 EA Push Button - Pedestrian/Tactile $1,800.00 $18,000.00 $1,900.00 $19,000.00 $1,600.00 $16,000.00831EABroadband Antenna $3,600.00 $3,600.00 $4,000.00 $4,000.00 $3,200.00 $3,200.00841EARemove and Salvage Luminaire, Miscellaneous Electrical $3,000.00 $3,000.00 $1,000.00 $1,000.00 $6,500.00 $6,500.00852.0 CY Rip Rap - Class 1 Random $400.00 $800.00 $250.00 $500.00 $100.00 $200.0086100,000 UNIT Miscellaneous Work $1.00 $100,000.00 $1.00 $100,000.00 $1.00 $100,000.00 87 1 LS Temporary Water Supply $15,000.00 $15,000.00 $34,000.00 $34,000.00 $40,000.00 $40,000.00883EAAdjust Vault $1,000.00 $3,000.00 $1,500.00 $4,500.00 $800.00 $2,400.00$4,590,971.50 $4,875,559.00 $5,225,936.40 $4,590,971.50 $4,875,559.00 $5,225,936.40 Staci Venner, P.E.Robert Peccia & Associates 5/14/2019 TOTAL BASE BID CALCULATED: Engineer's Estimate Knife RiverBelgrade, MT Total PriceTotal Price Unit Price TOTAL BASE BID WRITTEN IN BID BOOK: Unit Price Total Price Montana Civil Contractors Unit Price Page 1 of 1 5/14/2019 73 CERTIFIED BID TABULATIONS (BID DATE: May 14, 2019 - 4PM) COTTONWOOD ROAD FROM BABCOCK ST. TO DURSTON RD. ALTERNATE #1 CITY OF BOZEMAN Robert Peccia & Associates, Inc. 3810 Valley Commons Drive #4, Bozeman, MT 59718 Item UnitNo.Quantity Unit Description BASE BID 1-A 1 LS Mobilization, Bonding, and Submittals (5% Max)$18,650.00 $18,650.00 $1,000.00 $1,000.00 $700.00 $700.00 2-A 1 LS Construction Surveying, Staking, and Testing $10,000.00 $10,000.00 $4,750.00 $4,750.00 $4,000.00 $4,000.00 3-A 1 LS Traffic Control $25,000.00 $25,000.00 $8,500.00 $8,500.00 $3,000.00 $3,000.00 40-A 2,535 CY Street Excavation (Above Subgrade)$22.00 $55,770.00 $18.00 $45,630.00 $20.00 $50,700.00 44-A 7,609 SY Geosynthetic $5.00 $38,045.00 $4.50 $34,240.50 $5.25 $39,947.25 46-A 1,274 CY Crushed Base Course (1.5" Minus)$32.00 $40,768.00 $32.00 $40,768.00 $32.00 $40,768.00 47-A 2,451 TON Asphalt Pavement, PG 58-28 $70.00 $171,570.00 $70.00 $171,570.00 $76.00 $186,276.00 48-A 7,916 SY Asphalt Seal and Chip Coat $2.50 $19,790.00 $2.00 $15,832.00 $2.30 $18,206.8058-A 1 LS Remove Pavement Markings $12,000.00 $12,000.00 $10,000.00 $10,000.00 $10,700.00 $10,700.00 $391,593.00 $332,290.50 $354,298.05 $391,593.00 $332,290.50 $354,298.05 Staci Venner, P.E.Robert Peccia & Associates5/14/2019 TOTAL ALTERNATE #1 BID CALCULATED: Unit Price Total Price Unit Price Total Price Unit Price Total Price Engineer's Estimate Knife RiverBelgrade, MT Montana Civil Contractors TOTAL ALTERNATE #1 BID WRITTEN IN BID BOOK: Page 1 of 1 5/14/2019 74 CERTIFIED BID TABULATIONS (BID DATE: May 14, 2019 - 4PM) COTTONWOOD ROAD FROM BABCOCK ST. TO DURSTON RD. ALTERNATE #2 CITY OF BOZEMAN Robert Peccia & Associates, Inc. 3810 Valley Commons Drive #4, Bozeman, MT 59718 Item UnitNo.Quantity Unit Description BASE BID 1-B 1 LS Mobilization, Bonding, and Submittals (5% Max)$2,250.00 $2,250.00 $100.00 $100.00 $500.00 $500.00 89-B 1 LS $45,000.00 $45,000.00 $8,200.00 $8,200.00 $10,000.00 $10,000.00 $47,250.00 $8,300.00 $10,500.00 $47,250.00 $8,300.00 $10,500.00 Staci Venner, P.E. Robert Peccia & Associates 5/14/2019 TOTAL ALTERNATE #1 BID CALCULATED: Unit Price Total Price Unit Price Total Price Unit Price Total Price Engineer's Estimate Knife RiverBelgrade, MT Montana Civil Contractors TOTAL ALTERNATE #1 BID WRITTEN IN BID BOOK: Page 1 of 1 5/14/2019 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89