HomeMy WebLinkAbout01-15-19 Downtown URD MinutesDowntown Urban Renewal District
Board Meeting Minutes
January 15, 2019
Attending: Bobby Bear, Bob Hietala, Cory Lawrence, Tony Renslow, Kate Wiggins, Jeff
Krauss, Chris Naumann
Absent: Bill Stoddart
Public Comment: Allison Totten, Comma Q, was present to “learn more about the
downtown plan and the URD board”.
Minutes
ACTION: Bob Hietala moved to approve the October and November minutes as
presented.
Bobby Bear seconded the motion.
All voted in favor.
Financial Report
Chris presented FY2019 finances as of January 15, 2019.
He outlined the previous month’s expenses as follows: $28,325 for 3rd
quarter DBP
management fee; $20,000 transfer to DBP for NBPP project; Technical Assistance grant of
$7,500 for 240 East Mendenhall; and $1,707 for Soroptomist and $1,878 lamp maintenance and
repairs.
The board had no questions regarding the finance report.
Executive Director’s Report
None provided
Discussion and Decision Items
Downtown Plan Funding Request (related documents attached below)
Chris reviewed the request from Agency Landscape + Planning for additional services and fees
He touched on the main justifications in his memo including: timeline increasing from original 7
months to over 10 months; considerable additional time spent responding to NCOD and Comm
Plan; and significant additional time needed to interact with City of Bozeman staff and engage in
more robust public outreach. Chris reiterated that he feels the additional $25,000 of funding to
complete the Plan and processes is well warranted.
Bob noted that we spent $80k in 2009 for a 45-page plan and the current draft exceeds 150
pages which we should not expect to cost only $80k as originally contracted.
Cory acknowledged that although the contract was for a fixed fee and timeline, 3 additional
months of work is significant and that the quality of their work has far exceeded all expectations.
Bobby added that this plan is downtown’s 10-year work plan, our guiding document for the next
decade, and there for it is imperative that we make the necessary investment in the best plan
possible.
Regarding the additional funding Chris said he had secured $5,000 from the City Community
Development Department and was going to request $5,000 from the Downtown BID board.
Therefore, the ask of the URD Board is for $15,000.
ACTION: Cory Lawrence moved to approve additional funding for the Downtown Plan
not to exceed $20,000.
Tony Renslow seconded the motion.
All voted in favor.
Downtown Plan Annotated Framework Review
Chris presented an overview of the Annotated Framework concentrating of the five major
themes, ten guiding principles, and major implementation recommendations.
THE HEART OF A THRIVING BOZEMAN
• Create connections within Downtown and among the surrounding districts.
• Manage and regulate parking to ensure appropriate access and balanced supply.
MORE THAN MAIN STREET
• Reinforce Downtown as the city center, through new and existing buildings of urban density,
considerable height and a diverse mix of uses.
• Protect the character of the Main Street Historic District and enhance the residential
neighborhoods through context-sensitive development.
WALKABLE AND ACCESSIBLE
• Use streets, sidewalks and alleys as a safe and comfortable multi-modal network.
• Expand transit and bicycle access and facilities to link Downtown to other employment,
residential, and commercial districts.
WELCOMING TO EVERYONE
• Foster a place that is welcoming and inclusive of all ages, incomes, abilities, and
backgrounds with a mix of uses and accessible places.
• Design new buildings for sustainability, durability and design excellence.
CONNECTED TO NATURE AND CULTURE
• Ensure Downtown open spaces foster gathering, recreation, flexibility, programming and local
identity.
• Highlight nature whenever possible, strengthening amenities that are unique to Bozeman.
The boards comments included:
1. Emphasize that nearby districts (Midtown, N7th, Cannery, NE) are also mixed-use
commercial districts.
2. Highlight downtown as a regional commercial, tourism, and retail trade center
3. Add recent Urban3 tax value analysis to demonstrate downtown’s ROI
4. Stress importance of simplified parking code requirements
Meeting was adjourned at 1:05 pm
MEMO January 11, 2019
TO: Downtown BID and URD Boards
FR: Chris Naumann
RE: Agency Additional Services and Fees Request
For the reasons outlined below, I am requesting that the URD and BID Boards consider
allocating additional funding to the Downtown Bozeman Improvement Plan.
The Agency team has more than exceeded my expectations as has the demands of the project.
It became apparent to me this fall that the team was investing more time and effort than
contracted to do. I met with Brie Hensold from Agency at the end of October to have an honest
conversation about the project, contract and compensation. She said that her team willingly
entered into the project knowing it would require more of their services than the $80,000
contract would cover. When further pressed, she also admitted that they had grossly
underestimated extent of the discrepancy. I asked Brie to provide me with a supplemental fee
proposal that would fairly cover the shortfall and be more commensurate of their work.
The attached Agency additional services and fee proposal breaks out the various components
totaling $25,000.
Below are the factors that drove the project well beyond the original scope and timeline. It is my
professional position that the additional fee is warranted not only for the circumstances outlined
below but also due to the exceptional job the team has done with public engagement and the
extremely high quality of their work product.
For comparison, the 2009 Downtown Plan cost $80,000. Accounting for inflation, in today’s
dollars that same investment would cost in excess of $93,000. Along those same lines, the 2009
Plan was 45 pages in length, whereas the draft 2019 Plan is 130 pages with an additional 30
pages of appendices.
The RFP for the 2019 Plan outlined a 4-month process (for $80,000). The subsequent contract
with Agency is based upon a 7-month timeline (for $80,000). With the tentative date for the City
Commission to adopt the Plan in mid-April, the project will last over 10 months.
Although acknowledged in the RFP and contract, the Agency team has spent considerably more
time than anticipated addressing issues related with the other City planning processes.
Consideration of the NCOD Guidelines, the Community Plan and Housing Needs Assessment
has required significant attention.
Another aspect that has proved more demanding than expected is the elevated level of City of
Bozeman involvement. Considering the pressures and sensitivities around Bozeman’s growth,
the City staff and administration have placed additional demands on the consulting team in the
form of meetings, communications, documentation, and schedule delays. Similarly, the
understandable expectation of a higher degree of public engagement has resulted in more
thought, time and effort than originally planned.
In conclusion, the dynamics around the growth our community is grappling with are
exponentially more complex than they were 10 years ago. Correspondingly the scope and scale
of the downtown planning process has been considerably more involved. Thankfully the Agency
team has risen to the occasion rather than limiting their efforts based on the shortcomings of the
original contract. Therefore, I respectfully request the Downtown Plan funding partners to
approve the supplemental consulting fees outlined below.
Original Expenses
$80,000 Agency Team Consulting Fee
$10,000 Administration Expenses (facilities, marketing, printing)
$90,000 Total Project Expenses
Original Funding
$50,000 Urban Renewal District for Consulting Fee
$10,000 Urban Renewal District for Administration Expenses
$20,000 Business Improvement District for Consulting Fee
$10,000 City Community Development Department for Consulting Fee
$90,000 Total Funding
Requested Additional Expenses
$25,000 Agency Fee for additional time and services
Proposed Additional Funding
$15,000 Urban Renewal District
$ 5,000 Business Improvement District
$ 5,000 City Community Development District
$25,000 Total Additional Funding
Thank you for taking the time to consider this request and review the documents prior to our
meetings on January 15 and 16, 2019.
Please contact me with any questions.
Attachments:
• 2019 DBIP PSA Additional Services Amendment
• Agency Additional Services Agreement
FIRST AMENDMENT TO PROFESSIONAL SERVICES AGREEMENT
This first amendment to the Professional Services Agreement for the update of the Downtown
Bozeman Improvement Plan dated June 15, 2018 (the “Agreement”) is made and entered into
January 18, 2019, by and between the Downtown Bozeman Partnership, a limited liability
corporation organized and existing under the laws of the State of Montana, with a mailing
address of 222 East Main Street #302, Bozeman, MT 59715, hereinafter referred to as
“Partnership,” and, Agency Landscape + Planning with a mailing address of 45 Lawn Street,
Cambridge, MA 02138, hereinafter referred to as “Design Professional.”
In consideration of the mutual covenants and agreements herein contained, the receipt and
sufficiency whereof being hereby acknowledged, the parties hereto agree to amend the
Agreement as follows:
1. Extension of Term/Effective. Section 2 of the Agreement is extended and will terminate
upon completion of the work included in the Additional Services Agreement of Exhibit A
but no later than April 31, 2019.
2. Payment. Section 4 of the Agreement is amended to include the amount specified in the
Additional Services Agreement of Exhibit A.
3. Agreement still valid. All remaining terms and provisions of the Agreement remain valid.
IN WITNESS WHEREOF, the parties hereto have executed this instrument the day and year
first above written.
DOWNTOWN BOZEMAN PARTNERSHIP AGENCY LANDSCAPE + PLANNING
By By
Chris Naumann, Executive Director Brie Hensold, Principal
Mr. Chris Naumann Executive Director
Downtown Bozeman Partnership 222 East Main #302
Bozeman MT 59715
December 3, 2018
Subject: Additional Services Agreement
Dear Chris:
This letter is to summarize additional services provided by Agency Landscape + Planning to
Downtown Bozeman Partnership between November 1, 2018 and April 31, 2019 on the
Downtown Bozeman Master Plan. The original scope of services for the master plan, dated
June 13, 2018, included work and an established schedule through the end of October 2018.
Likewise, the needs of the project and client team have expanded to include greater integration
and coordination with other ongoing projects and teams, additional visits, and more detailed
work to examine relationships and implications between the scale of growth Downtown and in
nearby neighborhoods.
These additional services are provided on behest of the client to cover work associated with a
schedule extension. These include:
• Ongoing participation in client and subconsultant calls, and project management
correspondence due to schedule extension. This is assumed to be include regular emails as
well as weekly calls through the end of January and monthly February through April - $6,500
• Additional review cycle and associated revisions to the master plan by various
stakeholders and staff - $5,600
• Additional content development, greater level of detail, and coordination with other
ongoing planning efforts (including the Community Plan, NCOD, and Housing Needs
Assessment), city staff and consultant teams to align the DBIP Update with the complexity of
current planning processes - $10,500
• One-person, one-day trip to present the final master plan by Brie Hensold or Gina Ford
- $2,400 (labor plus expenses, which are estimated for billing at cost)
The total for these services, inclusive of labor and expenses is $25,000.
If desired, additional person-trips can be added for a per diem cost of $1,500-2,500 per person,
depending on the representative and the cost of expenses at the time.
Expenses (costs for travel, reproduction, postage, messenger, telephone, etc.) are included at
cost with no mark-up.
Please indicate your agreement to the foregoing Proposal by signing two copies and returning
the copy to Agency Landscape + Planning, LLC.
Very truly yours,
Brie Hensold
Agency Landscape + Planning, LLC