HomeMy WebLinkAbout03-12-19 Downtown URD Executive Directors ReportExecutive Director’s Report
Downtown Urban Renewal District Board
March 12, 2019
Technical Assistance Program Update
Three planning grants have been awarded in FY19. One grant remains from FY2018 for the Osborne
Building. As a reminder, the Planning grants have a $7500 cap and the Façade grants are capped at
$3000.
Other Financial Program Updates
Streetscape Grants
None open
Life-Safety Grants
None open
Hotel Incentive Grant
Etha Hotel—Pending
Fiber Connectivity Grant
Avant Courier Building—Completed
Building Project Updates
223 East Main (former IOOF Building) completed February 1, 2019
Owenhouse redeveloping 2nd
floor as 8000+ square feet of office space to be completed in Winter
of 2019 for XY Planning Network
Etha Hotel (Armory building) Construction resumed April 30, 2018.
Black & Olive Apartments under construction to be completed Fall 2019
“OSM” Building 5 story mixed use building proposed on southwest corner of Babcock and
Wallace—scheduled to begin Summer 2019
BG Mill Building 5 story mixed use building proposed on southwest corner of Mendenhall and
Broadway—final site plan submitted
One 11 Lofts (corner of North Willson and West Lamme) 50-unit apartment building with 53 parking
spaces. Currently in final review by Community Development Department.
Merin Condos (on North Bozeman across from Dave’s Sushi) 28 units of owner-occupied housing.
Currently in development review.
Osborne Building (233 East Main—last vacant lot) 4 story mixed use building with 2 floors of
restaurant use and 2 floors of offices. Construction began October 2018.
Village Downtown 84 new residential loft units have been approved and 30 new residential condo
Date Project Name Project Address Applicant Professional Type Value
4/16/2018 Osborne Building 233 East Main Strreet Casey Durham Locati Arch Plan/Façade $ 10,500
Total $ 10,500
Date Project Name Project Address Applicant Professional Type Value
8/20/2018 BSWB Building 106 East Babcock Randy Scully Intrinsik Planning $ 7,500
8/23/2018 Garage Restaurant 451 East Main Pete Strom Intrinsik Planning $ 7,500
8/28/2018 240 East Mend 240 East Mendenhall Stacy Hooks Intrinsik Planning $ 7,500
Total $ 22,500
Technical Assistance Program FY2018 Report
Technical Assistance Program FY2019 Report
units are under review by the City
New Businesses Update
• MoFi—23 East Main (second floor)—relocating Spring 2019 from Baltimore Bldg
• XY Planning Network—24 East Main—relocated from 133 East Main
• TBD—133 East Main—formerly XY Planning
• Ashley Cole Boutique—223 East Main—OPEN
• El Camino—211 East Main—formerly Toro—OPEN
• Bacchus Pub—105 West Main—formerly Bacchus Pub—REOPENED
• Miller’s Jewelry—relocating Spring 2019
• Nina’s Tacos & Tequila—5 West Mendenhall—Opening March 2019
• TBD—129 West Main Street—formerly Boho Boze
• Intrepid Credit Union—424 East Main—formerly Lilly Lu—OPEN
• _____ Art Gallery—424 East Main—formerly Perspectives—OPEN
Planning Updates
In this section, I will provide update about several ongoing City planning processes.
Community Plan (City Growth Policy) Update
Consultants: Logan Simpson (Ft. Collins)
Update: Draft Plan is being developed.
https://www.bozeman.net/city-projects/bozeman-community-plan-update
NCOD and Design Guidelines Update
Consultants: Bendon Adams Consulting (Aspen, CO) and Orion Planning (Missoula, MT)
Update: draft policy recommendations were considered by Historic Preservation Board,
Zoning Commission, and Planning Board on February 26, 2019.
City Commission public hearing on draft policies will be April 8, 2019.
https://www.bozeman.net/city-projects/ncod-review
Housing Needs Assessment and Action Plan
Consultants: Navigate, LLC Workforce Housing Solutions
Update: the draft Community Housing Needs Assessment was presented to the City
Commission March 11, 2019. The assessment and corresponding action plan is being guided
by Housing Work Group consisting of community stakeholders including the Downtown
Partnership.
https://www.bozeman.net/city-projects/community-housing-needs-assessment
Downtown Strategic Parking Management Plan
See attached report from Bozeman Parking Division
Active Projects: Strategic Parking Management Plan
December 2018
COMPLETED
ON-GOING
PENDING
HOLD/NOT STARTED
STRATEGY
DESCRIPTION
PROJECTED
COMPLETION
ACTUAL
COMPLETION
COMMENTS
1
Formalize the guiding principles
as policies within the parking and
transporation system plan.
Aug-16
Adopted by the BPC in 8/2016.
2
Adopt the 85% rule as the
standard for measuring
performance of the parking
supply and triggering specific
management strategies.
Aug-16
Adopted by the BPC in 8/2016.
3
Strengthen the role of the
Parking Manager and the Parking
Services Division - to better
integrate with the Community
Development and Economic
Development planning.
On-Going
On-Going
PPM attending DRC meetings, and offering data/comment as
staff review.
4
Establish a policy for adjusting
rates (on and off-street)
Oct-16
Adopted by the BPC in 10/2016.
5
Establish a Capital Maintenance
Reserve Fund
Jul-16
CC Approval
8/14/17
BPC approved Resolution 2017-03 (6/2017); City Commission
approved Resolution #4837 on 8/14/17.
6
Re-evaluate and restructure
current cash-in-lieu program.
TBD
PPM is working with the Comm. Dev. Department; CDD has
assigned this a 'fall 2017' priority status; ACM Winn is re-
assembling an internal "Parking Strategy Team" (at instruction
of City Manager); Internal 'Parking Strategy Team' is
operating, strategies regarding #6,7,8 are expected to be
8
Re-evaluate and clarify the
purpose and intent of the
current code section regarding
Special Improvement District #
565.
TBD
PPM is waiting on the Admin./Legal Depts. For further
instruction on this issue; ACM Winn is re-assembling an
internal "Parking Strategy Team" (at instruction of City
Manager), 3/1/18; Internal 'Parking Strategy Team' is
operating, strategies regarding #6,7,8 are expected to be
forthcoming (6/2018)
9
Implement a Facilities
Maintenance Plan.
12/30/2018
On-going
PPM is completing research for facility mgt. best practices,
starting to draft Fac. Mgt. plan, 8/17;
10
Develop a reasonable schedule
of data collection to assess
performance, including an
accurate on and off street
inventory (public and private)
and an occupancy/utilization
analysis.
5/1/17 & 7/1/17
COMPLETE
Data collection occurred, following the Strategic Parking
Management Plan, Spring and Summer 2017; WTI report
(draft) submitted 9/2017, under staff review at this time;
Final comments submitted to WTI for modification, 10/23/17;
The final WTI Parking Occupancy Report was released on
11/14/2017, analysis is underway - including
review/memorandum from Rick Williams Consulting.
11
Identify off-street shared use
opportunities based on data
from strategy 9. Establish goals
for transitioning employees,
begin outreach to opportunity
sites, negotiate agreements, and
assign employees to facilities.
On-Going
1st shared use agreement negotiated and approved with Big
Sky Western Bank (June 2017); Completion of the WTI
Parking Occupancy Study on 11/14/17 is expected to
demonstrate areas where new shared space agreements will
be most effective; Shared Use Agreement and GIS Layer
complete 6/1/18; PPM is identifying several private parking
sites as potential areas for shared use parking agreements.
12
Complete the 2008 Parking
District Identification
Signage/Branding Plan
Complete October
2018
Work has begun to design and implement lot specific signage
15
Upgrade the access/revenue
control system at the Bridger
Garage.
5/1/2018
RFP Selection Committee is in final stages of award
recommendation, as of 9/7/17. Following 9/2017 bid award,
staff is engaged in final contract negotiations and project
planning; Contracts signed 10/16/17 - Scope of Work signed
10/27/17; Project launch expected by 12/1/17: Project kick
off call held 11/10/17, data conversion and preliminary staff
training underway; Data conversion is nearing completion of
second data extraction, staff training is underway, transition
planning on-going; estimated GOLIVE of 4/28/18; T2 Software
and all technology (inc. LPR) installed; continuing to make
operational tweaks, and remedy fixed-camera accuracy
("context") issues as of 9/6/18.
16
Install a vehicle counter system
at Bridger Garage and at the
Surface lots.
2/1/2019
On-Going
Installation of vehicle counting system has been moved to
"Phase II" of the 2018 Parking Technology Project; following
successful completion of t "Phase I" - T2 and fixed/mobile
LPR.
17
Establish best practice protocols
and performance metrics for
existing enforcement personnel
and support enforcement with
appropriate technology.
On-going
Court/Appeals Packet (4/17); Uniform Policy (8/17);
Enhanced Safety Procedures; Security Camera Policy; LPR
Policy; PEO Assigned Routes Policy;
18
Expand bike parking network to
create connections between
parking and the downtown to
encourage employee bike
commute trips and draw
customers to downtown
businesses.
On-going
PPM met with City's 'bike/pedestrian' consultant to open the
door for potential new partnerships; follow up planned for
September 2018
19
Explore changes to existing
residential on street permit
programs and evaluate
potentially implement new
residential parking permit
districts in the neighborhood
north and south of the
downtown commercial district.
1/1/2019
On-going
City Commission requested (11/20/17) that this effort be
complete, with recommendation to them, by late
Spring/Early Summer 2018. PPM will provide preliminary
report to BPC on 3/8/18, final report on 4/12/18;
Presentation to City Commission on 4/23/18; Post-CC report,
the PPM continues to work on revised code changes and
RPPD determinations for eventual resubmittal to CC,
1/2019;
20
Evaluate on street pricing in high
occupancy areas.
No activity at this time.
21
Explore expanding access
capacity with new parking supply
and/or transit
No activity at this time.
22
Develop cost forecasts for
preferred parking supply and
shuttle options.
No activity at this time.
23
Explore and develop funding
options.
No activity at this time.
24
Explore the implementation of
on street pricing.
No activity at this time.
on "P" towers. Likewise, the PPM is working to develop
additional technology related and regulatory signage for the
garage and lots based on the 2008 format; COMPLETE
October 2018
13
Clarify current on-street parking
signage, particularly in areas
where unlimited parking is
allowed. Consider incorporating
the current City parking logo into
on-street signage.
On-going
PSD, in cooperation with the GIS Department, has started an
inventory of parking signs and zones within the B-3. Parking
Services Division submitted completed hand recorded field
map of B-3 to GIS, 10/1/18; Estimated completion is late
November 2018. This data should demonstrate where
additional and/or clearer signage is needed in the B-3; PSD
and Dwn. Bus. Partnership working to develop an inventory
of all B-3 on-street parking spaces, to integrate with
sign/zone inventory.
14
Rename all publicly owned lots
and garages by address.
COMPLETED
8/12/18
Resolution 2018-06 was presented and approved at the
8/12/18 meeting of the BPC.
forthcoming (6/2018); BPC adopted Resolution 2018-03
recommending CIL increase to $25000 (6/2018),to be
forwarded to CC for action; City Commission consideration of
Resolution 4292 (increasing CILP to $25000) scheduled for
12/17/18;
7
Re-evaluate code based
minimum parking requirements
PPM worked with the ED dept on changes to the minimum
parking standards (UDC) in the B2M zone, approved by CC
9/2017; PPM actively attending internal DRC meetings to
offer guidance on policy issues; ACM Winn is re-assembling
an internal "Parking Strategy Team" (at instruction of City
Manager), 3/1/18; Internal 'Parking Strategy Team' is
operating, strategies regarding #6,7,8 are expected to be
forthcoming (6/2018)