Loading...
HomeMy WebLinkAboutA-302 Existing Building Elevations 04-29-19 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Architect BUILDING AND SITE MATERIAL LEGEND DEMO MATERIALS Sr 2—1,on Bozeman,AT—15 ph.(4D6)579-845a M 0,124'-6" T.O.EXISTING ROOF Qe License ASPHALT SHINGLES-Mile � p°p, M1a-Asphalt shingle M2a-Painted Wood M3a-Existing M4a-Painted Shingle M5a-Painted Brick SEo •.Rcy,,� ASPHALT SHINGLES-M1a Painted Metal Siding ��V�,•$RETT R' F"; POTTER •`�� L OUTLOOKER-M2a - _ 2599 s 2 GUTTER TO DOWNSPOUT-M3a :,mP•BOZEMAN.ApQ PAINTED SHINGLE SIDING-M4a �I EXISTING HISTORICAL WINDOW-M2a �- PAINTED SHINGLE SIDING-M4e GUTTER TO DOWNSPOUT-M3a \� 429-19 __ ❑" ❑ TRANSITIONING TRIM-M2a - III fe PAINTED TRIM-M2a M6a-Painted Lap M7a-Painted M6a-Porch Floor M9a-Exposed M 10a-Wrought Iron Owner K OUTLOOKER-M2a— Siding Foundation Aggregate Railing �1os'-B" Concrete Step LAURA STANLEY 4 T.O.SECOND FINISHED FLOOR a GUTTER AND ROOF 502 SOUTH 6TH AVENUE TRANSITIONING TRIM-M2a (TO BE REMOVED)-M2a/M3a BOZEMAN,MT 59715 AP 68 PAINTED E ISTSIG WIND W EXISTING WINDOW J (TO BE REMOVED)-M2a PAINTED LAP SIDING-Mile CONTRACTOR TO MATCH HISTORIC Contractor EXTERIOR CROWN MOLDING PROFILE AT PAINTED TRIM-M2a ALL REPAIRED/NEW WINDOW SYSTEMS KRAVETZ HOME CONTRACTOR TO MATCH HISTORIC 10 " PAINTED LATTICE SCREENING EXTERIOR CROWN MOLDING PROFILE AT BUILDERS, I N C T.O.FIRST FINISHED FLOOR TO BE REMOVED-M2a ALL REPAIREDMEW WINDOW SYSTEMS PAINTED TRANSITION TRIM-M2a PAINTED FOUNDATION WALL-M7a H 41 SERENITY LANE BOZEMAN,MT 59715 406-587-8250 wk 406-580-8250 cell 9z-0 - - 1 T.O.BASEMENT FINISHED FLOOR G /� EXISTING EAST ELEVATION 1/4rr=1 r_0rr — t F CONTRACTOR TO MATCH HISTORIC EXTERIOR JAMB/SILL PROFILES AT ALL REPAIRED/NEW WINDOW SYSTEMS CONTRACTOR TO MATCH HISTORIC EXTERIOR JAMB/SILL PROFILES AT ALL REPAIRED/NEW WINDOW SYSTEMS Project - ---------------=--_-_-_---- ASPHALT SHINGLES-M1a E O GENERAL NOTE: UTLOOKER-M2a STANLEY EXISTING SOLAR PANEL ARRAY TO REMAIN ALL HISTORIC EXTERIOR WINDOW TRIM PROFILES RESIDENCE --- - TO BE FIELD DIMENSIONED/DUPLICATED BASED ON THE . - - -- EXISTING HISTORICAL WINDOW-M2a EXISTINGHISTORICTRlM ON THE BUILDING AND THEN 109'-8 " (TO BE REMOVED) APPROVED BY ARCHITECT PRIOR TO FABRICATION, COOPER PARK T .SECOND FINISHED FLOOR.O _ - - HISTORIC DISTRICT PAINTED SHINGLE SIDING-M4a 502 S.6th Street D TRANSITIONING TRIM-M2a Bozeman,MT 59715 ASPHALTSHINGLES-M1a 3 HISTORIC TRIM DUPLICATION GALLATIN COUNTY 1/4rr=1 r_Orr MONTANA Issued/Revised 4/29119 PAINTED TAPERED WOOD COLUMN-M2a C PAINTED WOOD PLINTH-M2a PAINTED BRICK COLUMN BASE-M5a PAINTED LAP SIDING-M6a Drawing Title PORCH FLOOR-Mae ' PAINTED CONCRETE STEPS-M7a EXISTING 100'-0" TO FIRST BUILDING FINISH B FLOORED ELEVATIONS WROUGHT IRON RAILING TO BE REMOVED-M10a PAINTED CAST-IN-PLACE Project No. CONCRETE STEPS TO BE REMOVED-M7a STANLEY THIS SECTION TO BE Drawn DEMOLISHED,PER PLAN POTTER 111,92'-0" Drawing No. T.O.BASEMENT FINISHED FLOOR A I 2 EXISTING SOUTH ELEVATION A-302 1/4"=1'-0" 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16