CHANGE ORDER
No. '1
DATE OF ISSUANCE: EFFECTIVE DATE:
OWNER rity of Rozemlln
CONTRACTOR Willi"m~ Plllmhing IV H"':.ting
Contract: Northwp.~t W:.t",rlin", "'In #(,(,<;
Project: Northwp.<::t W:.t",rlin.. "'In #(,(;.<;
OWNER'S Contract No: -------- ENGINEER'S Contract No. -------
ENGINEER r.,,<::tnn Pnginppring IV "'lIrvp.ying. P r
You are directed to make the following changes in the Contract Documents:
Description: Miscellaneous items of additional work performed throughout the construction ofthe project. There are no bid items in
the contract to cover these items.
Reason for Change Order: Changes in conditions encountered during the construction of the project.
Attachments: N/A
I CHANGE IN CONTRACT PRICE: I I CHANGE IN CONTRACT TIMES: I
Original Contract Price Original Contract Times:
Substantial Completion: QO
$ Q41, 741 00 Ready for final payment: 100
(days or dates)
Net Increase (Decrease) from previous Change Orders Net change from previous Change Orders No. _ to
No. .L to -2: No. - :
Substantial Completion: N/A
$ 1 (, <; 1 I'i 00 Ready for final payment: N/A
,
(days)
Contract Price prior to this Change Order: Contract Times prior to this Change Order:
Substantial Completion: QO
$ Q<;R,?<;700 Ready for final payment: 100
(days or dates)
_...._~,,------
Net increase (decrease) of this Change Order: Net increase (decrease) this Change Order:
Substantial Completion: 0
$ 1 R, 1 OQ (, 1 Ready for final payment: 0
(days)
Contract Price with all approved Change Orders: Contract Times with all approved Change Orders:
Substantial Completion: QO
$ Q71'i,'1(,(, (,1 Ready for final payment: 100
(da s or dates
RECO~ ACCEPTED:
By: By:0~~f1L) ~Jff0?1V'-"\
By:
ENGIN~R (Authorized Signature) OWNER (Authorized re) CONT)~TOJ3. (Authorized Signature)
Date: I ~ '6jro Date: 1-/Z 2/2 () I Date: 2 Lj / ZtJ(}C
I /
EJCDC 1910-8-b (1996 Edition)
Prepared by the Engineers Joint Contract Document Committee and endorsed by The Associated General Contractors of America and the Construction Specitlcations Institute,
, I"'"'' "I . , , I ,., r-, r, 1
. . ' i;2L!_.J,:,':,:..:'~,L:.,:~" ',!, /i,}!
, ; !
" I
I' GASTON ENGINEERING
SURVEYING / SOILS TESTING
January 26, 2000
W.O. #: 91-505-4
Williams Plumbing & Heating
2131 Industrial Drive
Bozeman, MT 59715
ATIN: Terry Sutherland
RE: Northwest Waterline SID #665
Dear Mr. Sutherland:
Enclosed please find four copies of Change Order #3 for your review and signature. The following is a
summary of the change order requests included in Change Order #3 for your convenience.
Request Amount Description Recommendation
#
4 $1,091.17 Sewer Crossing @ UPS Pay 'l2
5 $755.30 Target Utility Crossings (Catron & Max Ave) Pay 'l2
6 $239.43 Lux Driveway Culvert Removal Pay 'l2
7 $352.43 Restraint added to hydrants (Mega Lugs) Pay 'l2
8 $2,329.39 Lux sewer service crossing Pay 'l2
11 ($711.20) Credit for culvert removal and sewer crossing not Approve
performed
12 $258.26 10" DIP not shown on plans Pay 'l2
14 $328.07 Abandoned Gas line crossing (Rest area) Approve
15 $739.04 Abandoned Gas line crossing (N of Costco, 2 Approve
locations)
16 $1,062.05 10" DIP cut and removal (Dead Man's Gulch) Approve
17 $544.07 Sewer line crossing Simmental ST A 25+70 Approve
18 $644.00 Second Pressure & Bac-t Test on Simmental at City Approve
of Bozeman's request
20 $2,791.95 Locate Casing on N 19th & Baxter PayY2
TSOI2600.wpd
CONSULTING ENGINEERS & LAND SURVEYORS
P.o. Box 861. 211 Haggerty Lane. Bozeman, MT 59715. (406) 586-0588. fax (406) 586~0589
.. .
James Nickelson ~2- September 21, 1999
W.O. #: 91-505-4
Request Amount Description Recommendation
#
22 $2,205.49 Mega lug joint restraint on hydrants Approve
23 $771.09 Sewer Crossing @ Baxter & 19th Approve
24 $3,034.70 Install 1" Service to Anderson Precast Approve
26 $1,481.53 Pressure test Costco water main Approve
31 $353.53 Standby time for sewer crossing on Baxter Approve
34 $584.86 Concrete removal around culvert on Baxter Approve
36 $260.00 Extend 24" arch pipe (10') Approve
37 $458.87 Electrical crossing 10' E of casing (east side ofN Approve
19th)
40 $860.40 Pipe restraint & insulation (east side of 19th on Approve
Baxter)
41 $233.84 Hydrants on Simmenta1 require additional restraint Approve
(All thread)
42 $1,350.30 3/4" Service on Baxter Lane Approve
The above summary includes the requests as agreed upon during our 12/2/99 meeting with the City of
Bozeman including the revised equipment and stand-by rates. Requests #13 and #33 are not included for
reasons stated in earlier correspondence.
The total amount for Change Order #3 is $18,109.61. Please execute these change orders at your earliest
convenience and return them to our office. We will then forward them to the City of Bozeman for
payment.
Please feel free to give me a call if you have any questions. Thank you.
Sincerely,
Gaston Engi~SUIVeying. P.c.
{1J6~
r -
By: Martin E. Gagnon, P .E.
Project Engineer
MGlkmb
Enclosure