Loading...
HomeMy WebLinkAbout19176 Project Summary MT A] Community Development PROJECT IMAGE Lot 1,Block 4 Southbridge Subdivision,PH 1 i S23,T02S,R05E Bozeman . Montana — Three and Four Plex Development �e APrll— Yt to vle PROJECT INFORMATION VICINITY MAP Project name: Southbridge Lot 1 BI 4 Three and Four Plex Development Projecttype(s): Site plan Description:Construction of(1)3 plex and(2)four plexes Street address: 1929,1931,and 1935 Southbridge Drive I' Zip code:59715 !: Zoning:R-3 Gross lot area: 47,206 sq.ft.or1.0837 acres Block frontage:Landscape Number of buildings:3 Type and Number of dwellings:(11)3 BR Townhome style condominiums Non-residential buildingsize(s):NA Non-residential building height(s):NA On stories) Number of parking spaces:33 Required,36 Provided Affordable housing(Y/N):N Cash in lieu of parkland(Y/N): N CITY USE ONLY Submittal date: Planner: Application file number: DRC required(Y/N): Revision Date: Development Review Application Al Page 1 of 3 Revision Date:5.16.18 REQUIRED FORMS: I Varies by project type,PLS 1. PROPERTYOWNER Name:Jason Roylance Full address(with:ip coda):343 Middle Road,Sheridan Montana 59749 Phone: (208)201-2244 Email: jwroylanoe@yahoo.com 2. APPLICANT Name:Jason Roylance Full address(with zip coda):343 Middle Road,Sheridan Montana 59749 Phone: (208)201-2244 Email: lwroylance @yahoo.com 3. REPRESENTATIVE Name:Randy Visser-Visser Architects Full address(with zip code):163 Quiet Water Way,Manhattan,MT 59741 Phone: (406)282-9922 Email: randy@visserarchitects.net 4. SPECIAL DISTRICTS Overlay District: ❑Neighborhood Conservation ®None Urban Renewal District: ❑Downtown ❑North 7th Avenue ❑Northeast ❑North Park ®None S. CERTIFICATIONS AND SIGNATURES This application must be signed by both the applicant(s)and the property owner(s)(if different)for all application types before the submittal will be accepted.The only exception to this is an informal review application that may be signed by the applicant(s)only. As indicated by the signature(s)below,the applicant(s)and property owner(s)submit this application for review under the terms and provisions of the Bozeman Municipal Code. It is further indicated that any work undertaken to complete a development approved by the City of Bozeman shall be in conformance with the requirements of the Bozeman Municipal Code and any special conditions established by the approval authority.I acknowledge that the City has an Impact Fee Program and impact fees may be assessed for my project.Further,I agree to grant City personnel and other review agency representative's access to the subject site during the course of the review process(Section 38.34.050,BMC). I(We)hereby certify that the above information is true and correct to the best of my(our)knowledge. Certification of Completion and Compliance-I understand that conditions of approval may be applied to the application and that I will comply with any conditions of approval or make necessary corrections to the application materials in order to comply with municipal code provisions. Statement of Intent to Construct According to the Final Plan-I acknowledge that construction not in compliance with the approved final plan may result in delays of occupancy or costs to correct noncompliance. continued on next page Development Review Application Al Page 2 of 3 Revision Date•5 16 18 REQUIRED FORMS: Varies by project type PLS Applicant Signature: Printed Name: Owner Signature:C Printed Name:�- w Owner Signature: Printed Name: If signing as a corporation or LLC,please provide the title and position of the individual signing on behalf of the corporation/LLC. Attach separate sheets for additional owner signatures. 6. APPLICATION TYPES Check all that apply,use noted forms. FORM FORM ❑ 1. Pre-application Consultation None ❑17. Informal Review INF ❑ 2. Master Site Plan MSP 1118. Zoning Deviation/Departure None ® 3. Site Plan SP 1319. Zoning or Subdivision Variance Z/SVAR 4. Subdivision pre-application PA ❑20. Conditional Use Permit CUP 5. Subdivision preliminary plan PP 1321. Special Temporary Use Permit STUP 6. Subdivision final plan FP 1322. Special Use Permit SUP 7. Subdivision exemption SE 1123. Regulated Activities in Wetlands WR ❑ 8. Condominium Review CR ❑24. Zone Map Amendment(non-Annexation) ZMA ❑ 9. PUD concept plan PUDC ❑25. UDC Text Amendment ZTA ❑10. PUD preliminary plan PUDP ❑26. Growth Polity Amendment GPA 1311. PUD final plan PUDFP 1327. Modification/Plan Amendment 13 MOD 12. Annexation and Initial Zoning ANNX ❑28. Extension ofApproved Plan EXT 013. Administrative Interpretation Appeal AIA 029. Reasonable Accommodation 11 RA 14. Administrative Project Decision Appeal APA 1130. Comprehensive Sign Plan CSP ❑15. Commercial Non-residential COA CCOA ❑16. Historic Neighborhood NCOA 1131. Other: Conservation Overlay COA CONTACT US Alfred M.Stiff Professional Building phone 406.582.2260 20 East Olive Street 59715(FED EX and UPS Only) fax 406.582.2263 PO Box 1230 Bozeman,MT59771 planning@ boz e m a n.n e t www.bozeman.net ttt��� �Van of 3 Revision Date:5.16.18 y project ty�PLS