HomeMy WebLinkAbout19176 Project Summary MT
A]
Community Development
PROJECT IMAGE
Lot 1,Block 4 Southbridge Subdivision,PH 1 i
S23,T02S,R05E
Bozeman . Montana
— Three and Four Plex Development �e
APrll— Yt to vle
PROJECT INFORMATION VICINITY MAP
Project name: Southbridge Lot 1 BI 4 Three and Four Plex Development
Projecttype(s): Site plan
Description:Construction of(1)3 plex and(2)four plexes
Street address: 1929,1931,and 1935 Southbridge Drive
I'
Zip code:59715 !:
Zoning:R-3
Gross lot area: 47,206 sq.ft.or1.0837 acres
Block frontage:Landscape
Number of buildings:3
Type and Number of dwellings:(11)3 BR Townhome style condominiums
Non-residential buildingsize(s):NA
Non-residential building height(s):NA
On stories)
Number of parking spaces:33 Required,36 Provided
Affordable housing(Y/N):N
Cash in lieu of parkland(Y/N): N
CITY USE ONLY
Submittal date: Planner:
Application file number: DRC required(Y/N): Revision Date:
Development Review Application Al Page 1 of 3 Revision Date:5.16.18
REQUIRED FORMS: I Varies by project type,PLS
1. PROPERTYOWNER
Name:Jason Roylance
Full address(with:ip coda):343 Middle Road,Sheridan Montana 59749
Phone: (208)201-2244
Email: jwroylanoe@yahoo.com
2. APPLICANT
Name:Jason Roylance
Full address(with zip coda):343 Middle Road,Sheridan Montana 59749
Phone: (208)201-2244
Email: lwroylance @yahoo.com
3. REPRESENTATIVE
Name:Randy Visser-Visser Architects
Full address(with zip code):163 Quiet Water Way,Manhattan,MT 59741
Phone: (406)282-9922
Email: randy@visserarchitects.net
4. SPECIAL DISTRICTS
Overlay District: ❑Neighborhood Conservation ®None
Urban
Renewal District: ❑Downtown ❑North 7th Avenue ❑Northeast ❑North Park ®None
S. CERTIFICATIONS AND SIGNATURES
This application must be signed by both the applicant(s)and the property owner(s)(if different)for all application types before the
submittal will be accepted.The only exception to this is an informal review application that may be signed by the applicant(s)only.
As indicated by the signature(s)below,the applicant(s)and property owner(s)submit this application for review under the terms
and provisions of the Bozeman Municipal Code. It is further indicated that any work undertaken to complete a development
approved by the City of Bozeman shall be in conformance with the requirements of the Bozeman Municipal Code and any special
conditions established by the approval authority.I acknowledge that the City has an Impact Fee Program and impact fees may
be assessed for my project.Further,I agree to grant City personnel and other review agency representative's access to the subject
site during the course of the review process(Section 38.34.050,BMC). I(We)hereby certify that the above information is true
and correct to the best of my(our)knowledge.
Certification of Completion and Compliance-I understand that conditions of approval may be applied to the application and that
I will comply with any conditions of approval or make necessary corrections to the application materials in order to comply with
municipal code provisions.
Statement of Intent to Construct According to the Final Plan-I acknowledge that construction not in compliance with the approved
final plan may result in delays of occupancy or costs to correct noncompliance.
continued on next page
Development Review Application Al Page 2 of 3 Revision Date•5 16 18
REQUIRED FORMS: Varies by project type PLS
Applicant Signature:
Printed Name:
Owner Signature:C
Printed Name:�- w
Owner Signature:
Printed Name:
If signing as a corporation or LLC,please provide the title and position of the individual signing on behalf of the corporation/LLC.
Attach separate sheets for additional owner signatures.
6. APPLICATION TYPES
Check all that apply,use noted forms. FORM
FORM
❑ 1. Pre-application Consultation None ❑17. Informal Review
INF
❑ 2. Master Site Plan MSP 1118. Zoning Deviation/Departure None
® 3. Site Plan SP 1319. Zoning or Subdivision Variance
Z/SVAR
4. Subdivision pre-application PA ❑20. Conditional Use Permit
CUP
5. Subdivision preliminary plan PP 1321. Special Temporary Use Permit
STUP
6. Subdivision final plan FP 1322. Special Use Permit
SUP
7. Subdivision exemption SE 1123. Regulated Activities in Wetlands
WR
❑ 8. Condominium Review CR ❑24. Zone Map Amendment(non-Annexation) ZMA
❑ 9. PUD concept plan PUDC ❑25. UDC Text Amendment
ZTA
❑10. PUD preliminary plan PUDP ❑26. Growth Polity Amendment GPA
1311. PUD final plan PUDFP 1327. Modification/Plan Amendment
13 MOD
12. Annexation and Initial Zoning ANNX ❑28. Extension ofApproved Plan EXT
013. Administrative Interpretation Appeal AIA 029. Reasonable Accommodation
11 RA
14. Administrative Project Decision Appeal APA 1130. Comprehensive Sign Plan CSP
❑15. Commercial Non-residential COA CCOA
❑16. Historic Neighborhood NCOA 1131. Other:
Conservation Overlay COA
CONTACT US
Alfred M.Stiff Professional Building phone 406.582.2260
20 East Olive Street 59715(FED EX and UPS Only) fax 406.582.2263
PO Box 1230
Bozeman,MT59771 planning@ boz e m a n.n e t
www.bozeman.net
ttt���
�Van
of 3 Revision Date:5.16.18 y project ty�PLS