Loading...
HomeMy WebLinkAbout1994 - Payback Agreement -South Wallace - Sewer50 Vt14 SOUTH WALLACE SEWER FINAL PAYBACK CALCULATIONS CITY OF BOZEMAN ENGINEERING DEPARTMENT AUGUST 30, 1994 f AUGUST 30, 1994 South Wallace Sewer Final Payback Calculations CONSTRUCTION COSTS: (Sime Construction) 538,365 ENGIirEERING COSTS: ('Thomas, Dean & Hoskins) Design: $3,700 Construction: $2,000 Additional Inspection: $6,544 SUBTOTAL: &14,909 3% Administrative Fee: $1,347 TOTAL: $46,256 PAYBACK RATE: 50.2103 sq. ft, CURRENT OWNER NL,P DESIGNATION AREA (sq. ft.) PRORATA PERCENTAGE PRORATA COST Harringtons G 8,252 3.0% 51,388 Knox C 9,75b 3.5% 51,619 Hamilton/1\4acpherson B 15,000 5.3% 52,452 Story Distributing F 16,142 5.8% 52,683 Ball D 24,750 8.8% $4,070 Gallatin Valley Seed A 29,700 10.6% 54,903 CMC Heartland Partners E* 176,062 63.0% 529,141 TOTALS: 279,656 sq. ft. 100.0% 546,256 *Total square footage for this property owner is 190,912. However, a reduction was given when a future street with cul-de-sac, and trail easement were factored in. The figure in the colunm above reflects the assessable square footage. Details arc as follows: Future street/cul-de-sac 7,850 sq. ft. Future 20' trail easement (approx. 350 linear feet) 7,000 sq. ft. TOTAL 14,850 SQ. FT. Ell 6 0 0 20 LINDLEY c 0 0 3 z 0 m �- S. u1a,P-�a rte. Sp-�� ra,,6o,4< 4y-eq- CEMETERY PAYBACK DESIGNATION MAP i t5 93 z4€) PLACE IUE I N s I rs.e�.� r," V r Cx.r 2 i 5T. 20 0 10 f -LI i LINDLEY 0 O O 3 z 0 H F- m rlb4rl< Are -q - I 20 Immul CEMETERY