Loading...
HomeMy WebLinkAboutG0.00 Cover Sheet 03-22-2019PROJECT #SHEET NUMBERREVISION:DATE2222 NE Oregon St #217 | Portland, OR This drawing is not intended nor shall it be used for construction purposes unless the signed professional stamp of a regisered architect employed at MINARIK Architecture, Inc. is affixed above.Consultant:971−319−6249 | www.minarikarch.com Project Status:© 2018 MINARIK Architecture, Inc ALL RIGHTS RESERVED These Drawings are the Property of MINARIK Architecture, Inc and are not to be used or reproduced in any manner without prior written permission. 2 / 1 3 / 2 0 1 9 5 : 2 2 : 1 0 P M 1 1806 G0.00795 Manley Road Bozeman MT 1/2/2019 Cover SheetSite Plan Submission Ma n l e y R o a d O f f i c e B u i l d i n g CO D E S : 20 1 2 I n t e r n a t i o n a l B u i l d i n g C o d e 20 1 2 I n t e r n a t i o n a l M e c h a n i c a l C o d e 20 1 4 N a t i o n a l E l e c t r i c C o d e 20 1 2 U n i f o r m P l u m b i n g C o d e 20 1 2 E n e r g y C o n s e r v a t i o n C o d e SHEET INDEX: PR O J E C T T E A M : Ow n e r : Ol d M a r s h L L C PO B o x 1 1 6 7 Bo z e m a n M T 5 9 7 1 1 P: 4 0 6 -58 0 -67 2 5 At t n : D e n n i s S t e i n h a u e r Co n t r a c t o r : Ar c h e r C o n s t r u c t i o n , I n c . PO B o x 1 1 6 7 Bo z e m a n M T 5 9 7 1 1 P: 4 0 6 -58 0 -67 2 5 At t n : D e n n i s S t e i n h a u e r Ar c h i t e c t : Mi n a r i k A r c h i t e c t u r e , I n c 22 2 2 N E O r e g o n , Su i t e 2 1 7 / P o r t l a n d , O R 9 7 2 3 2 P: 9 7 1 -31 9 -62 4 9 At t n : D o u g M i n a r i k / d o u g @ m i n a r i k a r c h . c o m St r u c t u r a l E n g i n e e r : La r r y J o h n s o n 15 2 W e s t S h o r t S t r e e t Bo z e m a n , M T 59 7 1 5 At t n : L a r r y J o h n s o n / l a r r y @ j o h n s o n e n g i n e e r . c o m Me c h a n i c a l & E l e c t r i c a l C o n s u l t a n t s : La n d s c a p e D e s i g n e r : Sc h m i d t t y D e s i g n a n d L a n d s c a p e s 64 3 0 F o x t r o t t e r L n . Bo z e m a n , M T 5 9 7 1 5 P: 4 0 6 -57 9 -37 4 0 At t n : K a t i e Z a m b a r a n o / k a t i e @ s c h m i d t t y d e s i g n . c o m Ci v i l E n g i n e e r : C a n d H E n g i n e e r i n g 10 9 1 S t o n e r i d g e D r i v e Bo z e m a n , M T 5 9 7 1 8 At t n : M a t t H a u s a u e r / m h a u s a u e r @ c henginee rs.com PR O P E R T Y I N F O R M A T I O N : Pr o j e c t A d d r e s s : 79 5 M a n l e y R o a d / B o z e m a n , M T 5 9 7 1 5 Co u n t y : Ga l l a t i n Le g a l D e s c r i p t i o n : Lo t 1 3 , B l o c k 1 , G a l l a t i n P a r k S u b d i v i s i o n , S e c . 3 6 , T . 1 S . , R , 5 E o f P . M . M . C i t y o f B o z e m a n , G a l l a t i n C o u n t y , M o n t a n a Zo n e : M -1 I n d u s t r i a l Pr o p e r t y / L o t A r e a : 23 3 7 7 S F FA R : (B l d g A r e a / L o t A r e a ) = .2 9 Bu i l d i n g F o o t p r i n t : 3 , 9 8 0 S F Lo t C o v e r a g e : 1 7 % Pa v e d a n d P a r k i n g A r e a : 13 1 9 9 S F La n d s c a p e A r e a : 37 0 2 S F Bu i l d i n g H e i g h t : Ma x A l l o w e d B u i l d i n g H e i g h t : 44 ' Pr o p o s e d B u i l d i n g H e i g h t : 34 ' -3" Bu i l d i n g A r e a s : Le v e l 1 : 3, 9 8 0 G r o s s S F Le v e l 2 : 2, 9 1 5 G r o s s S F To t a l B u i l d i n g A r e a : 6, 8 9 5 S F Oc c u p i a b l e A r e a s : In t e r i o r S p a c e s , N o t I n c l u d i n g S h a f t s , o r M e c h R o o m Le v e l 1 - Le a s e 1 : 3 2 3 4 S F Le v e l 1 - Co r e : Lo b b y : 1 1 8 S F Co r e C i r c u l a t i o n : 4 0 S F Re s t r o o m : 6 0 S F Re s t r o o m : 3 3 S F Ja n i t o r : 1 5 S F To t a l C o r e S p a c e = 2 6 6 S F St a i r s : 1 6 9 S F Le v e l 2 - Le a s e 2 : 23 2 2 S F Le v e l 2 - Co r e : Co r e C i r c u l a t i o n : 4 0 S F Re s t r o o m : 3 3 S F Re s t r o o m : 6 0 S F Ja n i t o r : 15 S F To t a l C o r e S p a c e = 14 8 S F St a i r s : 20 9 S F To t a l O c c u p i a b l e A r e a : 6, 3 4 8 S F Pa r k i n g C a l c u l a t i o n : Gr o s s b u i l d i n g S F x 8 5 % = p a r k i n g 68 9 5 S F X . 8 5 = , 5 8 6 0 S F Re q u i r e m e n t f o r O f f i c e U s e : 1 s t a l l p e r 2 5 0 S F 5, 8 6 0 / 2 5 0 = 2 3 s t a l l s Ma x i m u m P a r k i n g S p o t s 2 8 Pr o v i d e d 2 7 s t a l l s Us e d 4 f o r s n o w Fi r e S p r i n k l e r s : N/ A GE N E R A L N O T E S : 1. Th i s s e t o f d r a w i n g s i s p u b l i s h e d i n c o n j u n c t i o n w i t h a n i n l i n e s p e c i f i c a t i o n w i t h o u t wh i c h t h e C o n t r a c t D o c u m e n t s a r e I n c o m p l e t e . 2. Co n t r a c t o r m u s t c o m p l y w i t h t h e r u l e s a n d r e g u l a t i o n s o f t h e a g e n c i e s h a v i n g ju r i s d i c t i o n a n d s h a l l c o n f o r m t o a l l c i t y , co u n t y , s t a t e an d f e d e r a l c o n s t r u c t i o n s a f e t y an d s a n i t a r y l a w s , c o d e s s t a t u t e s a n d o r d i n a n c e s . A l l f e e s , t a x e s , p e r m i t s , a p p l i c a t i o n s an d c e r t i f i c a t e s o f i n s p e c t i o n , a n d t h e f i l i n g o f a l l w o r k w i t h g o v e r n m e n t a l a g e n c i e s s h a l l be t h e r e s p o n s i b i l i t y o f t h e c o n t r a c t o r . 3. All w o r k s h a l l b e p e r f o r m e d b y s k i l l e d a n d q u a l i f i e d w o r k m e n i n a c c o r d a n c e w i t h t h e be s t p r a c t i c e s o f t h e t r a d e s i n v o l v e d , a n d i n c o m p l i a n c e w i t h b u i l d i n g r e g u l a t i o n s a n d / o r go v e r n m e n t a l l a w s , s t a t u t e s o r o r d i n a n c e s c o n c e r n i n g t h e u s e o f u n i o n l a b o r . 4. Ea c h t r a d e w i l l p r o c e e d i n a f a s h i o n t h a t w i l l n o t d e l a y t h e t r a d e s f o l l o w i n g t h e m . 5. All w o r k s h a l l b e e r e c t e d a n d i n s t a l l e d p l u m b , l e v e l , s q u a r e , t r u e , a n d i n p r o p e r al i g n m e n t . 6. All w o r k a n d m a t e r i a l s s h a l l b e g u a r a n t e e d a g a in s t a l l d e f e c t s f o r a p e r i o d o f a t l e a s t on e ( 1 ) y e a r f r o m a p p r o v a l o f f i n a l p a y m e n t . 7. Do n o t s c a l e t h e d r a w i n g s . W r i t t e n d i m e n s i o n s t a k e p r e c e d e n c e o v e r s c a l e d di m e n s i o n s . D i m e n s i o n s a r e t o f a c e o f f r a m i n g , f a c e o f c o n c r e t e , g r i d l i n e , o r c e n t e r l i n e of o b j e c t , u n l e s s o t h e r w i s e n o t e d . PR O J E C T D E S C R I P T I O N : Co r e a n d S h e l l P e r m i t - Ma n l e y R o a d : Ne w c o n s t r u c t i o n o f 6 , 8 9 5 s f c o r e a n d s h e l l o f f i c e b u i l d i n g w i t h i n t e r i o r of f i c e T I . 2 s t o r y 3 4 ' -3" w o o d f r a m e c o n s t r u c t i o n . G r o u n d f l o o r h a s cr a w l s p a c e b e n e a t h s l a b . T h e p r o j e c t w i l l h a v e 2 7 t o t a l p a r k i n g s p a c e s , on e i s H C a c c e s s i b l e a n d t w o a r e c o o m p a c t s p o t s . 8. De t a i l e d d r a w i n g s a n d l a r g e r s c a l e d r a w i n g s t a k e p r e c e d e n c e o v e r s m a l l e r s c a l e dr a w i n g s . 9. Th e A r c h i t e c t s h a l l n e i t h e r h a v e c o n t r o l o v e r o r c h a r g e o f , n o r b e r e s p o n s i b l e f o r , th e c o n s t r u c t i o n m e a n s , m e t h o d s , t e c h n i q u e s , s e q u e n c e s o r p r o c e d u r e s , o r f o r sa f e t y p r e c a u t i o n s a n d p r o g r a m s i n c o n n e c t i o n w i t h t h e w o r k , s i n c e t h e s e a r e so l e l y t h e C o n t r a c t o r ' s r i g h t s a n d r e s p o n s i b i l i t i e s u n d e r t h e C o n t r a c t D o c u m e n t s . 10 . Th e s t a b i l i t y o f t h e s t r u c t u r e i s d e p e n d e n t o n t h e c o m p l e t e d c o n d i t i o n . T h e d e s i g n , ad e q u a c y , a n d s a f e t y o f e r e c t i o n b r a c i n g , s h o r i n g , t e m p o r a r y s u p p o r t s , e t c , i s t h e so l e r e s p o n s i b i l i t y o f t h e c o n t r a c t o r a n d h a s n o t b e e n c o n s i d e r e d b y t h e a r c h i t e c t / de s i g n e r . T h e c o n t r a c t o r i s r e s p o n s i b l e f o r t h e s t a b i l i t y o f t h e s t r u c t u r e p r i o r t o t h e co m p l e t i o n o f a l l s h e a r w a l l s , r o o f a n d f l o o r d i a p h r a g m s a n d f i n i s h m a t e r i a l s . 11 . Ov e r a l l s i t e p l a n b a s e d o n s p o t e l e v a t i o n s a n d n o n -comprehensive site survey by ot h e r s . A c t u a l s i t e c o n d i t i o n s m a y d i f f e r f r o m c o n d i t i o n s s h o w n i n t h e s e do c u m e n t s . C o n t r a c t o r s h a l l v e r i f y a n d c o n f irm existing conditions shown or im p l i e d o n t h e d r a w i n g s p r i o r t o t h e s t a r t o f c o n s t r u c t i o n o r o r d e r i n g m a t e r i a l s . No t i f y a r c h i t e c t / d e s i g n e r o f a n y d i s c r e p a n c i e s . 12. Contractor and subcontractor shall become familiar with the site, existing conditions, and these drawings prior to commencing work.13. Scope of work shall include work indicated and implied by these drawings.14. All construction debris to be removed off -site. All debris is to be disposed of in a legal manner at a landfill or recycling facili ty. No debris shall be disposed of in local waste collection facilities.15. Contractor to locate exact locations of utilities.16. Install all materials per manufacturer recommendations.17. All sheet metal work shall conform to current SMACNA (Sheet Metal and Air Conditioning Contractors' National Assoc., Inc.) Standards.18. Submit paint drawdowns, cabinetry shop drawings, and all other related finishes for designer approval per in line Specification on G0.05.19. Submit locations of fire strobes and thermostat locations for Designer approval prior to construction to avoid conflict with furnishings.GENERAL G0.00 Cover Sheet 2/14/2019 CIVIL C1.0 Site Plan 2/14/2019 C2.0 Grading and Drainage Plans 2/14/2019 C3.0 Details 2/14/2019 ARCHITECTURAL A1.00 Site Plan 2/14/2019 A0.03 Door & Window Schedule 1/2/2019 A1.01 Site Details 2/14/2019 A2.20 Level 1 Floor Plan 2/14/2019 A2.21 Level 2 Floor Plan 2/14/2019 A2.24 Roof Plan 1/2/2019 A3.00 Elevations 2/14/2019 A3.01 Elevations 2/14/2019 A4.00 Building Sections 2/14/2019 ELECTRICAL E1.00 Photometric Plan 1/2/2019 E1.01 Electrical Plan and Schedule 1/2/2019 LANDSCAPE L1.00 Landscape Plan 2/14/2019 Ar e a M a p o f S i t e a n d C o n t e x t 79 5 M a n l e y R d 1 /2 " M i l e R a d i u s 1 REVISIONDATEREASON FOR ISSUE 12/14/2019Site Plan Revisions