Loading...
HomeMy WebLinkAbout98- Gallatin Center Limited Partnership . . " .. BEFORE THE BOZEMAN CITY COMMISSION CITY OF BOZEMAN, MONTANA IN THE MATTER OF THE APPLICATION OF GALLATIN CENTER LIMITED PARTNERSHIP FOR THE PRELIMINARY SUBDIVISION PLAT FINDINGS OF FACT APPROVAL OF A SUBDIVISION P.U.D. TO AND DIVIDE 142 + /- ACRES INTO 27 LOTS FOR ORDER COMMERCIAl/INDUSTRIAl/BUSINESS PARK USES. PURSUANT to the Montana Subdivision and Platting Act, Section 76-3-101 through 76-3-614, Montana Codes Annotated, and the Bozeman Area Subdivision Regulations, the Bozeman City Commission reviewed the proposed Preliminary Subdivision Plat for the further division of Lot 3, Minor Subdivision #210, and Tract 0-2, C.O.S. 1827, being 142 + /- acres located west of North 19th Avenue, north and south of Valley Center Road, and north of Baxter Lane, to create 27 lots for commercial/industrial/business uses, as submitted by the applicant, together with the required supplementary plans and information, to determine if the information submitted meets the requirements of the Bozeman Area Subdivision Regulations and the Montana Subdivision and Platting Act, and in addition, to consider the recommendation of the Bozeman City-County Planning Board concerning the application. It appeared to the City Commission that all parties and the' public wishing to appear and comment before the Bozeman City-County Planning Board were given the opportunity to do so, and therefore, being fully advised of all matters having come before it regarding this application, the City Commission makes the following Findings of Fact, as required: FINDINGS OF FACT I. The application for the subject subdivision was made in conjunction with a zoning Planned Unit Development application on June 29, 1998. The application will create 27 lots for commercial/ industrial/business development in conjunction with a zoning Planned Unit Development. II. After finding the application was properly submitted and reviewed under the procedures of the Bozeman Area Subdivision Regulations, the application was GALLA TIN CENTER PLANNED UNIT DEVELOPMENT FINDINGS OF FACT AND ORDER PA GE 1 " considered by the Bozeman City-County Planning Board at a public hearing on August 18, 1998. Two members of the public spoke at the hearing, the first a representative of the residents of Thomas Drive who expressed concern regarding wildlife in the area and the proposal to turn Thomas Drive into the southbound lane of North 27th Avenue. The representative indicated the adjacent property owners will resist any attempts to annex their properties and to utilize Thomas Drive as right-of-way for North 27th Avenue. It was made clear that only a portion of Thomas Drive is dedicated right-of- way, and that the majority is in private access easements. The second person, also an adjoining property owner, requested she have input regarding the future alignment of North 27th Avenue and Deadman's Gulch, as that alignment will affect how her property can be developed. The Board considered the public's comments and found that the proposed alignment of North 27th Avenue and its construction as a collector, as anticipated in the transportation plan, was in the best interest of the community. They indicated property owners along Thomas Drive should be permitted access to North 27th Avenue once it is constructed, but that Thomas Drive should not be abandoned. The Board indicated the alignment of North 27th and Deadman's Gulch will be important to adjacent property owners, and those adjoiners should be consulted during the design of the intersection. After finding that the application complied with the required criteria established in Section 76-3-608, M.C.A. for the review of preliminary subdivision plats, the Board, on a vote of 9-0, forwarded the application to the Bozeman City Commission with a recommendation of conditional approval. III. The application was considered by the Bozeman City Commission at their regular meeting on September 8, 1998. Staff advised the Commission of an additional condition that was proposed by the City Engineering Department, based on the Planning Board's request that the intersection of North 27th and Deadman's Gulch be carefully planned. This condition will require the applicant, during review of Phases II and III, to provide a geometric design of the intersection that will take into account the need to provide a safe "cross" intersection of these two collector streets, and that will also GALLA TIN CENTER PLANNED UNIT DEVELOPMENT FINDINGS OF FACT AND ORDER PA GE 2 ~ consider the impacts of the intersection alignment with the proposed development west of the subdivision, and with the existing power lines. The applicant's representative advised the Commission that they agreed with the conditions recommended by the Planning Board as well as the new condition recommended by the Engineering Department. The subdivision was weighed against the review criteria established by Statute, and the following was found: A. PRIMARY REVIEW CRITERIA 1 . Effects on Agriculture. The development of this subdivision will remove 142 acres, less the wetland area, from hay production. This property has been annexed to the city, and it lies within the urban growth and sewer service boundaries of the City. Further it is designated to develop as commercial and industrial on the land use element of the 1990 Bozeman Area Master Plan Update. This community adopted plan determined that the most appropriate use for this property, once infrastructure is available, is for commercial and industrial use. Existing fencing along the develop's boundaries will be maintained as construction of the project proceeds, to protect adjacent agricultural uses. 2. Effects on Aqricultural Water User Facilities. The proposed relocation of East and West Catron Creeks must ensure that there are no effects on downstream water users. 3. Effects on Local Services. Conditions should be added to the approval of the subdivision to ensure appropriate easements, stormwater, water, sewer and street improvements are provided by the developer. The extension of North 27th Avenue, on the half section line, as a collector street is in compliance with the Transportation Plan, and will ensure appropriate future traffic circulation. The design of the intersection of North 27th and Deadman's Gulch must be carefully reviewed to ensure adequate access is provided to adjoining property. As evidenced by the findings of the traffic study, prior to filing the plat for Phases III and IV, intersection improvements and signalization of the intersection of North 19th Avenue and Baxter Lane must be completed in order to raise the level of service to a level of "C" for the designated design year. No building permits will be issued for Phases III and IV until the signal and intersection improvements are operational. This subdivision was reviewed concurrently with a zoning planned unit development for the same property. That review included the construction of a large retail store on Lot 8, and traffic studies indicated that it may be necessary for a traffic signal to be installed at the intersection of Catron Street and Valley Center Road prior to opening of the store. If the studies do not find that a light is needed at that time, prior to filing the plat for Phase I and/or Phase II, intersection improvements and signalization of the intersection of Catron Street and Valley Center Road must be completed, or financially guaranteed, in order to raise the level of service to "C" for the designated design year. 4. Effects on Natural Environment. Effects on the natural environment will be minimal due to the proposed drainage control system and flat grades on the site. The native grasses located near East and West Catron Creeks and in the common open space lots will be maintained with drainage easements. As the development will be served with municipal sewer, the threat of groundwater degradation from onsite sewage disposal will be GALLA TIN CENTER PLANNED UNIT DEVELOPMENT FINDINGS OF FACT AND ORDER PAGE 3 1 eliminated. Weeds will be controlled in accordance with the Weed Control Plan approved by the County Weed Control District. The relocation of the creeks can only be accomplished through the appropriate permitting processes. 5. Effects on Wildlife and Wildlife Habitat. There are no critical wildlife or wildlife habitat on the subdivision site or in the vicinity. 6. Effects on Public Health and Safety. Natural hazards particular to this site include the potential for minor flooding from the creeks. Mitigation will be attained primarily through setbacks from the streams. Man-made hazards include existing utility poles along the right-of-way of Thomas Drive. The construction of North 27th Avenue in this area will provide a median along the utility poles. The proposed subdivision lies along the western edge of the groundwater plume showing elevated levels of tetrachloromethane (PCEI and other associated contaminants within the Bozeman Solvent Site. Plume monitoring wells have been installed to track this plume, and the most current data on the wells indicate that PCE concentrations are all below the acceptable maximum contaminant level. Treatment of processed water from construction dewatering may be required by appropriate agencies. Municipal water lines will be protected from contact with groundwater, will be disinfected prior to use, and will meet the minimum leakage requirements of the City and Department of Environmental Quality. The subdivision will provide adequate pedestrian transportation routes through designated open space areas. B. COMPLIANCE WITH SURVEY REQUIREMENTS PROVIDED FOR IN PART 4 OF THE MONT ANA SUBDIVISION AND PLATTING ACT. The subdivision complies with the survey requirements of the Act, and the survey requirements will be further provided for will be complied with when the final plat is filed. C. COMPLIANCE WITH BOZEMAN AREA SUBDIVISION REGULATIONS. With conditions, the final plat will comply with the Regulations. D. COMPLIANCE WITH THE REQUIRED SUBDIVISION REVIEW PROCEDURES. The public hearing before the Planning Board was properly noticed, as required in the Subdivision Regulations. The notice was mailed to all adjoining property owners by Certified Mail, and the notice was published in the Bozeman Dailv Chronicle on August 2, 1998. All other process requirements have been followed. E. PROVISION OF EASEMENTS FOR THE LOCATION AND INSTALLATION OF ANY PLANNED UTILITIES. All utilities and necessary utility easements will be provided. F. PROVISION OF LEGAL AND PHYSICAL ACCESS TO EACH PARCEl. Legal and physical access to each parcel will be provided, either from existing limited access roads, or from new subdivision streets. All accesses to North 19th and Valley Center must be permitted from appropriate agencies. GALLA TIN CENTER PLANNED UNIT DEVELOPMENT FINDINGS OF FACT AND ORDER PA GE 4 : ORDER After considering all matters of record presented at the public hearing and meeting, the Commission found that the proposed preliminary plat for the Gallatin Center Planned Unit Development will comply with the requirements of the Bozeman Area Subdivision Regulations and the Montana Subdivision and Platting Act subject to conditions. The evidence as stated in the Findings of Fact, justifies the conditions imposed on the subdivision to ensure that the final plat complies with all regulations, that appropriate and safe vehicular and pedestrian circulation is provided, and adequate public access, utility easements, and rights-of-way are provided. THEREFORE, IT IS HEREBY ORDERED, on a vote of 5-0, that the subject subdivision be approved, subject to the conditions listed below. This City Commission order may be appealed by bringing an action in the Eighteenth District Court of Gallatin County, within 30 days after the adoption of this document by the City Commission, by following the procedures of Section 76-3-625, M.C.A. 1 . The approval of this subdivision/zoning PUD is based on the proposal contained in the submittal application received by the City-County Planning Office on June 29, 1998. This approval includes the relaxation of the following regulations: a. Up to a zero side yard setback, to give flexibility for the location of future structures and encourage clustering of buildings b. Increase in size and number of freestanding signs proposed at the entry locations to the development. Individual lots/buildings would be restricted to the square footage of signs permitted in the Sign Code c. Allow the temporary cul-de-sac on Deadman's Gulch to exceed 500-feet d. Allow a building permit for the Target store on Lot 8, Block 1 without the completion of site sewer and water improvements and prior to filing of the final plat for the subdivision only if adequate fire protection is provided, as required by the Fire Marshal for the Target Store. The Target store may not open to the public until adequate municipal water and sewer infrastructure and appropriate access is provided to the site. e. Allow a reasonable installation sequence of sidewalks, due to the long term nature of the project f. Use alternate paved road standards, with no curb or gutter All provisions of the Subdivision and Zoning regulations which are not specifically waived under this condition shall be complied with. GALLA TIN CENTER PLANNED UNIT DEVELOPMENT FINDINGS OF FACT AND ORDER PA GE 5 . : 2. The final subdivision plat shall conform to all requirements of the Bozeman Area Subdivision Regulations (August 1997 version) and the Uniform Standards for Final Subdivision Plats, show all existing and new easements, all existing applicable restrictions as shown on Minor Subdivision No. 210, and be accompanied by all appropriate documents, certification by the State Department of Environmental Quality Subdivision Program, a final platting certificate, all required certificates, and utility statement. The Certificate of Dedication must indicate that the roadways dedicated to the public are accepted for public use, but the City accepts no responsibility for maintaining the same, and that the owners agree that the City has no obligation to maintain the roads hereby dedicated to public use. Appropriate Certificates of Mortgagees must be signed by all lien holders on the property. Two c10thback (or equivalent) and mylar (or equivalent) copies of the final plat must be submitted for final plat approval, along with a digital copy of the final plat, on a double sided, high-density 3 % -inch floppy disk. 3. The developer shall have three (3) years from the date of preliminary plat approval to complete the conditions, conform to all regulations, and submit a complete application for Final Plat approval for ALL PHASES of the subdivision. This approval period may be extended by the City Commission upon request of the applicant as permitted in the subdivision regulations. 4. Prior to or concurrent with the filing of a plat for any phase of the subdivision, the final PUD plan must be submitted to and approved by the City, and the approved Development Guidelines and Covenants must also be filed. 5. The final plat of each phase shall eliminate the proposed use of blocks, as the block layout is associated with phases and not with the true alignment of blocks. The use of continuous lot numbers with no block numbers is acceptable in this instance. 6. Stop and street marker signs shall be installed at the intersections of subdivision streets with Valley Center, North 19th Avenue, Baxter Lane, and North 27th Avenue, as required during plan and specification review by the City Engineer. No building permits, with the exception of the Target Store, will be issued until street marker signs are installed for the street on which the building permit is located. 7. The property owner shall provide and file with the final subdivision plat of Phase I a Waiver of Right to Protest Creation of SIDs that is applicable to the entire subdivision for the improvements specified herein. The Waiver shall specify that in the event SlOs are not utilized for the completion of these projects, the property owner(s) shall agree to participate in an alternate financing method for completion of said improvements on a fair share, proportionate basis as determined by the square footage of the property, linear front footage of the property, taxable valuation of the property, or combination thereof. Said Waiver shall be a covenant running with the land and shall not expire. a. Signalization of the Valley Center Road/North 19th Avenue intersection b. Signalization of the Catron Street/Valley Center Road intersection c. Street improvements to North 19th Avenue and Valley Center Road GALLA TIN CENTER PLANNED UNIT DEVELOPMENT FINDINGS OF FACT AND ORDER PA GE 6 ---- -----......- : : d. Improvement of interior streets to city standards, if necessary/desired e. Creation of a city-wide park maintenance district f. Intersection/signalization improvements to Deadman's Gulch and North 19th Avenue, and g. Installation of additional south bound lanes on North 19th A venue 8. Prior to application for final plat approval, the subdivider shall enter into a Memorandum of Understanding with the Gallatin County Weed Control District, and a copy of the signed document shall be submitted to the planning office with the final plat application. A Covenants shall be placed on the final plat requiring the property owner(s) and/or Property Owner's Association to be responsible for the control of County declared noxious weeds. 9. A Storm water Master Plan for the subdivision for a system designed to remove solids, silt, oils, grease, and other pollutants from the runoff from the private and public streets and all lots must be provided to and approved by the City Engineer prior to final plat approval of Phase I. This plan must address the issues identified by the Montana Department of Transportation in an August 4, 1998 letter to the Planning Office, and the plan may be submitted by the City Engineer, at his discretion, to MDT for their approval. The master pian must depict the maximum sized retention basin location, show location of an provide easements for adequate drainage ways within the subdivision to transport runoff to the stormwater receiving channel. The plan shall include sufficient site grading and elevation information (particularly for the basin site, drainage ways and finished lot grades), typical storm water detention/retention basin and discharge structure details, basin sizing calculations and a stormwater maintenance plan. Any storm water ponds located within park or open space shall be designed and constructed to be conducive to the normal use and maintenance of the open space. While the runoff from the individual lots will be dependent on the intensity of use on each lot, the maximum sizing of the storm retention facilities for each lot will be established based on maximum site development. Final facility sizing may be reviewed and reduced during design review of the final site plan for each lot. The applicant shall provide a phasing schedule for the installation of the storm water improvements with the infrastructure plans. 10. Plans and specifications and a detailed design report for water and sewer main extensions, storm sewer and the public/private streets, prepared by a Professional Engineer, shall be provided to and approved by the City Engineer and the Montana Department of Environmental Quality. The applicant shall also provide Professional Engineering services for construction inspection, post-construction certification, and preparation of mylar record drawings. Construction shall not be initiated on the public infrastructure improvements until the plans and specifications have been approved and a pre-construction conference has been conducted. With the exception of the Target store, no building permits shall be issued prior to substantial completion and City acceptance of the required infrastructure improvements. Prior to issuance of a building permit for the Target store, "approvable" infrastructure plans for all infrastructure associated with the Target Store shall be submitted to the City Engineer. GALLA TIN CENTER PLANNED UNIT DEVELOPMENT FINDINGS OF FACT AND ORDER PA GE 7 , . . 11 . All infrastructure improvements including a) water and sewer main extensions (with the exception of those proposed to be installed by SID 665), and b) public streets, sidewalks, and related storm drainage i nfrastru ctu re improvements, shall be financially guaranteed or constructed prior to final plat approval for each phase. City standard sidewalks shall be constructed on all street frontages one foot off the property line, or otherwise as approved by the City Engineer, with the exception of the North 19th Avenue walk where the proposed trail will be utilized, at the time of development of each lot. The developer shall install, or financially guarantee, all sidewalks/trails prior to filing of the final plat for each phase. City sidewalk permits must be obtained, if applicable, prior to installation of the sidewalks. 12. The Montana Fish, Wildlife, and Parks, Natural Resource Conservation Service, Montana Department of Environmental Quality and Army Corps of Engineers shall be contacted by the applicant regarding the proposed project, and any required permits (i.e., 310, 404, Turbidity exemption, etc.) shall be obtained for the subdivision work as well as for the creek relocations. Copies of the permits, or letters indicating permits are not required, must be submitted to the Planning and/or Engineering Offices prior to commencement of infrastructure construction or creek relocation. A 35-foot setback from the mean high water mark of all streams must be shown on all final plats. 13. Easements, a minimum of 30-feet wide, for the water and sewer main extensions not located within public right-of-way shall be provided to the City Engineer prior to installation of the utility. The utility shall be located in the center of the easement, and in no case shall the utility be less than 10 feet from the edge of an easement. 14. All streets in the subdivision shall be privately maintained by the property owners association, and the property owner documents must include a mechanism to finance the maintenance. 15. As required by the Montana Department of Transportation, a combined traffic impact statement that collectively reviews all impacts and provides alternatives which will protect the integrity and safety of the North 19th corridor shall be prepared and presented to them. Any mitigation required in that study must be completed by the developers, as required by the Department. This study must be completed prior to the filing of the final plat for Phase I, and the findings and requirements of the Department complied with prior to filing of the phase(s) said improvements are required. 16. Prior to filing the plat for Phases III and IV, intersection improvements and signalization of the intersection of North 19th Avenue and Baxter Lane shall be completed in order to raise the level of service to a level of "C" for the design year which shall be 1 5 years following construction of the improvements. If at the time of platting Phases II and IV a signal is in place, the applicant shall submit a traffic study that evaluates the level of service and if the level of service is below a level of "0" the plat shall not be filed until intersection and/or signal improvements are completed, or financially guaranteed, to raise the level of service to level "C" for the 15 year design year. No building permits will be issued for Phases III and IV until the signal and intersection improvements are operational. 17. Unless previously completed for the Target store, prior to filing the plat for Phase I and/or Phase II, intersection improvements and signalization of the intersection of Catron Street and Valley Center Road shall be completed, or financially guaranteed, in order to raise the level of service to a level of "C" for the design year which shall be 15 years following construction, GALLA TIN CENTER PLANNED UNIT DEVELOPMENT FINDINGS OF FACT AND ORDER PA GE 8 . . '. unless Montana Department of Transportation and the City Engineer determine that improvements are not required based on a warrant study submitted by the applicant's engineer. 18. In conjunction with the construction of private/public street approaches to North 19th Avenue, the applicant shall be responsible for modifications of the striping of North 19th Avenue to accommodate left hand turn bays. Intersection lighting at all private/public road intersections with North 19th Avenue and Baxter Lane shall be provided. The applicant and property owners association shall be responsible for the installation, maintenance and operation of the lighting, and the Covenants shall be amended to reflect that responsibility. 19. Water rights or cash in-lieu thereof shall be provided as each phase of the subdivision if filed, as agreed to in the Annexation Agreement filed in the office of the Gallatin County Clerk and Recorder. 20. At the time of plan and specification review of Phase II and Phase III, the applicant's engineer shall provide a geometric design, in accordance with acceptable standards, for the intersection of North 27th Avenue and Deadman's Gulch Drive subject to the approval of the City Engineer. The design shall take into account the need to provide a safe "cross" intersection of these two collector streets and consider the impacts of the intersection alignment with the proposed development to the west of the subdivision and take into account the location of the existing power line. The final plat shall dedicate all right of way required to provide for the implementation of the approved design. DA TED this 19th day of October , 1998. CITY OF BOZEMAN ~~Frko~ ATTEST: (}~;/ ~ ROBIN L. SULLIVAN Clerk of the Commission GALLA TIN CENTER PLANNED UNIT DEVELOPMENT FINDINGS OF FACT AND ORDER PA GE 9