HomeMy WebLinkAboutAG2-01 Phase 2 Cover Sheet 03-06-19PROJECT INDEX
DATE OF ISSUE
09
.
2
6
.
1
9
P
E
R
M
I
T
D
O
C
S
P
H
A
S
E
2
DRAWING ISSUED FOR CONSTRUCTION / PERMIT
AG2 -01 PHASE 2 COVER SHEET
AS2 -00 MASTER SITE PLAN
PHASE 2 SITE PLAN AS2 -01
PHASE 2 SITE PLAN C-1.0 DIRECTORY, SCHEDULE, & MAP
C-1.1 NOTES, LEGEND, & ABBREVIATIONS
EXISTING CONDITIONS & SURVEY DATA C-2.0
PHASE 2 SITE PLAN C-2.1 EXISTING CONDITIONS & DEMOLITION PLAN
C-3.0 SITE PLAN
STREAMLINE BUS STOP PLAN C-3.1
C-3.2 SIGNAGE PLAN
C-3.3 STRIPING PLAN
UTILITY PLAN ROUNDABOUT C-3.4
UTILITY PLAN RUTH THIBEAULT WAY C-3.5
C-3.6 UTILITY PLAN ROUNDABOUT
C-4.0 GRADING PLAN ROUNDABOUT
GRADING PLAN RUTH THIBEAULT WAY C-4.1
CONSTRUCTION MANAGEMENT PLAN C-5.0
C-6.0 CIVIL DETAILS
CIVIL SITE DETAILS C-6.1
CIVIL SITE DETAILS C-6.2
CIVIL SITE DETAILS C-6.3
L100 LANDSCAPE OVERALL PLAN
PHASE 2 LANDSCAPE ENLARGEMENT PLAN L200
IRRIGATION OVERALL PLAN (PHASE 2) L300
ES2 -01 ELECTRICAL SITE PLAN -PHASE 2
RUTH THIBEAULT PHOTOMETRIC CALC -PHASE 2 ES2 -02
ELECTRICAL SITE DETAILS ES2 -03
SHEET
DATE
SHEET TITLE
BSD7
Bozeman School District
Consultant #:
12
1
6
W
e
s
t
L
i
n
c
o
l
n
S
t
r
e
e
t
D
,
Bo
z
e
m
a
n
,
M
T
5
9
7
1
5
404 West Main Street
Bozeman, MT 59715
REVIEWED BY:
DRAWN BY:
PE
R
M
I
T
D
O
C
U
M
E
N
T
S
P
H
A
S
E
2
PHASE 2 COVER
SHEET
AG2-01
2.26.19
VA
N
W
I
N
K
L
E
S
T
A
D
I
U
M
RE
N
O
V
A
T
I
O
N
S
Author
Checker
BSD7# 17-41-36
2 2 5 F r a n k l i n S t r e e t , S u i t e 1 1 0 0
B o s t o n , M A 0 2 1 1 0
t 6 1 7 .4 7 8 .0 3 0 0
f 6 1 7 .4 7 8 .0 3 2 1
w w w .p e r k i n s w i l l .c o m
REV. DESCRIPTION DATE
VAN WINKLE STADIUM RENOVATIONS
PROJECT DIRECTORY
Architect:
NE45 ARCHITECTURE
1627 W. Main St., Suite 325
Bozeman, MT 59715
P: 406.599.6213
Owner:
PHASE 2 PLAN SUMMARY
Structural:
DCI+BCE Engineers
Bozeman School
District #7
Todd Swinehart
BSD7, Director of Facilities
todd.swinehart@bsd7.org
1289 Stoneridge Dr #1A
Bozeman, MT 59718
P: 406.556.8600
1. THE CONTRACTOR SHALL FIELD VERIFY ALL CONDITIONS AND DIMENSIONS PRIOR TO ANY WORK AND SHALL BE RESPONSIBLE
FOR ALL WORK AND MATERIALS INCLUDING THOSE FURNISHED BY SUBCONTRACTORS
2. DIMENSIONS TAKE PRECEDENCE OVER DRAWINGS: DO NOT SCALE DRAWINGS TO DETERMINE ANY
LOCATIONS. THE ARCHITECT SHALL BE NOTIFIED OF ANY DISCREPANCY PRIOR TO CONTINUING WITH WORK.
3. GENERAL CONTRACTOR SHALL KEEP THE CONSTRUCTION SITE IN A BROOM CLEAN CONDITION AT ALL TIMES DURING THE
PROJECT.
4. THE CONTRACTOR SHALL REPORT TO THE ARCHITECT ANY ERRORS, INCONSISTENCIES OR OMISSIONS HE OR SHE MAY
DISCOVER. THE CONTRACTOR IS RESPONSIBLE FOR CORRECTING ANY ERROR AFTER THE START OF CONSTRUCTION WHICH HAS
NOT BEEN BROUGHT TO THE ATTENTION OF THE ARCHITECT. THE MEANS OF CORRECTING ANY ERROR SHALL FIRST BE
APPROVED BY THE ARCHITECT.
5. ALL REQUIRED CITY AND/OR COUNTY LICENSE SHALL BE ACQUIRED AND PAID FOR BY THE INDIVIDUAL TRADE.
6. THE ARCHITECT WILL REVIEW SHOP DRAWINGS AND SAMPLES FOR CONFORMANCE WITH THE DESIGN CONCEPT OF THE
PROJECT. THE ARCHITECT'S REVIEW OF A SEPARATE ITEM SHALL NOT INDICATE APPROVAL OF AN ASSEMBLY IN WHICH THE ITEM
FUNCTIONS.
7. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY LOCATION OF ALL EXISTING UTILITIES WHETHER SHOWN
HEREIN OR NOT AND TO PROTECT THEM FROM DAMAGE. THE CONTRACTOR SHALL BEAR ALL EXPENSES OF REPAIR OR
REPLACEMENT OF UTILITIES OR OTHER PROPERTY DAMAGED BY OPERATIONS IN CONJUNCTION WITH THE EXECUTION OF THE
WORK.
8. CITY APPROVED PLANS SHALL BE KEPT IN A SECURE PLACE AND SHALL NOT BE USED BY WORKERS. THE CONTRACTOR SHALL
BE RESPONSIBLE THAT ALL SUBCONTRACTORS' CONSTRUCTION SETS REFLECT THE SAME, CURRENT AND MOST ACCURATE
INFORMATION. THE CONTRACTOR SHALL ALSO MAINTAIN, IN GOOD CONDITION, ONE COMPLETE SET OF STAMPED CITY APPROVED
PLANS WITH ALL REVISIONS, ADDENDUMS, AND CHANGE ORDERS ON THE PREMISES AT ALL TIMES. THERE ARE TO BE UNDER THE
CARE OF THE JOB SUPERINTENDENT AND MUST BE MADE AVAILABLE TO BUILDING AND FIRE INSPECTORS FOR REFERENCE DURING
THE CONSTRUCTION.
9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLETE SECURITY OF THE SITE WHILE THE JOB IS IN PROGRESS AND
UNTIL JOB COMPLETION.
10. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO ENSURE THE SAFETY OF THE OCCUPANTS AND WORKERS
AT ALL TIMES.
11. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR ALL CONSTRUCTION MEANS AND METHODS AND SHALL MAINTAIN THE
STRUCTURAL INTEGRITY OF ANY CONSTRUCTION UNTIL ALL FINAL LATERAL AND VERTICAL LOAD CARRYING SYSTEMS ARE
COMPLETED.
12. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR AND SHALL REPLACE OR REMEDY ANY FAULTY, IMPROPER OR INTERIOR
MATERIALS OR WORKMANSHIP WHICH SHALL APPEAR, WITHIN ONE (1) YEAR AFTER THE COMPLETION AND ACCEPTANCE OF THE
WORK UNDER THIS CONTRACT.
13. CONTRACTOR TO PROVIDE BACKING OR BLOCKING AS REQUIRED FOR MOUNTING ALL WALL MOUNTED SHELVES, EQUIPMENT,
ACCESSORIES, CABINETS, ETC.
14. CONTRACTOR TO PROTECT ALL TRESS AND ROOTS NOT SLATED FOR REMOVAL DURING ONSTRUCTION.
15. GENERAL CONTRACTOR RESPONSIBLE FOR MAINTENANCE OF STAGING AREA, AND TO ENSURE THAT MATERIALS DELIVERY
AND STORAGE DO NOT INTERFERE WITH DAILY OPERATION OF ADJACENT PROPERTIES OR PUBLIC RIGHT -OF -WAY.
16. GENERAL CONTRACTOR RESPONSIBLE FOR CONSTRUCTION STAKING.
17. ALL DIMENSIONS ARE TAKEN FROM F.O. STUD OR COL CL U.N.O.
18. ALL DOOR/WINDOW DIMENSIONS ARE TO EDGE OF DOOR PANEL OR CL IF NO CL DIMENSION IS SHOWN FOR A PARTICULAR
DOOR/WINDOW TYPE, SEE SCHEDULE AND DOOR/WINDOW DETAILS FOR TYPICAL INSTALLATION DETAIL.
MEP:
Morrison -Maierle Inc.
2880 Technology Blvd W
Bozeman, MT 59718
P: 406.587.0721
Contractor:
Jackson Contractor
Group
80 Shire Trail
Bozeman, MT 59718
P: 406.577.2772
GENERAL NOTES
Jeff Lusin
jlusin@ne45arch.com
Aaron Overstreet
aoverstreet@ne45arch.com
Turf Consultant:
Millennium Sports
Technologies Inc.
1893 W. Kettle Ave.
Littleton, CO 80120
P: 303.730.1440
PERKINS + WILL
225 Franklin St.
Boston, MA 02110
P: 617.478.0300
IT/AV:
Access Consulting
2300 Regent St. Suite 207
Missoula, MT 59801
P: 406.327.0629
Civil:
TD&H Engineering
234 E Babcock St. #3
Bozeman, MT 59715
P: 406.586.0277
Landscape:
DHM Design
27 E Main St. Suite D
Bozeman, MT 59715
P: 406.219.2012
P: 406.522.6009
MASTER SITE PLAN PROJECT DESCRIPTION: NEW ±3,200 -SEAT MULTI -PURPOSE STADIUM
WITH SPORTS LIGHTING NORTH OF THE EXISTING VAN WINKLE STADIUM WITH ±9,400
SUPPORT BUILDINGS CONSISTING OF TRAINING, FIRST AID, EQUIPMENT STORAGE, TEAM
ROOMS, AND TOILET FACILITIES FOR FANS, PLAYERS, COACHES, AND OFFICIALS. AREA
AFFECTED ALSO INCLUDES TWO SOFTBALL FIELDS, CORRESPONDING PATHWAYS, A MULTI -
PURPOSE TURF FIELD, FENCING, RUTH THIBEAULT WAY PARENT DROP OFF TRAFFIC
DEVELOPMENT, MINI ROUND ABOUT AT 15TH INTERSECTION, CORRESPONDING LIGHTING
AND DEMOLITION OF EXISTING SOUTH BLEACHERS AT VAN WINKLE STADIUM.
GROSS AREA = 65.322 ACRES (2,845,426.32 SQ. FT.)
GROSS EXISTING BUILDING AREA = 425,000 SF.(W/ SWIM CENTER)
GROSS NEW BUILDING AREA = 9,483 SQ. FT.
TOTAL FLOOR AREA RATIO = 15.26%
LEGAL DESCRIPTION: S12, T02 S, R05 E, ACRES 27.08, HIGH SCHOOL TRACT IN NW 4
AHJ: City of Bozeman (Building)/State of Montana (MEP)
APPLICABLE CODES: 2012 International Building Code
2012 International Residential Code
2012 International Mechanical Code
2012 International Plumbing Code
2012 International Fuel Gas Code
2012 International Energy Conservation Code
2014 National Electric Code (NFPA 70)
2009 ICC/ANSI A117.1 Accessibility Standard
Americans with Disabilities Act (ADA)
ZONING: PLI
DESIGN CRITERIA: STRUCTURAL: SEE STRUCTURAL DRAWINGS
ENERGY: PERSCRIPTIVE
CONSTRUCTION TYPE: V-B
OCCUPANCY GROUP: ASSEMBLY A -5, GROUP B
MASTER SITE PLAN PROGRAM AREA CALCULATIONS
GROSS AREA SITE = 2.58 ACRES (112,500 SQ. FT.)
DRIVEWAY CIRCULATION AND PARKING AREAS:
GROSS EXISTING AREA = 64,500 SQ. FT.
GROSS NEW AREA = 68,000 SQ. FT.
TOTAL AREA RATIO = 60.44%
LANDSCAPING AREAS:
GROSS EXISTING AREA = 48,000 SQ. FT.
GROSS NEW AREA = 44,500 SQ. FT.
TOTAL AREA RATIO = 39.55%
PRIVATE OPEN SPACE : N/A
CITY PARKS : N/A
OTHER PUBLIC LANDS: ALL SCHOOL SITE
ZONING WITHIN 200 FT. OF THE SITE
VEHICLE AND BIKE PARKING CALCULATIONS
Existing Automobile Parking Spaces:
Lot West of Stadium = 279 spaces
Lot East of Stadium = 120 spaces
Ruth Thiebualt = 35 Spaces
Total Spaces around Stadium = 434 spaces
Required Bike Parking Spaces:
434 x 10% = 44 Spaces
50 Spaces to be provided
PHASE 2 SITE PLAN PROGRAM AREA CALCULATIONS
GROSS AREA SITE = 1.42 ACRES (61,881 SQ. FT.)
BUILDINGS:
N/A
TOTAL FLOOR AREA RATIO = N/A
DRIVEWAY CIRCULATION AND PARKING AREAS:
GROSS EXISTING AREA = 494,917 SQ. FT.
GROSS NEW AREA = 80,573 SQ. FT.
TOTAL AREA RATIO = 20.22%
LANDSCAPING AREAS:
GROSS EXISTING AREA = 1,621,287 SQ. FT.
GROSS NEW AREA = 231,547 SQ. FT.
TOTAL AREA RATIO = 65.12%
PRIVATE OPEN SPACE : N/A
CITY PARKS : N/A
OTHER PUBLIC LANDS: ALL SCHOOL SITE
PHASE 2 BIKE PARKING CALCULATIONS
Existing Automobile Parking Spaces:
Lot West of Stadium = 279 spaces
Lot East of Stadium = 120 spaces
Ruth Thiebualt = 35 Spaces
Total Spaces around Stadium = 434 spaces
Required Bike Parking Spaces:
434 x 10% = 44 Spaces
50 Spaces to be provided
MASTER SITE PLAN PROPOSED ENTITLEMENT
TOTAL PROJECT COMPLETION = AUG 2019
-14 MONTHS
PHASE 1 CONSTRUCTION
-JULY 2018 -JUNE 2019
PHASE 2 CONSTRUCTION
-JUNE 2019 -AUGUST 2019
PROJECT SUMMARY MASTER SITE PLAN SUMMARY
PHASE 2