HomeMy WebLinkAboutSite Utilization Plan 03.06.19Waste Waste Container Container DU R S T O N R O A D N. 15TH AVENUE Van Winkle BSD Site Utilization Plan Top Soil Stockpile Through 09/18 Top Soil Stockpile Through 09/18 Construction Entrance with Vehicle Track Pad Laydown Yard Entrance with track off pad PH2 Construction Limits Demolition of Stadium items will begin after Football and be Done before Track or Phase 2 Limited Access Construction Entrance with Track off Pad PHASE 1 Work to be completed around School Schedule Potential Jackson Contractor Group Office Trailer Location Construction Storage Containers 40yd Construction Waste Containers 40yd Recycling Containers Equipment Laydown Yard Required until End of Stadium Construction. Area to be Restored by Fall of 2019. Work to be completed around School Schedule Proposed Stockpile Location Recycling Recycling Phase 1: July 2018 - Feb. 2019 Phase 2: June 2019 - Aug. 2019 Phase 2: North sidewalk will be open for pedestrian, fire and emergency access Phase 1: Ruth Thibeault Way Sidewalks will be open for pedestrian use. Ruth Thibeault Way will be open for fire and emergency access Legend: PH1 Construction Fencing; 7/9/18 to Spring of 2019 Top Soil Stockpile Vehicle Track Pad Storage Container Construction Waste Container Recycling Container PH2 Construction Fencing; 6/11/19 to 8/24/19 Construction Laydown Yard Temporary Restroom SITE PLAN REVIEW - PHASE 2 02.26.19