Van Winkle BSD Site Utilization Plan
Top Soil
Stockpile
Through
09/18
Top Soil
Stockpile
Through
09/18
Construction
Entrance with
Vehicle Track Pad
Laydown Yard Entrance with track off pad
PH2 Construction Limits
Demolition of
Stadium items will
begin after Football
and be Done before
Track or Phase 2
Limited Access
Construction Entrance
with Track off Pad PHASE 1 Work to
be completed
around School
Schedule
Potential Jackson Contractor
Group Office Trailer Location
Construction Storage Containers
40yd Construction Waste Containers
40yd Recycling Containers
Equipment Laydown Yard
Required until End of Stadium
Construction. Area to be Restored
by Fall of 2019.
Work to be
completed around
School Schedule
Proposed
Stockpile
Location
Recycling
Recycling
Phase 1:
July 2018 - Feb. 2019
Phase 2:
June 2019 - Aug. 2019
Phase 2: North sidewalk
will be open for pedestrian,
fire and emergency access
Phase 1: Ruth Thibeault Way
Sidewalks will be open for
pedestrian use. Ruth
Thibeault Way will be open
for fire and emergency
access
Legend:
PH1 Construction
Fencing; 7/9/18 to
Spring of 2019
Top Soil Stockpile
Vehicle Track Pad
Storage Container
Construction Waste
Container
Recycling Container
PH2 Construction
Fencing; 6/11/19 to
8/24/19
Construction Laydown
Yard
Temporary Restroom
SITE PLAN REVIEW - PHASE 2 02.26.19