HomeMy WebLinkAbout19- Change Order 3 - Knife River Belgrade - Tamarack and Wallace Intersection Sewer Installation Change Order No. 3 Date of Issuance: January 31,2019 Effective Date: January 31,2019 Project: East Tamarack Street Owner: City of Bozeman Owner's Contract No.: N/A Reconstruction Contract: East Tamarack Street Reconstruction Date of Contract: July 18,2018 Contractor: Knife River-Belgrade Engineer's Project No.: 16417100 The Contract Documents are modified as follows upon execution of this Change Order: Description: Additional Labor and Equipment cost incurred for new sanitary sewer installation across Tamarack/Wallace inter- section due to conflicting location of existing gas main in Wallace intersection. Attachments (list documents supporting change): Serial Letter-07b from Knife River with cost of the Work. CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price: Original Contract Times: ❑ Working days ❑ Calendar days Substantial completion(days or date): $ 1,627,588.00 Ready for final payment(days): Decrease from previously approved Change Increase fiom previously approved Change Orders Orders No. 2 to No. 2: No. to No. i Substantial completion(days): $ 8,741.00 Ready for final payment(days): N/A Contract Price prior to this Change Order: Contract Times prior to this Change Order: Substantial completion(days or date): N/A $ 1,618,847.00 Ready for final payment(days): Increase of this Change Order: Increase of this Change Order: Substantial completion(days or date): N/A $ 20,100.00 Ready for final payment(days): Contract Price incorporating this Change Order: Contract Times with all approved Change Orders: Substantial completion(days or date): N/A $ 1,638,947.00 Ready for final payment(date): RECO D: ACCEPT,D: ACCBy: By: By: �!E:A X A Engineer( utho ed Signature) Owner(Authorized Signature) Contractor(Authorized Signature) Date: / Date: 3 7� Date: Approved by Funding Agency(if applicable): Date: EJCDC C-941 Change Order Prepared by the Engineers Joint Contract Documents Committee and endorsed by the Construction Specifications Institute. Page 1 of 2 AN MDU RESOURCES COMPANY www.kniferiver.com Intermountain Region-Belgrade Division PO Box 9 Belgrade,MT 69714 (406)388-6832 (406)388.8347 Fax January 21,2019 Shane Strong KLJ Engineering 1982 Stadium Dr. Suite 3 Bozeman, MT 59715-0697 Serial Letter-07b RE: East Tamarack Street Reconstruction Shane, As we have discussed at an earlier date, our utility subcontractor incurred some unanticipated costs due to the unexpected layout of the existing utilities in the Tamarack/Wallace intersection. Our subcontractor for that work accepts your adjusted worksheet showing costs for them in the amount of$19,145.00. Attached is that redlined breakdown of their extra costs totaling$19,145.00. Knife River would add 5%to that total for our mark up. $19,145.00 x 1.05 =$20,102.25. Knife River is requesting$20,100.00 for this extra work. In addition to this payment we are also requesting an additional 5 calendar days be added to the contract time. This would be for a weekend plus 3 working days. Your attention to this matter is appreciated. If you have any questions,please call me at 924-5602. Respectfully, Steven R.Baeth Project Manager/Estimator Knife River—Belgrade EQUAL OPPORTUNITY EMPLOYER Page 1/2 DAILY FORCE ACCOUNTBACKCHARGE/EXTRA WORK REPORT Job No. TAM Job Nnme keation: East Tamarack Street Reconstruction Date: 9/10/18-9/13/18 WMC Report No.: I Describe Work Perfomed: Added cost to dig and shore around utility crossings in N Wallace Ave that were not represented correctly on the ori&al drawings, The information contained herein shall represent the work performed on the date noted. Western Municipal Construction reserves the right to include overlooked expenses before final invoice, LABOR USED Name Clan111cation Straight or Blended Total St. Overihne Total TOTAL Honn IRste Time Ilaun 14010 Overtime Steve Raudenbush Su ciinicadent Is" $116.00 $170.00 50.00 $1740.00 JakeRaudenbush G xrotor/Foreman $95.00 $2 375.00 bt2s $0.00 $2 375.00 Bill Ckary ! ictator ?5 $69.00 $1725.00 0.00 $1,725.00 Casey wollman Laborer r $61.00 $1 525.00 $0.00 $1,525.00 )3ruameier O rator 20.' $69.00 $1380.00 /`'r 0 $0.00 $1,380.00 o. - $0,00 $0.00 so.00 $0.00 $0.00 a000 t;, $0.00 $9.00 $0.00 so.00 so.00 so.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 S0.00 - $0.00 so.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00 1 1 $0.00 So.00 $0.00 suol $0.00 0.00 so-001 $0.00 $0.001 $0.001 $0.00 .u tote Labor , 45.001 Subtotal La ur 50.001 lotall.siar AWNED EQUIPMENT RENTAL.EQUIPMENT Descoptlon HraWkd Cost/Rae Total Dritriptlpn- Uri Wkd Cost/Rate To al 335 Cat Excavator /V 25. $172.50 S4 312,50 Sheet Shoran! 25.0 $138.00 $3.450.00 Loader %` 2 U $74.82 $1870.50 Z..-r $0.00 350 J17 Excavator ` 2b.0 S166.11 $4152.75 `c f f' $0.00 Mtai Excavator 10.0. $33.45 $334.50 (v fI` $0.00 H�draulicVibratorvCompactor 10.0 $11.00 $110.00 _5-0 $0.00 $0.00 0. .90 $0.00 $0.00 $0.00 son d r . 75` $0.00 $0.00 `i r $0.00 30.00 _ $0.00 S0.00 _ $0.00 $0.00 _- $0.00 $0.00 S0.00 $0.00 _ $0.00 $0.00 _ $0.00 Subtotal Prior to Sales Tarr $10 780.25 Subtotal Prior to Salsa Tax $3,450.00 Sales' tf A Itcabie _ 0 % $0.00 8alea Tax ifAp illcabll e 0 yo $0.00 _ Subtotal EqWpmentj 510,780.25H Subtotal RentalE ul ment $3,459.110 Tt'ri'ALB UIPMENT S14,23D.29 u t>' z, � • '�