HomeMy WebLinkAboutA-001 Title Sheet 02-28-1902-28-19
BRETT R.
POTTER
2599
BOZEMAN, MT
BRETT R. POTTER, AIA, LEED AP
312 ACCOLA DRIVE
BOZEMAN, MT 59715
406-579-8450
YELLOWSTONE ARCHITECTS
- 2/28/19#1
CURT L. SMIT, PE
7540 CHURCHILL ROAD
MANHATTAN, MT 59741
406-282-7082
CONSULTING DESIGN SOLUTIONS, INC.
JUSTIN & JONI STEVENS
542 CLIFDEN DRIVE
BOZEMAN, MT 59718
JUSTIN (303) 885-6141
GALLATIN VALLEY PEDIATRIC
TY MONKS, PLLC
108 WEST BABCOCK STREET
BOZEMAN, MT 59715
406-582-9901
NISHKIAN MONKS
RAY PADILLA
1775 LOVE LANE
BOZEMAN, MT 59771
406-587-4451
R&R TAYLOR CONSTRUCTION
SITE PLAN DATA:
1.PARCEL SIZE - LOT 7 - 1.92 ACRES OR 83,635SF
2.FLOOR AREA RATIO = 5,087SF/5,822SF =0.87 FAR
3.MAIN LEVEL DRIVEWAY CIRCULATION AND PARKING = 28,883SF
4.NO PRIVATE RESIDENTIAL SPACE
5.NO CITY PARKS
6.NO OTHER PUBLIC LANDS
7.EXISTING ZONING WITHIN 200' OF THE SITE IS ZONED BP
axon
JONI (612) 386-1601
PROJECT DESCRIPTION
A new Valley Commons Subdivision Lot 7 single story
office building with attic storage/mechanical
located on PAD A.
PROJECT ADDRESS
3940 Valley Commons Drive, Bozeman MT 59718.
ZONING
BP (Entry Corridor) with all parcels zoned BP within 200'
of site
BUILDING SQUARE FOOTAGE
Gross Building SF = 5,087sf
BP
LEGAL DESCRIPTION
Seven Commons Condo Units 1 and 2 Building A Lot 7
of Valley Commons Subdivision Section 10, Township 2s,
Range 5E.
MSP # Z-14250
FEBRUARY 28th, 2019
100% BID SET DOCUMENTS FOR PERMITTING AND REGULATORY APPROVAL
PARKING CALCULATIONS:
1.PAD A FUTURE BUILDING = 22 SPACES X 250SF = MAX. SIZE 5,500SF AND THE BUILDING IS 5,087SF
2.PAD B NEW BUILDING = 5,573SF/250SF PER PARKING SPACE = 23 SPACES
3.PAD C EXISTING BUILDING = 4,597SF/250SF PER PARKING SPACE = 19 SPACES
4.PAD D EXISTING BUILDING = 4,587SF/250SF PER PARKING SPACE = 19 SPACES
5.TOTAL COMMON SPACES PROVIDED = 83 SPACES
6.AS PER DECLARATION PADS A-B-C-D HAVE COMMON ACCESS TO ALL PARKING SPACES
NEW LANDSCAPING = 467SF
SIGNAGE CALCULATION
VALLEY COMMONS DRIVE FRONTAGE: 76.5'
FIRST 25' X 3 = 75SF
REMAINING 51.5' X 1.5 = 77.25SF
TOTAL ALLOWED = 152.25 SF
(1) 67SF WALL MOUNT SIGN FACING SOUTH
(1)41SF WALL MOUNT SIGN FACING NORTH
(1)42SF WALL MOUNT SIGN FACING WEST
TOTAL= 150SF (2.25SF REMAINING)
(WE ALSO HAVE ONE ADDRESS SIGN
THAT DOES NOT COUNT TOWARDS OUR
TOTAL SF CALCULATION)
ARCHITECTURAL
A-001TITLE SHEET 02-28-19
A-101MAIN LEVEL FLOOR PLAN 02-28-19
A-102ROOF PLAN 02-28-19
A-201BUILDING ELEVATIONS 02-28-19
A-202 BUILDING ELEVATIONS 02-28-19
A-301BUILDING SECTIONS 02-28-19
A-302BUILDING SECTIONS 02-28-19
A-303BUILDING SECTIONS 02-28-19
A-401SCHEDULES & DETAILS 02-28-19
CIVIL - LANDSCAPE
C1.0 OVERALL SITE PLAN & PROJECT
INFORMATION 02-28-19
C2.0 SITE GRADING & DRAINAGE PLAN &
DETAILS 02-28-19
L1.0 PAD A LANDSCAPE PLAN 02-28-19
L1.1 MASTER LANDSCAPE PLAN 02-28-19
ELECTRICAL
ES1.1LIGHTING PLAN 02-28-19
ES1.2PHOTOMETRIC CALCULATIONS 02-28-19
ES1.3LIGHT FIXTURE CUT SHEETS 02-28-19
MECHANICAL
M2.1MAIN LEVEL FLOOR PLAN-HVAC 02-28-19PERCENTAGE OF LANDCAPING
TO PUD BUILDING SITE
= 467SF/5,822SF = 8.02%
GENERAL BUILDING SYSTEM DESCRIPTIONS
·EXTERIOR WINDOWS TO BE ANODIZED ALUMINUM FINISH
·INTERIOR DOOR SHALL HAVE SHEET ROCK RETURN HEAD/JAMB
·3" SPRAY AT RIM WITH R-19 VINYL BACKED BLANKET INSULATION AT CRAWL SPACE INSULATION
·2" SPRAY FOAM WITH R-11 BATT AT EXTERIOR WALL INSULATION SYSTEM
·ROOF INSULATION TO HAVE 6" SPRAY FOAM AT THE HEALS WITH BLOW IN INSULATION R-60·THE MECHANICAL ATTIC SHALL HAVE SPRAY FOAM AT THE WALLS AND BE PROTECTED ON BOTHSIDES BY SHEET ROCK TO ACHIEVE A 15MIN. THERMAL BARRIER.·ALL EXPOSED SPRAY FOAM MUST BE PROTECTED BY A 15MIN. THERMAL BARRIER TO BECOORDINATED BY THE CONTRACTOR IN THE FIELD.·THE METAL PACKAGE SHALL BE CONSTRUCTED BY BIG SKY METAL ART.·THE COLOR LED LIGHTING PACKAGE SHALL BE INSTALLED BY KRISHER ELECTRIC.·THE SECURITY PACKAGE SHALL BE INSTALLED BY SSI.
·THE IT PACKAGE SHALL BE INSTALLED BY GRANITE TCS.
·THE WINDOW PACKAGE SHALL BE PROVIDED BY VALLEY GLASS AND THE MAIN ENTRY DOOR
SYSTEM SHALL BE DESIGNED BY VALLEY GLASS TO ACCEPT THE KALWAL POCKET SYSTEM.