Loading...
HomeMy WebLinkAboutA-001 Title Sheet 02-28-1902-28-19 BRETT R. POTTER 2599 BOZEMAN, MT BRETT R. POTTER, AIA, LEED AP 312 ACCOLA DRIVE BOZEMAN, MT 59715 406-579-8450 YELLOWSTONE ARCHITECTS - 2/28/19#1 CURT L. SMIT, PE 7540 CHURCHILL ROAD MANHATTAN, MT 59741 406-282-7082 CONSULTING DESIGN SOLUTIONS, INC. JUSTIN & JONI STEVENS 542 CLIFDEN DRIVE BOZEMAN, MT 59718 JUSTIN (303) 885-6141 GALLATIN VALLEY PEDIATRIC TY MONKS, PLLC 108 WEST BABCOCK STREET BOZEMAN, MT 59715 406-582-9901 NISHKIAN MONKS RAY PADILLA 1775 LOVE LANE BOZEMAN, MT 59771 406-587-4451 R&R TAYLOR CONSTRUCTION SITE PLAN DATA: 1.PARCEL SIZE - LOT 7 - 1.92 ACRES OR 83,635SF 2.FLOOR AREA RATIO = 5,087SF/5,822SF =0.87 FAR 3.MAIN LEVEL DRIVEWAY CIRCULATION AND PARKING = 28,883SF 4.NO PRIVATE RESIDENTIAL SPACE 5.NO CITY PARKS 6.NO OTHER PUBLIC LANDS 7.EXISTING ZONING WITHIN 200' OF THE SITE IS ZONED BP axon JONI (612) 386-1601 PROJECT DESCRIPTION A new Valley Commons Subdivision Lot 7 single story office building with attic storage/mechanical located on PAD A. PROJECT ADDRESS 3940 Valley Commons Drive, Bozeman MT 59718. ZONING BP (Entry Corridor) with all parcels zoned BP within 200' of site BUILDING SQUARE FOOTAGE Gross Building SF = 5,087sf BP LEGAL DESCRIPTION Seven Commons Condo Units 1 and 2 Building A Lot 7 of Valley Commons Subdivision Section 10, Township 2s, Range 5E. MSP # Z-14250 FEBRUARY 28th, 2019 100% BID SET DOCUMENTS FOR PERMITTING AND REGULATORY APPROVAL PARKING CALCULATIONS: 1.PAD A FUTURE BUILDING = 22 SPACES X 250SF = MAX. SIZE 5,500SF AND THE BUILDING IS 5,087SF 2.PAD B NEW BUILDING = 5,573SF/250SF PER PARKING SPACE = 23 SPACES 3.PAD C EXISTING BUILDING = 4,597SF/250SF PER PARKING SPACE = 19 SPACES 4.PAD D EXISTING BUILDING = 4,587SF/250SF PER PARKING SPACE = 19 SPACES 5.TOTAL COMMON SPACES PROVIDED = 83 SPACES 6.AS PER DECLARATION PADS A-B-C-D HAVE COMMON ACCESS TO ALL PARKING SPACES NEW LANDSCAPING = 467SF SIGNAGE CALCULATION VALLEY COMMONS DRIVE FRONTAGE: 76.5' FIRST 25' X 3 = 75SF REMAINING 51.5' X 1.5 = 77.25SF TOTAL ALLOWED = 152.25 SF (1) 67SF WALL MOUNT SIGN FACING SOUTH (1)41SF WALL MOUNT SIGN FACING NORTH (1)42SF WALL MOUNT SIGN FACING WEST TOTAL= 150SF (2.25SF REMAINING) (WE ALSO HAVE ONE ADDRESS SIGN THAT DOES NOT COUNT TOWARDS OUR TOTAL SF CALCULATION) ARCHITECTURAL A-001TITLE SHEET 02-28-19 A-101MAIN LEVEL FLOOR PLAN 02-28-19 A-102ROOF PLAN 02-28-19 A-201BUILDING ELEVATIONS 02-28-19 A-202 BUILDING ELEVATIONS 02-28-19 A-301BUILDING SECTIONS 02-28-19 A-302BUILDING SECTIONS 02-28-19 A-303BUILDING SECTIONS 02-28-19 A-401SCHEDULES & DETAILS 02-28-19 CIVIL - LANDSCAPE C1.0 OVERALL SITE PLAN & PROJECT INFORMATION 02-28-19 C2.0 SITE GRADING & DRAINAGE PLAN & DETAILS 02-28-19 L1.0 PAD A LANDSCAPE PLAN 02-28-19 L1.1 MASTER LANDSCAPE PLAN 02-28-19 ELECTRICAL ES1.1LIGHTING PLAN 02-28-19 ES1.2PHOTOMETRIC CALCULATIONS 02-28-19 ES1.3LIGHT FIXTURE CUT SHEETS 02-28-19 MECHANICAL M2.1MAIN LEVEL FLOOR PLAN-HVAC 02-28-19PERCENTAGE OF LANDCAPING TO PUD BUILDING SITE = 467SF/5,822SF = 8.02% GENERAL BUILDING SYSTEM DESCRIPTIONS ·EXTERIOR WINDOWS TO BE ANODIZED ALUMINUM FINISH ·INTERIOR DOOR SHALL HAVE SHEET ROCK RETURN HEAD/JAMB ·3" SPRAY AT RIM WITH R-19 VINYL BACKED BLANKET INSULATION AT CRAWL SPACE INSULATION ·2" SPRAY FOAM WITH R-11 BATT AT EXTERIOR WALL INSULATION SYSTEM ·ROOF INSULATION TO HAVE 6" SPRAY FOAM AT THE HEALS WITH BLOW IN INSULATION R-60·THE MECHANICAL ATTIC SHALL HAVE SPRAY FOAM AT THE WALLS AND BE PROTECTED ON BOTHSIDES BY SHEET ROCK TO ACHIEVE A 15MIN. THERMAL BARRIER.·ALL EXPOSED SPRAY FOAM MUST BE PROTECTED BY A 15MIN. THERMAL BARRIER TO BECOORDINATED BY THE CONTRACTOR IN THE FIELD.·THE METAL PACKAGE SHALL BE CONSTRUCTED BY BIG SKY METAL ART.·THE COLOR LED LIGHTING PACKAGE SHALL BE INSTALLED BY KRISHER ELECTRIC.·THE SECURITY PACKAGE SHALL BE INSTALLED BY SSI. ·THE IT PACKAGE SHALL BE INSTALLED BY GRANITE TCS. ·THE WINDOW PACKAGE SHALL BE PROVIDED BY VALLEY GLASS AND THE MAIN ENTRY DOOR SYSTEM SHALL BE DESIGNED BY VALLEY GLASS TO ACCEPT THE KALWAL POCKET SYSTEM.