Loading...
HomeMy WebLinkAbout45 A3.1 BUILDING ELEVATIONS 2-12-19MAIN LEVEL 0" SECOND LEVEL 14' -4" ROOF 38' -0" THIRD LEVEL 26' -8" 678910131415 MAIN LEVEL (-28") -2' -4" T.O. PARAPET 42' -0" B A6.1 C A6.2 D A6.3 E A6.4 MAIN LEVEL (-14") -1' -2" 12 SIDEWALK POURED AGINGST BRICK SECOND LEVEL 14' -4" ROOF 38' -0" THIRD LEVEL 26' -8" 6 7 8 11 14 15 T.O. PARAPET 42' -0" B A6.1 C A6.2 D A6.3 E A6.4 MAIN LEVEL (-14") -1' -2" 12 33' - 0" 21' - 8"10' - 2" 15' - 0"35' - 7 1/4" STREET FACADE AREA 4' TO 8' FROM SIDEWALK GLAZING AREA LANDSCAPE TRANSPARENCIES: 588 SF glazing divided by 1045 SF total wall surface between 4' and 8’ = 56% glazing transparencies STREET FRONT CANOPIES: 170’ linear canopies divided by 260’ linear building frontage = 65% of street facing façade has canopies which provide weather protection JOB No.SHEET NUMBERPROJECT / OWNERCONSULTANTSARCHITECTLOCATI ARCHITECTS1007 E. MAIN SUITE 202 BOZEMAN MONTANA406-587-1139 FAX 587-7369STRUCTURALMECHANICALFIRE PROTECTIONCOPYRIGHT LOCATI ARCHITECTS P.L.L.P.2012 ALL RIGHTS RESERVEDISSUEDATEACOUSTICALCIVIL1746BZN COMMONS - PH 41101 E MAIN STBOZEMANSHOP EngineeringJM EngineeringCoffman EngineeringA3.12/12/19SITE PLAN REVJames Black AcousticsC&H EngineeringSCALE: 1/8" = 1'-0" NORTH ELEVATION SCALE: 1/8" = 1'-0" SOUTH ELEVATION