HomeMy WebLinkAbout10 AC2.1 SITE PLAN PH 4 2-12-1914" FLOOR STEP
14" FLOOR STEP
6" FLOOR STEP14" FLOOR STEP 7" STEP AT DOOR/INTERIOR26'-0"
8'-0"SETBACK8'-0"SETBACK8'-0"
SETBACK8'-0"SETBACK20'-0"
24'-0"
4'-6"26'-0"18'-0"
26'-0"40'-0"26'-0"24'-0"8'-0"PARKINGSETBACK18'-0"5'-6"18'-0"5'-6"18'-0"
18'-0"18'-0"4'-6"8'-0"
SETBACK
8'-0"SETBACK18'-0"26'-0"ELIMINATE EXIST CURB &REPLACE W/ ROLLOVER CURBCUT & REMOVE EXISTING CURB& ADD CONC SIDEWALK12'-6"(E)CITY STANDARD SIDEWALK CONSTRUCTED WITH PHASE 1.LANDSCAPING AND TREES TO BE INSTALLED WITH PHASE 4.10'-0"SETBACK5'-0
"2'-0"3'-0"17'-0"6'-0
"VISION TRIANGLEVISION TRIANGLEZERO LOT LINE AGREEMENTNO PARKING SETBACK & SHAREDPARKING AGREEMENT EXECUTEDRAMP 5% (5')RAMP 5% (1')RAMP 5% (1')
71'-0"REPLACEEXISTINGCURB18'-0"5'-6"24'-0"40'-0"24'-0"18'-0"24'-0"7'-0"VERIFYREPLACEEXISTINGCURBWFUTURE PHASERAMP TO BE CONSTRUCTEDW/ FUTURE PHASE10'-0"EXISTING SIDEWALK7'-6"59'-0"9'-0"36'-0"11'-6"50'-0"100'-0"45'-0"9'-0"24'-0"18'-0"81'-0"90'-0"9'-0"27'-0"63'-0"90'-0"10'-0"25'-0"50'-0"BOZEMAN
BOZEMAN COMMONS - PHASE 4SHEET NUMBER
PH 4 SITE
ISSUE
12/10/18
1101 EAST MAIN STREET
PROJECT / OWNERDATE 1746ARCHITECT
406-587-1139 FAX 587-7369
1007 E. MAIN SUITE 202 BOZEMAN MONTANA
LOCATI ARCHITECTSLANDSCAPE
CONSULTANTS
CIVIL
JOB No.
C & H ENGINEERING
RED BARN MONTANA
PH 4 SITE REV 2/12/19