Loading...
HomeMy WebLinkAbout01 Cover - Site 2-12-19PUBLIC PARK LAND DEDICATION TRACKING TABLE CURRENT PREVIOUS PHASES PHASES SUBDIVISION NAME: BOZEMAN COMMONS PROJECT NAME: PHASE 4 TOTAL FOR SUBDIVISION THIS PROPOSAL PHASE N/A PARK DED AC CIL &/OR IIL PHASE 2 PARK DED AC CIL &/OR IIL PHASE* 3 PARK DED AC CIL &/OR IIL NUMBER OF RES. UNITS PER PHASE / LOT / SITE PLAN: 11 UNITS 0 5 UNITS 6 UNITS ACREAGE PARK LAND AND / OR CIL REQUIRED: ** 11 X 0.3 = 0.33 AC, 14,374 SF 5 X 0.3 = 0.15 AC, 6,534 SF 6 X 0.3 = 0.18 AC, 7,841 SF VALUE OF IMPROVEMENTS IN LIEU PROPOSED: $___________________ VS. VALUE OF CODE-REQD. BASIC PARK IMPROVEMENTS: $___________________ (ATTACH COMPARISON CHART SPREADSHEET TBD WITH SITE PLAN SUBMITTAL TBD WITH SITE PLAN SUBMITTAL ACREAGE PARK LAND PREVIOUSLY DEEDED TO COB: 0 0 ACREAGE PARK LAND YET TO BE CONVEYED: 0.33 AC 0 PARK MASTER PLAN APPROVAL DATE: ______________ * INDICATE ADDITIONAL PHASES AS APPLICABLE **SHOW ACTUAL CALCULATIONS BOZEMAN PROJECT NAME: COMMONS EAST MAIN STREET BOZEMAN, MONTANA LOCATI 1007 ARCHITECT E. MAIN ARCHITECTS ST. SUITE 202 INDEX OF DRAWINGS BOZEMAN, MT 59715 CONTACT: LAURA DORNBERGER (P) 406-587-1139 (C) 406-570-7496 (E) LDORNBERGER@LOCATIARCHITECTS.COM DICK CONTRACTOR ANDERSON CONSTRUCTION PROJECT TEAM SHEET # - CONTENT 4498 JACKRABBIT LN BOZEMAN, MT 59718 CONTACT: TIM THOLT (P) 406-586-0889 (C) 406-579-4006 (E) TTHOLT@DACONSTRUCTION.COM LANDSCAPE RED 3084 THORPE BARN DESIGNER ROAD MONTANA BELGRADE, MT 59714 CONTACT: CHAD REMPHER (P) 406-924-8038 (E) CHAD@REDBARNMONTANA.COM CIVIL ENGINEER CIVIL LANDSCAPING ARCHITECTURAL C&1091 H STONERIDGE ENGINEERING DRIVE BOZEMAN, MT 59718 CONTACT: MATT HAUSAUER (P) 406-587-1115 (E) MHAUSAUER@CHENGINEERS.COM PROJECT INFORMATION VICINITY MAP PROPERTY OWNER: LOT LEGAL 2C-1, DESCRIPTION: AMENDED PLAT OF LOT C-23-A21, AND THE PARCELS DESCRIBED ON FILM 128, PAGE 186, AND IN BOOK 133 OF DEEDS, PAGE 209, NORTHERN PACIFIC ADDITION TO THE CITY OF BOZEMAN. LOCATED IN THE NE 1/4, SECTION 7, T.2 S., R. 6 E. OF P.M.M., CITY OF BOZEMAN, GALLATIN COUNTY, MONTANA. MAIN SECOND THIRD LEVEL LEVEL LEVEL FAR TOTAL 15,15,14,601 940 791 SQ. SQ. SQ. FT. FT. FT. 0.46,24 332 GSF SITE INFO: NORTH PHASE SITE PLAN 12/4 10/2018, SITE REV 2/PLAN 12/2019 BRIDGER 3424 US HIGHWAY VIEW 12 EAST DEVELOPMENT, LLC HELENA, MT 59601 CONTACT: MARK ESPONDA (P) 406-441-3539 (C) 406-459-3176 (E) MESPONDA@DACONSTRUCTION.COM A2.A2.A2.0 1 2 PHASE PHASE PHASE 4 4 4 MAIN MAIN SECOND LEVEL LEVEL LEVEL FLOOR FLOOR FLOOR PLAN PLAN PLAN 2/2/2/12/12/12/19 19 19 A2.A3.3 0 PHASE PHASE 4 4 THIRD COLOR LEVEL ELEVATIONS FLOOR PLAN 2/2/12/12/19 19 A3.A3.A3.1 2 3 PHASE PHASE PHASE 4 4 4 ELEVATIONS ELEVATIONS 3D ELEVATIONS 2/2/2/12/12/12/19 19 19 A6.2 PHASE 4 SECTION 2/12/19 EX1 MSP C1.0 EXISTING MASTER OVERALL SITE SITE SITE PLAN 2/2/2/12/12/12/19 19 19 C2.C2.C3.0 1 0 GRADING GRADING SITE DETAILS & & DRAINAGE DRAINAGE PLAN PLAN 2/2/2/12/12/12/19 19 19 C3.1 SITE DETAILS 2/12/19 L1.L101 L102 0 OVERALL PHASE PHASE 4 4 LANDSCAPE LANDSCAPE MASTER SITE PLAN PLAN LANSCAPE OVERALL BUILDING PLAN 08/2/2/12/12/23/19 19 17 L103 L104 PHASE PHASE 4 4 LANDSCAPE LANDSCAPE PLAN PLAN PARKING PARKING 2/2/12/12/19 19 SITE AREA 186,4.29 908 ACRES SQ. FT. (B-CURRENT ALL 2 ABUTTING ZONING PROPERTIES B-2 & R-0, R-4, M-1) 150 (BUILDING 5) 2 SF BEDROOM OPEN 2 OPEN SPACE UNITS SPACE X REQUIRED: = 750 SF ((OPEN OPEN MIN.) SPACE PRIVATE SPACE REQUIRED PROVIDED INDIVIDUAL BY = 10'X15' 750 SF BALCONIES TO BE 750 SF) PHASE 2 150 (BUILDING 6) PHASE 2 SF BEDROOM 3 OPEN 3 OPEN SPACE UNITS SPACE X REQUIRED: = 900 SF ((OPEN OPEN MIN.) SPACE PRIVATE SPACE REQUIRED PROVIDED INDIVIDUAL BY = 10'X15' 900 SF BALCONIES TO BE 900 SF) PARKLAND PARKLAND LINDLEY PARK IS PROPOSED TO MEET REQUIREMENTS AS CASH-IN-LIEU FOR OF PARKLAND RESIDENTIAL AND/MIXED OR IMPROVEMENTS USE BUILDINGS 2 TO & 3. PARKING ALL FUTURE BUILDING ADDRESSES SHOWN WERE DISCUSSED WITH CITY GIS BUT NEED TO BE CONFRIMED WITH COB AT EACH PHASE. 1101 PHASE BOZEMAN, EAST 4 PROPERTY MAIN MT 59715 STREET, ADDRESS: BUILDING INFO: THE OWNERS OF ADJOINING LOTS 13A, 2B, 2C-1, 1A-1 HAVE EXECUTED A LEGAL WRITTEN AGREEMENT FOR MUTUAL AND RECIPROCAL ACCESS EASEMENTS AND ZERO FOOT LOT LINE AGREEMENT. RECORDING #2579891. PLANNING APPLICATION NUMBER 18499 HAVE ADDITIONAL “SHARED ACCESS AGREEMENT AND GRANT OF RECIPROCAL EASEMENT” AND “RECIPROCAL PARKING EASEMENT AGREEMENT” TO BE EXECUTED WITH PARTIES LISTED ABOVE. PHASED DEVELOPMENT MASTER SITE PLAN ENTITLEMENT PERIOD TO BE FIVE YEARS. ISSUED OCTOBER 25, 2017. VICINITY MAP NORTH OPENSPACE R-0 R-4 M-1 B-2 B-2 SITE B-2 COVER AC2.AC2.0 1 EXISTING SITE ARCH COVER SITE SITE PLAN PLAN PHASE (PHASE 4 1) 12/2/2/12/12/10/19 19 18 AC2.AC2.AC2.2 3 4 ARCH ARCH ARCH MASTER PHOTOMETRIC PHOTOMETRIC SITE PLAN SITE DETAILS PLAN 2/2/2/12/12/12/19 19 19 AC3.AC3.0 1 REFUSE MATERIAL ENCLOSURE, BOARD SITE DETAILS 2/2/19/12/18 19 D D NET = = RESIDENTIAL 11/0.0008 (186908-DENSITY 173208) 2% SEE EXCESS PHASE OPEN SOUTHERN 4 FOR SPACE PHASE FACING X 67,4 425 BUILDING PATIOS SF = 1350 IN FOR SF OCCUPANTS LOT AREA PERCENTAGES AREA (CUMMULATIVE) %(TOTAL) PHASE 1 BUILDING 8,561 SQ. FT. 5% DRIVE/PARK 48,488 SQ. FT. 26% LANDSCAPE 129,806 SQ. FT. 69% PHASE 4 BUILDING 24,336 SQ. FT. 13% DRIVE/PARK 95,019 SQ. FT. 51% LANDSCAPE 67,553 SQ. FT. 36% PHASE FRONTAGE BLOCK FRONTAGE 4 - MIXED USE BLOCK 280 25 255 BUILDING BUILDING TOTAL BUILDING 4 BUILDING LF LF X X 3 1.SF 5 LINEAR = SIGNAGE 75 SF FEET OF SF SIGNAGE = 382.5 SF OF SIGNAGE 160 SIGNAGE = 160 SF SF TOTAL SIGNAGE = 457.SIGNAGE 5 SF, FOR HOWEVER PHASE 4 LOT BUILDING MAX SIGNAGE = 400 / 5 POTENTIAL BUILDINGS (PHASE 4 ORIGINALLY CONSISTED OF 2 BUILIDNGS) SIGNAGE