HomeMy WebLinkAbout01 Cover - Site 2-12-19PUBLIC PARK LAND DEDICATION TRACKING
TABLE CURRENT PREVIOUS PHASES PHASES
SUBDIVISION NAME: BOZEMAN COMMONS
PROJECT NAME: PHASE 4
TOTAL FOR
SUBDIVISION
THIS PROPOSAL PHASE
N/A
PARK DED AC CIL &/OR IIL
PHASE
2
PARK DED AC CIL &/OR IIL
PHASE*
3
PARK DED AC CIL &/OR IIL
NUMBER OF RES. UNITS PER PHASE / LOT /
SITE PLAN: 11 UNITS 0 5 UNITS 6 UNITS
ACREAGE PARK LAND AND / OR CIL
REQUIRED: **
11 X 0.3 = 0.33 AC,
14,374 SF
5 X 0.3 = 0.15 AC,
6,534 SF
6 X 0.3 = 0.18 AC,
7,841 SF
VALUE OF IMPROVEMENTS IN LIEU
PROPOSED:
$___________________ VS. VALUE OF
CODE-REQD. BASIC PARK IMPROVEMENTS:
$___________________
(ATTACH COMPARISON CHART
SPREADSHEET
TBD WITH SITE PLAN
SUBMITTAL
TBD WITH SITE PLAN
SUBMITTAL
ACREAGE PARK LAND PREVIOUSLY DEEDED
TO COB: 0 0
ACREAGE PARK LAND YET TO BE CONVEYED: 0.33 AC 0
PARK MASTER PLAN APPROVAL DATE:
______________
* INDICATE ADDITIONAL PHASES AS
APPLICABLE
**SHOW ACTUAL CALCULATIONS
BOZEMAN PROJECT NAME: COMMONS
EAST MAIN STREET BOZEMAN, MONTANA
LOCATI 1007 ARCHITECT E. MAIN ARCHITECTS ST. SUITE 202 INDEX OF DRAWINGS
BOZEMAN, MT 59715
CONTACT: LAURA DORNBERGER
(P) 406-587-1139
(C) 406-570-7496
(E) LDORNBERGER@LOCATIARCHITECTS.COM
DICK CONTRACTOR ANDERSON CONSTRUCTION
PROJECT TEAM SHEET # - CONTENT
4498 JACKRABBIT LN
BOZEMAN, MT 59718
CONTACT: TIM THOLT
(P) 406-586-0889
(C) 406-579-4006
(E) TTHOLT@DACONSTRUCTION.COM
LANDSCAPE RED 3084 THORPE BARN DESIGNER ROAD MONTANA
BELGRADE, MT 59714
CONTACT: CHAD REMPHER
(P) 406-924-8038
(E) CHAD@REDBARNMONTANA.COM
CIVIL ENGINEER
CIVIL
LANDSCAPING
ARCHITECTURAL
C&1091 H STONERIDGE ENGINEERING DRIVE
BOZEMAN, MT 59718
CONTACT: MATT HAUSAUER
(P) 406-587-1115
(E) MHAUSAUER@CHENGINEERS.COM
PROJECT INFORMATION
VICINITY MAP
PROPERTY OWNER:
LOT LEGAL 2C-1, DESCRIPTION: AMENDED PLAT OF LOT C-23-A21, AND THE PARCELS DESCRIBED ON FILM 128, PAGE 186, AND
IN BOOK 133 OF DEEDS, PAGE 209, NORTHERN PACIFIC ADDITION TO THE CITY OF BOZEMAN. LOCATED
IN THE NE 1/4, SECTION 7, T.2 S., R. 6 E. OF P.M.M., CITY OF BOZEMAN, GALLATIN COUNTY, MONTANA.
MAIN SECOND THIRD LEVEL LEVEL LEVEL
FAR TOTAL
15,15,14,601 940 791 SQ. SQ. SQ. FT. FT. FT.
0.46,24 332 GSF
SITE INFO:
NORTH
PHASE SITE PLAN 12/4 10/2018, SITE REV 2/PLAN 12/2019
BRIDGER 3424 US HIGHWAY VIEW 12 EAST DEVELOPMENT, LLC
HELENA, MT 59601
CONTACT: MARK ESPONDA
(P) 406-441-3539
(C) 406-459-3176
(E) MESPONDA@DACONSTRUCTION.COM
A2.A2.A2.0 1 2 PHASE PHASE PHASE 4 4 4 MAIN MAIN SECOND LEVEL LEVEL LEVEL FLOOR FLOOR FLOOR PLAN PLAN PLAN 2/2/2/12/12/12/19 19 19
A2.A3.3 0 PHASE PHASE 4 4 THIRD COLOR LEVEL ELEVATIONS FLOOR PLAN 2/2/12/12/19 19
A3.A3.A3.1 2 3 PHASE PHASE PHASE 4 4 4 ELEVATIONS ELEVATIONS 3D ELEVATIONS 2/2/2/12/12/12/19 19 19
A6.2 PHASE 4 SECTION 2/12/19
EX1 MSP C1.0 EXISTING MASTER OVERALL SITE SITE SITE PLAN 2/2/2/12/12/12/19 19 19
C2.C2.C3.0 1 0 GRADING GRADING SITE DETAILS & & DRAINAGE DRAINAGE PLAN PLAN 2/2/2/12/12/12/19 19 19
C3.1 SITE DETAILS 2/12/19
L1.L101 L102 0 OVERALL PHASE PHASE 4 4 LANDSCAPE LANDSCAPE MASTER SITE PLAN PLAN LANSCAPE OVERALL BUILDING PLAN 08/2/2/12/12/23/19 19 17
L103 L104 PHASE PHASE 4 4 LANDSCAPE LANDSCAPE PLAN PLAN PARKING PARKING 2/2/12/12/19 19
SITE AREA 186,4.29 908 ACRES SQ. FT.
(B-CURRENT ALL 2 ABUTTING ZONING PROPERTIES B-2 & R-0, R-4, M-1)
150 (BUILDING 5) 2 SF BEDROOM OPEN 2 OPEN SPACE UNITS SPACE X REQUIRED: = 750 SF
((OPEN OPEN MIN.) SPACE PRIVATE SPACE REQUIRED PROVIDED INDIVIDUAL BY = 10'X15' 750 SF
BALCONIES TO BE 750 SF)
PHASE 2
150 (BUILDING 6) PHASE 2 SF BEDROOM 3 OPEN 3 OPEN SPACE UNITS SPACE X REQUIRED: = 900 SF
((OPEN OPEN MIN.) SPACE PRIVATE SPACE REQUIRED PROVIDED INDIVIDUAL BY = 10'X15' 900 SF
BALCONIES TO BE 900 SF)
PARKLAND
PARKLAND LINDLEY PARK IS PROPOSED TO MEET REQUIREMENTS AS CASH-IN-LIEU FOR OF PARKLAND RESIDENTIAL AND/MIXED OR IMPROVEMENTS USE BUILDINGS 2 TO & 3.
PARKING
ALL FUTURE BUILDING ADDRESSES SHOWN WERE DISCUSSED WITH CITY GIS BUT NEED TO BE
CONFRIMED WITH COB AT EACH PHASE.
1101 PHASE BOZEMAN, EAST 4 PROPERTY MAIN MT 59715 STREET, ADDRESS:
BUILDING INFO:
THE OWNERS OF ADJOINING LOTS 13A, 2B, 2C-1, 1A-1 HAVE
EXECUTED A LEGAL WRITTEN AGREEMENT FOR MUTUAL
AND RECIPROCAL ACCESS EASEMENTS AND ZERO FOOT
LOT LINE AGREEMENT. RECORDING #2579891.
PLANNING APPLICATION NUMBER 18499 HAVE ADDITIONAL “SHARED ACCESS AGREEMENT AND GRANT OF
RECIPROCAL EASEMENT” AND “RECIPROCAL PARKING EASEMENT AGREEMENT” TO BE EXECUTED WITH
PARTIES LISTED ABOVE.
PHASED DEVELOPMENT MASTER SITE PLAN ENTITLEMENT
PERIOD TO BE FIVE YEARS. ISSUED OCTOBER 25, 2017.
VICINITY MAP
NORTH
OPENSPACE
R-0 R-4
M-1
B-2 B-2
SITE B-2
COVER AC2.AC2.0 1 EXISTING SITE ARCH COVER SITE SITE PLAN PLAN PHASE (PHASE 4 1) 12/2/2/12/12/10/19 19 18
AC2.AC2.AC2.2 3 4 ARCH ARCH ARCH MASTER PHOTOMETRIC PHOTOMETRIC SITE PLAN SITE DETAILS PLAN 2/2/2/12/12/12/19 19 19
AC3.AC3.0 1 REFUSE MATERIAL ENCLOSURE, BOARD SITE DETAILS 2/2/19/12/18 19
D D NET = = RESIDENTIAL 11/0.0008 (186908-DENSITY 173208)
2% SEE EXCESS PHASE OPEN SOUTHERN 4 FOR SPACE PHASE FACING X 67,4 425 BUILDING PATIOS SF = 1350 IN FOR SF
OCCUPANTS
LOT AREA PERCENTAGES AREA (CUMMULATIVE) %(TOTAL)
PHASE 1
BUILDING 8,561 SQ. FT. 5%
DRIVE/PARK 48,488 SQ. FT. 26%
LANDSCAPE 129,806 SQ. FT. 69%
PHASE 4
BUILDING 24,336 SQ. FT. 13%
DRIVE/PARK 95,019 SQ. FT. 51%
LANDSCAPE 67,553 SQ. FT. 36%
PHASE FRONTAGE BLOCK FRONTAGE 4 - MIXED USE BLOCK 280 25 255 BUILDING BUILDING TOTAL BUILDING 4 BUILDING LF LF X X 3 1.SF 5 LINEAR = SIGNAGE 75 SF FEET OF SF SIGNAGE = 382.5 SF OF SIGNAGE
160 SIGNAGE = 160 SF SF TOTAL SIGNAGE = 457.SIGNAGE 5 SF, FOR HOWEVER PHASE 4 LOT BUILDING MAX SIGNAGE = 400 / 5 POTENTIAL BUILDINGS (PHASE 4 ORIGINALLY CONSISTED OF 2 BUILIDNGS)
SIGNAGE