Loading...
HomeMy WebLinkAboutPHASE2-plan-021519 PROPOSED BOZEMAN WEST APARTMENTS ZONED R-4 —Ma� ew aw aw ew e�ew�— ew _ TSCHACHE LANE 60'EASEMENT _ew �s -e ss- EDGE SUBBASE EDGE SUBBASE 6 W" SS 9 CP 4700.77' I _ EXISTING PARKING LOT E 9 `- PHASE3J BLDG 1 INSTALLED WITH PHASE 1 EDGE SUBBASE S / 3 / 10 m FIRE R CK , 9Np m0 T-TURNAROUND E � �0/ Ay \ E / O C OSS WA /J / S IPE / BLDG 2 2430TSCHACHE LANE PHASE 2 / 1.CURB,SIDEWALK AND PAVE PHASE 2 AREA. 2.INSTALL STORM POND FOR BUILDING 2. 3.CREATE TRANSITIONS BETWEEN SUBBASE AND PAVED AREAS. 4.INSTALL SECOND TRASH ENCLOSURE J i / GRAPHIC SCAM / 30 0 15 30 IN FEET) I inch= 30 fL 11"X17":1"=60 ft VERIFY SCALE REVISIONS DRAWN BY:JRM PROJECT NUMBER THESE PRINTS MAY BE NO. DESCRIPTION DATE By TSCHACHE APARTMENTS 1086.011 REDUCED.LINE BELOW CHK'D.BY: MEASURES ONE INCH ON 1 UPDATED PER SITE CHANGES 02-15-19 JRM ORIGINAL DRAWING. Engineering APPR.BY: BOZEMAN MT SHEET NUMBER Consulting 204 N.111h Ave. Design Bozeman,MT 59715 DATE:10/23/18 DRAWING NUMBER MODIFY SCALE ACCORDINGLY NGWEERING, INC Planning Phone:(406)581 a319 Q,A.REVIEW BY: PHASE 2 PH-2 H:\1086\011\ACAD\SHEETS\PHASE2.dwg Plotted by christopher wasia on 2/14/2019 5:08 PM 77,E H;ir,nrn,n(,l 3,,wdardo o nwitamt COPYRIGHT©GENESIS ENGINEERING,INC.2019 DATE: