Loading...
HomeMy WebLinkAbout19- Joint Funding Agreement - U.S. Geological Survey (USGS) - Streamflow Gaging Station on the East Gallatin River Form 9-1366 U.S. Department of the Interior Customer#:6000001514 (May 2018) U.S.Geological Survey Agreement M 19RSJFA019 Joint Funding Agreement Project#: RSOOFN6 FOR TIN M 81-6001238 Water Resource Investigations Fixed Cost Agreement YES[X] NO[ ] THIS AGREEMENT is entered into as of the October 1, 2018, by the U.S. GEOLOGICAL SURVEY,Wyoming- Montana Water Science Center, UNITED STATES DEPARTMENT OF THE INTERIOR, party of the first part, and the City of Bozeman party of the second part. 1. The parties hereto agree that subject to the availability of appropriations and in accordance with their respective authorities,there shall be maintained, in cooperation Water Resource Investigations, continued operation of a streamflow-gaging station on East Gallatin River above Water Reclamation Facility, near Bozeman (06048650), herein called the program.The USGS legal authority is 43 USC 36C;43 USC 50, and 43 USC 50b. 2. The following amounts shall be contributed to cover all of the cost of the necessary field and analytical work directly related to this program. 2(b)include In-Kind-Services in the amount of$0.00 (a) $6,770 by the party of the first part during the period October 1, 2018 to September 30, 2019 (b) $9,850 by the party of the second part during the period October 1, 2018 to September 30, 2019 (c) Contributions are provided by the party of the first part through other USGS regional or national programs, in the amount of:$0 Description of the USGS regional/national program: (d) Additional or reduced amounts by each party during the above period or succeeding periods as may be determined by mutual agreement and set forth in an exchange of letters between the parties. (e) The performance period may be changed by mutual agreement and set forth in an exchange of letters between the parties. 3. The costs of this program may be paid by either party in conformity with the laws and regulations respectively governing each party. 4. The field and analytical work pertaining to this program shall be under the direction of or subject to periodic review by an authorized representative of the party of the first part. 5. The areas to be included in the program shall be determined by mutual agreement between the parties hereto or their authorized representatives. The methods employed in the field and office shall be those adopted by the party of the first part to insure the required standards of accuracy subject to modification by mutual agreement. 6. During the course of this program, all field and analytical work of either party pertaining to this program shall be open to the inspection of the other party, and if the work is not being carried on in a mutually satisfactory manner, either party may terminate this agreement upon 60 days written notice to the other party. 7. The original records resulting from this program will be deposited in the office of origin of those records. Upon request, copies of the original records will be provided to the office of the other party. 8. The maps, records or reports resulting from this program shall be made available to the public as promptly as possible.The maps, records or reports normally will be published by the party of the first part. However,the party of the second part reserves the right to publish the results of this program, and if already published by the party of the first part shall, upon request, be furnished by the party of the first part, at cost, impressions suitable for purposes of reproduction similar to that for which the original copy was prepared. The maps, records or reports published by either party shall contain a statement of the cooperative relations between the parties. The Parties acknowledge that scientific information and data developed as a result of the Scope of Work(SOW)are subject to applicable USGS review, approval, and release requirements,which are available on the USGS Fundamental Science Practices website(https://www2.usas.gov/fsp/). Form 9-1366 U.S. Department of the Interior Customer#:6000001514 (May 2018) U.S.Geological Survey Agreement#: 19RSJFA019 Joint Funding Agreement Project#: RSOOFN6 FOR TIN#:81-6001238 Water Resource Investigations 9. Billing for this agreement will be rendered annually. Invoices not paid within 60 days from the billing date will bear Interest, Penalties, and Administrative cost at the annual rate pursuant the Debt Collection Act of 1982, (codified at 31 U.S.C. §3717)established by the U.S. Treasury. USGS Technical Point of Contact Customer Technical Point of Contact Name: Kirk Miller Name: Brian Heaston Supervisory Hydrologist-Hydrologic Project Engineer Data Section Chief Address: City Of Bozeman P.O. Box 1230 Address: 521 Progress Circle Ste 6 Bozeman, MT 59771-1230 Cheyenne,WY 82007-9660 Telephone: (406)582-2924 Telephone: (307)775-9168 Fax: Fax: (307)778-2764 Email: Email: kmiller@usgs.gov USGS Billing Point of Contact Customer Billing Point of Contact Name: Jennifer Walg rave Name: Brian Heaston Budget Analyst Project Engineer Address: 3162 Bozeman Ave Address: City Of Bozeman P.O. Box 1230 Helena, MT 59601 Bozeman, MT 59771-1230 Telephone: (406)457-5916 Telephone: (406)582-2924 Fax: (406)457-5990 Fax: Email: jwalgrave@usgs.gov Email: U.S.Geological Survey United States City of Bozeman Department of Interior Signature Signatures (�Q Digitally signed byJOHN KILPATRICK Date:2019.03.08 11:11:00-07'00' t Q By Date: 03108/2019 g Date:4 I Name:John M Kilpatrick Name: Title: Director Title: By Date: Name: Title: By Date: Name: Title: Attachment Statement of Work COOPERATIVE WATER RESOURCES PROGRAM City of Bozeman USGS Wyoming-Montana Water Science Center Federal Fiscal Year 2019 (20181001 - 20190930) Station Name Bozeman USGS Streamgaging - Collect, compute, review, and publish continuous annual streamflow record - Provide real-time data 06048650 E Gallatin R ab Water Reclamation Facility nr Bozeman MT $9,850 $6,770 Streamgaging SUBTOTAL $9,850 $6,770 Bozeman USGS Streamgaging TOTAL $9,850 $6,770 Performance Period Annual: Oct 1 2018 through Sep 30 2019 (data collection) Funding Period Oct 1 2018 through Sep 30 2019