Loading...
HomeMy WebLinkAbout03-25-19 City Commission Packet Materials - A5. Cottonwood and Ida PUD18516 City Commission Staff Report for the Cottonwood and Ida (PUD) Preliminary Plan Date: City Commission Public Hearing March 25, 2019 City Commission Room, Bozeman City Hall, 121 North Rouse Avenue Bozeman, MT 59715 Project Description: A Preliminary Planned Unit Development (PUD) application to allow a mixed residential and commercial development with relaxations to zoning regulations requested for apartment building use, building height parking, street design, restaurant design, transparency, front setbacks and a request for concurrent construction. Project Location: 615 East Cottonwood Street and 720 North Ida Avenue. The parcels are legally described as Lots 5-16, Block 106 including a vacated alley and Lots 17-28, Block 105 including a vacated alley in the Northern Pacific Addition to Bozeman located in S06, T02 S, R06 E, P.M.M., Gallatin County, Montana. Recommendation: Approval with conditions and code provisions Motion: “Having reviewed and considered the application materials, public comment, and all the information presented, I hereby adopt the findings presented in the staff report for application 18516 and move to approve the Cottonwood and Ida Planned Unit Development application subject to conditions and all applicable code provisions.” Report Date: March 13, 2019 Staff Contact: Brian Krueger, Development Review Manager Executive Summary The property owner and applicant submitted an application to develop an existing underutilized site in the Northeast Historic Mixed Use District, NEHMU. The site is accessed from a future extension of East Aspen Street and from East Cottonwood Street. The development proposes a mix of uses including apartment buildings, an office building, a mixed use building including artisan manufacturing and a restaurant building. The proposal include four buildings. The largest building includes apartments, 64 units, and offices, 29,700 sq. ft., separated horizontally over an underground parking structure consisting of 96 parking spaces. The other buildings on site include a 12 unit apartment building, a mixed use building with artisan manufacturing, 5,400 sq. ft. with 16 units mixed into the building and one 2,150 square foot commercial restaurant building. The application includes the concurrent construction of East Aspen Street, North Ida Avenue and the north half of East Cottonwood Street. The subject property is zoned Northeast Historic Mixed Use District. The site is 2.06 acres in size. The north half of the property includes four multi use storage and warehouse buildings constructed beginning in 1960. All buildings on the north half of 546 18516 Staff Report for the Cottonwood and Ida Planned Unit Development PUD Page 2 of 35 the property are proposed for demolition. The south half of the site includes a grain warehouse building constructed in 1930. The grain warehouse is proposed to remain and be adaptively reused through the site development process for use as a restaurant/community building. Eleven relaxations to the Bozeman Municipal Code (BMC) zoning regulations are proposed with the application: 1. BMC 38.310.040.C Table of Uses. The application requests for to add apartment buildings as an allowable use in the NEHMU district. 2. BMC 38.310.040.C Table of Uses. The application requests to increase the size of the allowable restaurant use in NEHMU from 1,500 to 2,200 square feet. 3. BMC 38.320.050 Form and Intensity Standards. The application proposes to decrease the required front setback from 20 to 8 feet. 4. BMC 38.320.050 Form and Intensity Standards. The application proposes to allow zero lot line conditions in the NEHMU. 5. BMC 38.320.050 Form and Intensity Standards. The application proposes to increase the allowable maximum height to be increased from 45’ to 54’. 6. BMC 38.320.050 Form and Intensity Standards. The application proposes to increase the maximum lot coverage in NEHMU from 40% to 45%. 7. BMC 38.510.030.C Landscape Block Frontage. The application proposes to decrease the required residential transparency from a minimum 15% to 8%. 8. BMC 38.510.030.B Storefront Block Frontage. The application proposes to decrease the required commercial transparency from 60% to 30%. 9. BMC 38.540.050.A.1 Residential Parking Standards. The application proposes to reduce the requirement for efficiency units from 1.25 spaces per unit to 1 space per unit. The application proposes to reduce the requirements for one bedroom units from 1.5 spaces per unit to 1.25 spaces per unit. 10. BMC 38.540.050.A.2 Non-residential Parking Standards. The application proposes to reduce all nonresidential parking standards by 40%. 11. BMC. 38.400.050.A.1 Street Design. The application proposes to not construct the street according to the adopted designs for local streets and instead construct East Cottonwood Street with back out angled parking. Concurrent construction of the adjacent streets, site infrastructure and buildings is proposed. The criteria for granting a PUD are found in BMC 38.430.090. A PUD is a discretionary approval and the review authority must find that the overall development is superior to that offered by the basic existing zoning standards as required in BMC 38.20.030.A.4. The intent of a PUD is to promote maximum flexibility and 547 18516 Staff Report for the Cottonwood and Ida Planned Unit Development PUD Page 3 of 35 innovation in development proposals within the City. The applicants can request relaxations from the code in exchange for a higher quality of design. The obligation to show a superior outcome is the responsibility of the applicant. The applicant asserts that the overall outcome of the proposal is superior to what would be obtained from the application of the default NEHMU district. The Development Review Committee (DRC) has reviewed the application. Based on its evaluation of the application against the criteria, the DRC found the application adequate for continued review. The DRC supports the granting of concurrent construction for this project with the satisfaction of all code requirements related to concurrent construction with the final planned unit development application. The Design Review Board (DRB) reviewed the application on February 27, 2019. The Design Review Board is the design review advisory body to the City Commission on this application. The DRB recommended approval of the project with the conditions and code provisions outlined in this staff report. The Recreation and Parks Advisory Board Subdivision Committee reviewed the application on March 8, 2019 and recommended approval of the applicant’s proposal to utilize cash in lieu of parkland for the parkland requirement for the development. The Community Affordable Housing Board reviewed the application on March 13, 2019 and recommended approval of the applicant’s proposal to utilize affordable housing in order to meet PUD performance points. Public comment has been received on this application. As of the writing of this report there were eight public comments received. Seven were in favor of the application and one was not in favor of the application citing reduced setbacks, parking reductions and increased building height. Unresolved Issues There are no unresolved issues with the application. Alternatives 1. Approve the application with the recommended conditions and report findings; 2. Approve the application with modifications to the recommended conditions and modifications to the report findings; 3. Deny the application based on findings of non-compliance with the applicable criteria contained within the staff report; or 4. Open and continue the review on the application with the concurrence of the applicant, with specific direction to staff or the applicant to supply additional information or to address specific items. 548 18516 Staff Report for the Cottonwood and Ida Planned Unit Development PUD Page 4 of 35 TABLE OF CONTENTS Executive Summary ................................................................................................................................. 1 Unresolved Issues ..................................................................................................................................... 3 Alternatives ................................................................................................................................................ 3 SECTION 1 - MAP SERIES ............................................................................................................................ 5 SECTION 2 - REQUESTED RELAXATION / DEVIATIONS / VARIANCES ................................ 14 SECTION 3 - RECOMMENDED CONDITIONS OF APPROVAL ..................................................... 14 SECTION 4 – REQUIRED CODE PROVISIONS ................................................................................... 17 SECTION 5 - STAFF ANALYSIS AND FINDINGS ............................................................................... 17 APPENDIX A –PROJECT SITE ZONING AND GROWTH POLICY ................................................. 33 APPENDIX B – OWNER INFORMATION AND REVIEWING STAFF .......................................... 34 APPENDIX C –PLANNED UNIT DEVELOPMENT INTENT ........................................................... 34 ATTACHMENTS ........................................................................................................................................... 35 549 18516 Staff Report for the Cottonwood and Ida Planned Unit Development PUD Page 5 of 35 SECTION 1 - MAP SERIES Zoning Classification 550 18516 Staff Report for the Cottonwood and Ida Planned Unit Development PUD Page 6 of 35 Growth policy designation 551 18516 Staff Report for the Cottonwood and Ida Planned Unit Development PUD Page 7 of 35 Current Land Use 552 553 18516 Staff Report for the Cottonwood and Ida Planned Unit Development PUD Page 9 of 35 554 18516 Staff Report for the Cottonwood and Ida Planned Unit Development PUD Page 10 of 35 555 18516 Staff Report for the Cottonwood and Ida Planned Unit Development PUD Page 11 of 35 556 18516 Staff Report for the Cottonwood and Ida Planned Unit Development PUD Page 12 of 35 557 18516 Staff Report for the Cottonwood and Ida Planned Unit Development PUD Page 13 of 35 558 17232 Staff Report for the Bridger Vale Planned Unit Development (PUD) Page 14 of 35 SECTION 2 - REQUESTED RELAXATIONS 1. BMC 38.310.040.C Table of Uses. The application requests for to add apartment buildings as an allowable use in the NEHMU district. 2. BMC 38.310.040.C Table of Uses. The application requests to increase the size of the allowable restaurant use in NEHMU from 1,500 to 2,200 square feet. 3. BMC 38.320.050 Form and Intensity Standards. The application proposes to decrease the required front setback from 20 to 8 feet. 4. BMC 38.320.050 Form and Intensity Standards. The application proposes to allow zero lot line conditions in the NEHMU. 5. BMC 38.320.050 Form and Intensity Standards. The application proposes to increase the allowable maximum height to be increased from 45’ to 54’. 6. BMC 38.320.050 Form and Intensity Standards. The application proposes to increase the maximum lot coverage in NEHMU from 40% to 45%. 7. BMC 38.510.030.C Landscape Block Frontage. The application proposes to decrease the required residential transparency from a minimum 15% to 8%. 8. BMC 38.510.030.B Storefront Block Frontage. The application proposes to decrease the required commercial transparency from 60% to 30%. 9. BMC 38.540.050.A.1 Residential Parking Standards. The application proposes to reduce the requirement for efficiency units from 1.25 spaces per unit to 1 space per unit. The application proposes to reduce the requirements for one bedroom units from 1.5 spaces per unit to 1.25 spaces per unit. 10. BMC 38.540.050.A.2 Non-residential Parking Standards. The application proposes to reduce all nonresidential parking standards by 40%. 11. BMC. 38.400.050.A.1 Street Design. The application proposes to not construct the street according to the adopted designs for local streets and instead construct East Cottonwood Street with back out angled parking. The relaxations may be granted with a Planned Unit Development (PUD). The criteria for granting PUD relaxations are included in BMC 38.430.030.A.4.c. Staff has reviewed the criteria and finds that they are met for all eleven relaxations with the adoption of the staff analysis and findings below for justification. SECTION 3 - RECOMMENDED CONDITIONS OF APPROVAL Please note that these conditions are in addition to any required code provisions identified in this report. 1. The applicant is advised that unmet code provisions, or code provisions that are not specifically listed as conditions of approval, does not, in any way, create a waiver or other relaxation of the lawful requirements of the Bozeman Municipal Code or state law. 559 18516 Staff Report for the Cottonwood and Ida Planned Unit Development Page 15 of 35 2. The final planned unit development plan must be submitted, reviewed, and approved prior to the approval of any subsequent site plan. 3. The requested relaxations to the following sections are granted as proposed in the application materials and must be reflected in the final planned unit development plan, design guidelines and associated property owners’ association documents as approved: 1. BMC 38.310.040.C Table of Uses. The application requests for to add apartment buildings as an allowable use in the NEHMU district. 2. BMC 38.310.040.C Table of Uses. The application requests to increase the size of the allowable restaurant use in NEHMU from 1,500 to 2,200 square feet. 3. BMC 38.320.050 Form and Intensity Standards. The application proposes to decrease the required front setback from 20 to 8 feet. 4. BMC 38.320.050 Form and Intensity Standards. The application proposes to allow zero lot line conditions in the NEHMU. 5. BMC 38.320.050 Form and Intensity Standards. The application proposes to increase the allowable maximum height to be increased from 45’ to 54’. 6. BMC 38.320.050 Form and Intensity Standards. The application proposes to increase the maximum lot coverage in NEHMU from 40% to 45%. 7. BMC 38.510.030.C Landscape Block Frontage. The application proposes to decrease the required residential transparency from a minimum 15% to 8%. 8. BMC 38.510.030.B Storefront Block Frontage. The application proposes to decrease the required commercial transparency from 60% to 30%. 9. BMC 38.540.050.A.1 Residential Parking Standards. The application proposes to reduce the requirement for efficiency units from 1.25 spaces per unit to 1 space per unit. The application proposes to reduce the requirements for one bedroom units from 1.5 spaces per unit to 1.25 spaces per unit. 10. BMC 38.540.050.A.2 Non-residential Parking Standards. The application proposes to reduce all nonresidential parking standards by 40%. 11. BMC. 38.400.050.A.1 Street Design. The application proposes to not construct the street according to the adopted designs for local streets and instead construct East Cottonwood Street with back out angled parking. 4. Lots 5-16, Block 106 including a vacated alley and Lots 17-28, Block 105 including a vacated alley in the Northern Pacific Addition to Bozeman located in S06, T02 S, R06 E, P.M.M., Gallatin County, Montana must be aggregated and/or the common boundaries of said lots must be reconfigured through the applicable subdivision review process to accommodate the project prior to final planned unit development plan approval. 5. Ten foot front setback utility easements must be provided for as shown on the preliminary planned unit development plans either through individual recordable documents or thorough the subdivision exemption review process prior to final 560 18516 Staff Report for the Cottonwood and Ida Planned Unit Development Page 16 of 35 planned unit development plan approval. 6. Public access easements must be provided for as shown on the preliminary planned unit development plans for all publicly accessible open space areas prior to final planned unit development plan approval. 7. No property may be removed from the covenants without written approval of the City of Bozeman. 8. The City of Bozeman has relied upon the overall design and design standards required as part of the planned unit development application. The design and design standards may not be altered without consent of the City. 9. A notice prepared by the City must be filed concurrently with the amended plat so that it will appear on title reports. It must read substantially as follows The Amended Plat of Lots 5-16, Block 106 including a vacated alley and Lots 17-28, Block 105 including a vacated alley in the Northern Pacific Addition to Bozeman located in S06, T02 S, R06 E, P.M.M., Gallatin County, Montana known as the Cottonwood and Ida Planned Unit Development (PUD) are subject to specific design standards, unique building setbacks and heights, parking requirements and uses. These standards may be found in [insert correct reference to design standard location]. Lot owners are advised that these are specific to the Cottonwood and Ida Planned Unit Development and are in place of the general development standards of the same subject of the City of Bozeman Zoning. If a development standard is not specifically established in the Cottonwood and Ida PUD approval documents the general standards of the City apply. Modification of the special standards would require an amendment to the Cottonwood and Ida Planned Unit Development. Modifications are strongly discouraged. It is the obligation of the lot owner to be fully informed as to these standards before beginning any home or site design process. Approval by the design review entity established in the covenants of the development does not bind the City of Bozeman to approve a construction plan. 10. The applicant must execute at the Gallatin County Clerk & Recorder's Office prior to approval of the final Planned Unit Development, a waiver of right-to-protest creation of a City-wide special district for parks and trail, which would provide a mechanism for the fair and equitable assessment of costs for City parks and trails. 11. The offsite parking agreement must be for a minimum term of 25 years and must be completed, executed and filed prior to subsequent site plan approval. 12. The offsite parking agreement must be incorporated into the property owners’ association documents as a required responsibility of the association along with the requirement to assess for and pay any required fees to satisfy the long term offsite parking agreement. 13. Prior to planned unit development final plan approval the applicant must provide the following modified historic property record documentation for the demolition of the existing structure at 620 E. Cottonwood Street: Property address, legal location, architectural description, digital interior and exterior elevation photographs, site map, and a quadrangle map. A modified completion of the Montana Historic Property 561 18516 Staff Report for the Cottonwood and Ida Planned Unit Development Page 17 of 35 Record is a documentation of the current structure conditions and not an analysis of the historic integrity of property. The modified property card will be housed permanently online on the City’s Architecture Inventory Map. 14. A deed restriction requiring affordable housing in the applicable amount proposed for planned unit development performance per the definition in BMC 38.700.020 must be placed on Lot A, underlying buildings 1, 2, and 6. 15. If not already filed for the subject site, the applicant must provide and file with the County Clerk and Recorder's office executed Waivers of Right to Protest Creation of Special Improvement Districts (SID’s) for the following: a. Street improvements to East Aspen Street including paving, curb/gutter, sidewalk, and storm drainage b. Street improvements to Ida Avenue including paving, curb/gutter, sidewalk, and storm drainage c. Street improvements to Front Street including paving, curb/gutter, sidewalk, and storm drainage d. Street improvements to East Tamarack Street including paving, curb/gutter, sidewalk, and storm drainage e. Street improvements to East Peach Street including paving, curb/gutter, sidewalk, and storm drainage f. Street improvements to Front Street including paving, curb/gutter, sidewalk, and storm drainage g. Intersection improvements to North Wallace Avenue and East Tamarack Street h. Intersection improvements to North Wallace Avenue and East Peach Street i. Intersection improvements to Front Street and East Aspen Street j. Intersection improvements to Front Street and Ida Avenue The document filed must specify that in the event an SID is not utilized for the completion of these improvements, the developer agrees to participate in an alternate financing method for the completion of said improvements on a fair share, proportionate basis as determined by square footage of property, taxable valuation of the property, traffic contribution from the development, or a combination thereof. The applicant must provide a copy of the filed SID waiver prior to final PUD approval. 16. The intersections of East Aspen Street and Front Street and Ida Street and Front Street must be reconfigured to meet the City’s minimum design standard. The intersections must be improved with the first phase of development. The City’s Engineering Department may approve an alternative design incorporating the existing park provided the City Community Development Department and Parks Department support the alternative design. An alternative design must be approved prior to final PUD approval. SECTION 4 – REQUIRED CODE PROVISIONS 1. BMC 38.220.050. A final approved weed control plan must be submitted prior to planned unit development final plan approval. 562 18516 Staff Report for the Cottonwood and Ida Planned Unit Development Page 18 of 35 2. BMC 220.080. Irrigation water. Clarify proposed water demand for irrigation system. Clarify the nature of the existing well and water right to support the new demand. Provide letter from DNRC confirming water right or intent to issue right to support the project prior to approval of the planned unit development final plan. 3. BMC 38.220.300 and 310. The property owners’ association documents must include the requirements of Section 38.220.300 and 320. The proposed documents must be finalized and recorded with the planned unit development final plan. 4. BMC 38.230.020.A and C. a subsequent site plan application is required to be reviewed and approved for all phases of this development prior to building permit issuance. 5. BMC 38.270.030.D For concurrent construction provide a full response to the required items in Section 38.270.030.D BMC. The concurrent construction response was provided, but not in accordance with the required section. Provide response to PUD concurrent construction and finalize all of the required code elements prior to the approval of the planned unit development final plan, approval of concurrent construction and prior to building permit issuance. 6. BMC 38.410.060.B.4 Encroachments proposed in required ten foot private utility easement areas required along all streets. No written approval from all utility companies is provided as required. The current and entire list of utility companies operating in Montana can be attained from the Montana Public Service Commission. Provide approval for encroachment prior to approval of planned unit development final plan. 7. BMC 38.420.030 Cash in lieu of land dedication for parkland. Cash in lieu of parkland has not been paid. The cash in lieu amount due is required to be paid prior to subsequent site plan approval. 8. BMC 38.430.040.A.3 outlines the review and approval process for the planned unit development final plan. Final plan review and approval. The final plan must be in compliance with the approved preliminary plan and/or development guidelines. Upon approval or conditional approval of a preliminary plan and the completion of any conditions imposed in connection with that approval, an application for final plan approval may be submitted. For approval to be granted, the final plan must comply with the approved preliminary plan. This means that all conditions imposed by the city commission as part of its approval of the preliminary plan have been met and: The final plan does not change the general use or character of the development; The final plan does not increase the amount of improved gross leasable non-residential floor space by more than five percent, does not increase the number of residential dwelling units by more than five percent and does not exceed the amount of any density bonus approved with the preliminary plan; The final plan does not decrease the open space and/or affordable housing provided; The final plan does not contain changes that do not conform to the requirements of this chapter, excluding properly granted deviations, the applicable objectives and criteria of section 38.430.100, or other objectives or criteria of this chapter. The final plan must not contain any changes which would allow increased 563 18516 Staff Report for the Cottonwood and Ida Planned Unit Development Page 19 of 35 deviation/relaxation of the requirements of this chapter; and the final plat, if applicable, does not create any additional lots which were not reviewed as part of the preliminary plan submittal. Final plan approval. The final plan may be approved if it conforms to the approved preliminary plan in the manner described above. Prior to final plan approval, the review authority may request a recommendation from the DRB, DRC, ADR staff, or other entity regarding any part of a proposed final plan. 9. BMC 38.520.070 Location and design of service areas. No detailed service areas identified for gas and electric entrance locations into the buildings or proposed methods to separate and mitigate impacts as required. Show gas and electric locations with the true size and extent of all proposed meters as required per SP1 on entire site and the proposed locations for private utility entrance locations into the buildings. Planned unit development final plan must provide clear information on utility entrances into each building and demonstrate compliance with this code section with the subsequent site plan. 10. BMC 38.540.070 Off-site parking. Provide site plan for offsite parking that demonstrates the proposed lot meets all requirements of the BMC and the off-site parking code section. Clarify the uses proposed to utilize the offsite parking and provide exhibit showing compliance with distance requirements per use. Provide draft long term parking agreement or draft deed restriction in order to demonstrate compliance with BMC 38.540.070.6 with planned unit development final plan. 11. BMC 38.550.050.I. Irrigation plans are required to be submitted with the PUD open space landscape plan with the subsequent site plan application. 12. BMC 38.550.060.A.1. The PUD open space landscape plan must meet the requirements of 23 performance points and be finalized and completed with the subsequent site plan application. 13. BMC 38.400.050.A1. The property owner’s association must maintain the proposed on street angled parking allowed on East Cottonwood Street including snow plowing and maintenance of the parking surfaces. The property owners’ association documents must include language to this effect and be reviewed and approved prior to final PUD approval. 14. BMC 38.400.010.A.8 The existing satellite dish encroaching into the emergency access route must be removed prior to final PUD approval to ensure emergency services are not inhibited. 15. BMC 38.400.090.D.2 The applicant has indicated that the emergency vehicle access road will only be utilized by emergency service, as such the City’s access standards do not apply provided the following are met: a. The property owners association documents continue language describing the accesses may only be utilized be emergency services. The language must be reviewed and approved prior to final PUD approval. 564 18516 Staff Report for the Cottonwood and Ida Planned Unit Development Page 20 of 35 b. City approved barricades are placed at both the north and south access points c. The street vision triangles for the north and south access points be removed from the final PUD submittal 16. BMC 38.400.100.C Street vision triangles shown on the preliminary PUD submittal exceed the City’s requirements. The final PUD submittal must correctly show the City’s street vision triangles prior to approval. 17. BMC 38.410.060.A An amended plat must be completed prior to final PUD approval for the proposed changes to the lots. a. The public utility easements along the property street frontages must be provided using the City’s standard language prior to final PUD approval. No encroachments may be permitted without the approval from the utility companies registered with the Montana Public Service Commission. b. The public access easements for required public sidewalks located outside of the right-of-way must be provided using the City’s standard language prior to final PUD approval. c. A public drainage easement must be provided for the drainage infrastructure supporting the public right-of-way which is located inside of the property. The easement must be provided, reviewed, and approved by the City prior to final PUD approval. 18. BMC 38.410.070.A.1 Certified water and sewer design reports must be provided prior to final PUD approval. 19. BMC 38.410.080.A A certified drainage report for the public right-of-way drainage must be reviewed and approved by the City prior final PUD approval. a. The applicant must submit a stormwater maintenance plan for the proposed stormwater infrastructure for review and approval prior to final PUD approval. The approved maintenance plan be included within the property owner’s associate document prior to final PUD approval. 20. BMC 38.430.070.A a. All public infrastructure, both on and offsite, must be installed with the first phase of development. SECTION 5 - STAFF ANALYSIS AND FINDINGS Analysis and resulting recommendations are based on the entirety of the application materials, municipal codes, standards, plans, public comment, and all other materials available during the review period. Collectively this information is the record of the review. The analysis in this report is a summary of the completed review. 565 18516 Staff Report for the Cottonwood and Ida Planned Unit Development Page 21 of 35 Applicable Plan Review Criteria, Section 38.230.100, BMC. The applicant is advised that unmet code provisions, or code provisions that are not specifically listed as conditions of approval, do not in any way create a waiver or other relaxation of the lawful requirements of the Bozeman Municipal Code or State law. In considering applications for plan approval under this title, the advisory boards and City Commission shall consider the following: 1. Conformance to and consistency with the City’s adopted growth policy Yes. The property has a future land use designation of Industrial and is zoned NEHMU, Northeast Historic Mixed Use. The proposed residential units, office and restaurant uses and artisan manufacturing uses increase the intensity of commercial uses and the density of residential uses beyond the existing development pattern. The change in intensity is anticipated by the growth policy in areas of the city with adequate infrastructure. The project is in conformance to and consistent with the City’s adopted growth policy, the Bozeman Community Plan, including the following goals and objectives: Goal LU-1: Create a sense of place that varies throughout the City, efficiently provides public and private basic services and facilities in close proximity to where people live and work, and minimizes sprawl. The NEHMU district has a distinct sense of place, this project contributes to an existing and expanding mixed use area and allows people to live in close proximity to work, public and private basic services and minimizes sprawl. Objective LU-1.4 Provide for and support infill development and redevelopment which provides additional density of use while respecting the context of the existing development which surrounds it. Respect for context does not automatically prohibit difference in scale or design. This project provides additional density of residential and commercial use while respecting the context of the mixed use area. The change in scale is allowable with the design presented as it has human scale and is compatible with the district with building sized within their context and integrated into the neighborhood. Objective LU-2.3: Encourage redevelopment and intensification, especially with mixed uses, of brownfields and underutilized property within the City consistent with the City’s adopted standards. This project includes mixed uses and increase residential density and is proposed on underutilized property in an ongoing and developing mixed use district. Objective E-4.2: Promulgate efficient land use practices. 566 18516 Staff Report for the Cottonwood and Ida Planned Unit Development Page 22 of 35 This project promulgates efficient land use practices and provides a high net residential density and FAR with office, manufacturing and restaurant uses, while adding a significant amount of usable open space area that can be used by the entire community. Objective C-2.5 Explore and encourage innovative parking solutions for both residential and commercial projects including parking best practices, expanding parking districts, cash in lieu of parking and design guidelines for structured parking. This project proposes a parking reduction, structured parking integrated into the building design and offsite parking that will allow the project to provide an intensity of use today while having the ability to adapt to the changing transportation infrastructure in town including autonomous vehicles, ridesharing, car sharing, and increased transit service. Goal H-1: Promote an adequate supply of safe, quality housing that is diverse in type, density, cost, and location with an emphasis on maintaining neighborhood character and stability. This project provides additional quality housing at high density in an area that has historically included smaller residential low density uses. More recent infill projects in this neighborhood have included apartment uses over mixed commercial uses. This project will add to the neighborhood character and the stability of this area. Residential uses provide additional eyes on the street and have a twenty four hour presence that will make the district safer and enhance the overall neighborhood. For more information on the growth policy designation please see Appendix A. 2. Conformance to this chapter, including the cessation of any current violations Yes. The project, if approved, will conform to the Bozeman Municipal Code other than the requested relaxations. There are no known documented violations of the BMC for this property. Code provisions are provided related to final planned unit development plan approval and subsequent site plan approval. 3. Conformance with all other applicable laws, ordinances, and regulations Yes. The proposed uses of the site are consistent with the allowed uses of the NEHMU district with the additional of the apartment building use. No specific conflicts have been identified. Additional steps will be required including but not limited to final payment for cash in lieu of water rights, approval of the final planned unit development, subdivision exemption to realign and aggregate the underlying lots, dedication of the utility easements, construction of infrastructure, PUD final plan documents and application, site plan approval and building permits. The Building Division of the Department of Community Development will review the requirements of the 567 18516 Staff Report for the Cottonwood and Ida Planned Unit Development Page 23 of 35 International Building Code for compliance at the time of building permit application. Conditions of approval and code provisions are provided related to these issues. Condition of approval 1 requires full compliance with all applicable code requirements. 4. Conformance with special review criteria for applicable permit type as specified in article 2 Yes. The CUP and PUD criteria are reviewed below. The project meets the requirements and criteria as presented. 5. Conformance with the zoning provisions of article 3, including permitted uses, form and intensity standards and requirements, applicable supplemental use criteria, and wireless facilities and/or affordable housing provisions if applicable Yes. The uses are permitted in the NEHMU district with the addition of apartment building uses requested through relaxation. Form and intensity standards are met with the proposal other than the proposed relaxations for the front setback and zero lot line conditions, lot coverage and building heights. Affordable housing is proposed in compliance with the PUD performance standards and will be confirmed through the planned unit development final plan process. Condition of approval 14 requires a deed restriction to assure the applicability of the affordable housing long term is proposed. The north half of the property includes four multi use storage and warehouse buildings constructed beginning in 1960. All buildings on the north half of the property are proposed for demolition. The south half of the site includes a grain warehouse building constructed in 1930. The grain warehouse is proposed to remain and be adaptively reused through the site development process for use as a restaurant/community building .Condition of approval 13 is related to documentation of the grain warehouse prior to modifications to the building. 6. Conformance with the community design provisions of article 4, including transportation facilities and access, community design and element provisions, and park and recreational requirements Yes. The proposed streets meet standards with the proposed relaxations. East Aspen Street, East Cottonwood Street and North Ida Avenue are required to be improved with this project. The proposed parking is to be met with reductions allowed through relaxation of the parking requirements. Pedestrian access is provided from the street directly through and into the project. The primary entrances into each building are connected to the City’s sidewalk system. Perimeter street frontage sidewalks are provided on every perimeter street in conformance to standards. The lots and block meet standards, water and sewer is provided to each lot through mains within the city owned rights of way. The applicant will be constructing water mains to support the site. Site surface drainage generally meets standards at this level in the design for the streets 568 18516 Staff Report for the Cottonwood and Ida Planned Unit Development Page 24 of 35 and development. Cash in lieu of water rights is proposed and will be paid with the final site plan for site development. The applicant proposes to pay cash in lieu of parkland in conformance with standards, capped at twelve dwelling units per acre. The Recreation and Parks Advisory Board Subdivision Committee supports the use of cash in lieu for this project and recommends approval. Small encroachments are proposed into the required front setback utility easements. Condition of approval 5 requires the establishment of utility easements to serve the property and the surrounding utility grid. Code provision 6 requires approval of the utility holders prior to final approval of the encroachments. Concurrent construction of East Aspen Street, East Cottonwood Street and North Ida Avenue and the associated sewer and water mains is proposed. The Development Review Committee reviewed the request for concurrent construction with the understanding that the applicant agrees to standards and to complete the requirements in BMC 38.270.030.D with the planned unit development final plan and prior to building permit issuance. The Development Review Committee recommends concurrent construction be approved with all the required code elements. 7. Conformance with the project design provisions of article 5, including compatibility with, and sensitivity to, the immediate environment of the site and adjacent neighborhoods and other approved development; design and arrangement of the elements of the plan; landscaping; open space; lighting, signage; The development is compatible with and sensitive to the immediate environment of the site and the adjacent neighborhoods and other approved development relative to, building mass and height, landscaping, orientation of parking and building placement on the site. The buildings comply with permanence in building materials, building quality, architectural integration, neighborhood identity, and orientation of parking and service areas. The general approach to landscaping meets standards. The design of the plan is consistent with the existing natural topography. The site will be raised to allow the inclusion of underground parking. There are no water bodies or significant existing vegetation on site. A general comprehensive signage is proposed in conformance with standards. Parking is proposed to be reduced via a relaxation for both residential and commercial uses. 96 parking spaces are proposed in an underground parking structure and 72 parking spaces are proposed offsite for the non-residential uses. 32 on street spaces are proposed for residential use. Prior to reductions the project would have required 255.3 parking spaces, with reductions the required parking is proposed at 166.1 parking 569 18516 Staff Report for the Cottonwood and Ida Planned Unit Development Page 25 of 35 spaces. 200 parking spaces are proposed to be provided through a combination of onsite, offsite and on street as outlined above. The offsite parking must have a long term lease established prior to final approval of the site plan and be integrated into the property owners association documents as a required element per conditions of approval 11 and 12. 8. Conformance with environmental and open space objectives set forth in articles 4—6, including the enhancement of the natural environment, watercourse and wetland protections and associated wildlife habitats; and if the development is adjacent to an existing or approved public park or public open space area, have provisions been made in the plan to avoid interfering with public access to and use of that area Yes. Pervious pavers are proposed to treat stormwater from the development. This is in compliance with best practices for Low Impact Development. The approach to the stormwater system meets code standards. The final review of the stormwater system will occur with the site plan review. The development is adjacent to a small public park and climbing boulder. No significant impact to the park is anticipated from this development. 9. Conformance with the natural resource protection provisions of article 4 and article 6 Yes. No streams, floodplains, critical plant communities or wetlands exist on site. 10. Other related matters, including relevant comment from affected parties Public comment has been received on this application. As of the writing of this report there were eight public comments received. Seven were in favor of the application and 570 18516 Staff Report for the Cottonwood and Ida Planned Unit Development Page 26 of 35 one was not in favor of the application citing reduced setbacks, parking reductions and increased building height. 11. If the development includes multiple lots that are interdependent for circulation or other means of addressing requirement of this title, whether the lots are either: a. Configured so that the sale of individual lots will not alter the approved configuration or use of the property or cause the development to become nonconforming; or b. The subject of reciprocal and perpetual easements or other agreements to which the City is a party so that the sale of individual lots will not cause one or more elements of the development to become nonconforming The property must be configured through the applicable subdivision review process to relocate and aggregate common lot boundaries prior to the approval of the final PUD plan. Condition 4 is related to this issue. 12. Phasing of development The project is proposed to be constructed in one phase. Concurrent construction of East Aspen Street, East Cottonwood Street and North Ida Avenue and the associated sewer and water mains is proposed. The Development Review Committee reviewed the request for concurrent construction with the understanding that the applicant agrees to standards and to complete the requirements in BMC 38.270.030.D with the planned unit development final plan and prior to building permit issuance. The Development Review Committee recommends concurrent construction be approved with all the required code elements. Conditional Use Permit Review Criteria, Section 38.230.110, BMC. E. In addition to the review criteria of section 38.230.100, the review authority shall, in approving a conditional use permit, determine favorably as follows: 1. That the site for the proposed use is adequate in size and topography to accommodate such use, and all yards, spaces, walls and fences, parking, loading and landscaping are adequate to properly relate such use with the land and uses in the vicinity; The site is adequate. The proposed buildings, site design, pedestrian connectivity, open space and mix of uses will enhance the neighborhood. Landscaped areas are coordinated with adjoining properties and within the proposed development. The landscape design will improve the street frontages of the site. The reduced setbacks proposed through relaxation relate well to the historic building placements within the vicinity. All parking is proposed either in an underground structure or offsite which 571 18516 Staff Report for the Cottonwood and Ida Planned Unit Development Page 27 of 35 provides for an uninterrupted streetscape for pedestrians and the addition of on street parking. 2. That the proposed use will have no material adverse effect upon the abutting property. Persons objecting to the recommendations of review bodies carry the burden of proof; No adverse impacts to abutting properties have been identified. The construction of East Aspen Street and the reconstruction and completion of North Ida Avenue and East Cottonwood Street will improve safety for vehicles, cyclists, and pedestrians which promotes public health and safety. General welfare will be promoted through a variety of apartment types which will provide a variety of housing options for area residents. The provision of additional office, manufacturing and restaurant uses to the districts promotes general welfare by providing an expansion and additional density to the mixed of uses in the NEHMU. The development serviced by the existing municipal sanitary sewer and water systems promotes public health by protecting groundwater from degradation associated with on-site septic systems and domestic wells. Stormwater will be managed in pervious pavers and other retention facilities to filter out sediment and treat runoff. 3. That any additional conditions stated in the approval are deemed necessary to protect the public health, safety and general welfare. Such conditions may include, but are not limited to: a. Regulation of use; b. Special yards, spaces and buffers; c. Special fences, solid fences and walls; d. Surfacing of parking areas; e. Requiring street, service road or alley dedications and improvements or appropriate bonds; f. Regulation of points of vehicular ingress and egress; g. Regulation of signs; h. Requiring maintenance of the grounds; i. Regulation of noise, vibrations and odors; j. Regulation of hours for certain activities; k. Time period within which the proposed use shall be developed; l. Duration of use; m. Requiring the dedication of access rights; and 572 18516 Staff Report for the Cottonwood and Ida Planned Unit Development Page 28 of 35 n. Other such conditions as will make possible the development of the city in an orderly and efficient manner. The requirements of the DRC review and the proposed conditions outlined in this report, the future covenants, the maintenance plans and project design guidelines associated with the project will address these areas. F. In addition to all other conditions, the following general requirements apply to every conditional use permit granted: 1. That the right to a use and occupancy permit shall be contingent upon the fulfillment of all general and special conditions imposed by the conditional use permit procedure; and 2. That all of the conditions shall constitute restrictions running with the land use, shall apply and be adhered to by the owner of the land, successors or assigns, shall be binding upon the owner of the land, his successors or assigns, shall be consented to in writing, and shall be recorded as such with the county clerk and recorder's office by the property owner prior to the issuance of any building permits, final plan approval or commencement of the conditional use. The necessary recording of documents will be addressed as part of the final PUD plan process. Conditions 3, 7, 8, and 9 are related to this issue. Planned Unit Development Review Criteria, Section 38.430.090.E, BMC. The application presents the applicant’s response to these criteria. 2. In addition to the criteria for all site plan and conditional use reviews, the following criteria will be used in evaluating all planned unit development applications. a. All development. All land uses within a proposed planned unit development shall be reviewed against, and comply with, the applicable objectives and criteria of the mandatory "all development" group. (1) Does the development comply with all city design standards, requirements and specifications for the following services: water supply, trails/walks/bike ways, sanitary supply, irrigation companies, fire protection, electricity, flood hazard areas, natural gas, telephone, storm drainage, cable television, and streets? Yes, except for those standards proposed for relaxation the application conforms and in some areas exceeds standards. (2) Does the project preserve or replace existing natural vegetation? Yes. The site has been substantially disturbed by development and previous land uses and does not include significant natural vegetation. There will be substantial placement 573 18516 Staff Report for the Cottonwood and Ida Planned Unit Development Page 29 of 35 of new vegetation within the site open spaces and perimeter street frontage. A code provision requires a final weed control plan with the planned unit development and further landscaping must be provided in accordance with code requirements with the subsequent site plan application. (3) Are the elements of the site plan (e.g., buildings, circulation, open space and landscaping, etc.) designed and arranged to produce an efficient, functionally organized and cohesive planned unit development? Yes. The proposal is cohesive and has a variety of coordinating elements ranging from efficient circulation, underground structured parking, integrated architecture between buildings, presentations of building fronts to the streets, private residential open spaces, open spaces available to the public, and multiple landscape configurations. Condition of approval 6 requires the recordation of public access easement in order to finalize all publicly accessible plaza and circulation areas as presented in the preliminary plans. (4) Does the design and arrangement of elements of the site plan (e.g., building construction, orientation, and placement; transportation networks; selection and placement of landscape materials; and/or use of renewable energy sources; etc.) contribute to the overall reduction of energy use by the project? Yes. The project proposes to construct to a LEED ND designation. LEED for Neighborhood Development (LEED-ND), where "LEED" stands for Leadership in Energy and Environmental Design, is a United States-based rating system that integrates the principles of smart growth, urbanism and green building into a national system for neighborhood design. LEED certification provides independent, third-party verification that a development's location and design meet accepted high levels of environmentally responsible, sustainable development. The LEED-ND system is a collaboration between the United States Green Building Council, the Congress for the New Urbanism and the Natural Resources Defense Council. A reduction in parking will require alternative modes of transportation be utilized by residents, employees, and customers of the developments. This will encourage enhanced transit to the area. (5) Are the elements of the site plan (e.g., buildings, circulation, open space and landscaping, etc.) designed and arranged to maximize the privacy by the residents of the project? Yes. The project is design to allow a diversity of residential types and configurations, many ground floor units have access to outdoor spaces for their own use which provide a public private separation for their units. Along the perimeter streets the residential units along the frontages are raised up above the sidewalk level to a varying degree to provide a transitional space between the public street and the private units. The 574 18516 Staff Report for the Cottonwood and Ida Planned Unit Development Page 30 of 35 development complies with the interior special residential block frontage for all units. Landscaping is provided along the streetscape and within the development that will provide additional privacy. All vehicular access to the site is via the underground parking structure that will generally only be used by the residents, city services and their private service providers. (6) Park land. Does the design and arrangement of buildings and open space areas contribute to the overall aesthetic quality of the site configuration, and has the area of park land or open space been provided for each proposed dwelling as required by section 38.420.020? Yes. Parkland is provided per code requirements via cash in lieu of dedication. Open space is provided for each residential building in compliance with standards. Conditions of approval 10 requires that a parks and trails district waiver be provided with the planned unit development final plan in accordance with BMC 38.420.100. (7) Performance. All PUDs shall earn at least 20 performance points. Yes. With a PUD, Section 38.430.090.E.2.a.7 requires at least 20 performance points for the subject property. There are 11 options provided in the UDC to meet this requirement. Points can be met using any combination of on-site and off-site open space or other options listed in the code. The Preliminary PUD must specify how the performance points are being met. Open space provisions for phased PUD developments: If a project is to be built in phases, each phase shall include an appropriate share of the proposed recreational, open space, affordable housing and other site and building amenities of the entire development used to meet the requirements of section 38.430.090.E.2. The appropriate share of the amenities for each phase shall be determined for each specific project at the time of preliminary approval and shall not be based solely upon a proportional or equal share for the entire site. The PUD is proposing to satisfy the performance requirements with credits for affordable housing (21), additional open space with public access (9.37), underutilized and brownfield sites (6.67), LEED-ND (15) and low impact development plan (6). The tabulation is under the common open space section of the application narrative on page 25. The application satisfies the requirement with 58 performance points. The development exceeds standards. Conditions of approval, 6 and 14 are provided related to this issue in order to provide public access as proposed and to assure affordable housing is provided as required to achieve the performance points. 575 18516 Staff Report for the Cottonwood and Ida Planned Unit Development Page 31 of 35 (8) Is the development being properly integrated into development and circulation patterns of adjacent and nearby neighborhoods so that this development will not become an isolated "pad" to adjoining development? Yes the project will create new connections to the neighborhood around it with the construction of additional streets sidewalks and open spaces. c. Mixed Use. Planned unit developments in mixed-use areas (REMU, UMU, and NEHMU zoning districts) may include commercial, light industrial, residential and mixes of various primary and accessory uses. The particular types or combination of uses are determined based upon its merits, benefits, potential impact upon adjacent land uses and the intensity of development. (1) Is the project substantially consistent with the intent and purpose statements for the underlying zoning district? Yes. This neighborhood includes commercial uses, offices, manufacturing and housing. The intent of the northeast historic mixed-use district is to provide recognition of an area that has developed with a blend of uses not commonly seen under typical zoning requirements. The unique qualities and nature of the area are not found elsewhere in the city and should be preserved as a place offering additional opportunities for creative integration of land uses. This PUD provides a creative integration of land uses. The intent of this area is to allow private and case-by-case determination of the most appropriate use of land in a broad range of both non-residential and residential uses. This PUD proposes appropriate use of the land with a broad range of nonresidential and residential uses. (2) Is the project located adjacent or within proximity to an arterial or collector street that provides adequate access to the site? Yes. The project is located 300 feet from Peach Street, a collector street and 300 feet from Tamarack Street a collector street with both streets feeding into Rouse Avenue to the west the closest arterial street to the project. (3) Is the project on at least two acres of land? Yes, the site is 2.01 acres of land. (4) Do the uses relate to each other in terms of location within the PUD, pedestrian and vehicular circulation, architectural design, utilization of common open space and facilities, streetscape, etc.? Yes, the overall site layout and design guidelines provide a comprehensive design that coordinates pedestrian and vehicular circulation, architectural design and the utilization of open space and facilities. 576 18516 Staff Report for the Cottonwood and Ida Planned Unit Development Page 32 of 35 (5) Does the overall project achieve or exceed the FAR "floor area ratios" envisioned for the underlying district? Yes. There is no designated FAR required in the NEHMU. The proposed total FAR of the development is 1.8 with 46 dwelling units to the acre. (6) Is it compatible with and does it reflect the unique character of the surrounding area? Yes. This development will contribute to the mixed use character in this area and the eclectic residential and nonresidential uses located in this neighborhood. (7) Is there direct vehicular and pedestrian access between on-site parking areas and adjacent existing or future off-site parking areas which contain more than ten spaces? Yes. All parking spaces are accesses through the underground parking structure. The offsite parking proposed at the northwest corner of Wallace Avenue and East Aspen Street is within the distance requirements for off-site parking.. (8) Does the project encourage infill, or does the project otherwise demonstrate compliance with the land use guidelines of the city growth policy? Yes. This project is an infill project on an underutilized site. (9) Does the project provide for outdoor recreational areas (such as urban plazas, courtyards, landscaped areas, open spaces, or urban trails) for the use and enjoyment of those living in, working in or visiting the development? Yes. Private residential and publicly accessible open space are proposed for those living, working in or visiting the development. (10) Does the project provide for private outdoor areas (e.g., private setbacks, patios and/or balconies, etc.) for use by the residents and employees of the project which are sufficient in size and have adequate light, sun, ventilation, privacy and convenient access to the household or commercial units they are intended to serve? Yes. Outdoor balconies and patios are proposed for many of the individual dwelling units. Shared green roof deck opens space is provided for the apartment residents in Buildings 1-2. Commercial open space is provided for the office use. (11) Does the project provide for outdoor areas for use by persons living and working in the development for active or passive recreational activities? Yes. Private and publicly accessible open space are proposed. The project is very close to the mountains to main street trail system. (12) Is the overall project designed to enhance the natural environment, conserve energy and provide efficient public services and facilities? 577 18516 Staff Report for the Cottonwood and Ida Planned Unit Development Page 33 of 35 Yes. Enhancements to this underutilized site and connection to city services will allow a high density residential development in close proximity to services, transit, recreation and employment opportunities. The project is being designed as a LEED-ND neighborhood. (13) If the project is proposing a residential density bonus as described below, does it include a variety of housing types and urban styles designed to address community-wide issues of affordability and diversity of housing stock? Yes, Affordable housing a variety of housing types and urban styles are proposed. A deed restriction is required in order to provide long term availability. (14) Residential density bonus. If the project is proposing a residential density bonus (30 percent maximum) above the residential density of the zoning district or building type within which the project is located and which is set forth in division 38.310 of this chapter, does the proposed project exceed the established regulatory design standards (such as for setbacks, off-street parking, open space, etc.) and ensure compatibility with adjacent neighborhood development? The number of dwelling units obtained by the density bonus is determined by dividing the lot area required for the dwelling unit type by one plus the percentage of density bonus sought. The minimum lot area per dwelling obtained by this calculation must be provided within the project. Those dwellings subject to division 38.380 must be excluded from the base density upon which the density bonus is calculated. Not applicable. No formal density bonus is proposed. APPENDIX A –PROJECT SITE ZONING AND GROWTH POLICY Zoning Designation and Land Uses: The property is zoned NEHMU, Northeast Historic Mixed Use The intent of the northeast historic mixed-use district is to provide recognition of an area that has developed with a blend of uses not commonly seen under typical zoning requirements. The unique qualities and nature of the area are not found elsewhere in the city and should be preserved as a place offering additional opportunities for creative integration of land uses. The intent of this area is to allow private and case-by-case determination of the most appropriate use of land in a broad range of both non-residential and residential uses. Standards for buffering between different land uses are deliberately not as high as standards elsewhere in the community as it is assumed that persons choosing to locate in this area are aware of the variety of possible adjacent land uses and have accepted such possibilities as both acceptable and desirable. It is expected that the lots within this district will continue to develop under a variety of uses which may increase or decrease in scope in any given portion of the district. The clear intent of this district is to support a mix and variety of non-residential and residential uses. Nothing in division 38.300 of this article 578 18516 Staff Report for the Cottonwood and Ida Planned Unit Development Page 34 of 35 shall be interpreted to be discouraging or prejudicial to any listed use except as set forth as principal and conditional uses. Adopted Growth Policy Designation: The property is designated as Industrial in the Bozeman Community Plan. This classification provides areas for the uses which support an urban environment such as manufacturing, warehousing, and transportation hubs. Development within these areas is intensive and is connected to significant transportation corridors. In order to protect the economic base and necessary services represented by industrial uses, uses which would be detrimentally impacted by industrial activities are discouraged. Although use in these areas is intensive, these areas are part of the larger community and shall meet basic standards for landscaping and other site design issues and be integrated with the larger community. In some circumstances, uses other than those typically considered industrial have been historically present in areas which were given an industrial designation in this growth policy. Careful consideration must be given to public policies to allow these mixed uses to coexist in harmony. APPENDIX B – OWNER INFORMATION AND REVIEWING STAFF Owner: Bangtail Partners LLC 1189 Tennessee Street, Unit 103, San Francisco, CA 94107 Applicant: Imperial Development LLC 33 North Black Avenue, Bozeman, MT 59715 Representatives: Thinktank Design Group Inc. 33 North Black Avenue, Bozeman, MT 59715 Report By: Brian Krueger, Development Review Manager APPENDIX C –PLANNED UNIT DEVELOPMENT INTENT Sec. 38.430.010. Intent. A. It is the intent of the city through the use of the planned unit development (PUD) concept, to promote maximum flexibility and innovation in the development of land and the design of development projects within the city. Specifically, with regard to the improvement and protection of the public health, safety and general welfare, it shall be the intent of this chapter to promote the city's pursuit of the following community objectives: 1. To ensure that future growth and development occurring within the city is in accord with the city's adopted growth policy, its specific elements, and its goals, objectives and policies; 2. To allow opportunities for innovations in land development and redevelopment so that greater opportunities for high quality housing, recreation, shopping and employment may extend to all citizens of the city area; 3. To foster the safe, efficient and economic use of land and transportation and other public facilities; 579 18516 Staff Report for the Cottonwood and Ida Planned Unit Development Page 35 of 35 4. To ensure adequate provision of public services such as water, sewer, electricity, open space and public parks; 5. To avoid inappropriate development of lands and to provide adequate drainage, water quality and reduction of flood damage; 6. To encourage patterns of development which decrease automobile travel and encourage trip consolidation, thereby reducing traffic congestion and degradation of the existing air quality; 7. To promote the use of bicycles and walking as effective modes of transportation; 8. To reduce energy consumption and demand; 9. To minimize adverse environmental impacts of development and to protect special features of the geography; 10. To improve the design, quality and character of new development; 11. To encourage development of vacant properties within developed areas; 12. To protect existing neighborhoods from the harmful encroachment of incompatible developments; 13. To promote logical development patterns of residential, commercial, office and industrial uses that will mutually benefit the developer, the neighborhood and the community as a whole; 14. To promote the efficient use of land resources, full use of urban services, mixed uses, transportation options, and detailed and human-scale design; and 15. To meet the purposes established in section 38.01.040. ATTACHMENTS The full application and file of record can be viewed at the Community Development Department at 20 E. Olive Street, Bozeman, MT 59715. Public Comment The Design Review Board (DRB) minutes February 27, 2019. The Recreation and Parks Advisory Board Subdivision Committee email March 8, 2019. The Community Affordable Housing Board minutes March 13, 2019 Application 580 From:Bob Bayley To:Agenda Subject:Development at E. Cottonwood and Ida Ave. App #18516 Date:Monday, March 04, 2019 9:59:46 PM Dear City Commission, I am writing to strongly support the mixed use development proposed for my NE Bozeman neighborhood at the intersection of E Cottonwood and Ida Ave. My wife and I live at 104 N Church which is about one half mile south of the development. Although we have only lived in Bozeman for four years we were strongly attracted to the NE Bozeman neighborhood for its mixed use and dynamic, energetic urban character. Aspects of this development which deserve high praise and city approval include: - Mixed use and modest scaled buildings which mesh nicely with the surrounding community - Major affordable housing component - Generous open space which filters throughout the development and offers easy access to occupants and the community - Natural, creative landscaping which will serve as an example to the city, residents and developers on how to conserve water resources - Energy conserving - Ample parking, much of which will be below ground which will save valuable street level space for people, landscaping and buildings Sincerely, Bob Bayley 104 N Church, Unit 1B 406-570-3643 581 From:Peter MacFadyen To:Agenda Subject:Cottonwood & Ida Preliminary PUD, Application #18516 Date:Monday, March 04, 2019 7:48:56 PM Attachments:Pete MacFadyen _ Cottonwood & Ida Preliminary PUD, Application #18516.pdf To whom it may concern,Please find attached my letter in support of the Cottonwood and Ida project. Pete -- Pete MacFadyenFounder & Executive Director Big Sky Youth Empowerment406.539.0399 | BYEP.org 582 3/4/2019 Re: Cottonwood & Ida Preliminary PUD, Application #18516 Dear City Commission, My name is Pete MacFadyen and I have lived at 314 North Wallace for over 15 years now. I’m so proud of the city for the excellent work that was completed on our street two summers ago now with the traffic circles and general calming measures. I hear lots of folks complain but at the end of the day as a resident the calming measures are working. Today I am writing to express my support for the Cottonwood & Ida project. Undoubtedly it will bring more traffic both cars and humans to our street but I must say being part of a community far outweighs the impact of increased traffic. I’ve looked at the plans and love that it offers ‘affordable & attainable’ housing to members of our community. The design is also very attractive (at least to my eye) and I believe it will serve to bring people together. With the addition of the Wild Crumb and Treeline Coffee my family and I have seen nothing but increased vitality in our neighborhood. There is something great about people on foot walking to pick up a loaf of bread or to grab a cup of coffee. In general this means that people look up and say hello which, of course, is one thing everyone loves about Bozeman. Please feel free to reach out to me if you have questions about my comments. But I wanted to let you all know that I think it’s a great idea and I look forward to watching our community continue to transform in positive and well thought out ways. Sincerely, Pete MacFadyen 583 From:Jessica Rounds To:Agenda Subject:Cottonwood & Ida Preliminary PUD, Application #18516 Date:Tuesday, March 05, 2019 10:42:39 AM Date: March 5, 2019 Re: Cottonwood & Ida Preliminary PUD, Application #18516 Dear City Commission, My name is Jessica Rounds and I have been renting 415 N Church Ave for the last 3 years. I havelived in a few different places around town for the last 6 years but northside area of Bozeman hascaptured my heart. I support this project because I love the idea of affordable housing that is eco-friendly andcommunity focused. The design is beautiful and would only serve to continue elevating the northsideaesthetic. My best,Jessica Rounds415 N Church AveBozeman MT 59715   584 From:Gustav Dose To:Agenda Subject:Cottonwood & Ida Preliminary PUD, Application #18516 Date:Thursday, March 07, 2019 12:15:45 PM Attachments:PastedGraphic-2.tiff Dear City Commission, My name is Gustav Dose, I am the owner of Mountains Walking Brewery and live at 414 NPlum. I support the Cottonwood and Ida Project. After looking at the plans I think it will at a nice community feel and I really like the density and walkability factors. I think the area needswhat this project provides in affordable housing. Thank you for considering my thoughts, With gratitude, Gustav Dose 585 From:Samuel Thompson To:Agenda Subject:Cottonwood & Ida Preliminary PUD #18516 Date:Friday, March 08, 2019 2:08:59 PM March 8, 2019 RE: Cottonwood & Ida Preliminary PUD #18516 Dear City Commission, My name is Shaw Thompson and I reside in the historic grain elevator located at700 N. Wallace Ave. - the neighboring property to the west of the proposed project. My family and I have restored this old building over the past 18 years and we are happy to live in it, and feel grateful to have a successful business, operating as the Misco Mill Gallery, in the building as well.I wish to voice my support for this project in this letter. I like the way the projecthas been presented to the neighborhood; asking for input from everyone. It seems that the project has listened to that input. Further, I feel the design is extremely thoughtful from the details of the buildings all the way to the landscaping. I likethe mix of open public space with the higher density community. Also, theproposed construction methods are appealing for an environmentally conscious end result. Thank you for your consideration. Sincerely, Shaw Thompson 586 From:Debra De Bode To:Agenda Subject:Comments on Cottonwood and Ida PUD, Application # 18516 Date:Sunday, March 10, 2019 12:59:59 PM To: City of Bozeman Department of Community Development, Attn: Brian Krueger and City Commissioners I am writing as an owner of commercial property located two blocks from the proposeddevelopment, as well as a resident of the Northeast Neighborhood. I have attended several presentations/listening sessions about this property. I support the concept of in-fill -- to apoint, but think that new developments should be planned to fit into existing neighborhoods, rather than impose an entirely different format on them. The immediate area currently consistsalmost exclusively of single-family homes and small shops and businesses -- no large apartment buildings or office buildings. I think that the developers are trying to do too much with a small parcel of land in a part ofBozeman that has a deficient set of roads to handle current traffic. Peach and Wallace streets have both recently undergone improvements and, other than the Rouse project, no other localroad improvements are planned. I do not support the project as proposed. Specific to the variances that are being requested: 1) Apartments are needed in Bozeman, but the addition of 76 units along with an office building, workshops and a restaurant adds an unreasonable amount of activity to this location.If apartments are to become an allowable use in this district, the number of units need to be scaled back and/or some of the rest of the project needs to be denied. 2) The required front setback should be maintained for any allowed apartment building orresidence. If a building is commercial in nature, having it more closely border the sidewalk may be acceptable. A question: What are the developer's plans for snow storage and removal?As the past two, snowy winters have demonstrated, this is a serious issue that affects parking, mobility and visibility for drivers and pedestrians. Any allowance of reduced setbacks shouldbe tied to a plan to deal with snow on the property. 3) The allowable height should be maintained at 45 feet. Mountain views are an amenity for everyone that should not be compromised. 4) Landscape and Block Frontage requirements should be maintained as set forth in code.Bozeman prides itself on being a "tree city," "green," etc. -- not overly urban. 5) Neither Residential Parking Standards nor Non-residential Parking Standards should be reduced AT ALL. Maintaining these standards is key to preventing an unbearable amount ofstreet congestion in the area. 6) The proposal to lease a significant amount of required parking on the land of the former Lehrkind Brewery is unacceptable in that it is obviously a temporary fix for a permanentproblem. Future development of that parcel will occur and must be considered. Thank you, 587 Debra De Bode MT Hop Dogs, LLC527 N Montana Ave. Bozemandebradebode@gmail.com 588 1 Robin Crough From:Deejay Newell <deejay@treelinecoffee.com> Sent:Tuesday, March 12, 2019 1:20 PM To:Agenda Subject:Cottonwood & Ida Preliminary PUD, Application #18516 Categories:Public Comment Date: 3/12/2019 Re: Cottonwood & Ida Preliminary PUD, Application #18516 Dear City Commission, My name is Danielle (Deejay) Newell and am the co-owner Treeline Coffee Roasters located in the North East Side Neighborhood of Bozeman at 624 N. Wallace. My business partner and I have been following the Cottonwood & Ida project closely as it will directly affect our business with its close proximity to the cafe. I believe the project will be an excellent addition to the neighborhood as it will continue to instill a sense of community in the Northside. Right now, our neighborhood lacks affordable housing for the growing demographic of young professionals in Bozeman. I believe this project will open up opportunities for these individuals working in Bozeman and making Bozeman wages to live comfortably and sustainably in a neighborhood surrounded by a wide variety of businesses to cater to their daily needs. After reviewing the plans, I also believe that this project will enhance the aesthetic quality of the neighborhood. Right now, the space is not being utilized in an efficient way and by adding housing, parking and room for more business - we will continue to see the Northside grow in a sustainable and manageable way. This project has my support the for the reasons listed above as well as others not mentioned. I believe this project will benefit Bozeman and be an excellent addition to our community. Best, DEEJAY NEWELL B E A N A M B A S S A D O R P: 5 3 0 - 2 6 3 - 6 7 5 2 E: DEEJAY@TREELINECOFFEE.COM 589 Design Review Board Wednesday, February 27th, 2019 at 5:30 pm City Hall, Commission Room | 121 N. Rouse Ave. A. 05:33:59 PM (00:00:36) Call meeting to order and Roll Call B. 05:34:08 PM (00:00:45) Changes to the Agenda C. 05:34:22 PM (00:00:59) Minutes • 2.13.19 Minutes (PDF) • 2.13.19 Video 05:34:37 PM (00:01:14) MOTION: to approve minutes from the February 13, 2019 meeting: Scott Freimuth. 05:34:44 PM (00:01:21) SECONDED: M. Ethan Barlow. 05:34:46 PM (00:01:23) VOTE: All in Favor- Motion Carries Unanimously. D. 05:34:55 PM (00:01:32) Public Comment Please state your name and address in an audible tone of voice for the record. This is the time for individuals to comment on matters falling within the purview of the Committee. There will also be an opportunity in conjunction with each action item for comments pertaining to that item. Please limit your comments to three minutes. E. Action Items 1. 05:35:13 PM (00:01:50) 18516 Cottonwood & Ida PUDP (Krueger) A Preliminary Planned Unit Development (PUD) application to allow a mixed residential and commercial development with relaxations to zoning regulations requested for apartment building use, building height parking, street design, restaurant design, transparency, front setbacks and a request for concurrent construction. • 18516 Staff Report • 18516 Application Materials • 18516 Plans Development Review Manager Brian Krueger gave an introduction to the application. 05:47:34 PM (00:14:11) Eric Nelson of Think Tank Design Group spoke for the applicant and gave a presentation on the application. 06:20:10 PM (00:46:47) Nelson introduced the applicant team. 06:21:53 PM (00:48:30) Nelson and Krueger answered questions from the board about design. 06:30:06 PM (00:56:43) Nelson and Krueger answered further questions about access to the underground parking, walkability, use, and conditions for approval. 590 06:39:42 PM (01:06:19) Nelson and Kruger answered further questions about planned street reconstruction, parking, pedestrian connectivity of the parking to the rest of the project, and possible public plaza use. 06:47:35 PM (01:14:12) Nelson and the application team answered questions about the project such as modifications to the existing building on property and articulation. 06:56:41 PM (01:23:18) MOTION: In regard to application 18516, and having reviewed and considered the application materials, public comment, and all information presented, I here adopt the findings in the staff report for application 18516 and move to recommend approval of the Cottonwood and Ida PUD application subject to conditions and all applicable code provisions: Charlie Franklin. 06:57:22 PM (01:23:59) SECONDED. 06:57:27 PM (01:24:04) A comment and discussion period from the Board regarding the application occurred. 07:19:40 PM (01:46:17) VOTE: Motion Carries 6-1. 2. 07:20:12 PM (01:46:49) Election of Design Review Board Officers 07:21:07 PM (01:47:44) MOTION: I nominate Mark as the Chair and Charlie as the Vice Chair: M. Ethan Barlow. 07:21:15 PM (01:47:52) SECONDED. 07:21:18 PM (01:47:55) Vice Chair Franklin disclosed that his term on the Board ends in June and he may or may not be returning. 07:22:24 PM (01:49:01) Chair Hufstetler stated he would be happy to Chair one more year or let someone else give it a shot. He also disclosed he would be missing a few meetings in the summer months. 07:23:35 PM (01:50:12) VOTE: All in Favor – Motion Carries Unanimously. F. 07:23:58 PM (01:50:35) FYI/Discussion- none. 1. Future Agenda Items G. 07:24:02 PM (01:50:39) Adjournment For more information please contact Brian Krueger at bkrueger@bozeman.net This board generally meets the second and fourth Wednesday of the month at 5:30pm Committee meetings are open to all members of the public. If you have a disability and require assistance, please contact our ADA coordinator, Mike Gray at 406-582-3232 (TDD 582-2301). 591 1 Brian Krueger From:Mitchell Overton Sent:Friday, March 8, 2019 3:47 PM To:Brian Krueger Cc:'Richard Shanahan'; 'Brian Close'; 'Katie Bills-Walsh' Subject:RE: Two PUD's for Parkland Review Brian:  RPAB Sub Review motion, comments, and condition below.  RPAB: please review for anything missing.    1) Cottonwood and Ida PUD 18516 request cash in lieu of parkland for .73 acres at the City’s adopted per sq. ft.  rate.    a. Improvements / installation of parking area for Depot Park appropriate and aligns with future Front  Street Path development and provides walkable access to Story Mill Spur and Story Mill Community  Park.   b. Open public movement through development site encouraged and inviting.  c. .73 acres Developer proposed cash‐in‐lieu of parkland dedication at $1.50/sq.ft. = $47,6982 deemed  acceptable.  i. Motion passed for above three items     2. Bridger Vale PUD 17232 and subdivision 17231 request dedication of parkland with relaxations to park frontage  and park frontage loss mitigation.   a. Park entrance improvements with on street parking.  b. Development of open space aggregated to Glen Lake Rotary Park.  c. Dedicated parkland found acceptable with alley eliminating encroachment issues, property aggregated  to Glen Lake Rotary Park, trail connecting into Glen Lake Rotary Park trail system, and condition of  installation of pet waste station.  i. Motion to approve park plan and parking relaxation approved with condition of installation of  pet waste station in dedicated parkland.       Mitchell J.  Overton, MS, CPRP  Director, Parks and Recreation Department  City of Bozeman, MT  (o)406‐582‐3222  (c)406‐595‐7020  www.bozeman.net     From: Mitchell Overton   Sent: Monday, March 4, 2019 4:59 PM  To: Richard Shanahan <richard@shanahanarchitects.com>; 'Brian Close' <taxatty123@gmail.com>; Katie Bills‐Walsh  <katie.j.bills@gmail.com>  Subject: FW: Two PUD's for Parkland Review    592 2 RPAB Subdivision Review Materials.  Meeting scheduled for this Friday at 2pm at Stiff Building Basement Conference Room.    Mitchell J.  Overton, MS, CPRP  Director, Parks and Recreation Department  City of Bozeman, MT  (o)406‐582‐3222  (c)406‐595‐7020  www.bozeman.net     From: Mitchell Overton   Sent: Friday, March 1, 2019 3:47 PM  To: Melanie Eubank <MEubank@BOZEMAN.NET>  Cc: Brian Krueger <BKrueger@BOZEMAN.NET>; Thom White <TWhite@BOZEMAN.NET>  Subject: FW: Two PUD's for Parkland Review    Melanie:  Brian K. has two more developments to add to the next RPAB Subd. Review.  Please schedule with the Committee Chair  as appropriate.    Thanks,    Mitchell J.  Overton, MS, CPRP  Director, Parks and Recreation Department  City of Bozeman, MT  (o)406‐582‐3222  (c)406‐595‐7020  www.bozeman.net     From: Brian Krueger   Sent: Friday, March 1, 2019 12:34 PM  To: Thom White <TWhite@BOZEMAN.NET>  Cc: Mitchell Overton <MOverton@BOZEMAN.NET>  Subject: Two PUD's for Parkland Review    Hello,    I have two projects that need an RPAB recommendation. They are scheduled for City Commission on March 25 for public  hearing. Please let me know when you will review as I would like to invite the applicants and to attend. Thanks.    1) Cottonwood and Ida PUD 18516 request cash in lieu of parkland for .73 acres at the City’s adopted per sq. ft.  rate.  See attached site usage plan top left corner of plan sheet.  2) Bridger Vale PUD 17232 and subdivision 17231 request dedication of parkland with relaxations to park frontage  and park frontage loss mitigation. See attached park plans and narrative.  593 3   Brian Krueger | Development Review Manager, Community Development   City of Bozeman | 20 East Olive St. | P.O. Box 1230 | Bozeman, MT 59771 406.582.2259 | bkrueger@bozeman.net | www.bozeman.net   594 Community Affordable Housing Advisory Board March 13th, 2019 | 8 AM | City Hall Commission Room: 121 N. Rouse Ave A. 08:02:18 AM (00:01:53) Call meeting to order & Roll Call  Excused Absence: Steve Wheeler Present Were:  Brian Guyer (Ex-Aficionado Member)  Terry Cunningham (Commission Liaison)  Greg Stratton  Noel Seeburg  Kevin Thane (Board Chair)  Jody Bartz  Dulaney Collins  Martin Matsen (Staff Liaison) B. 08:02:27 AM (00:02:01) Changes to the Agenda C. 08:02:31 AM (00:02:06) Public Comment Please state your name and address in an audible tone of voice for the record. This is the time for individuals to comment on matters falling within the purview of the Committee. There will also be an opportunity in conjunction with each action item for comments pertaining to that item. Please limit your comments to three minutes. D. 08:03:46 AM (00:03:21) Minutes for Approval  2.13.19 Minutes (PDF) o 2.13.19 Video Link 08:03:43 AM (00:03:18) MOTION to approve minutes: Greg Stratton 08:03:49 AM (00:03:24) MOTION SECONDED: Jodi Bartz 08:04:07 AM (00:03:41) Chair Thane provided some corrections to the February 13th meeting minutes: 1. Commissioner Cunningham was present. 2. Typo on p.2 at 8:25 AM - bonds, not “bonda” 08:04:47 AM (00:04:22) VOTE: All in Favor – Motion Carries 595 E. Action Items 1. 08:05:16 AM (00:04:51) Consideration and Recommendation of the Affordable Housing Plan for Bridger Vale Subdivision 17231 (Krueger) A Preliminary Plat application to allow the subdivision of 6.48 acres into twenty townhome lots, one commercial lot, one city park lot, one open space lot with an associated street and alley. The application includes a concurrent Preliminary Planned Unit Development (PUD) application to allow the mixed residential and commercial development with relaxations to regulations requested for required park frontage, REMU setbacks, public lands irrigation, street design and a request for concurrent construction.  17231 Affordable Housing Recommendation  17231 Affordable Housing Plan Application  17231 PUD Site Plan 08:05:35 AM (00:05:10) Planner and Development Review Manager, Brian Krueger presented on behalf of staff and introduced the project. The 20 proposed townhome lots are subject to the affordable housing requirements. The applicant is proposing $9,788.00 per dwelling unit in cash-in- lieu for the two required units. The amount due at the time of final plat / occupancy will be recalculated in that year’s dollars as the proposed amount is for the 2018 requirements. 08:08:07 AM (00:07:41) Mr. Krueger and Director of Community Development, Marty Matsen responded to questions from Chair Thane regarding how the affordable housing ordinance will be applied. 08:16:20 AM (00:15:54) Andy Ebbighausen, project builder spoke on behalf of the applicant. They had originally planned on providing condos to fill the affordable housing requirement, but the ordinance had changed to exclude condos since they began the project and so they changed their proposal to cash-in-lieu funds to meet the ordinance requirement. 08:18:16 AM (00:17:51) Mr. Ebbighausen responded to board member questions regarding their target market and their original plan to meet the affordable housing ordinance requirements before condos were removed. 08:22:27 AM (00:22:02) Public Comment Opportunity 08:22:45 AM (00:22:19) MOTION to recommend approval of the project’s affordable housing proposal provided the wording is changed to meet the revised affordable housing ordinance: Kevin Thane 08:22:53 AM (00:22:28) MOTION SECONDED: Greg Stratton 08:22:54 AM (00:22:29) VOTE: Motion Carries 5-0 596 2. 08:24:37 AM (00:24:12) Consideration and Recommendation of the Affordable Housing Plan for Cottonwood and Ida Planned Unit Development 18516 (Krueger) A Preliminary Planned Unit Development (PUD) application to allow a mixed residential and commercial development with relaxations to zoning regulations requested for apartment building use, building height parking, street design, restaurant design, transparency, front setbacks and a request for concurrent construction.  18516 PPUD Project Introduction  18516 PPUD Project Overview & PUD Information  18516 PPUD Building Design Objectives  18516 PPUD Alignment of District Goals & Design Objectives 08:24:44 AM (00:24:19) Mr. Krueger introduced the project and reviewed the proposed affordable housing requirements. The project proposes 92 dwelling units as apartments in various configurations. 08:28:01 AM (00:27:35) Commissioner Cunningham asked if this is the first project where they voluntarily offered affordable housing units to earn Planned Unit Development (PUD) performance points. In this case, the applicant is proposing affordable rental units, which is allowed through the PUD process. 08:31:48 AM (00:31:23) Erik Nelson of Think Tank Design Group introduced himself and the project and explained that they are not applying for any tax credits, but that the project is privately funded. Mr. Nelson explained that this is a mixed use development with 24,700 sq. ft. of commercial space, 8,000 sq. ft. of plaza space, Leed certified, with 92 residential dwellings including a mix of for sale and rental units. The project also contains 200 parking spaces and 50,000 sq. ft. of open space. 08:42:09 AM (00:41:44) Mr. Nelson responded to questions from board members and briefly discussed the affordable units and their efforts to work with HRDC to create an MOU to manage the units that are geared toward 65% of AMI. Following, Mr. Nelson responded to questions regarding longevity and the future goals of the affordable units. 09:04:16 AM (01:03:51) Mr. Nelson responded to questions regarding the Leed certification goal of the project. 09:06:14 AM (01:05:49) MOTION to support the proposed 21 points for the PUD process because of the affordable housing component of the project: Kevin Thane 09:06:40 AM (01:06:15) MOTION SECONDED: Jody Bartz 09:06:49 AM (01:06:24) VOTE: All in Favor – Motion carries unanimously 597 3. 09:07:20 AM (01:06:55) Timber Ridge Project (Summit Housing / HRDC) Presentation and preliminary request for funding for the Low Income Housing Tax Credit (LIHTC) application. 09:08:02 AM (01:07:37) Rusty Snow of Summit Housing Group presented on behalf of the Timber Ridge affordable housing project. Mr. Snow provided an overview of the project and explained that this is a second phase, related to the Stoneridge Housing project and offers all 40 units at an affordable rate of 60% AMI down to 40% AMI affordability. Mr. Snow explained that Summit Housing Group does nothing but affordable housing projects and has produced 1,646 units throughout the western United States. Timber Ridge will serve a wide range of AMI: 25% at 60% AMI, 65% at 50% AMI and 10% at 40% AMI. 09:16:49 AM (01:16:24) Mr. Snow explained the process they’re going through with Montana Board of Housing – their letter of intent (LOI) is due in April when all of the applicants will submit and that presentations follow roughly 60 days later (90 days from now). 09:19:43 AM (01:19:18) Mr. Snow responded to questions from board members regarding past funding experiences with other municipalities. 09:25:40 AM (01:25:15) MOTION that CAHAB continue to support the Timber Ridge housing project and provide a letter of support that Summit Housing can take forward to the Montana Board of Housing presentation. Additionally, CAHAB will recommend funding of $25,000. 09:26:52 AM (01:26:27) MOTION SECONDED: Greg Stratton 09:26:59 AM (01:26:34) VOTE: All in Favor – Motion Carries 09:27:20 AM (01:26:55) Director Matsen suggested the board be more open ended with the dollar amount recommended or to allow for additional funds. 09:27:59 AM (01:27:34) REVISED MOTION (friendly amendment): MOTION that CAHAB continue to support the Timber Ridge housing project and provide a letter of support that Summit Housing can take forward to the Montana Board of Housing presentation. Additionally, CAHAB will recommend a financial commitment of support to be determined at a later time. 09:28:11 AM (01:27:46) Approval of the Letter to the Commission in support of the GMD Development Project on Tschache Lane Mr. Steve Dymoke of GMD Development provided a status update on the GMD Development on Tschache Lane. 09:30:22 AM (01:29:57) Board members discussed the letter to the City Commission recommending $500,000 funding for the project. Board member Stratton recommended that they add wording to spread out the funding over the course of one to three fiscal years or as needed. 598 09:32:47 AM (01:32:22) MOTION to forward letter to City Commission with suggested changes: Kevin Thane 09:32:47 AM (01:32:22) VOTE: All in Favor – Motion Carries Unanimously (Motion and Vote were done in one statement) 4. Continued Discussion of CAHAB 2019 Goals and Priorities F. Non-Action Items 1. Housing Needs Assessment Discussion/Comments G. FYI/Discussion 1. 09:33:20 AM (01:32:55)Affordable Housing Action Plan / Program Mgr. Update (Matsen) 2. 09:35:25 AM (01:35:00) HRDC Monthly update (Guyer)  Willow Springs Project  Boulevard Apartments 3. 09:37:22 AM (01:36:57) GAR Gallatin Assoc. of Realtors Summary (Seeburg) 4. 09:38:04 AM (01:37:39) Reminder: Ethics Training Scheduled for 10 AM on March 27th, 2019 H. 09:38:20 AM (01:37:54) Adjournment | 9:30 AM For more information please contact Lacie Kloosterhof at lkloosterhof@bozeman.net. This board generally meets the second Wednesday of each month at 8:00 AM Committee meetings are open to all members of the public. If you have a disability and require assistance, please contact our ADA coordinator, Mike Gray at 582-3232 (TDD 582-2301). 599 COTTONWOOD + IDA A VIBRANT, DIVERSE, ATTAINABLE COMMUNITY IN THE CORE OF THE NORTHEASTERN NEIGHBORHOOD MIXED-USE DEVELOPMENT PROPOSAL || BOZEMAN, MT PUD CONCEPT SUBMITTAL || NOVEMBER, 2017 RESPONSE & RESUBMITTAL I || OCTOBER 30, 2018 RESPONSE & RESUBMITTAL II || JANUARY 21, 2019 DESIGN TEAM OPENSCOPE STUDIO, INC. THINKTANK DESIGN GROUP, INC. RICHARD FERNAU, FAIA OWNER BANGTAIL PARTNERS, LLC 1189 TENNESSEE STREET, UNIT 103 SAN FRANCISCO, CA 94107 600 COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 PROJECT INTRODUCTION INTRODUCTION STATEMENT SITE VICINITY MAP & DIAGRAM PROPOSED USES & COMPILED DATA PROJECT TEAM CERTIFICATION OF OWNERSHIP APPLICATION FORMS & CHECKLISTS DEVELOPMENT REVIEW APPLICATIONS PUDP CHECKLIST SP1 CHECKLIST PROJECT OVERVIEW PROJECT OVERVIEW & GOALS EXISTING CONDITIONS & HISTORY SITE ZONING & LAND USES GENERAL BUILDING INFORMATION PROPOSED PUD POINTS PROPOSED RELAXATIONS ALIGNMENT OF GOALS WITH DISTRICT PLANS AND VISION NE GOALS PUD COMMUNITY DESIGN OBJECTIVES PROPOSED OWNERSHIP ESTIMATED NUMBER OF EMPLOYEES FOR BUSINESSES, RESPONSIBILITY FOR IMPACT MITIGATION & DESIGN METHODS TO REDUCE ENERGY CONSUMPTION RATIONALE FOR CHOICES MADE BY THE APPLICANT GENERAL SITE DATA LAND USE CITY LAND USE POLICIES & OBJECTIVES ACHIEVED LAND USE CLASSIFICATION ALIGNMENT OF GOALS WITH NORTHEAST URBAN RENEWAL PLAN ALIGNMENT OF GOALS FROM VISION NE / RUDAT REPORT INFRASTRUCTURE INFRASTRUCTURE STRATEGIES & SUMMARIES WATER RIGHTS & CONCURRENT CONSTRUCTION PLAN BUILDING & DESIGN BUILDING DESIGN OBJECTIVES BUILDING STRATEGIES BUILDING MATERIALS DESIGN VIGNETTES SIGNAGE COMPREHENSIVE SIGN PLAN APPENDICES SECTION 1 1.00 1.01 1.02 1.03 1.04 SECTION 2 2.00 2.01 2.02 SECTION 3 3.00 3.01 3.02 3.03 3.04 3.05 3.06 3.07 3.08 3.09 3.10 3.11 SECTION 4 4.00 4.01 4.02 4.03 SECTION 5 5.00 5.01 SECTION 6 6.00 6.01 6.02 6.03 SECTION 7 7.00 SECTION 8 TABLE OF CONTENTS page 3 page 13 page 36 page 64 page 70 page 77 page 84 page 90 601 COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 3 PROJECT INTRODUCTION INTRODUCTION STATEMENT SITE VICINITY MAP & DIAGRAM PROPOSED USES & COMPILED DATA PROJECT TEAM CERTIFICATION OF OWNERSHIP 1.00 1.01 1.02 1.03 1.04 SECTION 1 602 EXCERPT FROM THE NORTHEAST NEIGHBORHOOD R/UDAT REPORT APRIL 2017 “Today, the Northeast Neighborhood is strategically located and can support the housing shortage, and leverage existing infrastructure, encouraging a contemporary form of multi modal transportation due its proximity to downtown, the university and access to adjacent natural amenities. The question will be how the Northeast Neighborhood can be strategic without destroying its character and the attributes that make it unique. The challenge will be accommodating new housing and commercial development with appropriate policies and design standards to maintain the integrity and quality of life for residents and business owners in the existing area. Design must also honor the past and the historical significance of the location. New policies should regulate new construction so that it fits within the neighborhood and focuses on quality context-sensitive design. As Bozeman continues to grow, a focus on great public spaces, walkability, and opportunities to cater to active lifestyles will continue to enhance Bozeman as a place and reinforce its great quality of life and economy of choice for knowledged workers and talented professionals. One fear of additional development in the Northeast Neighborhood is gentrification of the area and increased values in an already price sensitive market. The City should explore a regional policy to make housing more attainable to the region as a whole. However, certain developments could implement a portion of housing that is below market rates in exchange for other concessions. For example, public property could be made available to those developers that conscientiously address some levels of affordable housing. Design should be unique and reflect the existing character distinguishable from other parts of the neighborhood.” The Cottonwood and Ida Neighborhood Development addresses these challenges by providing new housing at reasonable prices, while maintaining the integrity of the existing community - honoring the past and accommodating the future. 603 SP1 Submittal 01-17-2019 12-20-20181” = 20’-0” OVERALLILLUSTRATIVE SITE PLAN & SHEETLIST L0.00 1” = 20’-0” LANDSCAPE SHEETLIST L0.00 OVERALL ILLUSTRATIVE SITE PLAN & SHEETLISTL1.00 MATERIALS PLANL1.01 TAKE-OFF PLANL2.00 PLANTING PALETTEL2.01 PLANTING PLANL3.00 IRRIGATION PLAN L4.00 GRADING PLANL4.01 STORMWATER PLANL5.00 SNOW STORAGE PLANL6.00 LIGHTING DIAGRAML7.00 PERFORMANCE POINTS ASPEN ST. COTTONWOOD ST.IDA ST.5’-00” 17’-6” 5’-0” 14’-0”5’-0” 20’-0” PROJECT NAME: COTTONWOOD-IDA PROJECT ADDRESS: COTTONWOOD & IDA STREETS BOZEMAN, MT 59715 PROPERTY OWNER:IMPERIAL DEVELOPMENT33 NORTH BLACK AVE. BOZEMAN, MT 59715CONTACT: JON EVANS, (406) 451-1470 LANDSCAPE PLAN PREPARER:FLETCHER STUDIO2325 3RD ST. SUITE #413SAN FRANCISCO, CA 94107CONTACT: DAVID FLETCHER, (415) 431-7878 SITE DESCRIPTION:THE COTTONWOOD-IDA SITE IS LOCATED IN THE NORTHEAST NEIGHBORHOOD OF BOZEMAN, MONTANA. THE NEIGHBORHOOD IS AN ACTIVE MIXTURE OF CONTEMPORARY WORK SPACES, INDUSTRIAL ARTS AND DISTRIBUTION CENTERS, AS WELL AS SMALL BUSINESSES AND SINGLE-FAMILY RESIDENCES. THE SITE IS BOUNDED BY E COTTONWOOD STREET TO THE SOUTH, N IDA AVENUE TO THE EAST, AND E ASPEN STREET TO THE NORTH. THE DESIGN AIMS TO CONTRIBUTE TO AN ALREADY VIBRANT AND DIVERSE COMMUNITY BY BOTH RESPECTING BOZEMAN AND THE NEIGHBORHOOD’S CULTURAL IDENTITY WHILE ALSO LOOKING TOWARDS THE FUTURE OF THE CITY. SPECIFICALLY, THE DESIGN ACCOMMODATES NEW HOUSING, SMALL BUSINESS SPACES, AND OFFICE SPACE IN AN AFFORDABLE AND CONTEXTUALLY RESPONSIVE MANNER. THE DESIGN ALSO WORKS TO EMBRACE MULTI-MODEL TRANSPORTATION, ESPECIALLY CYCLING. THE SITE INCLUDES A NUMBER OF OPEN SPACES FOR BOTH RESIDENTS AND THE GENERAL PUBLIC, PARTICULARLY A LARGE PUBLIC PLAZA AT THE HEART OF THE SITE. BLDG 6 BLDG 1 BLDG 2 BLDG 3 BLDG 4BLDG 5 MISCO MILL PLAZA COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 5 INTRODUCTION STATEMENT The site is in the Northeast part of Bozeman and carries a unique zoning designation found only in this part of town the Northeast Historic Mixed-Use District (NEHMU). The Unified Development Code (UBC) describes this District as follows, “The intent of the Northeast Historic Mixed-Use District is to provide recognition of an area that has developed with a blend of uses not commonly seen under typical zoning requirements. The unique qualities and nature of the area are not found elsewhere in the city and should be preserved as a place offering additional opportunities for creative integration of land uses.” This project proposes an integration of a broad range of housing and commercial activity along with thoughtful public plaza spaces to connect to the existing fabric of the neighborhood. The project will exceed LEED Neighborhood Design Standards, incorporate low impact development approaches, and most importantly provide affordable housing options. PROJECT SITE E COTTONWOOD ST E ASPEN ST IDA AVEE PEACH ST E TAMARACK ST PLUM AVEN WALLACE AVEN ROUSE AVEN BROADWAY AVEE A V O C A D O S T 604 SOUTHWEST CORNER, COTTONWOOD STREET COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 6 SOUTHEAST CORNER, COTTONWOOD STREET AND IDA AVENUE INTRODUCTION STATEMENT CONCEPT IMAGES 605 COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 7 AERIAL VIEW INTRODUCTION STATEMENT CONTINUED G A A DE C F B A APARTMENT 10% AFFORDABLE B TOWNHOUSE STYLE APARTMENTS SALE CONDOS C GROUND FLOOR ARTISAN MANUFACTURING SALE CONDOS D SECOND THIRD FLOOR RESIDENTIAL LOFTS SALE CONDOS E EXISTING REHABILITATED BUILDING FOR CAFE USE OPEN PAVILLION F OFFICE BUILDING G OFFSITE PARKING H PUBLIC PLAZA H MISCO MILLWALLACE AVEIDA AVE CO T T O N W O O D S T ASP E N S T 606 COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 8 1/2 MILE RADIUS 1/4 MILE RADIUS TRAILS BIKE LANES BIKE ROUTES SHARED USE PATHS STREAMS RAILWAYS CITY LIMITS PARKS OPEN SPACE FIRE STATION & POLICE SUBSTATION SCHOOL NORTH 5 MINUTE WALK (1/4 MILE) • PARK TRAILS • FAIRGROUNDS • BASEBALL FIELD • CAFES • BUS STOP • OFFICES • ARTIST STUDIOS 10 MINUTE WALK (1/2 MILE) • ELEMENTARY SCHOOL • BOZEMAN CITY HALL • DOWNTOWN RETAIL DISTRICT • PUBLIC LIBRARY • LINDLEY PARK • BEALL PARK • STORY MILL PARK • PUBLIC POOL (3/4 MILE) SITE VICINITY MAP AND DIAGRAM E OAK ST E BIRCH ST CE D A R S T BO H A R T L NL STE OAK STGOLD AVEE COTTONWOOD ST E ASPEN ST IDA AVEE PEACH ST E TAMARACK ST FRIDLEY ST PLUM AVEIDA AVEDAVIS ST FRIDLEY S T DAVIS ST E LAMME STN WALLACE AVEN ROUSE AVEN BLACK AVEFR O N T S T VILLAGE DO WNTO W N BLVDN BROADWAY AVEE MENDENHALL ST 607 COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 9 COMPILED DATA BUILDING USE GROSS SF NET AREA LOT COV. FOOTPRINT UNIT TOTAL BLDG 1 RESIDENTIAL 40,072 GSF 34,061 SF 11,631 SF 46 UNITS BLDG 2 RESIDENTIAL 10,791 GSF 9,172 SF 3,558 SF 18 UNITS BLDG 3 RESIDENTIAL 15,908 GSF 13,522 SF 5,192 SF 12 UNITS BLDG 4 RESIDENTIAL / ARTISAN 26,645 GSF 22,648 SF 8,359 SF 16 UNITS BLDG 5 RESTAURANT / COMMERCIAL 2,156 GSF 1,833 SF 2,156 SF BLDG 6 OFFICE / COMMERCIAL 29,650 GSF 25,203 SF 9,538 SF PUBLIC PLAZA 6,750 SF OPENSPACE 11,650 SF RESIDENTIAL PARKING UNDER GROUND GARAGE 39,395 GSF 33,486 SF 36,998 SF 96 SPACES TOTAL PROJECT PARKING 200 SPACES TOTAL BUILDING SF 125,216 GSF 106,434 SF 39,422 SF TOTAL SITE SF 90,013 SF FLOOR AREA RATIO (F.A.R.)1.4 G A AD E C F B PROPOSED USES A APARTMENT 10% AFFORDABLE B TOWNHOUSE STYLE APARTMENTS SALE CONDOS C GROUND FLOOR ARTISAN MANUFACTURING SALE CONDOS D SECOND THIRD FLOOR RESIDENTIAL LOFTS SALE CONDOS E EXISTING REHABILITATED BUILDING FOR CAFE USE OPEN PAVILLION F OFFICE BUILDING G OFFSITE PARKING H PUBLIC PLAZA H 608 COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 10 PROJECT TEAM OWNER Bangtail Partners LLC. 1189 Tennessee Street, Unit 103 San Francisco, CA 94107 DEVELOPER Imperial Development, Llc. Contact: Jon Evans 33 North Black Ave. Bozeman, MT 59715 406-451-1470 ARCHITECTS Openscope Studio, Inc. Contact: Ian Dunn / Mark Hogan 1776 18th Street San Francisco, CA 94107 415-891-0954 Iandunn@Openscopestudio.com Markhogan@Openscopestudio.com ThinkTank Design Group Contact: Erik Nelson / Brian Caldwell 33 North Black Ave. Bozeman, MT 59715 406-587-3628 Fernau & Hartman Architects Contact: Richard Fernau, FAIA 506 Miles Street Clyde Park, MT 59018 406-686-9193 GENERAL CONTRACTOR Langlas & Associates Contact: Loren Cantrell 1019 East Main, Ste 101 Bozeman, MT 59715 406-585-3420 LANDSCAPE ARCHITECT Fletcher Studio Contact: David Fletcher 2325 3rd Street, #413 San Francisco, CA 94107 415-431-7878 Dfletcher@Fletcherstudio.com CIVIL ENGINEER Sanderson Stewart Contact: Mike Russell 106 East Babcock Street Bozeman, MT 59715 855-656-5255 STRUCTURAL ENGINEER Nishkian-Monks Contact: Ty Monks 108 West Babcock Street Bozeman, MT 59715 406-582-9901 Tmonks@Nishkian.com MEP ENGINEER Emerald City Engineers, Inc. Contact: Adam French, P.E. 21705 Highway 99 Mountlake Terrace, WA 98043 425-741-1200 ACOUSTICAL Charles M. Salter Associates, Inc. Contact: Ethan Salter, PE, LEED AP 130 Sutter Street, Floor 5 San Francisco, CA 94104 415-397-0442 BUILDING ENVELOPE Simpson Gumpertz & Heger Contact: Gregory Doelp 100 Pine Street, Suite 1600 San Francisco, CA 94111 415-495-3700 LEED / SUSTAINABILITY Kath Williams + Associates Contact: Kath Williams P.O. Box 1191 Bozeman, MT 59771 406-586-3175 Kath@Kathwilliams.com 609 610 SUBDIVISION GUARANTEE Reorder Form No. 12421 SCHEDULE A Policy Number: 7170-1-1-109058-2018.72156-215267676 Order No. 1-109058 (Bangtail Partners, LLC) Liability: $200.00 Fee: $160.00 Dated: October 17, 2018 at 8:00 A.M. Assured: The County of Gallatin and in the City of Bozeman in Montana. The assurances referred to on the face page are: That, according to those public records which, under the recording laws, impart constructive notice of matters relative to the following described real property: Parcel A: Lots 5 through 16, inclusive, all in Block 105 of The Northern Pacific Addition to The City of Bozeman, Gallatin County, Montana. Together with the vacated alley, adjacent and contiguous thereto, pursuant to Ordinance No 628, recorded July 29, 1991 in Film 117, page 1328,,according to the official plat thereof on file and of record in the office of the County Clerk and Recorder of Gallatin County, Montana. [Plat No. C-23] Parcel B: Lots 17 through 28, Inclusive, all in Block 105 of The Northern Pacific Addition to the City of Bozeman, Gallatin County, Montana. Together with the vacated alley adjacent and contiguous thereto, pursuant to Ordinance No. 628, recorded July 29, 1991 in Film 117, page 1328, according to the official plat thereof on file and of record in the office of the County Clerk and Recorder of Gallatin County, Montana. [Plat No. C-23] Title to said real property is vested in: Bangtail Partners, LLC, a California limited liabililty company subject to the matters shown below under Exceptions, which Exceptions are not necessarily shown in the order of their priority. (Continued) 611 COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 13 APPLICATION FORMS AND CHECKLISTS DEVELOPMENT REVIEW APPLICATIONS A1 APPLICATION PUDP APPLICATION SP1 APPLICATION N1 APPLICATION PUDP CHECKLIST SP1 CHECKLIST 2.00 2.01 2.02 SECTION 2 612 A1 DEVELOPMENT REVIEW APPLICATION PROJECT IMAGE PROJECT INFORMATION Project name: Project type(s): Description: Street address: Zip code: Zoning: Gross lot area: Block frontage: Number of buildings: Type and Number of dwellings: Non-residential building size(s): (in stories) Non-residential building height(s): Number of parking spaces: Affordable housing (Y/N): Cash in lieu of parkland (Y/N): VICINITY MAP CITY USE ONLY Submittal date: Application file number: Planner: DRC required (Y/N): Revision Date: Development Review Application A1 Page 1 of 3 Revision Date: 5.16.18 REQUIRED FORMS: Varies by project type, PLS Cottonwood and Ida Planned Unit Development / Site Plan Mixed Use project with a broad range of housing units and commercial office / artist spaces 615 East Cottonwood Street & 720 N Ida Ave 59715 NEHMU 90,013 SF 300 LF Cottonwood, 300 LF Ida, 300 LF Aspen six 92 30,000 SF 3 stories 201 Yes Yes Cottonwood: Mixed, Ida: Mixed, Aspen: Mixed 200 613 DEVELOPMENT REVIEW APPLICATION 1. PROPERTY OWNER Name: Full address (with zip code): Phone: Email: 2. APPLICANT Name: Full address (with zip code): Phone: Email: 3. REPRESENTATIVE Name: Full address (with zip code): Phone: Email: 4. SPECIAL DISTRICTS Overlay District: Neighborhood Conservation None Urban Renewal District: Downtown North 7th Avenue Northeast North Park None 5. CERTIFICATIONS AND SIGNATURES This application must be signed by both the applicant(s) and the property owner(s) (if different) for all application types before the submittal will be accepted. The only exception to this is an informal review application that may be signed by the applicant(s) only. As indicated by the signature(s) below, the applicant(s) and property owner(s) submit this application for review under the terms and provisions of the Bozeman Municipal Code. It is further indicated that any work undertaken to complete a development approved by the City of Bozeman shall be in conformance with the requirements of the Bozeman Municipal Code and any special conditions established by the approval authority. I acknowledge that the City has an Impact Fee Program and impact fees may be assessed for my project. Further, I agree to grant City personnel and other review agency representative’s access to the subject site during the course of the review process (Section 38.34.050, BMC). I (We) hereby certify that the above information is true and correct to the best of my (our) knowledge. Certification of Completion and Compliance – I understand that conditions of approval may be applied to the application and that I will comply with any conditions of approval or make necessary corrections to the application materials in order to comply with municipal code provisions. Statement of Intent to Construct According to the Final Plan – I acknowledge that construction not in compliance with the approved final plan may result in delays of occupancy or costs to correct noncompliance. continued on next page Development Review Application A1 Page 2 of 3 Revision Date: 5.16.18 REQUIRED FORMS: Varies by project type, PLS Bangtail Partners LLC PO Box 10195, Palo Alto CA 94303-0995 406-587-3628 erik@thinktankarchitects.com Imperial Development LLC 33 N Black Ave Bozeman, MT 59715 406-587-3628 erik@thinktankarchitects.com Thinktank Design Group Inc (Erik Nelson) 33 N Black Ave, Bozeman, MT 59715 406-587-3628 erik@thinktankarchitects.com 1189 Tennessee Street, Unit 103, San Francisco, CA 94107 614 Imperialo Development, LLC. Managing Member Bangtail Partners, LLC., Managing Member 615 PUDP Planned Unit Development Preliminary PUDP Page 1 of 3 Revision Date 01-26-18 Required Forms: A1, SP1 Recommended Forms: PUD PRELIMINARY PLAN REQUIRED MATERIALS APPLICATION SETS 3 total sets are required that include 1 copy of every item below bound or folded into 8½ x 11 or 8½ x 14 sets. Complete and signed development review application form A1. Complete materials required by the SP1 checklist. Materials and plans that include all the required items listed in the preliminary PUD plan checklist below. Standard application sets required plan sizes: 2 sets that include full size 24 x 36 inch plans 1 set that include 11 x 17 inch plans 2-digital versions of all materials (JPEG or PDF) on separate CD-ROM’s or USB drives. Individual files must be provided at 5MB or less in size. Files shall be named according to naming protocol. Notes: All plans must be drawn to scale on paper not smaller than 8½ x 11 inches or larger than 24 x 36 inches. The name of the project must be shown on the cover sheet of the plans. If 3-ring binders will be used, they must include a table of contents and tabbed dividers between sections. Plans that are rolled or not bound into sets will not be accepted. NOTICING MATERIALS Completed and signed property adjoiners certificate form N1and materials APPLICATION FEE Base fee $1,666 If includes dwellings add: $94 per dwelling unit If includes nonresidential uses add: $292 per 1000 square feet of nonresidential gross building space. PUD PRELIMINARY PLAN CHECKLIST A Planned United Development (PUD) Preliminary Plan review is the second step in the PUD entitlement process. When a subdivision is proposed in conjunction with a zoning PUD the subdivision review shall be coordinated with the zoning review and a subdivision preliminary plat application shall also be submitted concurrent with this application. 1. Overall project narrative providing a thorough and extensive description of the overall project including design intent, project goals, project timeframe, proposed uses, site improvements and buildings. 2. A complete list of proposed relaxations to the BMC listed by individual section and reason for the relaxation. 3. Name, mailing address and full contact information for project team including: owner, developer, architect, civil engineer, landscape architect/designer and electrical engineer. 4. A title report for subdivision or proposed subdivision guarantee with all current property ownership. 5. Data regarding site conditions, land characteristics, available community facilities and utilities and other related general information about proposed uses, adjacent land uses and the uses of land within one-half mile of the subject parcel of land both existing and proposed. This shall be in narrative and/or table formats. Provide the following supporting maps: existing land use map, community plan land use x x x x x x 616 Planned Unit Development Preliminary PUDP Page 2 of 3 Revision Date 01-26-18 Required Forms: A1, SP1 Recommended Forms: designation map, city zoning map, neighborhood and entryway overlay map for property showing conditions within 200 feet of the project boundaries. 6. Overall land use ratios for: a. existing footprints of existing buildings and structures b. proposed buildings and structures c. driveways and parking areas d. streets, roads and alleys with areas of rights of way identified separately e. private open spaces for residential uses f. landscape areas g. city parkland 7. Overall project floor area ratio (FAR) and net residential density. 8. Development Schedule. If phasing is proposed, provide narrative clearly describing project phasing with the proposed phasing of all infrastructure, buildings, driveways and parking and landscaping. 9. Phasing Plan exhibit clearly showing all site and infrastructure improvement with phase boundaries including detailed limits of construction and approaches to mitigate any conflicts with phase boundaries and site safety and function. 10. Phasing table that shows phase area and data for each phase including: area in acres and square feet, lot area in acres and square feet, building foot print square feet, building floor area, FAR, street right of way, common opens space, landscaped area, PUD open space square feet and percentage of total, PUD performance points by type and parking space requirements. 11. Table of proposed buildings include phase information, footprint, gross square footage, stories, whether building is existing or proposed, and building use designations by building floor. 12. Colored aerial vicinity map within one-half mile of the site with project site and other significant community facilities, streets, trails, watercourses, railways, highways and other applicable features identified by name. 13. Overall site illustration in color showing all building foot prints, landscaped areas, site circulation including vehicular, bike, and pedestrian facilities. 14. Statements of objectives and conformance to city policy and plans: a. Statement of applicable City land use policies and objectives achieved by the proposed plan and how it furthers the implementation of the Bozeman Community Plan, provide specific land use goals and objectives in the Community Plan that are furthered by the proposed PUD; b. Statement of proposed ownership of public and private open space areas and applicant’s intentions with regard to future ownership of all or portions of the PUD; c. Estimate of number of employees for business, commercial, and industrial uses; d. Description of rational behind the assumptions and choices made by the applicant; e. The applicant shall submit as evidence of successful completion of the applicable Community Design objectives and Criteria of Section 38.20.090.E, documentation pursuant to these regulations for each proposed use; the applicant shall submit written explanation for each of the applicable objectives or criteria as to how the plan does or does not address the objective or criterion; the Director may require, or the applicant may choose to submit, evidence that is beyond what is required in that section; any variance from the criterion shall be described; f. Detailed description of how conflicts between land uses are being avoided or mitigated; g. Statements of design methods to reduce energy consumption, (e.g. - home/business, utilities, transportation fuel, waste recycling). 15. If not provided by subdivision application materials, physiographic data and summaries for: landforms and geology and soils; hydrology; vegetation; noxious weeds; wildlife and viewsheds. If the project is a brown field site, provide site history, data and copies of any environmental site 617 Planned Unit Development Preliminary PUDP Page 3 of 3 Revision Date 01-26-18 Required Forms: A1, SP1 Recommended Forms: assessments that have been completed. An approved noxious weed management plan must be submitted. 16. Narrative descriptions of site access and overall utilities including an overview, parking, existing and proposed condition of the streets providing access to the site, proposed accesses to the site and utilities including water, sewer, storm drainage, solid waste, gas, electric and shallow franchise facilities. 17. Development and Design Guidelines per Section 38.20.070.D.2 BMC. 18. Comprehensive Signage Plan, if applicable. CONTACT US Alfred M. Stiff Professional Building 20 East Olive Street 59715 (FED EX and UPS Only) PO Box 1230 Bozeman, MT 59771 phone 406-582-2260 fax 406-582-2263 planning@bozeman.net www.bozeman.net 618 SP1 SITE PLAN CHECKLIST SITE PLAN REQUIREMENTS ALL INFORMATION AND ITEMS BELOW MUST BE ON SITE PLAN SHEETS AND NOT PRESENTED ON SEPARATE ATTACHMENTS EXCEPT 1, 47, 77, 78, 79, 82, 83 AND STORMWATER, SEWER, WATER AND WETLAND REPORTS, IF PROVIDED. GENERAL INFORMATION 1. Project narrative describing the project type, proposed use scope, size (dwellings, building size(s), building height(s), number of buildings, number of total parking spaces) intent, and phasing, if applicable. The narrative must include a response to the City’s conceptual review comments. 2. Name of project/development. 3. Name and mailing address of developer and owner. 4. Name and mailing address of engineer, architect, landscape architect, planner, etc. 5. Location of project/development by street address/legal description. 6. Location/vicinity map, including area within one-half mile of the site. 7. A construction route map showing how materials and heavy equipment will travel to and from the site. 8. Location, percentage of parcel(s) and total site, and square footage of the following: a. Existing and proposed buildings and structures. b. Driveway circulation and parking areas. c. Landscaped areas. d. Private open space, provide boundary/ies and dimensions of each space provided (if residential requirement) on plans or separate exhibit. Provide a summary total types of dwelling units and total open space required and provided. e. City Parks. f. Other public lands (school sites, public access greenway corridors, trail corridors). SITE PLAN GENERAL 9. Boundary line of property with dimensions. 10. Date of plan preparation and changes. 11. North point indicator. 12. Suggested scale of 1 inch to 20 feet, but not less than 1 inch to 100 feet. 13. Parcel size(s) in gross acres and square feet. 14. Estimated total floor area and estimated ratio of floor area to lot size (floor area ratio, FAR), with a breakdown by land use. 15. Total number (with number of bedrooms), type and density per type of dwellings, and total new and gross residential density and density per residential parcel. The density per parcel must be presented as net residential density per Section 38.700.130 BMC. Site Plan Checklist SP1 Page 1 of 6 Revision Date: 5.16.18 REQUIRED FORMS:A1, SP, N1, PLS, DEM (if demolition), WR (if wetlands), AH (if affordable housing)619 SITE PLAN CHECKLIST SITE PLAN DETAILS THE LOCATION, IDENTIFICATION AND DIMENSIONS OF THE FOLLOWING EXISTING AND PROPOSED DATA, ONSITE AND TO A DISTANCE OF 100 FEET (200 FEET FOR PUD’S) OUTSIDE THE SITE BOUNDARY, EXCLUSIVE OF PUBLIC RIGHTS-OF-WAY UNLESS OTHERWISE STATED. 16. Topographic contours at a minimum interval of 2 feet, or as determined by the Director. 17. Location of City limit boundaries, and boundaries of Gallatin County’s Bozeman Area Zoning Jurisdiction, within or near the development. 18. Existing zoning within 200 feet of the site. 19. Adjacent streets and street rights-of-way to a distance of 150 feet, except for sites adjacent to major arterial streets where the distances shall be 200 feet. The full width of the street including curb, gutter, sidewalk, drive approaches, intersections and street lighting must be shown for both sides of the street. 20. Block frontages. 21. On site streets and rights-of-way. Including curb gutter, sidewalks, and street lights. 22. Ingress and egress points. 23. Traffic flow on site. 24. Traffic flow off site. 25. All parking facilities, including circulation aisles, access drives, covered and uncovered bicycle parking and bicycle rack type and detail, compact spaces, ADA accessible spaces and motorcycle parking, on-street parking (delineated by a 24’ long under interrupted space(s) directly adjacent to the project site outside of site vision triangles and hydrant locations), number of employee and non-employee parking spaces, existing and proposed, and total square footage of each. 26. Setbacks, building footprint and any proposed encroachments. Any setback or property line encroachments must be clearly shown and be noted with encroachment type e.g. awning, weather protection, cantilever, lighting, eave, etc. 27. Utilities and utility rights of way and easements existing and proposed, including: a. Electric. b. Natural Gas. c. Telephone, cable and similar utilities. d. Water. e. Sewer (sanitary, treated effluent and storm). 28. Surface water, including: a. Ponds, streams and irrigation ditches (include classifications be based upon a determination of the Gallatin Conservation District; note classification of each feature on plans). b. Watercourses, water bodies and wetlands (include classifications based upon a determination of the Gallatin Conservation District, Army Corps of Engineers, or Wetland Delineation Report; note classification of each feature on plans). c. Floodplains as designated on the Federal Insurance Rate Map or that may otherwise be identified as lying within a 100 year floodplain through additional floodplain delineation, engineering analysis, topographic survey or other objective and factual basis. d. A floodplain analysis report in compliance with Article. 29. Grading and drainage plan, including provisions for on-site retention/detention and water quality improvement facilities as required by the Engineering Division, or in compliance with B.M.C. Section 14 storm drainage ordinance and best management practices manual adopted by the City. All surface stormwater facilities must demonstrate compliance with Section 38.410.080 BMC including providing cross sections for each facility. Site Plan Checklist SP1 Page 2 of 6 Revision Date: 5.16.18 REQUIRED FORMS:A1, SP, N1, PLS, DEM (if demolition), WR (if wetlands), AH (if affordable housing)620 SITE PLAN CHECKLIST 30. All drainageways, streets, arroyos, dry gullies, diversion ditches, spillways, reservoirs, etc. which may be incorporated into the storm drainage system for the property shall be designated: a. The name of the drainageway (where appropriate). b. The downstream conditions (developed available drainageways, etc.). c. Any downstream restrictions. 31. Significant rock outcroppings, slopes of greater than 15 percent or other significant topographic features. 32. Sidewalks, walkways, driveways, crosswalks, loading areas and docks, bikeways, including typical details and interrelationships with vehicular circulation system, indicating proposed treatment of points of conflict. 33. Provision for handicapped accessibility, including but not limited to, wheelchair ramps, parking spaces, handrails and curb cuts, including signage and construction details and the applicant’s certification of ADA compliance. A certification block must be provided on the plan sheets. 34. Fences, walls, railings and handrails, including typical details. 35. Permanent trash enclosure and refuse collection areas, including typical details and elevations. 36. Construction management plan include exterior construction period material staging, spoils location and construction trash enclosure location(s). A trash container type must be provided and detailed (40 yard roll off, fenced enclosure, etc.). If spoils storage is proposed a timeline for removal must be provided. 37. Curb, asphalt section and drive approach construction details. 38. Location and extent of snow storage areas. 39. Location and extent of street vision triangles extended to center of right of way including adjacent street intersections and all alley and driveway access points. 40. Unique natural features, significant wildlife areas and vegetative cover, including existing trees and shrubs having a diameter greater than 2.5 inches, by species. 41. Historic, cultural and archaeological resources, describe and map any designated historic structures or districts, and archaeological or cultural sites. 42. Major public facilities, including schools, parks, shared use pathways, trails, etc. within a distance of 200 feet. PARKLAND AND AFFORDABLE HOUSING 43. If residential, provide the required parkland for the development, including calculations per Section 38.420 BMC (Park and Recreation Requirements) in a table format, see table format in the PLS document. 44. If cash in lieu is proposed, a thorough calculation including the base requirement and any net based upon maximum density, narrative addressing the findings the City must make to grant cash in lieu, and the appraisal must be provided to make the request per Section 38.420.030 BMC, unless using city valuation. 45. If parkland is proposed a park plan shall be submitted consistent with Section 38.220.060.A.16 BMC. 46. Source and amount of parkland credit to be used if previously provided. If from a subdivision confirm amount provided and detailed phase information as required in table format outlined in the PLS document. 47. Describe how the site plan will satisfy any requirements of Section 38.380, BMC (Affordable Housing) which have either been established for that lot(s) through the subdivision process or if no subdivision has previously occurred are applicable to a site plan. The description shall be of adequate detail to clearly identify those lots and dwellings designated as subject to the section’s compliance requirements and to make the obligations placed on the affected lots and dwellings readily understandable. If affordable housing is not being provided place that statement on the site plan sheets with the site data in item 8. 48. If affordable housing is provided, or cash in lieu is proposed use form AH. Site Plan Checklist SP1 Page 3 of 6 Revision Date: 5.16.18 REQUIRED FORMS:A1, SP, N1, PLS, DEM (if demolition), WR (if wetlands), AH (if affordable housing)621 SITE PLAN CHECKLIST Site Plan Checklist SP1 Page 4 of 6 Revision Date: 5.16.18 REQUIRED FORMS:A1, SP, N1, PLS, DEM (if demolition), WR (if wetlands), AH (if affordable housing) LIGHTING DETAILS 49. Lighting plan and electrical site plan, complete with all structures, parking spaces, building entrances, traffic areas (both vehicular and pedestrian), vegetation that might interfere with lighting, and adjacent uses, containing a layout of all proposed fixtures by location and type. 50. A photometric lighting plan that contains a layout of all proposed fixtures by location and type and extends the photometric information to the property boundaries and rights of way. For fueling canopies a second photometric plan is required to specifically analyze the light output underneath the drip line of the fuel canopy. 51. Details for all proposed exterior fixtures that are keyed to the fixtures noted in the lighting electrical plan and the photometric lighting plan. The detail must demonstrate compliance with full cut-off requirements in Section 38.570 BMC and be located on the lighting plan sheets. BUILDING DESIGN AND SIGNAGE 52. Front, rear and side elevations of all buildings, structures, fences and walls with height dimensions and roof pitches. Show open stairways, exterior lighting, weather protection, awnings and other projections from exterior building walls. Building elevations must include proposed exterior building materials, windows and doors including a color and material palette for all proposed features keyed to the building elevations. 53. Provide transparency calculations for any elevation that faces a street and is a block frontage. Provide minimum and maximum height of transparency from grade. Provide area of transparency and percentage in relation to total facade. 54. Provide elevations and details of all ground mounted and rooftop mechanical screening. 55. Floorplans that include all floors and roof plan. Annotate/designate uses for all rooms and areas. Seating/serving area layout required for all restaurants. 56. Exterior signs if applicable. Include building frontage dimension(s) and maximum sign area calculation, provide sign dimensions and square footage of each. Note — The review of signs in conjunction with this application is only review for sign area compliance with Section 38.560 BMC (Signs). A sign permit must be obtained from the Building Division prior to erection of any and all signs, addition design guidelines apply for signs within zoning Overlay Districts. LANDSCAPE PLAN A SEPARATE LANDSCAPE PLAN SHALL BE SUBMITTED AS PART OF THE SITE PLAN APPLICATION UNLESS THE REQUIRED LANDSCAPE INFORMATION CAN BE INCLUDED IN A CLEAR AND UNCLUTTERED MANNER ON A SITE PLAN WITH A SCALE WHERE ONE INCH EQUALS 20 FEET. ALL INFORMATION MUST BE ON PLAN SHEETS. 57. Project name, street address, and lot and block description. 58. Date, scale, north arrow, and the names, addresses, and telephone numbers of both the property owner and the person preparing the plan. Plan preparer shall be a state registered landscape architect; an individual with a degree in landscape design and two years of professional design experience in the state; or an individual with a degree in a related field (horticulture, botany, plant science, etc.) and at least five years of professional landscape design experience, of which two years have been in the state. 59. Location of existing boundary lines and dimensions of the lot. 60. Existing and proposed grade that complies with maximum allowable slope and grade. 61. Approximate centerlines of existing watercourses, required watercourse setbacks, and the location of any 100-year floodplain; the approximate location of significant drainage features; and the location and size of existing and proposed streets and alleys, utility easements, utility lines, driveways and sidewalks on the lot and/or adjacent to the lot. 62. Location of all pavement, curbs, sidewalks and gutters. 622 SITE PLAN CHECKLIST Site Plan Checklist SP1 Page 5 of 6 Revision Date: 5.16.18 REQUIRED FORMS:A1, SP, N1, PLS, DEM (if demolition), WR (if wetlands), AH (if affordable housing) 63. Show location of existing and/or proposed drainage facilities which are to be used for drainage control including proposed landscaping and seeding as required by Section 38.410.080.H BMC. 64. Location and extent of snow storage areas. 65. Location and extent of street vision triangles, extended to the center of right of way. 66. Complete landscape legend providing a description of plant materials shown on the plan, including typical symbols, names (common and botanical name), locations, quantities, container or caliper sizes at installation, heights, spread and spacing and identification of drought tolerant and/or native and adapted species. The location and type of all existing trees on the lot over 6 inches in caliper must be specifically indicated. 67. Size of planting at the time of installation and at maturity. 68. Complete illustration of landscaping and screening to be provided in or near off-street parking and loading areas, including information as to the amount (in square feet) of landscape area to be provided internal to parking areas and the number and location of required off-street parking and loading spaces. 69. Street frontage landscaping, including boulevard details and tree grate details as applicable based upon block frontage. 70. Locations and dimensions of proposed landscape buffer strips, including watercourse buffer zones demonstrating compliance with watercourse setback planting plan requirements per Section 38.410.100.A.2.F BMC unless previously provided during subdivision review. 71. Location, height and material of proposed landscape screening and fencing (with berms to be delineated by one foot contours). 72. An indication of how existing healthy trees (if any) are to be retained and protected from damage during construction. 73. Size, height, location and material of proposed seating, lighting, planters, sculptures, and water features. 74. A description of proposed watering methods including any use of high efficiency irrigation technologies and best practice, source of irrigation water and estimated amount of water consumption broken down by vegetation type (e.g. turf, shrubs, trees) and total estimated water consumption. 75. Areas to be irrigated and type of proposed irrigation and the irrigation system design plan. 76. Tabulation of performance points earned by the plan per Section 38.550.060 BMC. STREETS AND TRAFFIC 77.Traffic study. Street, traffic, and access information required in Section 38.220.060.A.12 BMC or that the requirement is waived in writing by the Engineering Division prior to application submittal. WATER AND WATER RIGHTS 78.Water rights information. If cash in lieu is proposed a cash in lieu of water rights calculation and payment amount certified by the Engineering Division. 79. If water wells are proposed, a letter from the Department of Natural Resources confirming their intent to issue a permit or exemption. DEVIATIONS 80. Either through the site plan requirement above or separate exhibit clearly show any proposed deviations related to site requirements such as yards/setbacks, lot coverage, parking or other applicable standards. 81. Either through the building elevation requirement above or separate exhibit clearly show any proposed deviations related to building construction such as height, second story additions, or other applicable standards. 623 SITE PLAN CHECKLIST Site Plan Checklist SP1 Page 6 of 6 Revision Date: 5.16.18 REQUIRED FORMS:A1, SP, N1, PLS, DEM (if demolition), WR (if wetlands), AH (if affordable housing) 82.For deviations in the Neighborhood Conservation Overlay a deviation narrative shall be provided stating which Section(s) of the Bozeman Municipal Code are proposed for deviation, to what extent and include a response to the following: a. How the modification is more historically appropriate for the building and site in question and the adjacent properties, as determined in Section 38.340.050 BMC than would be achieved under a literal enforcement of this chapter (Chapter 38, BMC); b. How the modifications will have minimal adverse effect on abutting properties or the permitted uses thereof; and c. How the modifications will assure the protection of the public health, safety and general welfare. d. How the requested deviation will encourage restoration and rehabilitation activity that will contribute to the overall historic character of the community. If more than one deviation, a response to the criteria shall be provided for each deviation. DEPARTURES 83.For departures, a departure narrative must be provided stating which Section(s) of the Bozeman Municipal Code are proposed for departure, the scope and extent of the plan proposed for departure and a response to the required departure criteria. If more than one departure, a summary and response to the criteria must be provided for each departure. CONTACT US Alfred M. Stiff Professional Building 20 East Olive Street 59715 (FED EX and UPS Only) PO Box 1230 Bozeman, MT 59771 phone 406.582.2260 fax 406.582.2263 planning@bozeman.net www.bozeman.net 624 N1 Noticing Materials Page 1 of 1 Revision Date 1-05-16 Required Forms: N1 Recommended Forms: Required Forms: NOTICING MATERIALS Notice is required for certain projects in order for citizens to participate in decision making which affects their interests and provides opportunity to receive information pertinent to an application that would not otherwise be available to the decision maker. SITE PLAN, MASTER SITE PLAN, CONDITIONAL USE PERMIT, VARIANCE, DEVIATION, FIRST MINOR SUBDIVISON AND SIMILAR REQUIRED NOTICING MATERIALS Completed and signed property adjoiners certificate form N1. Legible list of full names and addresses of all property owners within 200 feet of the project site, attached to this checklist. Stamped, unsealed, plain (no return address) #10 envelopes preaddressed with the names and addresses of the adjoining property owners. MAJOR AND SUBSEQUENT MINOR SUBDIVISION REQUIRED NOTICING MATERIALS Completed and signed property adjoiners certificate form N1. Legible list of full names and addresses of all property owners within 200 feet of the project site and not physically contiguous (touching a boundary) to the subdivision, attached to this checklist. Clearly label list ADJOINER NOT CONTIGUOUS. Stamped, unsealed, plain (no return address) #10 envelopes preaddressed with the names and addresses of the adjoining property owners. Legible list of full names and addresses of all property owners physically contiguous (touching a boundary) including recorded purchasers under contract for deed to be sent certified mail attached to this checklist. Clearly label list CONTIGUOUS. Stamped, unsealed, plain (no return address) #10 envelopes preaddressed with the names and addresses of the physically contiguous property owners including recorded purchasers under contract for deed. Two sets additional mailing labels with the names and addresses of the physically contiguous property owners including recorded purchasers under contract for deed attached. NOTICE Current property owners of record can be found at the Gallatin County Clerk and Recorder’s Office in the Gallatin County Courthouse 311 West Main Street Bozeman, Montana. CERTIFICATION I, _____________________________________________, hereby certify that, to the best of my knowledge, the attached name and address list of all adjoining property owners (including all condominium owners, within 200 feet of the property located at ________________________________________________________, is a true and accurate list from the last declared Gallatin County tax records. I further understand that an inaccurate list may delay review of the project. _______________________________________ Signature CONTACT US Alfred M. Stiff Professional Building 20 East Olive Street 59715 (FED EX and UPS Only) PO Box 1230 Bozeman, MT 59771 phone 406-582-2260 fax 406-582-2263 planning@bozeman.net www.bozeman.net Erik R Nelson , Thinktank Design Group Inc. 615 East Cottonwood ✔ ✔ ✔ Erik Nelson Digitally signed by Erik Nelson DN: cn=Erik Nelson, o=Thinktank Design Group Inc, ou, email=erik@thinktankarchitects.com, c=US Date: 2018.10.26 14:26:23 -06'00' 625 COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 27 PUDP CHECKLIST A Planned Unit Development (PUD) Preliminary Plan Review is the second step in the PUD entitlement process. When a subdivision is proposed in conjunction with a zoning PUD the subdivision review shall be coordinated with the zoning review and a subdivision preliminary plat application shall also be submitted concurrent with this application. Overall project narrative providing a thorough and extensive description of the overall project including design intent, project goals, project timeframe, proposed uses, site improvements and buildings. A complete list of proposed relaxations to the BMC listed by individual section and reason for the relaxation. Name, mailing address and full contact information for project team including: owner, developer, architect, civil engineer, landscape architect/designer and electrical engineer. A title report for subdivision or proposed subdivision guarantee with all current property ownership. Data regarding site conditions, land characteristics, available community facilities and utilities and other related general information about proposed uses, adjacent land uses and the uses of land within one-half mile of the subject parcel of land both existing and proposed. This shall be in narrative and/or table formats. Provide the following supporting maps: existing land use map, community plan land use designation map, city zoning map, neighborhood and entryway overlay map for property showing conditions within 200 feet of the project boundaries. Overall land use ratios for: A. Existing footprints of existing buildings and structures B. Proposed buildings and structures C. Driveways and parking areas D. Streets, roads and alleys with areas of rights of way identified separately E. Private open spaces for residential uses F. Landscape areas G. City parkland Overall project Floor Area Ratio (FAR) and Net Residential Density. Development Schedule. If phasing is proposed, provide narrative clearly describing project phasing with the proposed phasing of all infrastructure, buildings, driveways and parking and landscaping. Phasing Plan exhibit clearly showing all site and infrastructure improvement with phase boundaries including detailed limits of construction and approaches to mitigate any conflicts with phase boundaries and site safety and function. Phasing table that shows phase area and data for each phase including: area in acres and square feet, lot area in acres and square feet, building footprint square feet, building floor area, FAR, street right of way, common opens space, landscaped area, PUD open space square feet and percentage of total, PUD performance points by type and parking space requirements. page 36 page 46 page 10 page 90 page 3, 36 page 36, 64 page 9 1 2 3 4 5 6 7 8 9 10 626 COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 28 Table of proposed buildings include phase information, footprint, gross square footage, stories, whether building is existing or proposed, and building use designations by building floor. Colored aerial vicinity map within one-half mile of the site with project site and other significant community facilities, streets, trails, watercourses, railways, highways and other applicable features identified by name. Overall site illustration in color showing all building footprints, landscaped areas, site circulation including vehicular, bike, and pedestrian facilities. Statements of objectives and conformance to city policy and plans: A. Statement of applicable City land use policies and objectives achieved by the proposed plan and how it furthers the implementation of the Bozeman Community Plan, provide specific land use goals and objectives in the Community Plan that are furthered by the proposed PUD; B. Statement of proposed ownership of public and private open space areas and applicant’s intentions with regard to future ownership of all or portions of the PUD; C. Estimate of number of employees for business, commercial, and industrial uses; D. Description of rational behind the assumptions and choices made by the applicant; E. The applicant shall submit as evidence of successful completion of the applicable Community Design objectives and Criteria of Section 38.20.090.E (new code reference 38.430.090.E), documentation pursuant to these regulations for each proposed use; the applicant shall submit written explanation for each of the applicable objectives or criteria as to how the plan does or does not address the objective or criterion; the Director may require, or the applicant may choose to submit, evidence that is beyond what is required in that section; any variance from the criterion shall be described; F. Detailed description of how conflicts between land uses are being avoided or mitigated; G. Statements of design methods to reduce energy consumption, (e.g. home/business, utilities, transportation fuel, waste recycling). If not provided by subdivision application materials, physiographic data and summaries for: landforms and geology and soils; hydrology; vegetation; noxious weeds; wildlife and viewsheds. If the project is a brownfield site, provide site history, data and copies of any environmental site assessments that have been completed. An approved noxious weed management plan must be submitted. Narrative descriptions of site access and overall utilities including an overview, parking, existing and proposed condition of the streets providing access to the site, proposed accesses to the site and utilities including water, sewer, storm drainage, solid waste, gas, electric and shallow franchise facilities. Development and Design Guidelines per Section 38.20.070.D.2 BMC. Comprehensive Signage Plan, if applicable. page 9, 43 page 8 page 8 page 65 page 57 page 60 page 61 page 65, 66 page 60 page 38 page 4 page 84 11 12 13 14 15 16 17 18 PUDP CHECKLIST CONTINUED 627 COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 29 SP1 CHECKLIST SITE PLAN REQUIREMENTS All information and items below must be on site plan sheets and not presented on separate attachments except narratives, legal documents, traffic studies, stormwater, sewer, water and wetland reports, if provided. Project narrative describing the project type, proposed use scope, size (dwellings, building size(s), building height(s), number of buildings, number of total parking spaces) intent, and phasing, if applicable. The narrative must include a response to the City’s conceptual review comments. Name of project/development. Name and mailing address of developer and owner. Name and mailing address of engineer, architect, landscape architect, planner, etc. Location of project/development by street address/legal description. Location/vicinity map, including area within one-half mile of the site. A construction route map showing how materials and heavy equipment will travel to and from the site out to one-half mile. sheet AS.000 sheet AS.000 sheet AS.000 sheet AS.000 sheet AS.000 sheet AS.000 sheet AS.100 1 2 3 4 5 6 7 SITE PLAN DATA Boundary line of property with dimensions. Date of plan preparation and changes. North point indicator. Suggested scale of 1 inch to 20 feet, but not less than 1 inch to 100 feet. Parcel size(s) in gross acres and square feet. Estimated total floor area and estimated ratio of floor area to lot size (floor area ratio, FAR), with a breakdown by land use. Location, percentage of parcel(s) and total site, and square footage of the following: A. Existing and proposed buildings and structures. B. Driveway circulation and parking areas. C. Landscaped areas. D. Private open space, provide boundary/ies and dimensions of each space provided (if residential requirement) on plans or separate exhibit. Provide a summary total types of dwelling units and total open space required and provided. E. City parks. F. Other public lands (school sites, public access greenway corridors, trail corridors, etc.). Total number (with number of bedrooms), type and density per type of dwellings, and total new and gross residential density and density per residential parcel. The density per parcel must be presented as net residential density per section 38.700.130 Bmc. sheet AS.102 sheet AS.100 sheet AS.100 - 102, 110 - 114 sheet AS.101 sheet AS.101 sheet AS.101 sheet AS.102 sheet AS.102 8 9 10 11 12 13 14 15 GENERAL PROJECT INFORMATION 628 COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 30 SP1 CHECKLIST CONTINUED SITE PLAN DETAILS The location, identification and dimensions of the following existing and proposed data, onsite and to a distance of 100 feet (200 feet for PUD’s) outside the site boundary, exclusive of public rights-of-way unless otherwise stated. Topographic contours at a minimum interval of 2 feet, or as determined by the director. Location of City limit boundaries, and boundaries of Gallatin County’s Bozeman Area Zoning Jurisdiction, within or near the development. Existing zoning within 200 feet of the site. Adjacent streets and street rights-of-way to a distance of 150 feet, except for sites adjacent to major arterial streets where the distances shall be 200 feet. The full width of the street including curb, gutter, sidewalk, drive approaches, intersections and street lighting must be shown for both sides of the street. Block frontages. On site streets and rights-of-way. Including curb gutter, sidewalks, and street lights. Ingress and egress points vehicular & pedestrian. Traffic flow on site. Traffic flow off site. All parking facilities, including circulation aisles, access drives, covered and uncovered bicycle parking and bicycle rack type and detail, compact spaces, ADA accessible spaces and motorcycle parking, on-street parking (delineated by a 24’ long under interrupted space(s) directly adjacent to the project site outside of site vision triangles and hydrant locations), number of employee and non-employee parking spaces, existing and proposed, and total square footage of each. Setbacks, building footprint and any proposed encroachments. Any setback or property line encroachments must be clearly shown and be noted with encroachment type e.g. Awning, weather protection, cantilever, lighting, eave, etc. Utilities and utility rights of way and easements existing and proposed, including: A. Electric B. Natural gas C. Telephone, cable and similar utilities D. Water E. Sewer (sanitary, treated effluent and storm) Surface water, including: A. Ponds, streams and irrigation ditches (include classifications be based upon a determination of the Gallatin Conservation District; note classification of each feature on plans). B. Watercourses, water bodies and wetlands (include classifications based upon a determination of the Gallatin Conservation District, Army Corps of Engineers, or wetland delineation report; note classification of each feature on plans). sheet C3.0 sheet AS.100 sheet AS.100 sheet C1.1, 2.0, 2.1 sheet AS.111, 201-203 sheet C2.1 sheet AS.101, 110, 111 see PUDP Appendix E see PUDP Appendix E sheet AS.100, AS.110 sheet AS.101 sheet C2.0, 2.1, 4.0, 5.0, 6.0 C3.0, 4.0, 6.0 16 17 18 19 20 21 22 23 24 25 26 27 28 629 COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 31 C. Floodplains as designated on the federal insurance rate map or that may otherwise be identified as lying within a 100 year floodplain through additional floodplain delineation, engineering analysis, topographic survey or other objective and factual basis. D. A floodplain analysis report in compliance with Section 38.31 BMC. Grading and drainage plan, including provisions for on-site retention/detention and water quality improvement facilities as required by the Engineering Division, or in compliance with BMC Section 14 storm drainage ordinance and best management practices manual adopted by the City. All surface stormwater facilities must demonstrate compliance with Section 38.410.080 BMC including providing cross sections for each facility. All drainageways, streets, arroyos, dry gullies, diversion ditches, spillways, reservoirs, etc. Which may be incorporated into the storm drainage system for the property shall be designated: A. The name of the drainageway (where appropriate). B. The downstream conditions (developed available drainageways, etc.). C. Any downstream restrictions. Significant rock outcroppings, slopes of greater than 15 percent or other significant topographic features. Sidewalks, walkways, driveways, crosswalks, loading areas and docks, bikeways, including typical details and interrelationships with vehicular circulation system, indicating proposed treatment of points of conflict. Provision for disabled accessibility, including but not limited to, wheelchair ramps, parking spaces, handrails and curb cuts, including signage and construction details and the applicant’s certification of ADA compliance. A certification block must be provided on the plan sheets. Fences, walls, railings and handrails, including typical details. Permanent trash enclosure and refuse collection areas, including typical details and elevations. Construction management plan include exterior construction period material staging, spoils location and construction trash enclosure location(s). A trash container type must be provided and detailed (40 yard roll off, fenced enclosure, etc.). If spoils storage is proposed a timeline for removal must be provided. Curb, asphalt section and drive approach construction details. Location and extent of snow storage areas. Location and extent of street vision triangles extended to center of right of way including adjacent street intersections and all alley and driveway access points. Unique natural features, significant wildlife areas and vegetative cover, including existing trees and shrubs having a diameter greater than 2.5 Inches, by species. SP1 CHECKLIST CONTINUED SITE PLAN DETAILS sheet C3.0, 4.0 sheet C3.0, 4.0 sheet L4.00, L1.0 sheet AS.101 sheet AS.103, 104 sheet AS.104 sheet AS.111 sheet AS.111 sheet AS.111 sheet L5.00 sheet C2.1 sheet L2.00, L2.01 29 30 31 32 33 34 35 36 37 38 39 40 630 COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 32 SP1 CHECKLIST CONTINUED Historic, cultural and archaeological resources, describe and map any designated historic structures or districts, and archaeological or cultural sites. Major public facilities, including schools, parks, shared use pathways, trails, etc. Within a distance of 200 feet. sheet C1.0 sheet AS.000 41 42 PARKLAND AND AFFORDABLE HOUSING If residential, provide the required parkland for the development, including calculations per Section 38.420 BMC (park and recreation requirements) in a table format, see table format in the PLS document. If cash in lieu is proposed, a thorough calculation including the base requirement and any net based upon maximum density, narrative addressing the findings the Commission must make to grant cash in lieu, and the appraisal must be provided to make the request per Section 38.420.030 BMC, unless using City valuation. If parkland is proposed a park plan shall be submitted consistent with Section 38.220.060.A.16 BMC. Source and amount of parkland credit to be used if previously provided. If from a subdivision confirm amount provided and detailed phase information as required in table format outlined in the PLS document. Describe how the site plan will satisfy any requirements of Section 38.380, BMC (affordable housing) which have either been established for that lot(s) through the subdivision process or if no subdivision has previously occurred are applicable to a site plan. The description shall be of adequate detail to clearly identify those lots and dwellings designated as subject to the section’s compliance requirements and to make the obligations placed on the affected lots and dwellings readily understandable. If affordable housing is not being provided place that statement on the site plan sheets with the site data in item 8. If affordable housing is provided, or cash in lieu is proposed use form AH. sheet AS.102 see PUDP Appendix H 43 44 45 46 47 48 LIGHTING DETAILS Lighting plan and electrical site plan, complete with all structures, parking spaces, building entrances, traffic areas (both vehicular and pedestrian), vegetation that might interfere with lighting, and adjacent uses, containing a layout of all proposed fixtures by location and type. A photometric lighting plan that contains a layout of all proposed fixtures by location and type and extends the photometric information to the property boundaries and rights of way. For fueling canopies a second photometric plan is required to specifically analyze the light output underneath the drip line of the fuel canopy. Details for all proposed exterior fixtures that are keyed to the fixtures noted in the lighting electrical plan and the photometric lighting plan. The detail must demonstrate compliance with full cut-off requirements in Section 38.570 BMC and be located on the lighting plan sheets. sheet E1.0 sheet E1.01 sheet E0.01 49 50 51 631 COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 33 SP1 CHECKLIST CONTINUED BUILDING DESIGN AND SIGNAGE Front, rear and side elevations of all buildings, structures, fences and walls with height dimensions and roof pitches. Show open stairways, exterior lighting, weather protection, awnings and other projections from exterior building walls. Building elevations must include proposed exterior building materials, windows and doors including a color and material palette for all proposed features keyed to the building elevations. Provide transparency calculations for any elevation that faces a street and is a block frontage. Provide minimum and maximum height of transparency from grade. Provide area of transparency and percentage in relation to total facade. Provide elevations and details of all ground mounted and rooftop mechanical screening. Floor plans that include all floors and roof plan. Annotate/designate uses for all rooms and areas. Seating/serving area layout required for all restaurants. Exterior signs if applicable. Include building frontage dimension(s) and maximum sign area calculation, provide sign dimensions and square footage of each. Note — the review of signs in conjunction with this application is only review for sign area compliance with Section 38.560 BMC (signs). A sign permit must be obtained from the building division prior to erection of any and all signs, addition design guidelines apply for signs within zoning overlay districts. sheet AS.201 - AS.204 sheet AS.201 - AS.204 sheet AS.104 sheet AS.110 - AS.114 sheet AS.201 - AS.204 52 53 54 55 56 LANDSCAPE PLAN A separate landscape plan shall be submitted as part of the site plan application unless the required landscape information can be included in a clear and uncluttered manner on a site plan with a scale where one inch equals 20 feet. All information must be on plan sheets. Project name, street address, and lot and block description. Date, scale, north arrow, and the names, addresses, and telephone numbers of both the property owner and the person preparing the plan. Plan preparer shall be a state registered landscape architect; an individual with a degree in landscape design and two years of professional design experience in the state; or an individual with a degree in a related field (horticulture, botany, plant science, etc.) And at least five years of professional landscape design experience, of which two years have been in the state. Location of existing boundary lines and dimensions of the lot. Existing and proposed grade that complies with maximum allowable slope and grade. Approximate centerlines of existing watercourses, required watercourse setbacks, and the location of any 100-year floodplain; the approximate location of significant drainage features; and the location and size of existing and proposed streets and alleys, utility easements, utility lines, driveways and sidewalks on the lot and/or adjacent to the lot. sheet AS.000 sheet AS.000 sheet AS.101 sheet C3.0 sheet C3.0, 4.0 57 58 59 60 61 632 COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 34 SP1 CHECKLIST CONTINUED Location of all pavement, curbs, sidewalks and gutters. Show location of existing and/or proposed drainage facilities which are to be used for drainage control including proposed landscaping and seeding as required by Section 38.410.080.H BMC. Location and extent of snow storage areas. Location and extent of street vision triangles, extended to the center of right of way. Complete landscape legend providing a description of plant materials shown on the plan, including typical symbols, names (common and botanical name), locations, quantities, container or caliper sizes at installation, heights, spread and spacing and identification of drought tolerant and/or native and adapted species. The location and type of all existing trees on the lot over 6 inches in caliper must be specifically indicated. Size of planting at the time of installation and at maturity. Complete illustration of landscaping and screening to be provided in or near off- street parking and loading areas, including information as to the amount (in square feet) of landscape area to be provided internal to parking areas and the number and location of required off-street parking and loading spaces. Street frontage landscaping, including boulevard details and tree grate details as applicable based upon block frontage. Locations and dimensions of proposed landscape buffer strips, including watercourse buffer zones demonstrating compliance with watercourse setback planting plan requirements per Section 38.410.100.A.2.F BMC unless previously provided during subdivision review. Location, height and material of proposed landscape screening and fencing (with berms to be delineated by one foot contours). An indication of how existing healthy trees (if any) are to be retained and protected from damage during construction. Size, height, location and material of proposed seating, lighting, planters, sculptures, and water features. A description of proposed watering methods including any use of high efficiency irrigation technologies and best practice, source of irrigation water and estimated amount of water consumption broken down by vegetation type (e.g. Turf, shrubs, trees) and total estimated water consumption. Areas to be irrigated and type of proposed irrigation and the irrigation system design plan. Tabulation of performance points earned by the plan per Section 38.550.060 BMC. sheet C2.1 sheet C4.0, sheet L4.01 sheet L5.0 sheet C2.1 sheet L2.00, L2.01 sheet L2.00, L2.01 sheet L2.00, L2.01 sheet L2.00, L2.01 sheet L3.00 sheet L2.00, L2.01 sheet L2.00, L2.01 sheet L2.00, L2.01 sheet L3.00 sheet L3.00 sheet L7.00 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 STREETS AND TRAFFIC Traffic study. Street, traffic, and access information required in Section 38.220.060.A.12 BMC or that the requirement is waived in writing by the engineering division prior to application submittal. see PUDP Appendix E77 633 COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 35 SP1 CHECKLIST CONTINUED WATER AND WATER RIGHTS Water rights information. If cash in lieu is proposed a cash in lieu of water rights calculation and payment amount certified by the engineering division. If water wells are proposed, a letter from the department of natural resources confirming their intent to issue a permit or exemption. see PUDP page 7478 79 DEVIATIONS Either through the site plan requirement above or separate exhibit clearly show any proposed deviations related to site requirements such as yards/setbacks, lot coverage, parking or other applicable standards. Either through the building elevation requirement above or separate exhibit clearly show any proposed deviations related to building construction such as height, second story additions, or other applicable standards. For deviations in the Neighborhood Conservation Overlay a deviation narrative shall be provided stating which Section(s) of the Bozeman Municipal Code are proposed for deviation, to what extent and include a response to the following: A. How the modification is more historically appropriate for the building and site in question and the adjacent properties, as determined in Section 38.340.050 BMC than would be achieved under a literal enforcement of this Chapter (Chapter 38, BMC); B. How the modifications will have minimal adverse effect on abutting properties or the permitted uses thereof; and C. How the modifications will assure the protection of the public health, safety and general welfare. D. How the requested deviation will encourage restoration and rehabilitation activity that will contribute to the overall historic character of the community. If more than one deviation, a response to the criteria shall be provided for each deviation. sheet AS.101 sheet AS.201 - AS.204 see PUDP page 38 - 41 80 81 82 DEPARTURES For departures, a departure narrative must be provided stating which Section(s) of the Bozeman Municipal Code are proposed for departure, the scope and extent of the plan proposed for departure and a response to the required departure criteria. If more than one departure, a summary and response to the criteria must be provided for each departure. 83 634 COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 36 PROJECT OVERVIEW PROJECT OVERVIEW & GOALS EXISTING CONDITIONS & HISTORY SITE ZONING & LAND USES GENERAL BUILDING INFORMATION PROPOSED PUD POINTS PROPOSED RELAXATIONS ALIGNMENT OF GOALS WITH DISTRICT PLANS AND VISION NE GOALS PUD COMMUNITY DESIGN OBJECTIVES PROPOSED OWNERSHIP ESTIMATED NUMBER OF EMPLOYEES FOR BUSINESSES, RESPONSIBILITY FOR IMPACT MITIGATION & DESIGN METHODS TO REDUCE ENERGY CONSUMPTION RATIONALE FOR CHOICES MADE BY THE APPLICANT GENERAL SITE DATA 3.00 3.01 3.02 3.03 3.04 3.05 3.06 3.07 3.08 3.09 3.10 3.11 SECTION 3 635 COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 37 PROJECT OVERVIEW PROJECT VISION Cottonwood + Ida will create a vibrant and diverse community on a 2-acre underutilized mixed use site, providing a diverse range of housing types to meet the needs of Bozeman. The 92 dwelling units are designed to be attainable by middle-income residents. In order to respond to the variety of building uses and sizes in the surrounding neighborhood, the development is organized into four residential buildings providing a broad set of housing types: affordable and market-rate apartments, townhouses, live- work units, and urban lofts. While 15% of the rental units (7 of the 46 rental units) will be set aside for those earning less than 65% AMI to help achieve the goals established in the city’s affordable housing ordinance, one of the guiding principles of the development is a focus on creating units that are affordable-by-design; with modest unit sizes, reduced parking demand, shared open space, and attractive common amenities; all in a walkable and bike-friendly neighborhood. The 29,700 SF office building will attract mid-size commercial tenants looking for new or expanded space near the downtown district. The project supports the community’s desire for a local arts culture, and acknowledges the neighborhood’s industrial past by including 5,400 SF of artisan manufacturing workshops. Located primarily along the ground floor on Cottonwood Street, the workshops will activate the project’s open spaces, and encourage pedestrian activity along the street edge. A Public Mill Yard will occupy the center of the site, framed by the distinctive facade of the adjacent Misco Mill, and lined with commercial and residential uses to provide day and evening, weekday and weekend activation. We will be renovating the existing grain building (building 5) to provide for a small scale restaurant / cafe that will activate the Mill Yard throughout the day. We are pursuing site-wide certification under the LEED Neighborhood Development program. The specific sustainability and certification goals for individual buildings are still being researched and coordinated. GOALS OF THE PROJECT 1. PROVIDE FOR DIVERSE AND AFFORDABLE HOUSING 2. THOUGHTFULLY INTEGRATE INTO THE EXISTING COMMUNITY OF THE NEIGHBORHOOD 3. PROMOTE BY EXAMPLE SUPERIOR URBAN DESIGN STRATEGIES 636 COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 38 EXISTING CONDITIONS & HISTORY The property does not have a registered historic value; however, the project is attempting to preserve the existing structure on the Southwest corner of the site that is believed to have predated 1937 based on aerial images from that era. A search through Polk Directories dating back to 1935 did not turn up any commercial listing at this site. It is believed that the Misco Mill on the adjacent property was constructed at the height of the depression in 1934 and the grain bin storage shortly after that. Below are the old ariel photographs along with current pictures of the property. ResourceTechnologiesInc. Figure 2 1937 Aerial Photograph605 East Cottonwood StreetBozeman, Montana Site Location N NOT TO SCALE 637 COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 39 EXISTING CONDITIONS & HISTORY CONTINUED A - NORTHEAST CORNER OF PROPERTY (ASPEN AND IDA) B - NORTHWEST CORNER OF PROPERTY (ASPEN AND WALLACE) C - SOUTHWEST CORNER OF PROPERTY (COTTONWOOD AND WALLACE) D - SOUTHEAST CORNER OF PROPERTY (COTTONWOOD AND IDA) AB C D 638 COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 40 EXISTING CONDITIONS & HISTORY CONTINUED EXISTING BUILDING TO BE REHABILITATED - INTO PLAZA PAVILLION (BUILDING 5) SOUTH EAST NORTH WEST 639 COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 41 EXISTING CONDITIONS & HISTORY CONTINUED EXISTING BUILDING TO BE REHABILITATED - INTO PLAZA PAVILLION (BUILDING 5) PRESERVE - ELEVATOR INTERIOR - ELEVATOR PRESERVE - CRIB CONSTRUCTION INTERIOR 640 COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 42 NORTH SITE ZONING & LAND USES RS (RESIDENTIAL SUBURBAN) RO (RESIDENTIAL OFFICE) RMH (RESIDENTIAL MOBILE HOME) R5 (RESIDENTIAL MIXED USE HIGH DENSITY) R4 (RESIDENTIAL HIGH DENSITY) R3 (RESIDENTIAL MEDIUM DENSITY) R2 (RESIDENTIAL SINGLEHOUSEHOLD, MEDIUM DENSITY) B3 (CENTRAL BUSINESS) B2 (COMMUNITY BUSINESS) M2 (MANUFACTURING AND INDUSTRIAL) M1 (LIGHT MANUFACTURING) HMU (HISTORIC MIXED USE) PLI (PUBLIC LANDS/INSTITUTIONS) MIXED USE RESTAURANT/BAR COMMERCIAL RETAIL SALES, SERVICES, BANKS HOTEL/MOTEL COMMERCIAL AUTO ADMINISTRATIVE/PROFESSIONAL LIGHT MANUFACTURING PARK OR OPEN SPACE CHURCH PUBLIC FACILITY SCHOOL/EDUCATIONAL FACILITY SINGLEHOUSEHOLD RESIDENTIAL MULTIHOUSEHOLD RESIDENTIAL MOBILE HOME/MOBILE PARK UNDEVELOPED VACANT ZONING (1/2 MILE) LAND USES (1/2 MILE) B-2 M-2 R-S M-1 M-1 R-MH R-2 HMU M-1 R-0 R-4 B-3 B-2 PLI R-4 R-3R-3 R-2 R-5 PLIB-2M PLI R-5 R-4 R-4 R-1 R-5 R-3 PLI PLI M-2 M-1 M-1 R-S M-1 R-S PLI R-3R-3 R-3 R-3 R-3 R-2 R-2 B-1 R-3 641 COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 43 GENERAL BUILDING INFORMATION 6 1 2 4 5 7 4A 3 RESIDENTIAL COMMERCIAL ARTISAN MFR. COMMUNITY 8 BUILDINGS AND OTHER ON-SITE IMPROVEMENTS The development consists of 6 distinct buildings, providing 92 residential units, 29,700 SF of office space, 5,400 SF of artisan manufacturing workshop spaces, a 96 space below-grade parking garage, and community space: 1 APARTMENT BUILDING Three and four stories over basement parking garage 22 Studio apartments 24 1-Bedroom flats 46 Units total 2 APARTMENT BUILDING Three stories over basement parking garage 18 Studios With Common Spaces 18 Units Total 3 TOWNHOUSE-STYLE APARTMENTS Three stories over grade 6 1-Bedroom Flats 6 2-Bedroom Townhouse-Style Apartments 12 Units Total 4 LOFT APARTMENT BUILDING Three stories over grade 4 1-Bedroom Live-Work Apartments 12 2-Bedroom Loft-Style Apartments 16 Units Total Artisan manufacturing (4A) Approximately 5,400 GSF (4,590 net SF) of ground floor workshop space to provide an active, pedestrian-oriented street edge along Cottonwood Ave. 5 EXISTING REHABILITATED BUILDING Renovated open air pavillion to provide an opportunity for a cafe on the plaza, as well as accessory program for the adjacent open spaces (bike parking, storage, etc.). 6 OFFICE BUILDING Approximately 29,700 GSF (25,203, net SF) of open-plan office space 7 BELOW-GRADE PARKING GARAGE Approximately 96 spaces 8 LEASED OFF SITE PARKING LOT UNIT MIX SUMMARY STUDIO 1BDRM 2BDRM TOTAL UNIT COUNT 40 34 18 92 PERCENTAGE 43% 37% 20% WALLACE AVEIDA AVEC O T T O N W O O D S T ASP E N S T 642 35’ 46’ 31’ 48’ 49’ 25’ COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 44 AFFORDABLE HOUSING 21 POINTS Three points for each percent of dwellings to be constructed in the residential development which are provided by long term contractual obligation to an affordable housing agency, for a period not less than 20 years, with a written plan assuring on- going affordability pricing and eligibility monitoring, and annual re-certification. Per UDO 38.700.020 Affordable housing. Housing for persons earning less than 65 percent of the area’s annual median income for rental housing and 100 percent of the area’s annual median income for purchased housing. Further, affordable housing does not require greater than 33 percent of the household gross annual median income for housing. Annual median income is defined by the Department of Housing and Urban Development Points achieved = 21 (7 rental units [ 7.6%] will be provided at rental rates at a maximum of 65% AMI ADDITIONAL OPEN SPACE 9.37 POINTS One and ¼ point for each percentage of the project area that is provided as publicly accessible open space. Project land area = 90,000 sf Publicly accessible plaza area = 6750 sf / 7.5% of the project total. See Sheet AS.102 Land Dedication Table. These are the public plazas indicated as Aspen Yard and Mill Yard. UNDERUTILIZED AND BROWNFIELD SITES 6.67 POINTS The site is 2 acres and the south acre previously had a scale hobby train located on the site. The north half of the site has been occupied by an industrial warehouse. Accounting for the underutilized south portion a minimum of one point will be achieved. Per (d) Underutilized and brownfield sites. One point for each 50 percent increase in the total square footage of commercial and/or industrial floor area on underutilized sites; one point for each 50 percent increase in the total number of dwelling units on underutilized sites; one point for each acre developed of the environmentally contaminated land; up to a total of one-third of the performance points required to be earned. Existing industrial / commercial floor area = 10,488 SF 50% increase factor = 5,244 SF Proposed commercial floor area = 35,521 SF Amount of increased SF = 35,521 – 10,488 = 25,033 SF Number of 50% increase factors / points =25,033 / 5,244 = 4.77 One point for each 50% increase in total = 4.77 Existing number of dwelling units = 0 ( using base density calculations would be 16 units) 50% increase factor = 8 Proposed number of dwelling units = 92 Number of units increased over base density = 92-16= 76 net increase Net increase divided by the 50% increase factor = points = 76 / 8 = 9.5 Environmentally contaminated land (does not apply) Points reached = 4.77 (commercial increase) + 9.5 (residential increase) = 14.27 Maximum allowable (1/3) total of 6.67 DESIGNED TO MEET LEEDND 15 POINTS The project design is based on LEED ND criteria. We intend on keeping the design to this standard and hope to achieve these points. The project has been registered and certified under current LEED version 4. The project is on track to achieve LEED Neighborhood Development Plan certification and possibly LEED Silver. See the LEED information provided in the appendix for the certification requirements and a breakdown of the LEED points expected to be achieved. INCLUSION OF LOWIMPACT DEVELOPMENT PLAN 6 POINTS The use of low impact development standards is a project goal and we hope to achieve these points by treating on-site storm water exceeding chapter 40 requirements, incorporating a integrated snow storage management plan, select plant species that meet drought tolerant standards, inclusion of weather based irrigation systems and limit the amount and type of sod. PROPOSED PUD POINTS PUBLIC OPEN SPACE ENHANCED STREETSCAPE WAYFINDING FEATURES RECYCLING STATION BUILDING HEIGHTS PROVIDED ARE AVERAGE ROOF HEIGHT ABOVE THE PARKING GARAGE PERFORMANCE POINTS SEC 38.430.090 E.2.7 A minimum of 20 points need to be achieved; we are expecting to achieve between 43 and 62 points. 643 ITEM NOTES POINT ESTIMATE AFFORDABLE HOUSING 7.6% OF THE UNITS OFFERED AT 65% AMI 21 ADDITIONAL OPEN SPACE PROJECT PROVIDES ADDITIONAL PUBLIC OPEN SPACE OF 6,750 SF OR 7.5% OF THE PROJECT TOTAL 9.37 ADAPTIVE REUSE OF BUILDING NOT USED HOWEVER WE ARE PROPOSING TO REUSE THE GRAIN DEPOT BUILDING AS A COMMUNITY CENTER 0 UNDERUTILIZED BROWNFIELD SITE SOUTH 1 ACRE IS CURRENTLY UNDERUTILIZED AND COULD BE CLASSIFIED AS A BROWNFIELD SITE 6.67 DESIGNED TO MEET LEEDND FOLLOWING LEEDND CRITERIA FOR TOTAL DEVELOPMENT 15 INCLUSION OF LOWIMPACT DEVELOPMENT GREEN PRACTICES FOR STORMWATER MANAGEMENT, LIMITED USE OF SOD, DROUGHT TOLERANT PLANTS, ETC. 6 SUSTAINABLE DESIGN AND CONSTRUCTION NOT USED HOWEVER ALL BUILDINGS WILL INCORPORATE BEST PRACTICES FOR SUSTAINABLE DESIGN 0 INTEGRATED WAYFINDING MEASURES NOT USED HOWEVER THE PROJECT WILL UTILIZE USE INTEGRATED WAYFINDING MEASURES FOR PARKING, PLAZAS, OFF SITE LOCATIONS, AND RESIDENTIAL ACTIVITIES 0 ON SITE RECYCLING TRANSFER STATION NOT USED HOWEVER THE PROJECT WILL INCLUDE RECYCLING FACILITIES FOR BOTH COMMERCIAL AND RESIDENTIAL USES 0 STREETSCAPE IMPROVEMENTS NOT USED HOWEVER ENHANCED STREETSCAPES WILL BE PROVIDED ALONG COTTONWOOD, ASPEN AND IDA 0 TOTAL POINTS NEEDED REQUIRED POINTS TO MEET PUD CRITERIA 20 TOTAL POINTS ANTICIPATED POINTS THE PROJECT IS EXPECTED TO MEET 58 COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 45 PROPOSED PUD POINTS CONTINUED 644 COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 46 REQUESTED RELAXATIONS FROM APPLICABLE PORTIONS OF THE UDC CHAPTER 38 Based on the underlying zoning of NEHMU we are requesting relaxations relative to the PUD for consideration. The goal of the project is to create a development that responds to the unique character of the district and provides for the needs of the community at large. The NEHMU is a unique district characterized by a broad spectrum of uses from residential to industrial. In many ways, this district was the first mixed use neighborhood in Bozeman. Our proposal includes a mix of both residential and commercial activity that responds well to the variety of uses. Over time the neighborhood has evolved to include more service-oriented businesses and is now host to cafes and coffeeshops along with a strong pattern of residential uses. We are requesting a total of eight relaxations to achieve the project which are outlined below. RELAXATION 1: APARTMENT BUILDINGS AS AN ALLOWABLE USE • CODE PROVISION: 38.310.040 Authorized uses – Commercial, mixed-use and industrial • TABLE 38.310.040.C: Permitted residential uses in commercial, mixed-use, and industrial zoning districts We are requesting that apartment buildings be included in the allowable uses for this project. In an effort provide more affordable rental housing for the City of Bozeman we are looking to provide apartments as a primary use type within the NEHMU. Rationale: The need for market rate and affordable rentals in walkable neighborhoods is key to the future success and livability of Bozeman. The current zoning type (NEHMU) was developed long ago as a bridge between residential uses and industrial uses. Overtime the neighborhood has evolved to become more of a residential enclave hosting many homes, cafes and artists while keeping the unique manufacturing vibe. Our project hopes to build on these trends and provide more opportunities and variety for housing. The additional housing will make the opportunity for residents to work and live in the same neighborhood. The added housing will create the possibility to provide both affordable units as well as market rate options. • The current zoning allows for apartments as an accessory use and is permitted on the second floors of commercial uses. We feel that our approach will make a better connection to the street by allowing residences to occur on the ground floor, as well as the second and subsequent floors. Residential uses are permitted on the ground floor in other portions of the code for this district and thus this would be consistent with that. RELAXATION 2: SMALL SCALE RESTAURANTS INCREASE IN SIZE FROM 1500 TO 2200 SF • CODE PROVISION: 38.310.040 Authorized uses – Commercial, mixed-use and industrial • TABLE 38.310.040.C: Permitted residential uses in commercial, mixed-use, and industrial zoning districts We are requesting an increase in the area of small-scale restaurants allowed in the NEHUM from 1500 SF as noted in Table 38.310.040 from 1500 SF to 2200 SF(3,000 SF if outdoor seating space is included). Rationale: The current code provides for a maximum of 1500 SF for restaurant service area in the NEHMU. PROPOSED RELAXATIONS 645 COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 47 PROPOSED RELAXATIONS CONTINUED We are redeveloping an existing historic grain building into a possible restaurant space and would like to utilize the entire building for a future restaurant. The building area is 2,175 SF and we have planned to have interior service area of 1200 SF and outdoor service area of up to 900 SF. While the space in the interior meets the current code limits, we would like to provide outdoor seating for patrons to enjoy the generous public plaza (Mill Yard) being created. It is understood that the outdoor seating would mostly be activated seasonally and concurrently with a greater amount of pedestrian / bike traffic. An objective of the Growth Policy is to provide for and support infill development that respects context of the existing development surrounding it. By preserving and reusing this historic building and completing the plaza space with a restaurant use it will attain many of the goals of the Growth Policy, and will produce a better outcome than the current code would have otherwise provided. RELAXATION 3: REDUCTION IN THE REQUIRED FRONT YARD SETBACK •CODE PROVISION: 38.320.050 Form and Intensity standards - Non-residential and other mixed use districts •TABLE 38.320.050: zone type NEHMU - Front Setback The current zoning front setback requirement is listed as 20’ and the project seeks to allow for a 10’ setback around the entire site at grade. The project seeks a setback of 8' along Aspen Street above the clearance requirements of underground utility easements. This front setback is larger than the 10’ in many cases as the project has created public through ways into the site to access an internal public plaza space. Rationale: The intent of the project is first and foremost to create a vibrant street edge that responds to the conditions in the neighborhood. The neighborhood is marked by several historic homes and argi- industrial structures that were built long before setbacks were dictated in the zoning code. Because of this there is a tremendous variation of setbacks from the street edge in the neighborhood. Our mixed-use project is looking to develop at a pattern more consistent with urban standards to be more efficient with land use as well as create a stronger pedestrian experience. We are seeking the front yard setbacks be 10’ rather than the required 20’ at grade. The 20’ setbacks certainly set a more suburban standard and would not convey the same sense of pedestrian experience. Additionally, the properties along both Aspen (3’) and Cottonwood (10’) currently have setbacks around this 10’ dimension or less and we feel that the street edge pattern would be better served to match these relationships. The requested 8' setback for buildings 1 and building 6 along Aspen Street occurs above the clearance requirements for underground utility easements provided along the front property boundty. This request provides shade and cover along entrances as required by the frontage requirements . RELAXATION 4: REDUCTION IN THE REQUIRED SIDE SETBACK TO ALLOW FOR ZERO LOT LINE CONDITION •CODE PROVISION: 38.320.050 Form and Intensity standards - Non-residential and other mixed- use districts •TABLE 38.320.050: zone type NEHMU - Side Setback The current zoning side setback requirement is listed as 3’ and we are requesting that zero lot line conditions are allowed per other zones identified in the BMC 38.320.050.C Table of Form and Intensity Standards. Adding allowance for zero lot lines to the NEHMU minimum setbacks required for the NEHMU for this PUD. Rationale: The setback reduction provides for the creation of separate lots on this unique mixed-use project. This separation only occurs between lots A and B for Building 3. It will appear to all passersby that 646 COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 48 PROPOSED RELAXATIONS CONTINUED there is in fact a 20’ separation between Building 2 on Lot A and Building 3 on Lot B. This is because the only portions of the buildings that exhibit the zero lot line condition are below grade at the parking garage level. All the appropriate easements and accesses will be reflected in the final lot boundary alignment. RELAXATION 5: INCREASE IN BUILDING HEIGHT • CODE PROVISION: 38.320.050 Form and Intensity standards - Non-residential and other mixed- use districts • TABLE 38.320.050: zone type NEHMU - Maximum building height The current building height in the district is 45’ (exclusive of elevator penthouses and parapets). While there are several historic buildings in the district that exceed this height limitation, it is our intent to achieve a building height only marginally higher than the 45’ and are requesting a maximum building height as described by code of 54’. Rationale: The project proposes a cluster of 3-story buildings on the perimeter of the 2-acre site and create landscaped podium level with parking hidden underneath. The effective building height from the podium level is near to or at 45’ for all buildings. These additional heights are needed to accommodate the parking level below the podium. The primary reason for this was to keep the parking structure out of the seasonal high-water table which is at 8’ below grade. The site naturally drops 4’ from the South to the North which provides a way to diminish the effects the below grade parking has. Building heights range throughout the project from 25’ to 54’ measured from the sidewalk level, with most of the street faces having approximately a 47’ height. RELAXATION 6: SEEKING AN INCREASE IN LOT COVERAGE FROM 40% TO 45% • CODE PROVISION: 38.320.050 Form and Intensity standards - Non-residential and other mixed- use districts • TABLE 38.320.050: zone type NEHMU - Lot Coverage The current zoning Maximum lot coverage (38.320.020.A) is 40% for primarily residential uses and 100% for primarily nonresidential uses. The project would be classified as primarily residential given that the bulk of the use square footage is programmed as residential. Specifically, 72% is residential and 26% is commercial use. The project is a requesting an increase in lot coverage from 40% to 45%. Rationale: The project has been thoughtfully designed to provide for a mix of uses on the site. Given that portions of the site are in fact commercial we feel that this additional lot coverage is minimal and any loss to the perceived open area that might have come with 5% less in lot coverage is more than made up for in the positive attributes of the design. The current site design is 41.4% lot coverage, however there may be some adjustments needed through the final design, thus the request of 45%. Additionally, a considerable amount of our site area is being dedicated for public access for the community to enjoy. RELAXATION 7: SEEKING A DECREASE IN BLOCK FRONTAGE TRANSPARENCY REQUIREMENTS FOR PORTIONS OF THE PROJECT • CODE PROVISION: 38.510.030.C Landscape Block frontage standards 647 COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 49 PROPOSED RELAXATIONS CONTINUED The blockfrontage standards state that a “Landscaped” frontage adjacent for residential have a minimum transparency (percentage of glass) of 15%. We are requesting a relaxation to this for Building 2 (along the East face, Ida frontage) and Building 3 (on the North, facing the private residential plaza and on the South, facing the Cottonwood frontage). In all of these cases we are able to meet a 8% transparency requirement. We are requesting that the façade transparency requirement be 8% for these locations Rationale: The project has been thoughtfully designed to provide for privacy, views and quality pedestrian experience along the street and sidewalk edge. These buildings all contain residential uses and have allocated windows for views and privacy. Given the space planning requirements for the individual residential units, windows have been placed to correspond with floors plans and to maintain energy efficiencies. The well thoughtout landscape plan and site circulation has provided a quality pedestrian experience for the guest to the site, along with the residents. These reductions in transparency will produce a superior quality design for this project than would otherwise be found in the strict enforcement of the code. REQUESTED RELAXATIONS OR DEPARTURES FROM OTHER PORTIONS OF THE CODE RELAXATION 8: SEEKING A DECREASE IN BLOCK FRONTAGE TRANSPARENCY REQUIREMENTS FOR PORTIONS OF THE PROJECT • CODE PROVISION: 38.510.030.B Storefront Block frontage standards The block frontage standards state in table 38.510.030.B that at least 60% of the ground floor area between 30” and 10’ above the sidewalk on primary facades be transparent/glazed. We are requesting a reduction to this such that a minimum of 30% is allowed. The project contains a couple of instances of this Building 4 along Cottonwood Street. Rationale: The project is designated as a mixed block front standard and as such we have addressed portions of the project as landscaped frontages and portions that more closely resemble storefront. In all cases, the very best design effort has been applied to ensure that the intent of the code is being met. In the case of Storefront standards the various buildings that this applies to are Building 4, and Building 5. Building 4 is intended to be for small “makers studio spaces” while other use may be appropriate this is the intent and to enhance these artist studios feel we have provided generous 8’ wide glass garage doors along with full glass entry doors for each of the studios. We feel that this approach will enhance the character of the district by encouraging artist appropriate spaces which are not necessarily spaces that have full glass across the front because much of the work in the process might not want to be on display. Building 4 provides 48% of the required transparency. The other instance where this occurs in on Building 5 which is quasi-historic grain building that has existing crib constructed walls on the North, West, and South. The North face in the one that faces the street and given the desire to preserve as much of these existing wood walls we needed to limit the amount of glass on this façade. The intended use for this building is that of a small café while having a larger percentage of glass along Cottonwood might be beneficial in this case the building also enjoys three other elevations that face public space that afford the needed transparency for the building’s occupants. Additionally, the pedestrian experience will not be sacrificed with the reduction in glass due in part the well-designed retrofit of this old building as well 648 COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 50 as the abundance of pedestrian plaza space that surround this building and project. This relaxation will produce a superior design and experiential outcome than would have otherwise been afforded with the strict interpretation of the code as can be seen from the well thought out and unique designs of all of the buildings. RELAXATION 9: PARKING CALCULATION FOR RESIDENTIAL USES SPECIFICALLY FOR EFFICIENCY AND ONE-BEDROOM UNITS Division 38.540 Parking 38.540.050 Number of parking spaces required A. 1. Residential uses • CODE PROVISION: Table 38.540.050-1 EFFICIENCY DWELLING UNITS The current code utilizes a calculation for efficiency units at a rate of 1.25 parking spaces per efficiency unit. We are requesting a relaxation to this that is similar to other zoning districts in our community of 1 parking space per efficiency unit. ONE BEDROOM UNITS The code calculates the number of parking spaces for a one-bedroom unit at 1.5 parking spaces for each one- bedroom unit. We are requesting that a rate of 1.25 parking spaces for each one-bedroom unit which is also applied to other zoning districts in our community. Rationale: The mix and types of housing provide an opportunity to more critically study the parking allowances for this project. The project is mostly composed of 1 bedroom and efficiency units that range in size from as low as 315 SF up to 600 SF 1 bedroom units. These smaller units provide efficiency as well as a greater likely hood of a single occupant in most cases. The parking standards used elsewhere in the country and even within the City of Bozeman Standards allow for efficiency units to be counted at a factor of 1 and for one-bedroom units factored at 1.25. The location of this property within walking distance to many basic services, transit availability, car share and well-developed bike facilities will promote the use of alternate means of transportation other than a car. Additionally, creating other opportunities for commercial activities on site will allow for some residents to walk to work and not find the need for a car. The project is taking a progressive approach to design and planning that considers modern trends in housing and in car ownership. A recent study from Stanford University economist Tony Seba found that private car ownership will drop 80% by 2030. While this is a bit of a stretch for rural Montana, statistics are showing a general decline in car ownership and an increase in multimodal transportation options. RELAXATION 10: PARKING REQUIREMENTS FOR NONRESIDENTIAL USES ADJUSTMENTS TO MINIMUM REQUIREMENTS • CODE PROVISION: 38.540.050 Number of parking spaces required, A. 2. Non-residential uses • CODE PROVISION: Table 38.540.050-3 PROPOSED RELAXATIONS CONTINUED 649 COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 51 The current code provides for adjustments to minimum standards for parking in commercial zone types and provides a general percentage reduction based on the type of uses and whether or not it is in a mixed-use neighborhood. These reductions range from 10% to 50%. We are requesting a reduction to our nonresidential parking demand of 40%. Rationale: The current zoning district was the first mixed use designation for the City and one of the smallest. While it holds this distinction, it is also one of the most overlooked districts as changes and modifications have occurred elsewhere in the code to support mixed use neighborhoods. This district matches what a small-scale community commercial mixed-use district looks and performs like, hosting a variety of services, employment opportunities and housing. We are looking to apply the same standards that are found elsewhere in the code and a similar reduction found in the ITE standards for mixed use projects. These standards provide for a contemplated reduction in parking for nonresidential use in a mixed use neighborhood since many of the patrons and employees would likely live within walking distance and would not require as many parking spaces to accommodate them. Additionally, access to other forms of transportation including, car share, transit, and well- developed bike facilities will further promote the non- reliance on the automobile. Another practical application of this that is applied in the ITE is based on the actual hours of use based on each use type in a mixed use project. For instance ITE calculations show that the average weekday parking demand at its highest at 4:00 pm when both residential and nonresidential uses overlap 44% and 90% respectively. This would still only require a total of 124 spaces for the project, where we have collectively provided 200 spaces. This is a logical use of parking reductions that will provide greater opportunity for a successful mixed-use neighborhood. RELAXATION 11: PROVIDE FOR BACK OUT ANGLED PARKING ALONG THE COTTONWOOD STREET FRONTAGE • CODE PROVISION: UDC 38.400.050.A.1 The current code states that all streets shall meet the City of Bozeman current design standards and specifications policy and that the City of Bozeman Modifications ot the Montana Public Works Standards Specifications shall apply. These standards do not provide for back out angled parking along a local street. We are requesting that back out angled parking be allowed given that this will match the full existing full street section along Cottonwood. The owner’s association for the project will be responsible for snow removal for this portion of the street. Rationale: The existing street section along Cottonwood has back out angled parking along the South curb line. We are proposing to continue this condition along the North curb line in front of our project. The cohesiveness of the street section will be better served by having matching conditions along both sides of the street. Additionally, Cottonwood is not a through street in the sense that this portion of Cottonwood only runs for three blocks in the NEHMU. The street will function more as a parking street than a through street in this instance and will produce a superior design outcome than would otherwise be had with the strict enforcement of the code. All other conditions of street drainage and design specifications will be met with the final engineering design. As mentioned above the owner’s association will be responsible for the maintenance of the proposed parking area this will include the snow removal and maintenance of the parking surface area. This is noted in draft condominium documents. 650 COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 52 ALIGNMENT OF GOALS WITH DISTRICT PLANS AND VISION NE GOALS PRINCIPLES, GOALS, IMPLEMENTATION POLICIES & OBJECTIVES GROWTH POLICYDESIGN OBJECTIVES PLAN 2005NEURD PLAN 2006ECONOMIC RUDAT / VISION NEUDO - NEHMUCOTTONWOOD & IDAHONOR / ENHANCE UNIQUE CHARACTER OF THE DISTRICT AND FOSTER A SENSE OF PLACE THROUGH MASSING SCALE, AND PLACEMENT OF BUILDINGS ON THE SITE THE PROJECT HONORS THE SCALE OF THE NEIGHBORHOOD. ADDITIONALLY, PROGRAM ELEMENTS SUCH AS ARTISTS, MAKERS ETC. HELP FOSTER A SENSE OF PLACE. SUPPORT INFILL DEVELOPMENT THAT PROVIDES ADDITIONAL DENSITY AND RESPECTS CONTEXT THE LOCATION OF THE SITE AND SURROUNDING EXISTING INFRASTRUCTURE CREATED A GREAT OPPORTUNITY FOR INFILL IN ITS TRUEST SENSE. THE MASSING AND SCALE OF THE BUILDINGS GO FURTHER TO RESPECT THE UNIQUE CONTEXT OF THE SITE BY MAINTAINING 3 STORIES WHILE STILL ADDING THE NEEDED DENSITY TO ACHIEVE AFFORDABLE HOUSING GOALS AND REDUCE THE IMPACTS OF SPRAWL ON OUR COMMUNITY. PROMOTE ENVIRONMENTALLY SOUND BUILDING & PLANNING TECHNIQUES THE PROJECT MEETS LEED ND STANDARDS AND INCORPORATES SEVERAL SUSTAINABLE DESIGN TECHNIQUES. THE USE OF UNDERGROUND PARKING, CLOSE PROXIMITY TO SERVICES, ADDITIONAL BIKE AND MULTI -MODAL TRANSPORTATION OPTIONS AND GREENROOFS ALL ADD TO THE BEST PRACTICES OF ENVIRONMENTALLY SOUND DESIGN AND PLANNING. PROVIDE SAFE, HEALTHY PUBLIC TRANSPORTATION FACILITIES AND INFRASTRUCTURE THROUGH THE CREATION OF ADDITIONAL PUBLIC INFRASTRUCTURE AND PEDESTRIAN PLAZAS AND WALKS A HEALTHIER NEIGHBORHOOD PLAN HAS BEEN DEVELOPED THROUGH THIS PROJECT. ADDITIONALLY THE NATURE OF THIS INFI LL DEVELOPMENT WILL DECREASE THE NEED FOR AUTOMOBILES AND WILL CONTRIBUTE TO A MORE WALKABLE COMMUNITY. SUPPORT ARTISTS AND PROVIDE OPPORTUNITY FOR PUBLIC ART PROVIDING OPPORTUNITIES FOR ARTIST RESIDENCES AND STUDIO SPACES AND INCORPORATING PUBLIC ART IN THE PLAZA SPACES WILL HELP TO SUPPORT LOCAL ARTISTS AND OVERALL IMPACT OF ART IN OUR COMMUNITY. RECOGNIZE IMPORTANCE OF BRIDGER VIEW SHED AND NEIGHBORHOOD IMPACTS BY KEEPING THE BUILDINGS ON THE PERIMETER TO A MAXIMUM OF 3 STORIES AND BREAKING UP THE BUILDINGS INTO SEVERAL SMALLER BUILDINGS RATHER THAN ONE LARGE ONE TO MAINTAIN VIEW ANGLES THROUGH THE SITE. PROMOTE SECURE PUBLIC OPENSPACES, POCKET PARKS, URBAN ROOMS, PLAZAS AND PUBLIC GATHERING SPACES THE PROJECT HAS OVER 20,000 SF OF PUBLIC PLAZA SPACES AND NEARLY A 1/4 MILE OF PEDESTRIAN WALKS THAT WILL BE IMPROVED WITH THIS PROJECT. ADDITIONALLY THE THROUGH CONNECTIONS ON SITE WILL INCREASE THE WALKABLITY OF THE NEIGHBORHOOD. ENCOURAGE THE INCLUSION OF AFFORDABLE HOUSING THE PROJECT PROVIDES 7.6% OF THE UNITS AT AFFORDABLE RATES AND THE BALANCE OF UNITS ARE INTENDED TO BE ATTAINABLE AT 65% AMI. THE GOAL OF BOTH AFFORDABLE AND ATTAINABLE HOUSING IS AT THE CENTER OF THIS PROJECT AND WILL GO A LONG WAY TOWARDS PROVIDING THE NEEDED HOUSING STOCK FOR BOZEMAN. CREATE A BROAD RANGE OF HOUSING TYPES THE PROJECT INCLUDES A RANGE OF HOUSING TYPES AND SIZES, FROM 2 BEDROOM TOWNHOUSE FL ATS, AS WELL AS 2 BEDROOM, 1 BEDROOM, STUDIO AND EFFICIENCY APARTMENT UNITS. THIS RANGE WILL MEET THE NEEDS OF A VERY BROAD DEMOGRAPHIC AND KEEP THE NEIGHBORHOOD VIBRANT. NEIGHBORHOOD DESIGN AND HUMAN SCALE THE PROJECT FINDS THE RIGHT BALANCE OF THE NEED FOR DEVELOPMENT TO PROVIDE HOUSING, OFFICES, AND ARTIST SPACES WHILE KEEP THE SCALE OF THE OVERALL DEVELOPMENT COMPATIBLE WITH THE NEIGHBORHOOD AND PROVIDES A HUMAN SCALE. THIS IS DONE BY KEEPING BUILDING HEIGHTS TO THREE STORIES, PLACING PARKING UNDERGROUND, AND BREAKING THE BUILDINGS INTO SMALL CLUSTERS THAT WILL PROVIDE THE HUMAN SCALE. STRATEGICALLY INVEST IN URBAN RENEWAL THE SITE IS LOCATED AT THE CENTER OF THE NORTHEAST URBAN RENEWAL DISTRICT AND THROUGH THIS DEVELOPMENT SEVERAL OF THE CONDITIONS OF BLIGHT AND THE MUCH NEEDED INFRASTRUCTURE WILL BE COMPLETED. THIS WILL PROMOTE THE LONG TERM GOALS OF THE DISTRICT AND CONTRIBUTE SIGNIFICANTLY TO THE OVERALL ECONOMIC DEVELOPMENT NEEDS OF THE CITY. 651 COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 53 PUD COMMUNITY DESIGN OBJECTIVES PUDP Checklist 14 E. Explanation for each of the Community Design Objectives and criteria in Section 38.430.090.E SECTION 38.430.090.E DESIGN OBJECTIVES AND PUD CRITERIA A. ALL DEVELOPMENT 1. Does the development comply with all city design standards, requirements and specifications for the following services: water supply, trails / walks / bike ways, sanitary supply, irrigations companies, fire protections, electricity, flood hazard areas, natural gas, telephone, storm drainage, cable television, and streets? Yes - all services and systems conform to the latest building codes adopted by the City of Bozeman Building Department. Standard services including water, sanitary supply, fire protection meet the current standards and codes issued by the City of Bozeman. Trails, walkways and bikeways have been provided both onsite as well as logical connections to the surrounding neighborhood networks. 2. Does the project preserve or replace existing natural vegetation? N/A - there are not significant existing natural vegetation features to be preserved. The current site conditions have about 45% of the site covered with building or paved surface and the unpaved areas have unmaintained weeds and bushes. The project will have less solid surface lot coverage and will have extensive landscaping. These are 6 trees that will need to be removed to accommodate the podium construction. Over 30 new trees will be planted on site with this project. 3. Are the elements of the site plan (e.g. Buildings, circulation, open space and landscaping, etc.) designed and arranged to produce an efficient, functionally organized and cohesive planned unit development? Yes - the layout of the buildings and placement of the plaza provide for open and direct connections across the site, and efficient circulation for both the residents and the public. 4. Does the arrangement of elements of the site plan (e.g. Building construction, orientation, and placement; transportation networks; selection and placement of landscape materials; and/ or use of renewable energy sources; etc.) Contribute to the overall reduction of energy use by the project? Yes - this infill project contributes to the overall reduction of energy, as does the walkability of the site plan and street edges. These have further been reinforced through the LEED Neighborhood Design Status we will achieve through this development. 5. Are the elements of the site plan (e.g. Buildings, circulation, open space and landscaping, etc.) designed and arranged to maximize privacy of the residents of the project? Yes - special consideration has been given to the various types of dwelling units to provide both privacy and accessibility. Ground level units will incorporate private outdoor spaces that will function as a privacy screen from other at grade activities. The second and third floor 652 COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 54 PUD COMMUNITY DESIGN OBJECTIVES CONTINUED units afford privacy due to their placement above grade. Each building is designed to maximize privacy while encouraging interaction with the other residents and community members through plaza spaces and shared roof decks. 6. Parkland - Does the design and arrangement of buildings and open space areas contribute to the overall aesthetic quality of the site configuration and has the area of parkland or open space been provided for each proposed dwelling as required by Section 38.420.020? Yes - we have provided all the open space and parkland required by the code. The primary organizing factor and key design goal was to create common public spaces that invite activity for residents, office users and neighborhood denizens to enjoy. We have accomplished this through the thoughtful arrangements of buildings - creating open spaces that vary in scale and character across the site. These include public plazas, private residential plazas, private personal outdoor spaces and balconies, and shared roof decks. 7. Performance - All PUDs must earn at least 20 performance points. Yes - we have achieved 58 points for the project. For specifics, see Section 3.04, page 44-45 of this document. 8. Is the development being properly integrated into the development and circulation patters of adjacent and nearby neighborhoods so that this development will not become an isolated “pad” to adjoining development? Yes - the project will create new connections to the neighborhood through the construction of upgraded street networks and sidewalks. The public plaza spaces will afford access and views through the site further connecting the project to the neighborhood. SECTION 38.430.090.E DESIGN OBJECTIVES AND PUD CRITERIA A. MIXED USE Planned unit developments in mixed-use areas (REMU, UMU, and NEHMU Zoning Districts) may include commercial, light industrial, residential and mixes of various primary and accessory uses. The types or combination of the uses are determined based upon its merits, benefits, potential impact upon adjacent land uses and intensity of development. 1. Is the project substantially consistent with the intent and purpose statements for the underlying zoning district? Yes - The underlying zoning is NEHMU, the “intent of this area is to allow private and case-by- case determination of the most appropriate use of land in a broad range of both non-residential and residential uses.” Additionally, “The unique qualities and nature of the area are not found 653 COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 55 PUD COMMUNITY DESIGN OBJECTIVES CONTINUED elsewhere in the city and should be preserved as a place offering additional opportunities for creative integration of land uses.” This project is very consistent with this intent. We include a range of housing types, and a range - and type - of commercial activity consistent with the zoning. 2. Is the project located adjacent or within proximity to an arterial or collector street that provides access to the site? Yes - The property is located 300 feet from Peach Street (Collector) and 300 feet from Tamarack Street (Collector) and 900+/- feet from Rouse Ave which is designated as a Principal Arterial in the City street network. 3. Is the project on at least two acres of land? Yes - 2.01 acres 4. Do the uses relate to each other in terms of location within the PUD, pedestrian and vehicular circulation, architectural design, utilization of common open space and facilities, streetscapes etc.? Yes 5. Does the overall project exceed the FAR “floor area ratios” envisioned for the underlying zoning district? N/A - none specified for the NEHMU district. The F.A.R. for this project is 1.8 6. Is it compatible with and does it reflect the unique character of the surrounding area? Yes - The character of the surrounding area has a mix of residential and commercial activity. There are two- and four-story mixed-use residential projects, a 70 feet repurposed grain elevator, metal warehouse buildings, historic brick buildings and single-family homes. We strove to develop a mass and scale that is consistent with this while being able to provide opportunities for more affordable units. The use of materials and unique architecture further reinforces the character of the district. 7. Is there direct vehicular and pedestrian access between on-site parking areas and adjacent existing or future offsite parking areas that contain more than 10 spaces? Yes - the project will lease parking spaces on an adjacent site which will have more than 10 spaces (72 spaces). Additionally, given that this project is surrounded on three sides by public streets creates direct connections both vehicular and pedestrian with the surrounding neighborhood. 8. Does the project encourage infill, or does the project otherwise demonstrate compliance with the land use guidelines of the Bozeman Growth Policy? 654 COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 56 PUD COMMUNITY DESIGN OBJECTIVES CONTINUED Yes - The project is exemplary of infill, it is taking an underutilized warehouse / brownfield site and redeveloping it to include a mix of both residential uses and commercial activity that will efficiently use the surrounding infrastructure. 9. Does the project provide for outdoor recreational areas (such as urban plazas, courtyards, landscaped areas, open spaces, or urban trails) for the use and enjoyment of those living in, working in or visiting the development? Yes - The project has provisions for urban plazas, courtyards, landscaped areas, access to off site open spaces and trails. See Landscape. 10. Does the project provide for private outdoor areas (e.g. private setbacks, patios and/or balconies etc.) for use by the residents and employees of the project which are sufficient in size and have adequate light, sun, ventilation, privacy and convenient access to the household or commercial units they are intended to serve? Yes - per the UDC the project has provided private outdoor spaces, patios and balconies per code for use by both commercial units and residential units. 11. Does the project provide outdoor areas for use by persons living and working in the development for active or passive recreational activities? Yes - The uses contemplated in this project would be more passive recreation in nature, however the project is located along a trail system that connects to the Story Mill Park which offers many active recreational opportunities. 12. Is the overall project designed to enhance the natural environment, conserve energy and provide efficient public services and faculties? Yes - The very nature of infill development and specifically this project achieving LEED ND Standards provides further evidence of the project’s commitment to conserving energy and preserving the natural environment. 13. If the project is proposing a residential density bonus as described below, does it include a variety of housing types and urban styles design to address the community-wide issues of affordability and diversity of housing stock? N/A - No density bonuses are proposed - however we meet housing diversity and affordability metrics. 14. Residential Density bonus. N/A - The project is not proposing any residential density bonuses. 655 OWNERSHIP MASTER OWNERS ASSOCIATION OWNS / MAINTAINS:Parking Lots General Common Areas Outside of Bldgs (Landscaping)Building #5 (Public Use) Land Under Buildings BUILDING 1RESIDENTIAL CONDO (APTS)BUILDING 2RESIDENTIAL CONDO (APTS) BUILDING 5COMMERCIAL CONDO(PUBLIC USE) See MasterOwners Assoc. BUILDING 3RESIDENTIAL CONDO (SALE) BUILDING 4RESIDENTIAL (SALE) / COMMERCIAL CONDO BUILDING 6COMMERCIAL CONDO (RENTAL) DIRECTOR CONDO ASSOCIATION OF UNIT OWNERS OWNS / MAINTAINS: LIMITED COMMON AREAS OUTSIDE OF BLDG 4: Outside of Bldg (Studs Out) Exterior Windows COMMON AREAS INSIDE CONDO UNIT OWNERS OWN / MAINTAINS:Interior Unit (Studs In) DIRECTOR CONDO ASSOCIATION OF UNIT OWNERS OWNS / MAINTAINS: LIMITED COMMON AREAS OUTSIDE OF BLDG 3: Outside of Bldg (Studs Out) Exterior Windows COMMON AREAS INSIDE CONDO UNIT OWNERS OWN / MAINTAINS:Interior Unit (Studs In) DIRECTOR CONDO ASSOCIATION OF UNIT OWNERS OWNS / MAINTAINS: LIMITED COMMON AREAS OUTSIDE OF BLDG 2: Outside of Bldg (Studs Out) Exterior Windows COMMON AREAS INSIDE CONDO UNIT OWNERS OWN / MAINTAINS:Interior Unit (Studs In) DIRECTOR CONDO ASSOCIATION OF UNIT OWNERS OWNS / MAINTAINS: LIMITED COMMON AREAS OUTSIDE OF BLDG 1: Outside of Bldg (Studs Out) Exterior Windows COMMON AREAS INSIDE CONDO UNIT OWNERS OWN / MAINTAINS:Interior Unit (Studs In) CONDO ASSOCIATION OF UNIT OWNERS OWNS / MAINTAINS: LIMITED COMMON AREAS OUTSIDE OF BLDG 6: Parking Lot @ Brewery Lease of Parking Lot @ Brewery Outside of Bldg (Studs Out)Exterior Windows COMMON AREAS FOR CONDO: ElevatorAssigned Parking In Lot (If Any)EntrywayLocker Room / Showers UNIT OWNERS OWN / MAINTAINS:Interior Unit (Studs In) DIRECTOR COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 57 The project will be organized under a condominium regime, see Appendix L for Draft Condominium Documents where each building will pay a proportionate share to the condo master to cover common areas (including public common areas), limited common area, and general maintenance. Each building will also have its own condominium owner’s association that can manage more building-specific issues such as elevators, stair towers, mail rooms and other common and limited common elements. PROPOSED OWNERSHIP 656 3 DIRECTORS PER CONDO ASSOCIATION (Elected By Unit Owners) ONE DIRECTOR PER BUILDING WILL ALSO BE A DIRECTOR OF MASTER OWNERS ASSOCIATION EACH OWNER WILL A MEMBER OF THE CONDO OWNERS ASSOCIATION & MASTERS OWNERS ASSOCIATION GOVERNANCE MASTER OWNERSASSOCIATION Members are all owners within PUD DIRECTOR #1 CONDO ASSOCIATION OF UNIT OWNERS BUILDING 1RESIDENTIAL CONDO (APTS) DIRECTOR #2 DIRECTOR #3 DIRECTOR #1 CONDO ASSOCIATION OF UNIT OWNERS BUILDING 2RESIDENTIAL CONDO (APTS) DIRECTOR #2 DIRECTOR #3 BUILDING 5COMMERCIAL CONDO(PUBLIC USE)MANAGED BY MASTEROWNERS ASSOC. DIRECTOR #1 DIRECTOR #1 CONDO ASSOCIATION OF UNIT OWNERS DIRECTOR #2 DIRECTOR #3 DIRECTOR #1 CONDO ASSOCIATION OF UNIT OWNERS BUILDING 3RESIDENTIAL CONDO (SALE) DIRECTOR #2 DIRECTOR #3 BUILDING 4RESIDENTIAL (SALE) / COMMERCIAL CONDO DIRECTOR #1 DIRECTOR #1 CONDO ASSOCIATION OF UNIT OWNERS DIRECTOR #2 DIRECTOR #3 BUILDING 6COMMERCIAL CONDO (RENTAL) 3 DIRECTORS PER CONDO ASSOCIATION (Elected By Unit Owners) ONE DIRECTOR PER BUILDING WILL ALSO BE A DIRECTOR OF MASTER OWNERS ASSOCIATION EACH OWNER WILL A MEMBER OF THE CONDO OWNERS ASSOCIATION & MASTERS OWNERS ASSOCIATION GOVERNANCE MASTER OWNERSASSOCIATION Members are all owners within PUD DIRECTOR #1 CONDO ASSOCIATION OF UNIT OWNERS BUILDING 1RESIDENTIAL CONDO (APTS) DIRECTOR #2 DIRECTOR #3 DIRECTOR #1 CONDO ASSOCIATION OF UNIT OWNERS BUILDING 2RESIDENTIAL CONDO (APTS) DIRECTOR #2 DIRECTOR #3 BUILDING 5COMMERCIAL CONDO(PUBLIC USE)MANAGED BY MASTEROWNERS ASSOC. DIRECTOR #1 DIRECTOR #1 CONDO ASSOCIATION OF UNIT OWNERS DIRECTOR #2 DIRECTOR #3 DIRECTOR #1 CONDO ASSOCIATION OF UNIT OWNERS BUILDING 3RESIDENTIAL CONDO (SALE) DIRECTOR #2 DIRECTOR #3 BUILDING 4RESIDENTIAL (SALE) / COMMERCIAL CONDO DIRECTOR #1 DIRECTOR #1 CONDO ASSOCIATION OF UNIT OWNERS DIRECTOR #2 DIRECTOR #3 BUILDING 6COMMERCIAL CONDO (RENTAL) COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 58 FINANCE MASTER OWNERS ASSOCIATION Members are all owners within PUD BUILDING 5COMMERCIAL CONDO(PUBLIC USE)MANAGED BY MASTEROWNERS ASSOC. ASSOCIATION OF UNIT OWNERS ASSOCIATION OF UNIT OWNERS ASSOCIATION OF UNIT OWNERS ASSOCIATION OF UNIT OWNERS ASSOCIATION OF UNIT OWNERS UNIT OWNERS PAY FEE TO OWNERS ASSOC.* (% Based On Unit Sq. Ft. / Building Sq.) *This fee includes fee for Master Owners Assoc. OWNERS ASSOC. PAY FEE TO MASTER ASSOC. (% Based On Bldg Sq Ft. / All Building Sq.) UNIT OWNERS UNIT OWNERS UNIT OWNERS UNIT OWNERS UNIT OWNERS BUILDING 6COMMERCIAL CONDO (RENTAL) BUILDING 4RESIDENTIAL (SALE) / COMMERCIAL CONDO BUILDING 3RESIDENTIAL CONDO (SALE)BUILDING 2RESIDENTIAL CONDO (APTS)BUILDING 1RESIDENTIAL CONDO (APTS) FINANCE MASTER OWNERSASSOCIATION Members are all owners within PUD BUILDING 5COMMERCIAL CONDO(PUBLIC USE)MANAGED BY MASTEROWNERS ASSOC. ASSOCIATION OF UNIT OWNERS ASSOCIATION OF UNIT OWNERS ASSOCIATION OF UNIT OWNERS ASSOCIATION OF UNIT OWNERS ASSOCIATION OF UNIT OWNERS UNIT OWNERS PAY FEE TO OWNERS ASSOC.* (% Based On Unit Sq. Ft. / Building Sq.) *This fee includes fee for Master Owners Assoc. OWNERS ASSOC. PAY FEE TO MASTER ASSOC. (% Based On Bldg Sq Ft. / All Building Sq.) UNIT OWNERS UNIT OWNERS UNIT OWNERS UNIT OWNERS UNIT OWNERS BUILDING 6COMMERCIAL CONDO (RENTAL) BUILDING 4RESIDENTIAL (SALE) / COMMERCIAL CONDO BUILDING 3RESIDENTIAL CONDO (SALE)BUILDING 2RESIDENTIAL CONDO (APTS)BUILDING 1RESIDENTIAL CONDO (APTS) 657 COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 59 ASSOCIATION DUTIES BEYOND MAINTENANCE MASTER OWNERSASSOCIATION ADDITIONAL RESPONSIBILITIES: Architectural ReviewCommon Parking Maintenance & Rules Common Area Rules including but not limited to: Pavilion Use, Snow Removal on Common Walkways, Signage on General Common, Storm Water Maintenance, Collection from Each Association, Maintenance of Sprinklers & Landscaping. Dispute Resolution Between Building Associations BUILDING 1RESIDENTIAL CONDO (APTS)BUILDING 2RESIDENTIAL CONDO (APTS) BUILDING 5COMMERCIAL CONDO(PUBLIC USE) See MasterOwners Assoc. BUILDING 3RESIDENTIAL CONDO (SALE) BUILDING 4RESIDENTIAL (SALE) / COMMERCIAL CONDO BUILDING 6COMMERCIAL CONDO (RENTAL) CONDO ASSOCIATION OF UNIT OWNERS ADDITIONAL RESPONSIBILITIES: Interior Signage Collection From Members Member Dispute Resolution Parking Lease Exterior of Building 6: Landscaping (within X Feet) Clean-up (within X Feet) CONDO ASSOCIATION OF UNIT OWNERS ADDITIONAL RESPONSIBILITIES: Interior Signage Collection From Members Member Dispute Resolution Exterior of Building 4: Landscaping (within X Feet) Clean-up (within X Feet) DIRECTOR DIRECTOR DIRECTOR CONDO ASSOCIATION OF UNIT OWNERS ADDITIONAL RESPONSIBILITIES: Interior Signage Collection From Members Member Dispute Resolution Exterior of Building 3: Landscaping (within X Feet) Clean-up (within X Feet) CONDO ASSOCIATION OF UNIT OWNERS ADDITIONAL RESPONSIBILITIES: Interior Signage Collection From Members Member Dispute Resolution Exterior of Building 2: Landscaping (within X Feet) Clean-up (within X Feet) CONDO ASSOCIATION OF UNIT OWNERS ADDITIONAL RESPONSIBILITIES: Interior Signage Collection From Members Member Dispute Resolution Exterior of Building 1: Landscaping (within X Feet) Clean-up (within X Feet) RESPONSIBLE FOR: Interiors of UnitPatio Snow Removal Contribute Funds to Association RESPONSIBLE FOR: Interiors of UnitPatio Snow Removal Contribute Funds to Association MAINTENANCE RESPONSIBILITIES MASTER OWNERSASSOCIATION MAINTAINS: Common Areas, Including But Not Limited To: Pavilion Landscaping Around Buildings Parking Garage / Areas (excl Bldg 6 parking)Storm Water Maintenance Common Area TrashSnow Removal From Entryway & Sidewalks BUILDING 1RESIDENTIAL CONDO (APTS)BUILDING 2RESIDENTIAL CONDO (APTS) BUILDING 5COMMERCIAL CONDO(PUBLIC USE) See MasterOwners Assoc. BUILDING 3RESIDENTIAL CONDO (SALE) BUILDING 4RESIDENTIAL (SALE) / COMMERCIAL CONDO BUILDING 6COMMERCIAL CONDO (RENTAL) CONDO ASSOCIATION OF UNIT OWNERS MAINTAINS BUILDING 6: Interior & Exterior Common AreasIncl But Not Limited To: ElevatorEntrywayHallwaysLocker Room / ShowersParking Lease AreaMechanical Room DIRECTOR UNIT OWNERS DIRECTOR CONDO ASSOCIATION OF UNIT OWNERS MAINTAIN BUILDING 4: Interior & Exterior Common AreasIncl But Not Limited To: ElevatorInterior CorridorEntry Lobbies (2)Trash Room (share with Bldg 3)Mechanical RoomElevator To Parking (share withBldg 1, 2, 3, 4) UNIT OWNERS DIRECTOR CONDO ASSOCIATION OF UNIT OWNERS MAINTAIN BUILDING 3: Interior & Exterior Common Areas Incl But Not Limited To: Trash Room (share with Bldg 4) Mechanical Room Elevator To Parking (share with Bldg 1, 2, 3, 4) RESPONSIBLE FOR: Interiors of Unit Patio Snow Removal Contribute Funds to Association UNIT OWNERS DIRECTOR CONDO ASSOCIATION OF UNIT OWNERS MAINTAIN BUILDING 2: Interior & Exterior Common Areas Incl But Not Limited To: Common Walkway to Bldg 1 Elevator To Parking (share with Bldg 1, 2, 3, 4) Trash Room (share with Bldg 1) Mailroom (share with Bldg 1) Entryway Mechanical Room Roof Top Area (share with Bldg 1) Kitchen & Laundry Areas (limited common expense per Pod) RESPONSIBLE FOR: Interiors of Unit Patio Snow Removal Contribute Funds to Association UNIT OWNERS DIRECTOR CONDO ASSOCIATION OF UNIT OWNERS MAINTAIN BUILDING 1: Interior & Exterior Common AreasIncl But Not Limited To: Elevator To Parking (share withBldg 1, 2, 3, 4)Trash Room (share with Bldg 2)Mailroom (share with Bldg 2)Entryway (share with Bldg 2, 3, 4)Mechanical RoomStairsBike Tuning Area (share with 2) RESPONSIBLE FOR: Interiors of Unit Patio Snow Removal Contribute Funds to Association UNIT OWNERS SHARED DECK 658 COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 60 RESPONSIBILITY FOR IMPACT MITIGATION The Northeast Historic Mixed-Use (NEHMU) is unique within the City - constantly evolving to accommodate a rich variety of uses. The Cottonwood and Ida Mixed-Use project contains the residential and commercial uses currently allowed, and promotes diverse land-uses that remain sensitive to the neighborhood context. While apartment buildings are not specifically permitted in the district, residential units are allowed on the second and subsequent floors above commercial spaces. The zoning code further states that the “standards for buffering between different land uses are deliberately not as high as standards elsewhere in the community as it is assumed that persons choosing to locate in this area are aware of the variety of possible adjacent land uses and have accepted such possibilities as both acceptable and desirable.” The project responds to existing conditions by placing denser commercial activity closer to the commercial office and shop spaces on surrounding blocks. Additionally, lower-scale residential units on the site (Building 3 Townhouse-style units) are located across the street from other single-family scaled residences. Other steps have been taken to reduce the overall mass and scale of this project by placing parking underground and, in place of surface parking, providing public open spaces to foster connections to the community. ESTIMATED NUMBER OF EMPLOYEES FOR BUSINESSES The project contains three primary types of commercial spaces. The first is a more traditional office format in Building 6, located at the Northwest corner of the site, where there are three levels of open-plan office. These spaces could be divided to host smaller tenants, however the intent is to lease the majority of the building to one or two primary tenants. The second type of commercial space is one we are classifying as “maker spaces” in Building 4. These would be smaller spaces where creatives could maintain a studio to showcase their work, or where a digital start-up could find an affordable foothold. Third, there is an opportunity for a small scale cafe located in building 5 on the Plaza. This would likely be a place that provides small dining opportunities for the office and makers as well as residents throughout the day. Below is a matrix of spaces and uses, along with estimates of the number of employees. EMPLOYEES COMMERCIAL OFFICE EMPLOYEES 81 ARTISAN MANUFACTURING EMPLOYEES 6 GENERAL PROPERTY MANAGER 1 SMALL SCALE CAFE 6 TOTAL 94 DESIGN METHODS TO REDUCE ENERGY CONSUMPTION The site planning will be certified by the US Green Building Council as a Leadership in Energy and Environmental Design Neighborhood Development (LEED ND). The project is being planned, designed, engineered and constructed to yield a development that makes much more efficient use of land and resources than land-use patterns typical for the region - thus reducing overall energy consumption. In addition to the overall site planning, strategies will be employed in the individual buildings to reduce energy consumption and promote long-term sustainable practices across the project - including low- flow plumbing fixtures, high-performance windows, energy efficient appliances, low-voltage lighting, and onsite recycling facilities. 659 COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 61 RATIONALE FOR CHOICES MADE BY THE APPLICANT From the early planning stages of the project we insisted that it contribute a solution for the shortage of affordable housing in Bozeman. Traditionally, more affordable housing has been pushed to the newer parts of town, with the older neighborhood becoming more and more gentrified. We see an opportunity to keep affordable housing options in the NEHMU District, taking advantage of the existing infrastructure and established neighborhoods surrounding the site. We also believe that the project needs to accommodate more than one demographic, and have included a broad range of unit types to promote a mix of age and income levels on the site. The project has also very intentionally approached the need to provide commercial uses in this mixed- use neighborhood so that there are opportunities for individuals to live close to where they may work. The hope is that both residents of the site and the surrounding neighborhood will be able to bike or walk to work. We have planned the site and the structures as a distinct micro-urban context, with individual residents living and working on-site, with inviting places for them to gather and enjoy the interactions of daily life. We have provided extensive public open spaces and landscaped courtyards to serve this purpose, and have intentionally created an open and accessible site. The unique aesthetic qualities of this district also compelled the project to respond in a unique manner, exploring architectural styles that respond to both the industrial and residential context. 660 COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 62 The Northeastern Neighborhood is host to a diverse, active set of residents, heavily invested in preserving their community’s unique identity, and intent on engaging with projects as they develop in the area. In April 2017, the neighborhood hosted a Regional and Urban Design Assistance Team (R/UDAT) workshop to gather community input on future development in the Northeastern Neighborhood. The team’s report provided a great deal of guidance as we established the project goals, developed a site strategy, and formulated the relationships to the streets and surrounding properties. FROM THE R/UDAT REPORT CHARACTER: “The community told the team that the neighborhood is ‘funky.’ The neighborhood’s character is authentic and unique in the context of Bozeman. It is a real place. The community also put intense value on the eclectic identity of the area and its mix of uses – a quality that is embraced and celebrated. The Northeast Neighborhood is also made up of creative and artistic people who value its diversity and freedom of self-expression. The neighborhood was widely described as livable, both for its adjacency to downtown and the quality of life it provides to the people who work and live here.” STREETS: “One of the most widely shared ideas on future improvements concerned the need to better connect existing assets throughout the neighborhood and make its streets more friendly to pedestrians and bicyclists.” DIVERSITY & AFFORDABILITY: “Two manifold interests emerged as important. The first is the preservation and strengthening of the unique sense of place in the neighborhood and its contributing components. The second characteristic is the accessible and affordable housing proposition that has traditionally prevailed in the neighborhood, and the value that affordability has in producing a diverse neighborhood that can support creative professionals and working families.” HISTORIC TRAIN DEPOT NORTHERN PACIFIC RAILWAY MISCO MILL CAFE BAKERYN. WALLACE AVE.N. IDA AVE.E. COTTONWOOD ST. SINGLE-FAMILY RESIDENCES SINGLE-FAMILY RESIDENCES MULTI-FAMILY RESIDENTIAL OFFICES & STUDIOS OFFICES & STUDIOS TECH OFFICES OFFICES & STUDIOS BEER & WINE DISTRIBUTOR LUMBER DISTRIBUTOR BIKE SHOP SINGLE-FAMILY RESIDENCES SINGLE-FAMILY RESIDENCES ARTISAN MFR. POCKET PARK INDUSTRIALINDUSTRIALINDUSTRIAL ARTISAN MFR. COMMERCIAL BUS DEPOT E. ASPEN ST. E. PEACH ST. BED & BREAKFAST TO DOWNTOWN FORMER BREWERY SITE PROJECT SITE NORTH 5 MINUTE WALK (1/4 MILE) • PARK TRAILS • FAIRGROUNDS • BASEBALL FIELD • CAFES • BUS STOP • OFFICES • ARTIST STUDIOS 10 MINUTE WALK (1/2 MILE) • ELEMENTARY SCHOOL • BOZEMAN CITY HALL • DOWNTOWN RETAIL DISTRICT • PUBLIC LIBRARY • LINDLEY PARK • BEALL PARK • STORY MILL PARK • PUBLIC POOL (3/4 MILE) GENERAL SITE DATA 661 COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 63 SOUTHEAST TO MT BLACKMORE SOUTHWEST TO GALLATIN PEAK NORTHWEST TO MT BALDY TOWNHOUSE-STYLE UNITS RELATE TO ADJACENT RESIDENTIAL SCALE OFFICE & APARTMENT BUILDINGS RELATE TO ADJACENT COMMERCIAL & INDUSTRIAL SCALE SITE CONDITIONS The blocks to the East and West of the site are predominantly single-family residential, while the blocks to the North and South consist of larger-scale industrial buildings, as well as small multi-family development. Immediately to the West of the site is the historic Misco Mill (now housing a high-end furniture maker) and small collection of industrial buildings - currently being used as a pottery studio. The East Aspen St. Right of way - to the North of the site - is currently closed to traffic, and provides an open green space with benches and a walking trail. There are no sidewalks around the street edges of the site, but there are potential pedestrian connections across Cottonwood Street to the nearby cafe and bakery. Downtown is 3/4 of a mile South as well, providing relatively direct pedestrian and biking connections. Outdoor recreation areas to the North and Northeast of Bozeman are also readily accessible. The lower levels of the project will offer views to the Northeast and Southeast. Upper floors gain views across Bozeman to the Southwest, and up the Gallatin River Valley to the Northwest. The site design responds to the variety of scales and land-use on adjacent properties by placing smaller-scale townhouse-style units across from the single-family neighbors to the East, while the larger masses of the office building and apartment building sit closer to the large industrial and warehouse buildings to the North. Buildings along Cottonwood conform to the scale and character of the recent multi- family developments to the South of the site. Pedestrian connections and through-block passages occur on the South and Northeastern portions of the site, while the vehicle traffic is directed Northwest to Wallace Avenue. FROM THE R/UDAT REPORT “The Core is the central portion of the R/UDAT project area and is an eclectic mix of light industrial buildings intermingled with small cottages, walking paths and historic sites. The look and feel of the core is central to how the resident’s see themselves. Developing a strategy for defining and protecting the Core is essential to maintaining the residents cultural connection to the city’s history as well as their neighborhood identity as a ‘funky,’ creative, and diverse place to live, work and play.”WALLACE AVEAERIAL FROM THE SOUTHEASTIDA AVEC O T T O N W O O D S T PEDESTRIAN CONNECTION PROPOSED VEHICLE CONNECTION ALLEYWAY ALIGNMENT VIEW SHEDS ASPEN STREET R.O.W. PRESERVE EXISTING BUILDING 662 COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 64 LAND USE CITY LAND USE POLICIES & OBJECTIVES ACHIEVED LAND USE CLASSIFICATION ALIGNMENT OF GOALS WITH NORTHEAST URBAN RENEWAL DISTRICT PLAN ALIGNMENT OF GOALS FROM VISION NE/RUDAT REPORT 4.00 4.01 4.02 4.03 SECTION 4 663 COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 65 CITY LAND USE POLICIES & OBJECTIVES ACHIEVED This infill, affordable housing, mixed use, urban plaza project exceeds many of the goals and objectives the City has across multiple planning documents from the Community Plan, Design Objectives Plan, Northeast Urban Renewal Plan, and the Economic Development Strategic Plan. Additionally, the design team and the developer facilitated an additional series of public meetings and charettes that further reinforced the goals of the project. (The RUDAT) the following covers the high-level items from the Bozeman Community Plan that are not covered elsewhere in the application. We have also provided a matrix of the basic policies that we are meeting across multiple planning documents. LAND USE – A SENSE OF PLACE BOZEMAN COMMUNITY PLAN GOAL LU-1: Create a sense of place that varies throughout the city, efficiently provides public and private basic services and facilities in close proximity to where people live and work and minimizes sprawl. The Cottonwood and Ida project is best described as a mixed-use infill project providing for places of work and housing within the existing fabric of a neighborhood. By Creating opportunities for multiple demographics and varying the types of housing, this project will successfully combat the pressures of sprawl. It is estimated that if this density of both commercial and residential uses were to develop under traditional greenfield development standards it would be nearly five times as consumptive of land. One of the objectives under this goal is: OBJECTIVE LU-1.4: Provide for and support infill development and redevelopment which provides additional density of use while respecting the context of the existing development which surrounds it. Respect for context does not automatically prohibit difference in scale or design. The Cottonwood and Ida project provides this much needed density while respecting the context of the existing neighborhood by placing much of the parking below grade, breaking up the buildings into multiple structures that create broad public plazas and intimate courtyards for enjoyment by the resident and the visitor alike. QUALITY COMMUNITY GOAL C-1: Human Scale and Compatibility - Create a community composed of neighborhoods designed for the human scale and compatibility in which the streets and buildings are properly sized within their context, services and amenities are convenient, visually pleasing, and properly integrated. This project has placed great emphasis on the human scale and as mentioned above by breaking up the massing of the buildings to more similarly match the context of the neighborhood and creating public spaces has created a visually pleasing and properly integrated quality set of buildings and public spaces. GOAL C-5: Public Landscaping and Architecture - Enhance the urban appearance and environment with architectural excellence, landscaping, trees and open space. OBJECTIVE C-5.2: Encourage inclusion of plazas and other urban design features as public areas within developments. The Cottonwood and Ida project provides over 6,750 SF of public plaza space that will provide an urban park experience unique to this neighborhood. 664 COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 66 GROWTH POLICY DESIGNATION / COMMUNITY PLAN DESIGNATION The project area is designated as “Industrial” in the Community Plan. This classification provides areas for uses which support an urban environment such as manufacturing, warehousing, and transportation hubs. Development within these areas is intensive and is connected to significant transportation corridors. In some circumstances, uses other than those typically considered industrial have been historically present in areas which were given an industrial designation in this growth policy. Careful consideration must be given to public policies to allow these mixed uses to coexist in harmony. The property holds a unique identity within this context given that it is also part of the NEHMU Zoning Classification (see below). This classification has provided for a mix of residential uses and commercial / industrial uses throughout its history. The project is compatible with this and will add to an ever-evolving future of this neighborhood. ZONING DESIGNATION Sec. 38.300.110. - Commercial and Mixed-use Zoning Districts - Intent and Purpose The intent and purposes of the commercial zoning districts are to establish areas within the City that are primarily commercial in character and to set forth certain minimum standards for development within those areas. Northeast Historic Mixed-Use District - Intent and Purpose. NEHMU 1. The intent of the Northeast Historic Mixed-use District is to provide recognition of an area that has developed with a blend of uses not commonly seen under typical zoning requirements. The unique qualities and nature of the area are not found elsewhere in the city and should be preserved as a place offering additional opportunities for creative integration of land uses. The intent of this area is to allow private and case-by-case determination of the most appropriate use of land in a broad range of both non-residential and residential uses. Standards for buffering between different land uses are deliberately not as high as standards elsewhere in the community as it is assumed that persons choosing to locate in this area are aware of the variety of possible adjacent land uses and have accepted such possibilities as both acceptable and desirable. It is expected that the lots within this district will continue to develop under a variety of uses which may increase or decrease in scope in any given portion of the district. 2. The clear intent of this district is to support a mix and variety of non-residential and residential uses. Nothing in Division 38.300 of this Article shall be interpreted to be discouraging or prejudicial to any listed use except as set forth as principal and conditional uses. As stated above the unique aspects of this zone type make it very suitable for a mixed use commercial and residential project. The project respects this identity both in the planning of uses as well as the scale of the architecture. LAND USE CLASSIFICATIONS 665 COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 67 THE NORTHEAST URBAN RENEWAL DISTRICT MISSION AND VISION: “The plan envisions a mixed-use neighborhood that is user-friendly, safe, secure and healthy. While the plan envisions a District with diversity of housing, businesses, and amenities, it intends to maintain the unique ambiance and historic character of the District.” NEURD Plan pg. 5 We used this mission statement along with feedback from the RUDAT to develop our plan. We are seeking to create a neighborhood that is user-friendly, offering plaza spaces and good connectivity to the surrounding neighborhood. We are providing a healthy mix of housing, businesses and amenities that respond to the unique ambiance of the district through massing and scale and configuration of buildings. The NEURD plan outlines nine principles along with goals and implementation policies that it seeks to achieve through the creation of our project it addresses many of these principals, goals, and implementation policies aligned in the plan. In fact, our project directly addresses 7 of these principals. Specifically, ALIGNMENT OF GOALS WITH NEURD (NORTHEAST URBAN RENEWAL DISTRICT) PLAN Principle 1 is to ensure health safety and security of the District by updating outdated or insufficient infrastructure. We intend to make improvements to the surrounding street network and utilities in collaboration with the District. This project also furthers the goal of a land use pattern that facilitates all modes of transportation. We have included substantial underground parking to provide the needed parking while shielding the presence of “parking lots” from the neighborhood viewshed. We have provided plazas and greenways to facilitate public pedestrian uses on the site and intend to create specific bike garage facilities to accommodate bike parking, storage, and maintenance areas. Principle 2 speaks to the desire to balance commerce and livability in the District within the mixed-use framework. Our project provides this balance and compatibility through the very best practices of urban design. We achieve this by providing good connections to public spaces for all that improve quality of life for the residents and business owners alike. Principle 3 is to “honor the unique character and vitality of the District”. We have taken great effort to include opportunities within this project for affordable and attainable housing, unique artist spaces and commercial uses that best fit the emerging character of the District. Additionally, our thoughtful consideration of mass and scale, attention to public values, and sustainable building practices will both honor the vitality and show a path forward that the district can truly be proud of. Principle 4 addresses the need for public open space that contributes to the health and appeal of the urban environment. This project creates over 20,000 SF of multiple public open spaces and provides improvements to adjacent greenways. Principle 5 establishes the framework to evaluate the cost of projects and programs weighted against their benefits to the district. This project provides the much-needed benefit of affordable housing and unique artists spaces in a progressive urban design that will enhance and preserve the unique character of the District. The project will also substantially increase the available increment in the District which can be used to achieve additional goals outlined in the plan. (continued) 666 COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 68 We have estimated this at $100,000 annually, after debt service, that can be used on other projects within the District. This principal exemplifies our project in so far that it will promote the principals and goals of the District and contribute significantly to the underlying value of the District. Principle 6 states the private land shall not be acquired for private use through the eminent domain process. Our project does not use any eminent domain in the redevelopment. We do offer our own private land to the public in the form of public plazas. Principle 7 states that projects shall consider impacts on adjacent neighborhoods. Our project has thoughtfully addressed the surrounding neighborhood by incorporating smaller scale housing next to smaller scale adjacent homes and placed more commercially oriented uses next to existing commercial uses. ESSENTIAL GOALS OF THE 2006 NEURD PLAN ACHIEVED • “Outdated or insufficient infrastructure should be repaired, replaced, or otherwise improved” (Principle 1, pg. 5 NEURD Plan) • “Assure compatibility of land use through appropriate urban design techniques” (Principle 2, pg. 6 NEURD Plan) • “Promote sustainable building practice and design within the District” (Principle 3, pg. 7 NEURD Plan) • “Encourage affordable housing” (Principle 2, pg. 6 NEURD Plan) • “Secure public open spaces in locations that will optimize accessibility” (Principle 4, pg.7 NEURD Plan) • “New structures should be designed keeping in mind public values of durability, flexibility, and simplicity. Thoughtful consideration of design, materials, and massing in construction of new private buildings will add strength and character to the built environment. To the degree that private sector can be influenced by a public partner in development, the community ought to strongly encourage excellence in urban design as a basis of partnership.” (Principle 3, pg.7 NEURD Plan) • “Harmonize commercial and industrial development with residential quality of life” (Principle 2, pg. 6 NEURD Plan) ALIGNMENT OF GOALS WITH NEURD PLAN (NORTHEAST URBAN RENEWAL DISTRICT) CONTINUED 667 COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 69 ALIGNMENT OF GOALS FROM THE VISION NE/RUDAT REPORT (NORTHEAST REGIONAL URBAN DESIGN ASSISTANCE TEAM) While not an adopted city policy document the RUDAT provided an opportunity for a broad base of neighborhood and community engagement discussing the future direction of this District and areas surrounding it. The RUDAT came up with a few guiding principles as follows: • Values the neighborhood’s unique vibrancy, diversity, artistry, history, commercial / industrial interface, walk- and bike - ability, and special bridger mountain views; • Understand that growth and change in our neighborhood is inevitable; • Embraces the notation that change can be positive, that it can enhance the neighborhood’s unique character and vitality and increase opportunities for affordable housing, connectivity and civic participation. The goals of the Cottonwood and Ida project very much align with these as we endeavor to create affordable housing opportunities and embrace the artistry and history of the District while making opportunities for civic participation on site. THE VISION NE/RUDAT FOLLOW-UP COMMITEE SEEKS TO: • Enhance neighborhood character We are looking to enhance the character through unique buildings and public spaces and provide commercial opportunities for artists to continue to contribute to the fabric of place. • Create new pocket parks, urban rooms and public gathering spaces We have incorporated several public plaza spaces and pocket parks within the site to support public gathering and invite the neighborhood to be part of the location as we ask to be part of the neighborhood. • Provide safe transportation through residential neighborhoods The project provides full pedestrian circulation through the site connecting to the existing sidewalk and trail network. Transportation patterns have been considered to keep most of the traffic on existing major roadways. • Support artists and artisans and provide opportunities for public art From the beginning our intent is to support and provide opportunity for the burgeoning artist community to flourish by adding additional artist spaces, as well as affordable places for artists to live and incorporate within the public spaces art. • Expand the trail network and connectivity to downtown Bozeman, the North 7th Corridor, and Story Mill Community Park This project creates a through pathway and can become a hub of connection to the various sub districts. • Consider the area’s agricultural and light industrial historical legacy The character of the buildings will incorporate attributes that pay homage to the legacy of the various historical uses. • Provide affordable housing options Lastly - we are providing both affordable housing and attainable housing through a mix of unit types to support the unique character of the neighborhood. 668 COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 70 INFRASTRUCTURE INFRASTRUCTURE STRATEGIES & SUMMARIES WATER RIGHTS CASH-IN-LIEU TABLE WATER WELL PROPOSED FOR IRRIGATION CONCURRENT CONSTRUCTION PLAN SECTION 5 5.00 5.01 669 COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 71 BELOW-GRADE PARKING GARAGE Two of the residential buildings, the office building, and a portion of the public open space are constructed over a parking garage. 96 Parking spaces Entry & exit to the parking garage is from Aspen Street in order to direct traffic to Wallace Avenue, and reduce traffic impacts on Cottonwood Street and Ida Avenue. EAST ASPEN STREET The entire right-of-way adjacent to the property is currently undeveloped. The proposal is to construct a roadway, with sidewalk and other street improvements along the north and south side of the right- of-way. In addition to the parking garage entry, the street will accommodate several parallel parking spaces, and a loading zone. EAST COTTONWOOD STREET The Northern half of the right-of-way adjacent to the project site will be improved. The intention is for the proposed improvements to match the character of recent improvements directly across the street - with sidewalk, street trees, and diagonal parking. NORTH IDA AVENUE The right-of-way adjacent to the project site will be improved with sidewalk, street trees, curb, and parallel parking. Improvements will continue East across the Ida right-of-way up to, but not including, the opposite curb. PEDESTRIAN ACCESS The 20’ fire lane will serve as a through-block pedestrian connection between the active Cottonwood- Wallace Intersection, and the open green space at Aspen Street. PUBLIC OPEN SPACES The main open space on the site takes advantage of the distinctive Misco Mill and the renovated on-site building to create a plaza suitable for hosting food vendors, farmer’s markets, and similar community events; as well as daily informal use by the office tenants, residents, and artisan community. Public services, such as event storage and restrooms will be located in the renovated building at the Southwest corner of the site. SITE ACCESSIBILITY INFRASTRUCTURE STRATEGIES & SUMMARIES CONTINUED 670 COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 72 PARKING The parking demand will be met primarily by the 96 space parking garage located partially below-grade across most of the site. With nearby bus stops, and downtown within easy walking and biking distance, we are able to provide residents and tenants with a community that is less reliant on their cars for daily commuting and errands. With ample on-site bike parking facilities, and a modest investment in carshare services, the reduced demand for parking is crucial to creating a more attainable - and more diverse - set of housing options. There will be accessible path of travel to commercial parking lot at Wallace & Aspen street. RESIDENTIAL PARKING STUDIOS 1-BDRM 2-BDRM UNITS DEMAND COUNTS 38 36 18 92 CURRENT CODE RATIO 1.25 1.5 2 137.5 PROPOSED REDUCTION RATIO 1 1.25 2 119.0 BIKE PARKING CODE 14 PROVIDED 100 (MIN) NON-RESIDENTIAL PARKING NON-RESIDENTIAL AREA AREA NET SF USE*RATIO DEMAND BUILDING 4 3,591 PRIMARILY OFFICE 250 14.36 BUILDING 5 1,200 RESTAURANT (INDOOR)50 24.00 700 RESTAURANT (OUTDOOR)100 7.00 BUILDING 6 20,127 PRIMARILY OFFICE 250 80.51 16 COVERED BIKE AND LOCKERS -10%(8.05) CURRENT CODE 117.8 PROPOSED PER PUD REDUCTION 40%70.7 PARKING PROVIDED ON SITE PARKING GARAGE 96 PRIMARILY RESIDENTIAL OFF SITE LEASE 72 FOR NON-RESIDENTIAL USE WITHIN 800 FEET OF ENTRANCE(S) ON STREET 32 COUNTED TOWARD RESIDENTIAL ONLY COVERED BIKE PARKING 88 ON SITE BIKE PARKING 50 TOTAL BIKE PARKING 138 TOTAL PROVIDED 200 TOTAL PER PUD REQUESTS 190 671 COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 73 FIRE PROTECTION Buildings 1 and 6 will have floors and/or roof decks at least 30 feet above the adjacent road where fire equipment will have access. We are proposing standpipe systems in the exit stairs at the North end of each of these buildings. All of the buildings and the below-grade parking garage will be fully-sprinklered per NFPA-13, with the exception of the single-story open-air existing building (building 5). The site is surrounded by public right of way on the North, South and East sides. The West side of the site will be maintained as a 20 feet wide fire equipment access route. Each side of the project will have at least one direct and readily accessible access point from the street or on-site fire access route onto the top of the parking garage, which functions as the ground floor for each of the buildings. INFRASTRUCTURE STRATEGIES & SUMMARIES CONTINUED SOLID WASTE COLLECTION A Trash room A serves the 64 studio and one-bedroom apartments in buildings 1 and 2. The 34 units on the upper floors have access to trash and recycling chutes that terminate in a trash room at street level. The trash chute will have a compactor, while the recycling chute will feed directly into a dumpster. The trash room is 300 sf (18 feet x 17 feet), and can accommodate up to four 4-yard dumpsters, roughly 6 feet x 4 feet each, including the two at the chutes.Building staff will use a pallet jack to move the dumpsters from the trash room to Aspen Street for pick-up, and will place them back in the trash room once they’ve been emptied. The 18 units on the ground floor will use a separate small trash room with four standard curbside bins. Those bins will be set out and retrieved by building staff. B Trash room B serves the 28 one- and two-bedroom units in buildings 3 and 4, as well as the commercial spaces in building 4. Residents and commercial tenants will place their trash and recycling into standard curbside bins. The bins will be put out and retreived by building staff. The trash room is 290 sf (21 feet x 14 feet) and is able to accommodate two 4-yard dumpsters for the commercial tenants, and six curbside bins for the residential tenants. Building staff will place the dumpsters and bins at Cottonwood Street for collection, and return them to the trash room when they’ve been emptied. C Trash room C serves the office building (building 6), with up to 90 employees. Janitorial staff will collect trash and recycling from the offices, and place it in dumpsters and/or curbside bins. The dumpsters and/or bins will be put out and retreived by building staff. The trash room is 280 sf (15 feet x 19 feet), and able to accommodate up to four 4-yard dumpsters, roughly 6 feet x 4 feet each. D Trash room D serves building 5 and cafe staff will collect trash and recycling and place it in a dumpster or curb side bins. The bins/dumpster will be out by staff and retrieved by staff.The trash enclosure is 10 feet x 10 feet and able to accomodate a four yard dumpster and recycling bin. 672 COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 74 WATER RIGHTS WATER WELL PROPOSED FOR IRRIGATION An existing well, located approximately in the Northeast corner of the project area, is proposed to be used for landscaping irrigation. We have had discussions with the department of natural resources and conservation and we understand that, as the project progresses, this use of the existing well is contingent upon providing proof of water rights. USE USE AREA SF RESIDENTIAL UNITS UNIT WATER DEMAND GAL/YR/1,000 SF UNIT WATER DEMAND AF/RESIDENTIAL UNIT ESTIMATED WATER VOLUMN GAL / YR AF / YR APARTMENT UNITS --92 --0.124 3,717,308 11.31 RESTAURANT 2,175 --165,000 --358,875 1.10 ARTISAN MANUFACTURING (ASSUMED RESTAURANT) 4,500 --165,000 --742,500 2.28 OFFICE 28,700 --10,000 --287,000 0.88 IRRIGATION N/A (EXEMPT WELL FOR IRRIGATION WATER) TOTAL 15.67 LESS CILWR CREDIT FROM 0.00 LESS HISTORICAL ANNUAL AVG METERED USE -0.07 NET VOLUME FOR CILWR 15.60 FINAL CILWR FEE - 18516 COTTONWOOD + IDA PUD @ $6,000 / AF $ 93,593.00 CASH-IN-LIEU TABLE 673 COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 75 CONCURRENT CONSTRUCTION PLAN The Cottonwood & Ida project includes the construction of five new buildings and renovation of one existing building with mixed use of commercial, multi-family residential and office/retail. Two of the proposed buildings of which will be built on top of a podium above a parking garage. A courtyard/plaza, interior to the site, will be a publicly-accessible space. These buildings will be constructed in a single phase. Off-site infrastructure improvements will be necessary in conjunction with the aforementioned site improvements. The Developer proposes concurrent construction of off-site infrastructure improvements in order to satisfy the infrastructure needs of the project (water, sewer, storm drain and transportation) while progressing the construction of the on-site parking structure, buildings and appurtenances. It is anticipated that off-site sanitary sewer infrastructure will be the first public infrastructure element to be installed, as it is the deepest utility, on average. Storm drain and water infrastructure will follow, as well as widening the adjacent roads (Aspen Street to the north, Ida Avenue to the west, and Cottonwood Street to the south) to the approved roadway sections, including widened travel lanes, parking spaces, curb and gutter, as well as landscaping boulevards and sidewalks. The anticipated construction durations for these off-site infrastructure improvements are as follows: SANITARY SEWER - To be determined following PUDP review STORM DRAIN - To be determined following PUDP review WATER - To be determined following PUDP review ROADWAY - To be determined following PUDP review ESTIMATED OVERALL COMPLETION DATE OF OFF-SITE INFRASTRUCTURE IMPROVEMENTS - To be determined following PUDP review 674 COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 76 CONCURRENT CONSTRUCTION PLAN CONTINUED It is also likely that additional parking facilities within the Front Street Right-of-Way will be constructed in conjunction with the proposed Cottonwood & Ida project—this will provide parking stalls within the ROW for the City’s purposes adjacent and to the northeast of the existing Boulder Park which lies northeast of the on-site improvements. While the off-site infrastructure improvements are progressing in their installation, it is anticipated that the on-site improvements will be construction, with order and duration roughly as follows: 1. PARKING GARAGE CONSTRUCTION - To be determined following PUDP review 2. BUILDINGS 1 AND 2 - To be determined following PUDP review 3. BUILDING 6 - To be determined following PUDP review 4. BUILDING 3 - To be determined following PUDP review 5. BUILDING 4 - To be determined following PUDP review 6. EXISTING BUILDING 5 RENOVATIONS - _____________________ 7. SITE IMPROVEMENTS, OVERALL COMPLETION DATE OF ON-SITE IMPROVEMENTS - To be determined following PUDP review The Developer understands the requirement that off-site infrastructure improvements must be designed, constructed, and installed per Bozeman City standards and specifications, and ultimately approved by the City of Bozeman prior to issuance of Certificates of Occupancy. Additionally the Developer understands and will comply with all parts of the BMC 38.270.030.D. 675 COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 77 BUILDING & DESIGN BUILDING DESIGN OBJECTIVES BUILDING STRATEGIES BUILDING MATERIALS DESIGN VIGNETTES SECTION 6 6.00 6.01 6.02 6.03 676 COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 78 FROM THE R/UDAT REPORT “The look and feel of the core is central to how the resident’s see themselves and identify with the neighborhood. Developing a strategy for defining and protecting the core is essential to maintaining the residents’ cultural connection to the city’s history as well as their neighborhood identity as a ‘funky,’ creative, and diverse place to live, work and play.” Drawing heavily from community input gathered during the R/UDAT workshop held in april, 2017, a number of design priorities have been identified: NEIGHBORHOOD INTEGRATION The project will be responsive to the existing scale, massing, and land uses in the surrounding neighborhood, and will build upon the eclectic and creative spirit valued by the Northeastern neighborhood residents. The majority of the parking will be placed in an underground garage to minimize its impact, and to promote a pedestrian oriented and bike-friendly community. DIVERSITY The site must provide a wide range of housing options for the residents, and must respect the community’s desire to have housing that is affordable and attainable by middle-income local residents. The development must be truly mixed-use; bringing economic opportunities with new offices and maker spaces, housing options for residents of all walks of life, and much-needed community amenities and open spaces. CHARACTER The design of the site and buildings will enhance the neighborhood; providing a contemporary take on materials and forms already present and familiar in nearby homes and businesses. SUSTAINABILITY The site will be developed to be environmentally, economically, and socially sustainable. We are currently pursuing site-wide LEED Neighborhood Development Certification, and are committed to practical and progressive green building practices. The office space and workshops will offer new and expanded opportunities for local businesses; while the community rooms, open spaces, and overall integration of residential, production, and business uses will support a vibrant, creative, and diverse community for years to come. BUILDING DESIGN OBJECTIVES 677 COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 79 AERIAL LOOKING NORTHWEST NEIGHBORHOOD INTEGRATION • Respect the variety of building sizes and forms in the neighborhood, and offer a similar variety in the design of the individual buildings, and portions of building • Design the ground floor of all buildings with a pedestrian scale - residential stoops, main street storefronts, sheltered entries, inviting lobbies CHARACTER • Design each building to be distinctive while maintaining a coherent and cohesive project aesthetic • Develop individual details that respect the value that the community places on its own eclectic and creative culture OUTDOOR ROOMS • Provide outdoor rooms of different sizes to accommodate a variety of uses - from small groups to larger public events • Screen the edges of the outdoor spaces to preserve privacy within the nearby residences • Respond to the solar orientation of our open spaces - offer shade in the summer, and sun in the winter MATERIALS • Select materials that evoke the industrial heritage of the site, yet are appropriate for residential uses, and result in durable and sustainable structures BUILDING STRATEGIES 678 COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 80 BUILDING MATERIALS Exterior materials have been selected in order to reference the residential and industrial buildings found throughout the Northeastern neighborhood. The materials will be durable, with consideration given to reducing maintenance costs for the residents where feasible. Primary exterior wall surfaces will be faced in panel siding, and both corrugated and standing seam metal siding; while ground floor access points that are protected from the elements - entryways, stoops, storefronts, etc. - Will have wood siding. Railings, sunshades, fences, and similarly scaled items are still being designed but may consist of wood, steel frames, and/or perforated corrugated metal. Exterior materials include the following: • Wood Siding • Panel Siding • Standing Seam Metal Roof and Siding • Horizontal and Vertical Sun Shades • Horizontal and Vertical Corrugated Metal Siding WOOD SIDING PANEL SIDING STANDING SEAM METAL ROOFING AND SIDING CORRUGATED METAL SIDING HORIZONTAL AND VERTICAL SUN SHADES 679 COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 81 COTTONWOOD STREET LOOKING INTO THE CENTRAL COURTYARD ASPEN STREET DESIGN VIGNETTES 680 COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 82 COTTONWOOD STREET IDA AVENUE TOWNHOUSE-STYLE UNITS STREET EDGE DESIGN The perimeter of the site, and the adjacent right-of-way improvements will provide safe, pedestrian routes, landscaped with street trees and sidewalk planting; and activated with workshop spaces, residential stoops, and welcoming lobbies. 681 COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 83 PUBLIC AND RESIDENT AMENITIESThe project will offer a variety of amenities. Some of these spaces, such as the roof deck, bike workshop, and dog wash, will be used only by the residents. Others spaces, such as the courtyard and the active cottonwood frontage will be shared with the surrounding community. The outdoor publicly accessible open spaces offer pedestrian paths through the site as well, providing a space for street life to weave its way through the block. A VARIETY OF HOUSING TYPES In order to serve a diverse group of residents, the project will provide a broad range of housing types. The individual buildings will host specific apartment types that will attract different demographic groups, while the community facilities will provide social spaces for them to mix. At the same time, the provision of maker and office spaces will allow for the convenience of a live-work lifestyle. BUILDING 1 will contain studio and 1-bedroom apartments. The building will also accommodate most of the resident amenity spaces: roof deck, package room, bike workshop, dog wash, etc. BUILDING 2 will be dedicated to smaller studios. These “micro-units” will be provided with generous common kitchens, living rooms, home office spaces, and dining rooms to encourage community. BUILDING 3 will be divided into modest 1-bedroom flats and family-size 2-bedroom townhouse-style units. BUILDING 4 will make up the most urban edge of the project, and consist of ground floor 1-bedroom flats behind the makerspace workshops. The units on level 2 and 3 will be 1- and 2-bedroom townhouse / loft units.LIVE WORKCOMMUNITY COMMUNALURBAN HOUSING682 COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 84 SIGNAGE COMPREHENSIVE SIGN PLAN SECTION 7 7.00 683 COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 85 The following information and accompanying drawings are to provide allowable areas per building along with location of proposed signs to the extent possible given the current extent of building design and possible tenants uses. Permitted sign areas are given for all buildings. The construction type, graphics and lighting design styles are covered below: GENERAL SIGNAGE GUIDELINES General building and tenant signage limitations are described below and in the attached comprehensive sign plan drawings. The following are general criteria. • Prior to any fabrication of any sign, a sign permit must be obtained by the City of Bozeman. All signs and sign lighting must comply with the City of Bozeman Unified Development Code requirements and with this comprehensive sign plan • The following sign materials are encouraged • Wood • Metal • Frosted glass • Acrylic sheet in appropriate colors and limited quantity • Signs are encouraged to be constructed three dimensionally and not solely flat painted surfaces. PERMITTED SIGN TYPES The following sign types are permitted for the Cottonwood and Ida project • Blade signs • Projecting blade signs that address pedestrian users are highly encouraged • Blade signs shall be integrated into the building facade design both in placement and materiality • Blade sign dimensions are governed by the City Sign Code • Internally lit blade signs are not permitted • Wall signs • Wall signs shall have a three-dimensional quality to them with either raised letters or cut-outs providing a reveal from the surface that it is attached to • All fasteners are encouraged to be hidden where possible • Back lit signs are permitted on wall signs • Signs lit from the front face are not permitted • Temporary free-standing signs • Temporary signage may be place outside of the tenant space and at plaza entries during tenant hours and is encouraged • Temporary freestanding signs must be placed as to not impede pedestrian traffic • Signs not permitted • In addition to signs not permitted by the City of Bozeman Unified Development Code, the following sign types are not permitted. • Exposed or surface mounted box or cabinet style signs • Signs which are not professional in appearance COMPREHENSIVE SIGN PLAN 684 COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 86 PROPOSED SIGNS Sign quantities, locations and types are subject to change and the tenant space sign allocations are subject to change. Any adjustment to the sign quantities will not result in signs in excess of the total amount allowed per the building. • General site signs allowed per 38.560.050 signs exempt from permit On premise directional signs not exceeding 4 sf in area and 5 feet in height • Lot 1: 4 directional signs per above- location TBD • Lot 2: 4 directional signs per above- location TBD • Lot 3: 4 directional signs per above- location TBD • Lot 4: 4 directional signs per above – location TBD • Building 1 - Residential Building Identifier • Total signage allowable 8 sf • Signs proposed: Wall sign 8 sf • Building 2 - Residential Building Identifier • Total signage allowable 8 sf per frontage • Signs proposed: Wall sign 8 sf - along Ida Avenue Wall sign 8 sf - along Aspen Street • Building 3 - Residential Building Identifier • Total signage allowable 8 sf per street frontage • Signs proposed: Wall sign 4 sf - along Ida Avenue Wall sign 4 sf - along Cottonwood Street • Building 4 • Total signage allowable 8 Sf - Residential Building Identifier 250 Sf total - all commercial spaces maximum • Signs proposed: Wall sign 8 sf - Residential Identifier along Cottonwood Street General building signage reserved 40 sf allowed / 0 proposed Tenant space 1: 60 sf allowed / two 8 sf projection signs proposed Tenant space 2: 30 sf allowed / 8 sf projection sign proposed Tenant space 3: 30 sf allowed / 8 sf projection sign proposed Tenant space 4: 30 sf allowed / 8 sf projection sign proposed Tenant space 5: 30 sf allowed / 8 sf projection sign proposed Tenant space 6: 30 sf allowed / 8 sf projection sign proposed COMPREHENSIVE SIGN PLAN CONTINUED 685 COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 87 PROPOSED SIGNS Sign quantities, locations and types are subject to change and the tenant space sign allocation are subject to change. Any adjustment to the sign quantities will not result in signs in excess of the total amount allowed per the building. • Building 5 • Total signage allowable 82.5 Sf • Signs proposed: Wall sign 72 sf • Building 6 • Total signage allowable 159 sf • Signs proposed: General building wall signs 4 at 10 sf each (40 sf) Tenant roster signs 3 at 16 sf each (48 sf) Level 1 tenant allowance 24 sf Level 2 tenant allowance 24 sf Level 3 tenant allowance 24 sf Total signage proposed with allowances 156 sf COMPREHENSIVE SIGN PLAN CONTINUED 686 3 2 1 AS.104R2 SCALE ISSUE DATE PROJECT PRINTEDSTAMPENSC ARCHITECTURE | URBANISM | DESIGNECONSULTANTS SITE PLAN -SP1 As indicated 1/22/2019 12:06:05 PMAS.201 01-21-2019 STREETELEVATIONS COTTONWOOD & IDABOZEMAN, MT 59715 1707COTTONWOOD+ IDA 1/16" = 1'-0"2 SITE ELEVATION - EAST (IDA) 1/16" = 1'-0"3 SITE ELEVATION - SOUTH (COTTONWOOD) 1/16" = 1'-0"1 SITE ELEVATION - NORTH (ASPEN) SITE KEY PLAN - AS.201 BLOCK FRONTAGE ARTICULATION & TRANSPARENCYPER BMC SECTION 38.510.010.B, MIXED BLOCK FRONTAGE DESIGNATIONS HAVE THE OPTION TO COMPLY WITH EITHER STOREFRONT OR LANDSCAPE BLOCK FRONTAGE PROVISIONS WITH ADHERANCE TO MODIFICATIONS PER TABLE 38.510.030.C:STOREFRONT BLOCK FRONTAGE• GROUND FLOOR: NON-RESIDENTIAL USES SPECIFIED IN 38.10.020, EXCEPT FOR LOBBIES ASSOCIATED WITH RESIDENTIAL OR HOTEL/MOTEL USES ON UPPER FLOORS.• FLOOR TO CEILING HEIGHT: 13’ MIN. (NEW BLDGS)• RETAIL SPACE DEPTH: 20’ MIN. (NEW BLDGS)• BUILDING PLACEMENT: REQ. @ FRONT PROPERTY LINE / BACK EDGE OF SIDEWALK ADDN’L SETBACKS ALLOWED FOR WIDENED SIDEWALKS OR PEDESTRIAN ORIENTED SPACE• BUILDING ENTRANCES: MUST FACE STREET. FOR CORNER BUILDINGS, ENTRANCES MAY FACE THE STREET CORNER.• TRANSPARENCY: AT LEAST 60% OF GROUND FLOOR BETWEEN 30" AND 10' ABOVE SIDEWALK FOR PRIMARY FAÇADES AND 40% OF GROUND FLOOR BETWEEN 30" AND 10' ABOVE SIDEWALK FOR SECONDARY FAÇADES.DISPLAY WINDOWS MAY COUNT FOR UP TO 50% OF THE TRANSPARENCY REQUIREMENT PROVIDED THEY ARE AT LEAST 30" IN DEPTH TO ALLOW FOR CHANGEABLE DISPLAYS. TACK-ON DISPLAY CASES DO NOT QUALIFY AS TRANSPARENT WINDOW AREAS.• WEATHER PROTECTION: WEATHER PROTECTION W/ 8-15’ VERTICAL CLEARANCE AT LEAST 5’ IN AVG. DEPTH ALONG T LEAST 60% OF FACADE• PARKING LOCATION: NEW SURFACE AND STRUCTURED PARKING AREAS (GROUND FLOOR) MUST BE PLACED TO THE SIDE OR REAR OF STRUCTURES AND ARE LIMITED TO 60' OF STREET FRONTAGE. PROVIDE A 6' MINIMUM BUFFER OF LANDSCAPING BETWEEN THE STREET AND OFF STREET PARKING AREAS MEETING THE PERFORMANCE STANDARDS OF DIVISION 38.550.• SIDEWALK WIDTH: 12 FEET MINIMUM BETWEEN CURB EDGE AND STOREFRONT (AREA INCLUDES CLEAR/ BUFFER ZONE WITH STREET TREES). SETBACKS AND UTILITY EASEMENTS MUST ALSO BE CONSIDERED AND MAY RESULT IN A LARGER MINIMUM SIDEWALK WIDTH.LANDSCAPE BLOCK FRONTAGE• GROUND FLOOR: SEE TABLES 38.310.030-.040 FOR PERMITTED USE DETAILS.• BUILDING PLACEMENT: 10' MIN. FRONT SETBACK, EXCEPT WHERE GREATER SETBACKS ARE SPECIFIED IN THE DISTRICT IN DIVISION 38.220.• BUILDING ENTRANCES: BUILDING ENTRANCES MUST BE VISIBLE AND DIRECTLY ACCESSIBLE FROM THE STREET. FOR USES THAT FRONT ON MULTIPLE MIXED DESIGNATED BLOCK FRONTAGES, ENTRY ALONG BOTH STREETS IS ENCOURAGED, BUT NOT REQUIRED.• TRANSPARENCY:FOR BUILDINGS DESIGNED WITH GROUND LEVEL NON-RESIDENTIAL USES, AT LEAST 25% OF THE GROUND FLOOR BETWEEN 4'-8' ABOVE THE SIDEWALK.FOR RESIDENTIAL USES, AT LEAST 15% OF THE ENTIRE FAÇADE (ALL VERTICAL SURFACES GENERALLY FACING THE STREET). WINDOWS MUST BE PROVIDED ON ALL HABITABLE FLOORS OF THE FAÇADE.OTHER BUILDINGS DESIGNED WITH NON-RESIDENTIAL USES ON THE GROUND FLOOR WITHIN 10' OF SIDEWALK, AT LEAST 40% OF THE GROUND FLOOR BETWEEN 4'-8' ABOVE THE GROUND LEVEL SURFACE.• WEATHER PROTECTION: PROVIDE WEATHER PROTECTION AT LEAST 3’ DEEP OVER PRIMARY BUSINESS AND RESIDENTIAL ENTRIES• PARKING LOCATION: PROVIDE 10' MIN. BUFFER OF LANDSCAPING BETWEEN THE STREET AND OFF STREET PARKING AREAS• LANDSCAPING: AREA B/N STREET & BLDG MUST BE LANDSCAPED, PRIVATE PORCH OR PATIO SPACE, AND/OR PEDESTRIAN-ORIENTED SPACE• SIDEWALK WIDTH: 6' MINIMUM SIDEWALKS ARE REQUIRED ADJACENT TO ARTERIAL STREETS AND PUBLIC PARKS AND 5' MINIMUM WIDTH IN OTHER AREAS, EXCEPT THE REVIEW AUTHORITY MAY REQUIRE WIDER SIDEWALKS IN SPECIAL AREAS WHERE CALLED FOR IN ADOPTED PLANS OR WHERE SIGNIFICANT PEDESTRIAN TRAFFIC IS ANTICIPATED. FAÇADE ARTICULATION STOREFRONTS AND OTHER BUILDINGS WITH NON-RESIDENTIAL USES ON THE GROUND LEVEL MUST INCLUDE A MINIMUM OF THREE OF THE FOLLOWING ARTICULATION FEATURES EVERY 60 FEET (MAXIMUM) TO CREATE A HUMAN SCALED FAÇADE PATTERN:• WINDOWS• ENTRIES• USE OF WEATHER PROTECTION FEATURES• USE OF STRUCTURAL EXPRESSION• CHANGE IN ROOFLINE PER SUBSECTION F BELOW• CHANGE IN BUILDING MATERIAL OR SIDING STYLE• ARTICULATION OF A SINGLE BUILDING MATERIAL THROUGH VARYING COLORS, TEXTURES, OR INCORPORATING JOINTS OR AN INTEGRATED TRIM PATTERN• OTHER DESIGN TECHNIQUES THAT EFFECTIVELY REINFORCE A HUMAN-SCALED PATTERN COMPATIBLE WITH THE BUILDING'S SURROUNDING CONTEXT• PROVIDING VERTICAL ELEMENTS SUCH AS A TRELLIS WITH PLANTS, GREEN WALL, ART ELEMENT• PROVIDING VERTICAL BUILDING MODULATION OF AT LEAST 12 INCHES IN DEPTH IF TIED TO A CHANGE IN ROOFLINE PER SUBSECTION F BELOW OR A CHANGE IN BUILDING MATERIAL, SIDING STYLE, OR COLOR RESIDENTIAL BUILDINGS MUST INCLUDE ARTICULATION FEATURES AT APPROPRIATE INTERVALS RELATIVE TO THE SCALE OF THE FAÇADE IN ORDER TO REDUCE THE PERCEIVED MASSING OF THE BUILDING AND ADD VISUAL INTEREST. AT LEAST THREE OF THE FEATURES (LISTED ABOVE) MUST BE EMPLOYED AT INTERVALS RELATIVE TO THE INDIVIDUAL DWELLING UNITS OR AT A MAXIMUM OF EVERY 30 FEET. THE SCALE OF THE FAÇADE ARTICULATION SHOULD BE COMPATIBLE WITH THE SURROUNDING CONTEXT. ADDITIONAL FEATURES MAYINCLUDE:• USE OF VERTICAL PIERS/COLUMNS• OTHER DESIGN TECHNIQUES THAT EFFECTIVELY BREAK UP THE MASSING ATNO MORE THAN 30-FOOT INTERVALS SPECIAL RESIDENTIAL BLOCK FRONTAGE STANDARD COMPLIANCE SEE OVERALL FLOOR PLAN SHEET AS.111 FOR COMPLIANCE WITH ONE OF THE PUBLIC/PRIVATE 1" = 1'-0"4RENDERING - ASPEN 1" = 1'-0"5RENDERING - IDA 1" = 1'-0"6RENDERING - COTTONWOOD REVISIONS NO. DATE. 3 2 1 AS.104R2 SCALE ISSUE DATE PROJECT PRINTEDSTAMPENSC ARCHITECTURE | URBANISM | DESIGNECONSULTANTS SITE PLAN -SP1 As indicated 1/22/2019 12:06:05 PMAS.201 01-21-2019 STREETELEVATIONS COTTONWOOD & IDABOZEMAN, MT 59715 1707COTTONWOOD+ IDA 1/16" = 1'-0"2 SITE ELEVATION - EAST (IDA) 1/16" = 1'-0"3 SITE ELEVATION - SOUTH (COTTONWOOD) 1/16" = 1'-0"1 SITE ELEVATION - NORTH (ASPEN) SITE KEY PLAN - AS.201 BLOCK FRONTAGE ARTICULATION & TRANSPARENCY PER BMC SECTION 38.510.010.B, MIXED BLOCK FRONTAGE DESIGNATIONS HAVE THE OPTION TO COMPLY WITH EITHER STOREFRONT OR LANDSCAPE BLOCK FRONTAGE PROVISIONS WITH ADHERANCE TO MODIFICATIONS PER TABLE 38.510.030.C: STOREFRONT BLOCK FRONTAGE • GROUND FLOOR: NON-RESIDENTIAL USES SPECIFIED IN 38.10.020, EXCEPT FOR LOBBIES ASSOCIATED WITH RESIDENTIAL OR HOTEL/MOTEL USES ON UPPER FLOORS.• FLOOR TO CEILING HEIGHT: 13’ MIN. (NEW BLDGS)• RETAIL SPACE DEPTH: 20’ MIN. (NEW BLDGS)• BUILDING PLACEMENT: REQ. @ FRONT PROPERTY LINE / BACK EDGE OF SIDEWALK ADDN’L SETBACKS ALLOWED FOR WIDENED SIDEWALKS OR PEDESTRIAN ORIENTED SPACE• BUILDING ENTRANCES: MUST FACE STREET. FOR CORNER BUILDINGS, ENTRANCES MAY FACE THE STREET CORNER.• TRANSPARENCY: AT LEAST 60% OF GROUND FLOOR BETWEEN 30" AND 10' ABOVE SIDEWALK FOR PRIMARY FAÇADES AND 40% OF GROUND FLOOR BETWEEN 30" AND 10' ABOVE SIDEWALK FOR SECONDARY FAÇADES.DISPLAY WINDOWS MAY COUNT FOR UP TO 50% OF THE TRANSPARENCY REQUIREMENT PROVIDED THEY ARE AT LEAST 30" IN DEPTH TO ALLOW FOR CHANGEABLE DISPLAYS. TACK-ON DISPLAY CASES DO NOT QUALIFY AS TRANSPARENT WINDOW AREAS.• WEATHER PROTECTION: WEATHER PROTECTION W/ 8-15’ VERTICAL CLEARANCE AT LEAST 5’ IN AVG. DEPTH ALONG T LEAST 60% OF FACADE• PARKING LOCATION: NEW SURFACE AND STRUCTURED PARKING AREAS (GROUND FLOOR) MUST BE PLACED TO THE SIDE OR REAR OF STRUCTURES AND ARE LIMITEDTO 60' OF STREET FRONTAGE. PROVIDE A 6' MINIMUM BUFFER OF LANDSCAPING BETWEEN THE STREET AND OFF STREET PARKING AREAS MEETING THE PERFORMANCE STANDARDS OF DIVISION 38.550.• SIDEWALK WIDTH: 12 FEET MINIMUM BETWEEN CURB EDGE AND STOREFRONT (AREA INCLUDES CLEAR/ BUFFER ZONE WITH STREET TREES). SETBACKS AND UTILITY EASEMENTS MUST ALSO BE CONSIDERED AND MAY RESULT IN A LARGER MINIMUM SIDEWALK WIDTH. LANDSCAPE BLOCK FRONTAGE • GROUND FLOOR: SEE TABLES 38.310.030-.040 FOR PERMITTED USE DETAILS.• BUILDING PLACEMENT: 10' MIN. FRONT SETBACK, EXCEPT WHERE GREATER SETBACKS ARE SPECIFIED IN THE DISTRICT IN DIVISION 38.220.• BUILDING ENTRANCES: BUILDING ENTRANCES MUST BE VISIBLE AND DIRECTLY ACCESSIBLE FROM THE STREET. FOR USES THAT FRONT ON MULTIPLE MIXED DESIGNATED BLOCK FRONTAGES, ENTRY ALONG BOTH STREETS IS ENCOURAGED, BUT NOT REQUIRED.• TRANSPARENCY:FOR BUILDINGS DESIGNED WITH GROUND LEVEL NON-RESIDENTIAL USES, AT LEAST 25% OF THE GROUND FLOOR BETWEEN 4'-8' ABOVE THE SIDEWALK.FOR RESIDENTIAL USES, AT LEAST 15% OF THE ENTIRE FAÇADE (ALL VERTICAL SURFACES GENERALLY FACING THE STREET). WINDOWS MUST BE PROVIDED ON ALL HABITABLE FLOORS OF THE FAÇADE.OTHER BUILDINGS DESIGNED WITH NON-RESIDENTIAL USES ON THE GROUND FLOOR WITHIN 10' OF SIDEWALK, AT LEAST 40% OF THE GROUND FLOOR BETWEEN 4'-8' ABOVE THE GROUND LEVEL SURFACE.• WEATHER PROTECTION: PROVIDE WEATHER PROTECTION AT LEAST 3’ DEEP OVER PRIMARY BUSINESS AND RESIDENTIAL ENTRIES• PARKING LOCATION: PROVIDE 10' MIN. BUFFER OF LANDSCAPING BETWEEN THE STREET AND OFF STREET PARKING AREAS• LANDSCAPING: AREA B/N STREET & BLDG MUST BE LANDSCAPED, PRIVATE PORCH OR PATIO SPACE, AND/OR PEDESTRIAN-ORIENTED SPACE• SIDEWALK WIDTH: 6' MINIMUM SIDEWALKS ARE REQUIRED ADJACENT TO ARTERIAL STREETS AND PUBLIC PARKS AND 5' MINIMUM WIDTH IN OTHER AREAS, EXCEPT THE REVIEW AUTHORITY MAY REQUIRE WIDER SIDEWALKS IN SPECIAL AREAS WHERE CALLED FOR IN ADOPTED PLANS OR WHERE SIGNIFICANT PEDESTRIAN TRAFFIC IS ANTICIPATED. FAÇADE ARTICULATION STOREFRONTS AND OTHER BUILDINGS WITH NON-RESIDENTIAL USES ON THE GROUND LEVEL MUST INCLUDE A MINIMUM OF THREE OF THE FOLLOWING ARTICULATION FEATURES EVERY 60 FEET (MAXIMUM) TO CREATE A HUMAN SCALED FAÇADE PATTERN:• WINDOWS• ENTRIES• USE OF WEATHER PROTECTION FEATURES• USE OF STRUCTURAL EXPRESSION• CHANGE IN ROOFLINE PER SUBSECTION F BELOW• CHANGE IN BUILDING MATERIAL OR SIDING STYLE• ARTICULATION OF A SINGLE BUILDING MATERIAL THROUGH VARYING COLORS, TEXTURES, OR INCORPORATING JOINTS OR AN INTEGRATED TRIM PATTERN• OTHER DESIGN TECHNIQUES THAT EFFECTIVELY REINFORCE A HUMAN-SCALED PATTERN COMPATIBLE WITH THE BUILDING'S SURROUNDING CONTEXT• PROVIDING VERTICAL ELEMENTS SUCH AS A TRELLIS WITH PLANTS, GREEN WALL, ART ELEMENT• PROVIDING VERTICAL BUILDING MODULATION OF AT LEAST 12 INCHES IN DEPTH IF TIED TO A CHANGE IN ROOFLINE PER SUBSECTION F BELOW OR A CHANGE IN BUILDING MATERIAL, SIDING STYLE, OR COLOR RESIDENTIAL BUILDINGS MUST INCLUDE ARTICULATION FEATURES AT APPROPRIATE INTERVALS RELATIVE TO THE SCALE OF THE FAÇADE IN ORDER TO REDUCE THE PERCEIVED MASSING OF THE BUILDING AND ADD VISUAL INTEREST. AT LEAST THREE OF THE FEATURES (LISTED ABOVE) MUST BE EMPLOYED AT INTERVALS RELATIVE TO THE INDIVIDUAL DWELLING UNITS OR AT A MAXIMUM OF EVERY 30 FEET. THE SCALE OF THE FAÇADE ARTICULATION SHOULD BE COMPATIBLE WITH THE SURROUNDING CONTEXT. ADDITIONAL FEATURES MAY INCLUDE:• USE OF VERTICAL PIERS/COLUMNS• OTHER DESIGN TECHNIQUES THAT EFFECTIVELY BREAK UP THE MASSING AT NO MORE THAN 30-FOOT INTERVALS SPECIAL RESIDENTIAL BLOCK FRONTAGE STANDARD COMPLIANCE SEE OVERALL FLOOR PLAN SHEET AS.111 FOR COMPLIANCE WITH ONE OF THE PUBLIC/PRIVATE 1" = 1'-0"4RENDERING - ASPEN 1" = 1'-0"5RENDERING - IDA 1" = 1'-0"6RENDERING - COTTONWOOD REVISIONS NO. DATE. COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 88 COMPREHENSIVE SIGN ELEVATIONS WALL SIGN / PROJECT SIGN 36 SF WALL SIGN 36 SF PROJECTING SIGNS MAX 8 SF RESIDENTIAL BUILDING IDENTIFIER 8 SF RESIDENTIAL BUILDING IDENTIFIER 4 SF RESIDENTIAL BUILDING IDENTIFIER 8 SFPROJECTING SIGNS MAX 8 SF 687 3 2 1 AS.104R2 SCALE ISSUE DATE PROJECT PRINTEDSTAMPENSC ARCHITECTURE | URBANISM | DESIGNECONSULTANTS SITE PLAN -SP1 As indicated 1/22/2019 12:06:05 PMAS.201 01-21-2019 STREETELEVATIONS COTTONWOOD & IDABOZEMAN, MT 59715 1707COTTONWOOD+ IDA 1/16" = 1'-0"2 SITE ELEVATION - EAST (IDA) 1/16" = 1'-0"3 SITE ELEVATION - SOUTH (COTTONWOOD) 1/16" = 1'-0"1 SITE ELEVATION - NORTH (ASPEN) SITE KEY PLAN - AS.201 BLOCK FRONTAGE ARTICULATION & TRANSPARENCY PER BMC SECTION 38.510.010.B, MIXED BLOCK FRONTAGE DESIGNATIONS HAVE THE OPTION TO COMPLY WITH EITHER STOREFRONT OR LANDSCAPE BLOCK FRONTAGE PROVISIONS WITH ADHERANCE TO MODIFICATIONS PER TABLE 38.510.030.C: STOREFRONT BLOCK FRONTAGE • GROUND FLOOR: NON-RESIDENTIAL USES SPECIFIED IN 38.10.020, EXCEPT FOR LOBBIES ASSOCIATED WITH RESIDENTIAL OR HOTEL/MOTEL USES ON UPPER FLOORS.• FLOOR TO CEILING HEIGHT: 13’ MIN. (NEW BLDGS)• RETAIL SPACE DEPTH: 20’ MIN. (NEW BLDGS)• BUILDING PLACEMENT: REQ. @ FRONT PROPERTY LINE / BACK EDGE OF SIDEWALK ADDN’L SETBACKS ALLOWED FOR WIDENED SIDEWALKS OR PEDESTRIAN ORIENTED SPACE• BUILDING ENTRANCES: MUST FACE STREET. FOR CORNER BUILDINGS, ENTRANCES MAY FACE THE STREET CORNER.• TRANSPARENCY: AT LEAST 60% OF GROUND FLOOR BETWEEN 30" AND 10' ABOVE SIDEWALK FOR PRIMARY FAÇADES AND 40% OF GROUND FLOOR BETWEEN 30" AND 10' ABOVE SIDEWALK FOR SECONDARY FAÇADES.DISPLAY WINDOWS MAY COUNT FOR UP TO 50% OF THE TRANSPARENCY REQUIREMENT PROVIDED THEY ARE AT LEAST 30" IN DEPTH TO ALLOW FOR CHANGEABLE DISPLAYS. TACK-ON DISPLAY CASES DO NOT QUALIFY AS TRANSPARENT WINDOW AREAS.• WEATHER PROTECTION: WEATHER PROTECTION W/ 8-15’ VERTICAL CLEARANCE AT LEAST 5’ IN AVG. DEPTH ALONG T LEAST 60% OF FACADE• PARKING LOCATION: NEW SURFACE AND STRUCTURED PARKING AREAS (GROUND FLOOR) MUST BE PLACED TO THE SIDE OR REAR OF STRUCTURES AND ARE LIMITEDTO 60' OF STREET FRONTAGE. PROVIDE A 6' MINIMUM BUFFER OF LANDSCAPING BETWEEN THE STREET AND OFF STREET PARKING AREAS MEETING THE PERFORMANCE STANDARDS OF DIVISION 38.550.• SIDEWALK WIDTH: 12 FEET MINIMUM BETWEEN CURB EDGE AND STOREFRONT (AREA INCLUDES CLEAR/ BUFFER ZONE WITH STREET TREES). SETBACKS AND UTILITY EASEMENTS MUST ALSO BE CONSIDERED AND MAY RESULT IN A LARGER MINIMUM SIDEWALK WIDTH. LANDSCAPE BLOCK FRONTAGE • GROUND FLOOR: SEE TABLES 38.310.030-.040 FOR PERMITTED USE DETAILS.• BUILDING PLACEMENT: 10' MIN. FRONT SETBACK, EXCEPT WHERE GREATER SETBACKS ARE SPECIFIED IN THE DISTRICT IN DIVISION 38.220.• BUILDING ENTRANCES: BUILDING ENTRANCES MUST BE VISIBLE AND DIRECTLY ACCESSIBLE FROM THE STREET. FOR USES THAT FRONT ON MULTIPLE MIXED DESIGNATED BLOCK FRONTAGES, ENTRY ALONG BOTH STREETS IS ENCOURAGED, BUT NOT REQUIRED.• TRANSPARENCY:FOR BUILDINGS DESIGNED WITH GROUND LEVEL NON-RESIDENTIAL USES, AT LEAST 25% OF THE GROUND FLOOR BETWEEN 4'-8' ABOVE THE SIDEWALK.FOR RESIDENTIAL USES, AT LEAST 15% OF THE ENTIRE FAÇADE (ALL VERTICAL SURFACES GENERALLY FACING THE STREET). WINDOWS MUST BE PROVIDED ON ALL HABITABLE FLOORS OF THE FAÇADE.OTHER BUILDINGS DESIGNED WITH NON-RESIDENTIAL USES ON THE GROUND FLOOR WITHIN 10' OF SIDEWALK, AT LEAST 40% OF THE GROUND FLOOR BETWEEN 4'-8' ABOVE THE GROUND LEVEL SURFACE.• WEATHER PROTECTION: PROVIDE WEATHER PROTECTION AT LEAST 3’ DEEP OVER PRIMARY BUSINESS AND RESIDENTIAL ENTRIES• PARKING LOCATION: PROVIDE 10' MIN. BUFFER OF LANDSCAPING BETWEEN THE STREET AND OFF STREET PARKING AREAS• LANDSCAPING: AREA B/N STREET & BLDG MUST BE LANDSCAPED, PRIVATE PORCH OR PATIO SPACE, AND/OR PEDESTRIAN-ORIENTED SPACE• SIDEWALK WIDTH: 6' MINIMUM SIDEWALKS ARE REQUIRED ADJACENT TO ARTERIAL STREETS AND PUBLIC PARKS AND 5' MINIMUM WIDTH IN OTHER AREAS, EXCEPT THE REVIEW AUTHORITY MAY REQUIRE WIDER SIDEWALKS IN SPECIAL AREAS WHERE CALLED FOR IN ADOPTED PLANS OR WHERE SIGNIFICANT PEDESTRIAN TRAFFIC IS ANTICIPATED. FAÇADE ARTICULATION STOREFRONTS AND OTHER BUILDINGS WITH NON-RESIDENTIAL USES ON THE GROUND LEVEL MUST INCLUDE A MINIMUM OF THREE OF THE FOLLOWING ARTICULATION FEATURES EVERY 60 FEET (MAXIMUM) TO CREATE A HUMAN SCALED FAÇADE PATTERN:• WINDOWS• ENTRIES• USE OF WEATHER PROTECTION FEATURES• USE OF STRUCTURAL EXPRESSION• CHANGE IN ROOFLINE PER SUBSECTION F BELOW• CHANGE IN BUILDING MATERIAL OR SIDING STYLE• ARTICULATION OF A SINGLE BUILDING MATERIAL THROUGH VARYING COLORS, TEXTURES, OR INCORPORATING JOINTS OR AN INTEGRATED TRIM PATTERN• OTHER DESIGN TECHNIQUES THAT EFFECTIVELY REINFORCE A HUMAN-SCALED PATTERN COMPATIBLE WITH THE BUILDING'S SURROUNDING CONTEXT• PROVIDING VERTICAL ELEMENTS SUCH AS A TRELLIS WITH PLANTS, GREEN WALL, ART ELEMENT• PROVIDING VERTICAL BUILDING MODULATION OF AT LEAST 12 INCHES IN DEPTH IF TIED TO A CHANGE IN ROOFLINE PER SUBSECTION F BELOW OR A CHANGE IN BUILDING MATERIAL, SIDING STYLE, OR COLOR RESIDENTIAL BUILDINGS MUST INCLUDE ARTICULATION FEATURES AT APPROPRIATE INTERVALS RELATIVE TO THE SCALE OF THE FAÇADE IN ORDER TO REDUCE THE PERCEIVED MASSING OF THE BUILDING AND ADD VISUAL INTEREST. AT LEAST THREE OF THE FEATURES (LISTED ABOVE) MUST BE EMPLOYED AT INTERVALS RELATIVE TO THE INDIVIDUAL DWELLING UNITS OR AT A MAXIMUM OF EVERY 30 FEET. THE SCALE OF THE FAÇADE ARTICULATION SHOULD BE COMPATIBLE WITH THE SURROUNDING CONTEXT. ADDITIONAL FEATURES MAY INCLUDE:• USE OF VERTICAL PIERS/COLUMNS• OTHER DESIGN TECHNIQUES THAT EFFECTIVELY BREAK UP THE MASSING AT NO MORE THAN 30-FOOT INTERVALS SPECIAL RESIDENTIAL BLOCK FRONTAGE STANDARD COMPLIANCE SEE OVERALL FLOOR PLAN SHEET AS.111 FOR COMPLIANCE WITH ONE OF THE PUBLIC/PRIVATE 1" = 1'-0"4RENDERING - ASPEN 1" = 1'-0"5RENDERING - IDA 1" = 1'-0"6RENDERING - COTTONWOOD REVISIONS NO. DATE. 3 21 AS.104R2 SCALE ISSUE DATE PROJECT PRINTEDSTAMPENSC ARCHITECTURE | URBANISM | DESIGNECONSULTANTS SITE PLAN -SP1 As indicated 1/22/2019 12:06:51 PMAS.202 01-21-2019 SITEELEVATIONS COTTONWOOD & IDABOZEMAN, MT 59715 1707COTTONWOOD+ IDA 1/16" = 1'-0"1 SITE ELEVATION - WEST (MISCO MILL) 1/16" = 1'-0"2 SITE ELEVATION - EAST BLDGS 5,6 1/16" = 1'-0"3 SITE ELEVATION - SOUTH BLDGS 1,2,6 SITE KEY PLAN - AS.202 BLOCK FRONTAGE ARTICULATION & TRANSPARENCY PER BMC SECTION 38.510.010.B, MIXED BLOCK FRONTAGE DESIGNATIONS HAVE THE OPTION TO COMPLY WITH EITHER STOREFRONT OR LANDSCAPE BLOCK FRONTAGE PROVISIONS WITH ADHERANCE TO MODIFICATIONS PER TABLE 38.510.030.C: STOREFRONT BLOCK FRONTAGE • GROUND FLOOR: NON-RESIDENTIAL USES SPECIFIED IN 38.10.020, EXCEPT FOR LOBBIES ASSOCIATED WITH RESIDENTIAL OR HOTEL/MOTEL USES ON UPPER FLOORS.• FLOOR TO CEILING HEIGHT: 13’ MIN. (NEW BLDGS)• RETAIL SPACE DEPTH: 20’ MIN. (NEW BLDGS)• BUILDING PLACEMENT: REQ. @ FRONT PROPERTY LINE / BACK EDGE OF SIDEWALK ADDN’L SETBACKS ALLOWED FOR WIDENED SIDEWALKS OR PEDESTRIAN ORIENTED SPACE• BUILDING ENTRANCES: MUST FACE STREET. FOR CORNER BUILDINGS, ENTRANCES MAY FACE THE STREET CORNER.• TRANSPARENCY: AT LEAST 60% OF GROUND FLOOR BETWEEN 30" AND 10' ABOVE SIDEWALK FOR PRIMARY FAÇADES AND 40% OF GROUND FLOOR BETWEEN 30" AND 10' ABOVE SIDEWALK FOR SECONDARY FAÇADES.DISPLAY WINDOWS MAY COUNT FOR UP TO 50% OF THE TRANSPARENCY REQUIREMENT PROVIDED THEY ARE AT LEAST 30" IN DEPTH TO ALLOW FOR CHANGEABLE DISPLAYS. TACK-ON DISPLAY CASES DO NOT QUALIFY AS TRANSPARENT WINDOW AREAS.• WEATHER PROTECTION: WEATHER PROTECTION W/ 8-15’ VERTICAL CLEARANCE AT LEAST 5’ IN AVG. DEPTH ALONG T LEAST 60% OF FACADE• PARKING LOCATION: NEW SURFACE AND STRUCTURED PARKING AREAS (GROUND FLOOR) MUST BE PLACED TO THE SIDE OR REAR OF STRUCTURES AND ARE LIMITEDTO 60' OF STREET FRONTAGE. PROVIDE A 6' MINIMUM BUFFER OF LANDSCAPING BETWEEN THE STREET AND OFF STREET PARKING AREAS MEETING THE PERFORMANCE STANDARDS OF DIVISION 38.550.• SIDEWALK WIDTH: 12 FEET MINIMUM BETWEEN CURB EDGE AND STOREFRONT (AREA INCLUDES CLEAR/ BUFFER ZONE WITH STREET TREES). SETBACKS AND UTILITY EASEMENTS MUST ALSO BE CONSIDERED AND MAY RESULT IN A LARGER MINIMUM SIDEWALK WIDTH. LANDSCAPE BLOCK FRONTAGE • GROUND FLOOR: SEE TABLES 38.310.030-.040 FOR PERMITTED USE DETAILS.• BUILDING PLACEMENT: 10' MIN. FRONT SETBACK, EXCEPT WHERE GREATER SETBACKS ARE SPECIFIED IN THE DISTRICT IN DIVISION 38.220.• BUILDING ENTRANCES: BUILDING ENTRANCES MUST BE VISIBLE AND DIRECTLY ACCESSIBLE FROM THE STREET. FOR USES THAT FRONT ON MULTIPLE MIXED DESIGNATED BLOCK FRONTAGES, ENTRY ALONG BOTH STREETS IS ENCOURAGED, BUT NOT REQUIRED.• TRANSPARENCY:FOR BUILDINGS DESIGNED WITH GROUND LEVEL NON-RESIDENTIAL USES, AT LEAST 25% OF THE GROUND FLOOR BETWEEN 4'-8' ABOVE THE SIDEWALK.FOR RESIDENTIAL USES, AT LEAST 15% OF THE ENTIRE FAÇADE (ALL VERTICAL SURFACES GENERALLY FACING THE STREET). WINDOWS MUST BE PROVIDED ON ALL HABITABLE FLOORS OF THE FAÇADE.OTHER BUILDINGS DESIGNED WITH NON-RESIDENTIAL USES ON THE GROUND FLOOR WITHIN 10' OF SIDEWALK, AT LEAST 40% OF THE GROUND FLOOR BETWEEN 4'-8' ABOVE THE GROUND LEVEL SURFACE.• WEATHER PROTECTION: PROVIDE WEATHER PROTECTION AT LEAST 3’ DEEP OVER PRIMARY BUSINESS AND RESIDENTIAL ENTRIES• PARKING LOCATION: PROVIDE 10' MIN. BUFFER OF LANDSCAPING BETWEEN THE STREET AND OFF STREET PARKING AREAS• LANDSCAPING: AREA B/N STREET & BLDG MUST BE LANDSCAPED, PRIVATE PORCH OR PATIO SPACE, AND/OR PEDESTRIAN-ORIENTED SPACE• SIDEWALK WIDTH: 6' MINIMUM SIDEWALKS ARE REQUIRED ADJACENT TO ARTERIAL STREETS AND PUBLIC PARKS AND 5' MINIMUM WIDTH IN OTHER AREAS, EXCEPT THE REVIEW AUTHORITY MAY REQUIRE WIDER SIDEWALKS IN SPECIAL AREAS WHERE CALLED FOR IN ADOPTED PLANS OR WHERE SIGNIFICANT PEDESTRIAN TRAFFIC IS ANTICIPATED. FAÇADE ARTICULATION STOREFRONTS AND OTHER BUILDINGS WITH NON-RESIDENTIAL USES ON THE GROUND LEVEL MUST INCLUDE A MINIMUM OF THREE OF THE FOLLOWING ARTICULATION FEATURES EVERY 60 FEET (MAXIMUM) TO CREATE A HUMAN SCALED FAÇADE PATTERN:• WINDOWS• ENTRIES• USE OF WEATHER PROTECTION FEATURES• USE OF STRUCTURAL EXPRESSION• CHANGE IN ROOFLINE PER SUBSECTION F BELOW• CHANGE IN BUILDING MATERIAL OR SIDING STYLE• ARTICULATION OF A SINGLE BUILDING MATERIAL THROUGH VARYING COLORS, TEXTURES, OR INCORPORATING JOINTS OR AN INTEGRATED TRIM PATTERN• OTHER DESIGN TECHNIQUES THAT EFFECTIVELY REINFORCE A HUMAN-SCALED PATTERN COMPATIBLE WITH THE BUILDING'S SURROUNDING CONTEXT• PROVIDING VERTICAL ELEMENTS SUCH AS A TRELLIS WITH PLANTS, GREEN WALL, ART ELEMENT• PROVIDING VERTICAL BUILDING MODULATION OF AT LEAST 12 INCHES IN DEPTH IF TIED TO A CHANGE IN ROOFLINE PER SUBSECTION F BELOW OR A CHANGE IN BUILDING MATERIAL, SIDING STYLE, OR COLOR RESIDENTIAL BUILDINGS MUST INCLUDE ARTICULATION FEATURES AT APPROPRIATE INTERVALS RELATIVE TO THE SCALE OF THE FAÇADE IN ORDER TO REDUCE THE PERCEIVED MASSING OF THE BUILDING AND ADD VISUAL INTEREST. AT LEAST THREE OF THE FEATURES (LISTED ABOVE) MUST BE EMPLOYED AT INTERVALS RELATIVE TO THE INDIVIDUAL DWELLING UNITS OR AT A MAXIMUM OF EVERY 30 FEET. THE SCALE OF THE FAÇADE ARTICULATION SHOULD BE COMPATIBLE WITH THE SURROUNDING CONTEXT. ADDITIONAL FEATURES MAY INCLUDE:• USE OF VERTICAL PIERS/COLUMNS• OTHER DESIGN TECHNIQUES THAT EFFECTIVELY BREAK UP THE MASSING AT NO MORE THAN 30-FOOT INTERVALS SPECIAL RESIDENTIAL BLOCK FRONTAGE STANDARD COMPLIANCE SEE OVERALL FLOOR PLAN SHEET AS.111 FOR COMPLIANCE WITH ONE OF THE PUBLIC/PRIVATE REVISIONS NO. DATE. COTTONWOOD + IDA RESPONSE & RESUBMITAL II || JANUARY 2019 page 89 COMPREHENSIVE SIGN ELEVATIONS CONTINUED GENERAL BUILDING IDENTIFIER 10 SF EACH FACADE TENANT ROSTER 16 SF TENANT ROSTER AT COMMERCIAL BUILDING ALSO PLACED AT ALL PUBLIC ENTRIES (SOUTH EAST) 16 SF EACH ADDITIONAL 32 SF RESIDENTIAL BUILDING IDENTIFIER 8 SF RESIDENTIAL BUILDING IDENTIFIER 8 SF 688 PROJECT TYPEPLANNED UNIT DEVELOPMENT INCLUDING: DWELLING UNITS, OFFICE BUILDING, ARTISAN MANUFACTURING WORKSHOPS, PUBLIC COURTYARD, RENOVATION OF AN EXISTING BUILDING ON SITE, AND UNDERGROUND PARKING LOTPROPOSED USERESIDENTIAL, COMMERCIAL, MANUFACTURING, COMMUNITY SPACESCOPE• DWELLINGS:1. 92 DWELLINGS (20% TO MEET AFFORDABLE HOUSING ORDINANCE)A. STUDIO UNITS 40B. 1 BEDROOM 34C. 2 BEDROOM 18• BUILDING HEIGHT(S): 52 FOOT MAXIMUM BUILDING HEIGHT• NUMBER OF BUILDINGS: 6 TOTAL (5 NEW, 1 RENOVATED)• TOTAL PARKING SPACES: 2001. 96 SPACES IN UNDERGROUND GARAGE2. 32 SPACES AT ON-STREET LOCATION 3. 72 SPACES AT OFF-SITE LOCATIONINTENTCOTTONWOOD + IDA MIXED-USE DEVELOPMENT WILL CREATE A VIBRANT AND DIVERSE COMMUNITY ON A 2-ACRE UNDERUTILIZED INDUSTRIAL SITE, PROVIDING THE MOST DIVERSE RANGE OF HOUSING TYPES AVAILABLE IN BOZEMANNAME OF PROJECT: COTTONWOOD AND IDA NEIGHBORHOOD DEVELOPMENTLOCATION OF PROJECT: COTTONWOOD & IDA, BOZEMAN, MT 59715BLOCK / LOT(S): BLOCK 105 / LOTS 5, 28PARCEL SIZE(S)2.07 ACRES (90,013 SQ FT)PROJECT TEAMDEVELOPERBANGTAIL PARTNERS, LLC.CONTACT: JON EVANS33 NORTH BLACK AVE.BOZEMAN, MT 59715406-451-1470ARCHITECTSOPENSCOPE STUDIO, INC.CONTACT: IAN DUNN / MARK HOGAN1776 18TH STREETSAN FRANCISCO, CA415-891-0954IANDUNN@OPENSCOPESTUDIO.COMMARKHOGAN@OPENSCOPESTUDIO.COMTHINKTANK DESIGN GROUPCONTACT: ERIK NELSON / BRIAN CALDWELL33 NORTH BLACK AVE.BOZEMAN, MT 59715406-587-3628ERIK@THINKTANKARCHITECTS.COMBRIAN@THINKTANKARCHITECTS.COMFERNAU & HARTMAN ARCHITECTSCONTACT: RICHARD FERNAU, FAIA506 MILES STREETCLYDE PARK, MT 59018406-686-9193RF@FERNAUHARTMAN.COMGENERAL CONTRACTORLANGLAS & ASSOCIATESCONTACT: LOREN CANTRELL1019 E. MAIN ST., SUITE 101BOZEMAN, MT 59715406-585-3420LORENC@LANGLAS.COMLANDSCAPE ARCHITECTFLETCHER STUDIOCONTACT: DAVID FLETCHER / CHRIS WATKINS2325 3RD STREET, #413SAN FRANCISCO, CA 94107415-431-7878DFLETCHER@FLETCHERSTUDIO.COMCWATKINS@FLETCHERSTUDIO.COMGEOTECHNICAL ENGINEER ALLIED ENGINEERING SERVICES CONTACT: LEE EVANS 32 DISCOVERY DRIVE BOZEMAN, MT 59718 406-582-0221 LEVANS@ALLIEDENGINEERING.COMCIVIL ENGINEERSANDERSON STEWARTCONTACT: MIKE RUSSELL106 EAST BABCOCK STREETBOZEMAN, MT 57715406-922-4313MRUSSELL@SANDERSONSTEWART.COMSTRUCTURAL ENGINEERNISHKIAN-MONKSCONTACT: TY MONKS / MATT CLONINGER 108 WEST BABCOCK STREETBOZEMAN, MT 59715406-582-9901TMONKS@NISHKIAN.COMMCLONINGER@NISHKIAN.COMMEP ENGINEEREMERALD CITY ENGINEERS, INC.CONTACT: ADAM FRENCH, P.E. / SHAWN DOI 21705 HIGHWAY 99MOUNTLAKE TERRACE, WA 98043425-741-1200AFRENCH@EMERALDCITYENG.COMSDOI@EMERALDCITYENG.COMACOUSTICALCHARLES M. SALTER ASSOCIATES, INC.CONTACT: ETHAN SALTER / FELIPE TAVERA130 SUTTER STREET, FLOOR 5SAN FRANCISCO, CA 94104415-397-0442ETHAN.SALTER@CMSALTER.COMFELIPE.TAVERA@CMSALTER.COMBUILDING ENVELOPESIMPSON GUMPERTZ & HEGERCONTACT: MATTHEW S. WORSTER100 PINE STREET, SUITE 1600SAN FRANCISCO, CA 94111415-495-3700MSWORSTER@SGH.COMLEED / SUSTAINABILITYKATH WILLIAMS + ASSOCIATESCONTACT: KATH WILLIAMSP.O. BOX 1191BOZEMAN, MT 59771406-586-3175KATH@KATHWILLIAMS.COMLIGHTING DESIGN OPENSCOPE STUDIO, INC.CONTACT: GEORGIA KRAPF 1776 18TH STREETSAN FRANCISCO, CA 920-541-6563GEORGIAKRAPF@OPENSCOPESTUDIO.COMPROJECT LOCATION1/2 MILE AREA AROUND SITESCALEISSUE DATEPROJECTPRINTEDSTAMPENSCARCHITECTURE | URBANISM | DESIGNECONSULTANTSSITE PLAN -SP1 12" = 1'-0"1/24/2019 9:55:10 AMAS.00001-21-2019TITLE SHEETCOTTONWOOD & IDABOZEMAN, MT 597151707COTTONWOOD+ IDASITE PLAN - SHEET INDEXARCHITECTURALAS.000 TITLE SHEETAS.100 OVERALL PROJECT SITE PLANAS.101 ARCHITECTURAL SITE PLANAS.102 SITE USAGE INFORMATION PLANAS.103 ACCESSIBILITY DIAGRAMSAS.104 SITE DETAILSAS.110 OVERALL FLOOR PLAN - LVL 0AS.111 OVERALL FLOOR PLAN - LVL 1AS.112 OVERALL FLOOR PLAN - LVL 2AS.113 OVERALL FLOOR PLAN - LVL 3AS.114 OVERALL FLOOR PLAN - ROOF LEVELAS.201 STREET ELEVATIONSAS.202 SITE ELEVATIONSAS.203 SITE ELEVATIONSAS.204 SITE ELEVATIONSAS.301 SITE SECTIONS NORTH-SOUTHAS.302 SITE SECTIONS EAST-WESTAS.303 STREET CROSS SECTIONS18PROJECT NARRATIVEPROJECT INFORMATIONCONTACTSCOTTONWOOD + IDA MIXED-USE DEVELOPMENTA VIBRANT, DIVERSE, ATTAINABLE COMMUNITY IN THE CORE OF THE NORTHEASTERN NEIGHBORHOODDEVELOPED BY: IMPERIAL DEVELOPMENT, LLCPROPERTY OWNER: BANGTAIL PARTNERS, LLCVICINITY MAPDATE ISSUED01/21/201901/21/201901/21/201901/21/201901/21/201901/21/201901/21/201901/21/201901/21/201901/21/201901/21/201901/21/201901/21/201901/21/201901/21/201901/21/201901/21/201901/22/2019EXISTING TOPOGRAPY AND DEMOC1.001/22/2019PROPOSED LOT BOUNDARY ALIGNMENTSC1.101/22/2019SITE PLANC2.101/22/2019GRADING PLANC3.001/22/2019STORM DRAIN PLANC4.001/22/2019UTILITY PLANC5.001/22/2019EROSION CONTROL PLANC6.001/22/2019CIVIL CONSTRUCTION DETAILSC7.0REVISIONSNO. DATE.901/21/2019ILLUSTRATIVE SITE PLANL0.0001/21/2019MATERIALS PLANL1.0001/21/2019TAKE-OFF PLANL1.0101/21/2019PLANTING PALETTEL2.0001/21/2019PLANTING PLANL2.0101/21/2019IRRIGATION PLANL3.0001/21/2019GRADING PLANL4.0001/21/2019STORMWATER PLANL4.0101/21/2019SNOW STORAGE PLANL5.0001/21/2019LIGHTING DIAGRAML6.0001/21/2019PERFORMANCE POINTSL7.001141 SHEETS01/21/2019CIVILLANDSCAPESITE LIGHTING01/21/2019LUMINAIRE SCHEDULEE0.0101/21/2019SITE LIGHTINGE1.0001/21/2019SITE PHOTOMETRICSE1.01 301/22/2019OVERALL IMPROVEMENTS PLANC2.0689 6'-0"EAST COTTONWOOD STREETNORTH IDA AVENUEEAST ASPEN STREETNORTH WALLACE AVENUE180° 56' 59"300.06'89° 19' 05"300.15'269° 19' 05"300.05'180° 55' 54"300.06'PROPERTY LINEPROPERTY LINEPROPERTY LINEPROPERTY LINEBUILDING 6OFFICEBUILDING 1RENTAL APARTMENTSBUILDING 2STUDIOSBUILDING 3WALK-UPS & FLATSBUILDING 4COTTONWOOD LOFTSBLDG. 5EXIST'G REHAB. BLDG.ON-GRADE COURTYARDCOURTYARD OVER PARKING BELOWDRIVEWAY TO PARKING GARAGEEMERGENCY VEHICLE ACCESSCOMMERCIAL PARKING LOTPOCKET PARKCOURTYARD OVER PARKING BELOW72 SPACES6 SPACES9 SPACES17 SPACES11 SPACES11 SPACES18 SPACESDISTANCE OFFICE ENTRY TO PARKINGR 345'-0"EMERGENCY VEHICLE ACCESSFRO N T STREETPROJECT LOCATIONHMUM-1M-1M-2HMUE COTTONWOOD ST.E ASPEN ST.IDA AVE.WALLACE AVE.FR O N T ST.SEE CIVIL DRAWINGS FOR:• PUBLIC IMPROVEMENT ENGINEERING PLANSEE LANDSCAPE DRAWINGS FOR:• ILLUSTRATIVE SITE PLAN• MATERIAL PLANS• TAKE OFF PLAN• PLANTING PALETTE• PLANTING PLAN• IRRIGATION PLAN• GRADING PLAN• STORMWATER PLAN• SNOW STORAGE PLAN• LIGHTING DIAGRAM• PERFORMANCE POINTSSCALEISSUE DATEPROJECTPRINTEDSTAMPENSCARCHITECTURE | URBANISM | DESIGNECONSULTANTSSITE PLAN -SP1As indicated1/24/2019 9:48:20 AMAS.10001-21-2019OVERALLPROJECTSITE PLANCOTTONWOOD & IDABOZEMAN, MT 597151707COTTONWOOD+ IDA 1" = 40'-0"1SITE PLAN - OVERALL PROJECTNEARBY ZONING WITHIN 200 FEETSP1 REQUIREMENTS NOTESCONSTRUCTION ROUTE MAPREVISIONSNO. DATE.690 6'-0"1395 SFRESIDENT PLAZA 1125 SFPATIO100 SFPATIO1950 SFASPEN YARD4800 SFMILL YARD560 SFRESIDENT GREEN ROOF DECK75 SFBALCONY30704 SFRESIDUAL OPEN SPACEASPEN STREETCOTTONWOOD STREETIDA AVENUE113 SFPATIO1000 SFRESIDENT PLAZA 22900 SFRESIDENT PLAZA 3OPEN SPACE LEGENDCOMMERCIAL OPEN SPACEPRIVATE BALCONIES - 6' X 6' MIN.PRIVATE PATIOS - 8' X 8' MIN.PUBLIC PLAZARESIDENTIAL COMMON SPACERESIDUAL OPEN SPACEBUILDING 1RENTAL APARTMENTSBUILDING 2STUDIOSBUILDING 3WALK-UPS & FLATSBUILDING 4COTTONWOOD LOFTSBUILDING 5EXIST'G REHAB. BLDGPROPERTY LINEPROPERTY LINEPROPERTY LINEPROPERTY LINE100 SFPATIO600 SFRESIDENT GREEN ROOF DECK210 SFPATIO50 SFBALCONY70 SFBALCONY655 SFRESIDENT GREEN ROOF DECK50 SFBALCONY50 SFBALCONY50 SFBALCONY50 SFBALCONY70 SFBALCONY50 SFBALCONY50 SFBALCONY50 SFBALCONY50 SFBALCONY100 SFPATIO100 SFPATIO100 SFPATIO100 SFPATIO100 SFPATIO100 SFPATIO100 SFPATIO100 SFPATIO133 SFPATIO125 SFPATIO100 SFPATIO113 SFPATIOPARKING GARAGEDRIVEWAY100 SFPATIO100 SFPATIO100 SFPATIO100 SFPATIO100 SFPATIO100 SFPATIO100 SFPATIO100 SFPATIO100 SFPATIO210 SFPATIO210 SFPATIO210 SFPATIO210 SFPATIO210 SFPATIO26'-0" 13'-0"11'-4"9'-0"75'-0"26'-10"44'-9"20'-0"30'-0"17'-3"38'-0"BUILDING 6OFFICE20,000 SF NET LEASABLE2% COMMERCIAL OPEN SPACE400 SF OPEN SPACE REQUIRED14'-0"40'-0"120'-0"880 SFCOMMERCIALOPEN SPACE22'-0"40'-0"10'-0"21'-0"35'-0"16'-0"6'-9"7'-4"PUBLICLY ACCESSIBLE PUBLIC OPEN SPACEPUBLICLY ACCESSIBLE PUBLIC OPEN SPACEDOTTED PATH INDICATES PUBLIC ACCESS12'-6"8'-0"SCALEISSUE DATEPROJECTPRINTEDSTAMPENSCARCHITECTURE | URBANISM | DESIGNECONSULTANTSSITE PLAN -SP1 1" = 20'-0"1/24/2019 9:48:42 AMAS.10201-21-2019SITE USAGEINFORMATIONPLANCOTTONWOOD & IDABOZEMAN, MT 597151707COTTONWOOD+ IDA 1" = 20'-0"1SITE PLAN - USES AND AREASRESIDENTIAL OPEN SPACE REQUIREMENTSUNIT TYPE # BDRM COUNT OPEN SPACE REQ.01 APARTMENT BLDG0 STUDIO 1 23 2,300 SF1-BEDROOM 1 23 2,300 SF46 4,600 SF02 CO-LIVING0 STUDIO 1 18 1,800 SF18 1,800 SF03 TOWNHOUSES1-BEDROOM 1 6 600 SF2-BEDROOM TH 2 6 900 SF12 1,500 SF04 COTTONWOOD LOFTS1-BEDROOM 1 4 400 SF2-BEDROOM TH 2 12 1,800 SF16 2,200 SFTOTAL92 10,100 SFRESIDENTIAL OPEN SPACE PROVIDEDNAME AREABALCONY665 SFPRIVATE BALCONIES - 6' X 6' MIN.: 12 665 SFPATIO3,873 SFPRIVATE PATIOS - 8' X 8' MIN.: 31 3,873 SFRESIDENT GREEN ROOF DECK 1,815 SFRESIDENT PLAZA 11,395 SFRESIDENT PLAZA 21,000 SFRESIDENT PLAZA 32,900 SFRESIDENTIAL COMMON SPACE: 6 7,111 SFTOTAL11,649 SFREVISIONSNO. DATE.BUILDING 14600 SF OPEN SPACE REQUIRED WITH 46 UNITS4610 SF PROVIDED AS FOLLOWS:9 UNITS WITH PRIVATE PATIOS 900 SF (MIN. 100 SF EACH)37 UNITS ALLOCATED COMMON RESIDENTIAL OPEN SPACE:RESIDENTIAL GREEN ROOF DECK 1815 SFRESIDENTIAL PLAZA 1 (100%) 1395 SFRESIDENTIAL PLAZA 2 (50%) 500 SF3700 SF REQUIRED (37 UNITS x 100 SF)3710 SF PROVIDEDBUILDING 21800 SF OPEN SPACE REQUIRED WITH 18 UNITS2030 SF PROVIDED AS FOLLOWS:6 UNITS WITH PRIVATE PATIOS 710 SF (MIN. 100 SF EACH)12 UNITS ALLOCATED COMMON RESIDENTIAL OPEN SPACE:RESIDENTIAL PLAZA 2 (50%) 500 SFRESIDENTIAL PLAZA 3 (28%) 820 SF1200 SF REQUIRED (12 UNITS x 100 SF)1320 SF PROVIDEDBUILDING 31500 SF OPEN SPACE REQUIRED WITH 12 UNITS1860 SF PRIVATE OPEN SPACE PROVIDED AS FOLLOWS:1-BDRM UNITS W/ PRIVATE PATIOS600 SF REQUIRED (6 UNITS x 100 SF)600 SF PROVIDED (6 PATIOS x 100 SF EACH)2-BDRM UNITS W/ PRIVATE PATIOS 900 SF REQUIRED (6 UNITS x 150 SF)1260 SF PROVIDED (PATIOS x 210 SF EACH)BUILDING 42200 SF OPEN SPACE REQUIRED WITH 16 UNITS3465 SF PROVIDED AS FOLLOWS:1-BDRM UNITS W/ PRIVATE PATIOS600 SF REQUIRED (6 UNITS x 100 SF)600 SF PROVIDED (6 PATIOS x 100 SF EACH)1-BDRM UNITS W/ PRIVATE PATIOS400 SF REQUIRED (4 UNITS x 100 SF)400 SF PROVIDED (4 PATIOS x 100 SF EACH)2-BDRM UNITS W/ BALCONIES & COMMON OPEN SPACE1800 SF REQUIRED (12 UNITS x 150 SF) 665 SF AT PRIVATE BALCONIES1305 SF AT RESIDENTIAL PLAZA 3 (45%)REMAINING UNALLOCATED RESIDENTIAL OPEN SPACE783 SF AT RESIDENTIAL PLAZA 3 (27%)TOTAL SITE AREA = 90,012 SF LAND DEDICATION TABLEOPEN SPACE TYPE AREA% OF OVERALLSITE AREA% OF TOTALOPEN SPACECOMMERCIAL OPEN SPACE 880 SF 1.0% 1.8%PRIVATE RESIDENTIAL SPACE 4,539 SF 5.0% 9.1%PUBLIC PLAZA 6,750 SF 7.5% 13.5%RESIDENT COMMON OPEN SPACE 7,111 SF 7.9% 14.2%RESIDUAL OPEN SPACE 30,704 SF 34.1% 61.4%TOTAL 49,984 SF 55.5% 100.0%OPEN SPACE SUMMARIESRESIDENTIAL OPEN SPACE ALLOCATIONPUBLIC PARK LAND DEDICATION SUMMARYTRASH PICK-UPTRASH PICK-UPTRASH PICK-UPTRASH PICK-UP691 BUILDING 3:LANDSCAPE BLOCK FRONTAGE WITH RESIDENTIAL USESFAÇADE AREA 5542.05 S.F.TRANSPARENCY AREA 1299.72 S.F.REQUIRED TRANSPARENCY15%PROVIDED TRANSPARENCY 23.4%BUILDING 2: LANDSCAPE BLOCK FRONTAGE WITH RESIDENTIAL USESFAÇADE AREA4540 SFTRANSPARENCY AREA538 SFREQUIRED TRANSPARENCY15%PROVIDED TRANSPARENCY11.8%7'-0"PODIUM TO T.O. RIDGE43'-0"STANDING SEAM METAL ROOFINGWOOD SIDINGSTANDING SEAM METAL SIDINGCONC. RETAINING WALLSTANDING SEAM METAL SIDINGHORIZONTAL METAL SIDINGSIGNAGE: RESIDENTIAL BLDG. IDENTITY, 4 SFCOTTONWOODCONC. PLANTER WALLLANDSCAPED SLOPE; SEE LAND DWGSSIGNAGE: RESIDENTIAL BLDG. IDENTITY, 4 SFFAÇADE ARTICULATION AT30'-0"MAX. 30 FT. INTERVALFAÇADE ARTICULATION AT30'-0"MAX. 30 FT. INTERVALTOP OF RIDGE49'-1"SETBACK ENCROACHMENT8'-10"2'-3"PODIUM TO T.O. RIDGE48'-0"5'-0"PODIUM TO T.O. RIDGE43'-0"RAIL TYPE R2; SEE AS.104FENCE TYPE F1, SIM.; SEE AS.104GAS METERMETAL ACCENT PANEL AT WINDOWSBUILDING 5BUILDING 4:STOREFRONT BLOCK FRONTAGE AT PRIMARY FAÇADEPRIMARY FAÇADE AREA 1071.84 S.F.TRANSPARENCY AREA 515.57 S.F.REQUIRED TRANSPARENCY60% @ 2'-6" -10'-0" ABOVE SIDEWALKPROVIDED TRANSPARENCY48.1%BUILDING 3: LANDSCAPE BLOCK FRONTAGE WITH RESIDENTIAL USESFAÇADE AREA 1624 S.F.TRANSPARENCY AREA 150 S.F.REQUIRED TRANSPARENCY15%PROVIDED TRANSPARENCY9.3%SIGNAGE: PROJECT IDENTITY, 36 SFRESIDENTIAL BUILDING IDENTIFIER SIGN, 8 SF(7) PROJECTING SIGNS MAX. 8 SF EACHSIGNAGE: RESIDENTIAL BLDG. IDENTITY, 4 SFSTANDING SEAM METAL SIDINGSTANDING SEAM METAL ROOFINGWOOD SIDINGSTANDING SEAM METAL ROOFINGWOOD SIDINGCORRUGATED METAL SIDINGMTL. ROOFINGALUM WINDOW, TYP.IDAFAÇADE ARTICULATION AT30'-0"MAX. 30 FT. INTERVALFAÇADE ARTICULATION AT MAX. 60 FT. INTERVAL60'-0"WOOD SIDINGTOP OF RIDGE45'-1"RAIL TYPE R3; SEE AS.104MECHANICAL SCREENING; SEE AS.104ELECT. METERSDRIVEWAY ENTRY & EXITBUILDING 2:LANDSCAPE BLOCK FRONTAGE WITH RESIDENTIAL USEFAÇADE AREA 2543.29 S.F.TRANSPARENCY AREA 686.41 S.F.REQUIRED TRANSPARENCY15%PROVIDED TRANSPARENCY27.0%OVER SETBACKENCROACHMENTOVER SETBACKENCROACHMENTPODIUM TO T.O. ROOF46'-7"7'-0"PODIUM TO T.O. ROOF43'-0"SIGNAGE: GENERAL BLDG IDENTY, 10 SF EACH FAÇADESIGNAGE: TENANT ROSTER, 16 SF; PLACED AT ALL PUBLIC ENTRIES (SOUTH, EAST) 16 SF EACH, ADD'L 32 SFCORRUGATED METAL SIDINGPANEL SIDINGWOOD SIDINGWOOD SIDINGMETAL SIDINGPANEL SIDINGCONC. PLANTER WALLSPTD. WOOD SIDINGSTANDING SEAM METAL ROOFINGALUM. WINDOW, TYP.ALUM STOREFRONTSIGNAGE: RESIDENTIAL BLDG. IDENTITY, 8 SFWOOD SIDINGOPENBUILDING 1:LANDSCAPE BLOCK FRONTAGE WITH RESIDENTIAL USESFAÇADE AREA4011.41 S.F.TRANSPARENCY AREA870.32 S.F.REQUIRED TRANSPARECY15%PROVIDED TRANSPARENCY21.7%BUILDING 6: LANDSCAPE BLOCK FRONTAGE WITH GROUND FLOOR NON-RESIDENTIAL USESFAÇADE AREA 325.07 S.F.TRANSPARENCY AREA 96.03 S.F.REQUIRED TRANSPARENCY25% @ 4' -8' ABOVE SIDEWALKPROVIDED TRANSPARENCY29.5% @ 4' -8' ABOVE SIDEWALKFAÇADE ARTICULATION AT MAX. 60 FT. INTERVAL60'-0"MAX. 30 FT. INTERVALMAX. 30 FT. INTERVALFAÇADE ARTICULATION AT30'-0"FAÇADE ARTICULATION AT30'-0"SIGNAGE: RESIDENTIAL BLDG. IDENTITY, 8 SF6'-3"6'-0"PODIUM TO T.O. ROOF47'-4"RAIL TYPE R2; SEE AS.104RAIL TYPE R1; SEE AS.104MECH. SCREENING; SEE AS.104ELECT. METERSTRANSFORMER W/ SCREENING PER AS.104321SCALEISSUE DATEPROJECTPRINTEDSTAMPENSCARCHITECTURE | URBANISM | DESIGNECONSULTANTSSITE PLAN -SP1As indicated1/24/2019 10:18:51 AMAS.20101-21-2019STREETELEVATIONSCOTTONWOOD & IDABOZEMAN, MT 597151707COTTONWOOD+ IDA 1/16" = 1'-0"2SITE ELEVATION - EAST (IDA) 1/16" = 1'-0"3SITE ELEVATION - SOUTH (COTTONWOOD) 1/16" = 1'-0"1SITE ELEVATION - NORTH (ASPEN)SITE KEY PLAN - AS.201BLOCK FRONTAGE ARTICULATION & TRANSPARENCYPER BMC SECTION 38.510.010.B, MIXED BLOCK FRONTAGE DESIGNATIONS HAVE THE OPTION TO COMPLY WITH EITHER STOREFRONT OR LANDSCAPE BLOCK FRONTAGE PROVISIONS WITH ADHERANCE TO MODIFICATIONS PER TABLE 38.510.030.C:STOREFRONT BLOCK FRONTAGE• GROUND FLOOR: NON-RESIDENTIAL USES SPECIFIED IN 38.10.020, EXCEPT FOR LOBBIES ASSOCIATED WITH RESIDENTIAL OR HOTEL/MOTEL USES ON UPPER FLOORS.• FLOOR TO CEILING HEIGHT: 13’ MIN. (NEW BLDGS)• RETAIL SPACE DEPTH: 20’ MIN. (NEW BLDGS)• BUILDING PLACEMENT: REQ. @ FRONT PROPERTY LINE / BACK EDGE OF SIDEWALK ADDN’L SETBACKS ALLOWED FOR WIDENED SIDEWALKS OR PEDESTRIAN ORIENTED SPACE• BUILDING ENTRANCES: MUST FACE STREET. FOR CORNER BUILDINGS, ENTRANCES MAY FACE THE STREET CORNER.• TRANSPARENCY: AT LEAST 60% OF GROUND FLOOR BETWEEN 30" AND 10' ABOVE SIDEWALK FOR PRIMARY FAÇADES AND 40% OF GROUND FLOOR BETWEEN 30" AND 10' ABOVE SIDEWALK FOR SECONDARY FAÇADES.DISPLAY WINDOWS MAY COUNT FOR UP TO 50% OF THE TRANSPARENCY REQUIREMENT PROVIDED THEY ARE AT LEAST 30" IN DEPTH TO ALLOW FOR CHANGEABLE DISPLAYS. TACK-ON DISPLAY CASES DO NOT QUALIFY AS TRANSPARENT WINDOW AREAS.• WEATHER PROTECTION: WEATHER PROTECTION W/ 8-15’ VERTICAL CLEARANCE AT LEAST 5’ IN AVG. DEPTH ALONG T LEAST 60% OF FACADE• PARKING LOCATION: NEW SURFACE AND STRUCTURED PARKING AREAS (GROUND FLOOR) MUST BE PLACED TO THE SIDE OR REAR OF STRUCTURES AND ARE LIMITEDTO 60' OF STREET FRONTAGE. PROVIDE A 6' MINIMUM BUFFER OF LANDSCAPING BETWEEN THE STREET AND OFF STREET PARKING AREAS MEETING THE PERFORMANCE STANDARDS OF DIVISION 38.550.• SIDEWALK WIDTH: 12 FEET MINIMUM BETWEEN CURB EDGE AND STOREFRONT (AREA INCLUDES CLEAR/ BUFFER ZONE WITH STREET TREES). SETBACKS AND UTILITY EASEMENTS MUST ALSO BE CONSIDERED AND MAY RESULT IN A LARGER MINIMUM SIDEWALK WIDTH.LANDSCAPE BLOCK FRONTAGE• GROUND FLOOR: SEE TABLES 38.310.030-.040 FOR PERMITTED USE DETAILS.• BUILDING PLACEMENT: 10' MIN. FRONT SETBACK, EXCEPT WHERE GREATER SETBACKS ARE SPECIFIED IN THE DISTRICT IN DIVISION 38.220.• BUILDING ENTRANCES: BUILDING ENTRANCES MUST BE VISIBLE AND DIRECTLY ACCESSIBLE FROM THE STREET. FOR USES THAT FRONT ON MULTIPLE MIXED DESIGNATED BLOCK FRONTAGES, ENTRY ALONG BOTH STREETS IS ENCOURAGED, BUT NOT REQUIRED.• TRANSPARENCY:FOR BUILDINGS DESIGNED WITH GROUND LEVEL NON-RESIDENTIAL USES, AT LEAST 25% OF THE GROUND FLOOR BETWEEN 4'-8' ABOVE THE SIDEWALK.FOR RESIDENTIAL USES, AT LEAST 15% OF THE ENTIRE FAÇADE (ALL VERTICAL SURFACES GENERALLY FACING THE STREET). WINDOWS MUST BE PROVIDED ON ALL HABITABLE FLOORS OF THE FAÇADE.OTHER BUILDINGS DESIGNED WITH NON-RESIDENTIAL USES ON THE GROUND FLOOR WITHIN 10' OF SIDEWALK, AT LEAST 40% OF THE GROUND FLOOR BETWEEN 4'-8' ABOVE THE GROUND LEVEL SURFACE.• WEATHER PROTECTION: PROVIDE WEATHER PROTECTION AT LEAST 3’ DEEP OVER PRIMARY BUSINESS AND RESIDENTIAL ENTRIES• PARKING LOCATION: PROVIDE 10' MIN. BUFFER OF LANDSCAPING BETWEEN THE STREET AND OFF STREET PARKING AREAS• LANDSCAPING: AREA B/N STREET & BLDG MUST BE LANDSCAPED, PRIVATE PORCH OR PATIO SPACE, AND/OR PEDESTRIAN-ORIENTED SPACE• SIDEWALK WIDTH: 6' MINIMUM SIDEWALKS ARE REQUIRED ADJACENT TO ARTERIAL STREETS AND PUBLIC PARKS AND 5' MINIMUM WIDTH IN OTHER AREAS, EXCEPT THE REVIEW AUTHORITY MAY REQUIRE WIDER SIDEWALKS IN SPECIAL AREAS WHERE CALLED FOR IN ADOPTED PLANS OR WHERE SIGNIFICANT PEDESTRIAN TRAFFIC IS ANTICIPATED.FAÇADE ARTICULATIONSTOREFRONTS AND OTHER BUILDINGS WITH NON-RESIDENTIAL USES ON THEGROUND LEVEL MUST INCLUDE A MINIMUM OF THREE OF THE FOLLOWING ARTICULATION FEATURES EVERY 60 FEET (MAXIMUM) TO CREATE A HUMAN SCALED FAÇADE PATTERN:• WINDOWS• ENTRIES• USE OF WEATHER PROTECTION FEATURES• USE OF STRUCTURAL EXPRESSION• CHANGE IN ROOFLINE PER SUBSECTION F BELOW• CHANGE IN BUILDING MATERIAL OR SIDING STYLE• ARTICULATION OF A SINGLE BUILDING MATERIAL THROUGH VARYING COLORS, TEXTURES, OR INCORPORATING JOINTS OR AN INTEGRATED TRIM PATTERN• OTHER DESIGN TECHNIQUES THAT EFFECTIVELY REINFORCE A HUMAN-SCALED PATTERN COMPATIBLE WITH THE BUILDING'S SURROUNDING CONTEXT• PROVIDING VERTICAL ELEMENTS SUCH AS A TRELLIS WITH PLANTS, GREENWALL, ART ELEMENT• PROVIDING VERTICAL BUILDING MODULATION OF AT LEAST 12 INCHES IN DEPTH IF TIED TO A CHANGE IN ROOFLINE PER SUBSECTION F BELOW OR A CHANGE IN BUILDING MATERIAL, SIDING STYLE, OR COLORRESIDENTIAL BUILDINGS MUST INCLUDE ARTICULATION FEATURES AT APPROPRIATE INTERVALS RELATIVE TO THE SCALE OF THE FAÇADE IN ORDER TO REDUCE THE PERCEIVED MASSING OF THE BUILDING AND ADD VISUAL INTEREST. AT LEAST THREE OF THE FEATURES (LISTED ABOVE) MUST BE EMPLOYED AT INTERVALS RELATIVE TO THE INDIVIDUAL DWELLING UNITS OR AT A MAXIMUM OF EVERY 30 FEET. THE SCALE OF THE FAÇADE ARTICULATION SHOULD BE COMPATIBLE WITH THE SURROUNDING CONTEXT. ADDITIONAL FEATURES MAYINCLUDE:• USE OF VERTICAL PIERS/COLUMNS• OTHER DESIGN TECHNIQUES THAT EFFECTIVELY BREAK UP THE MASSING ATNO MORE THAN 30-FOOT INTERVALSSPECIAL RESIDENTIAL BLOCK FRONTAGE STANDARD COMPLIANCESEE OVERALL FLOOR PLAN SHEET AS.111 FOR COMPLIANCE WITH ONE OF THE PUBLIC/PRIVATE 1" = 1'-0"4RENDERING - ASPEN 1" = 1'-0"5RENDERING - IDA 1" = 1'-0"6RENDERING - COTTONWOODREVISIONSNO. DATE.692 BUILDING 6: TRANSPARENCY CALCULATIONS & BUILDING MASSING AND ARTICULATIION FOR WESTERN FAÇADE OF BLDG 6 NOT REQUIREDPANEL SIDING, TYP.VERTICAL SHADE PANELS; PERFORATED MTL.METAL SIDINGBOARD-FORM CONCRETEMTL. ROOFINGBUILDING 5RAILING TYPE R1; SEE AS.104EAST ASPEN ST.BUILDING 6: PUBLIC / COMMON AREAS ALONG EASTERN FAÇADE LANDSCAPE BLOCK FRONTAGE WITH GROUND FLOOR NON-RESIDENTIAL USESFAÇADE AREA 512 SFTRANSPARENCY AREA 275 SFREQUIRED TRANSPARENCY 25% @ 4' - 8' ABOVE SIDEWALKPROVIDED TRANSPARENCY 53.7% @ 4' - 8' ABOVE SIDEWALKBUILDING 5: NO WORK PROPOSEDEAST COTTONWOOD STREETPARKING GARAGEWOOD SIDINGPANEL SIDINGVERTICAL SHADE PANELS; PERFORATED MTL.ALUM WINDOW, TYP.ALUM STOREFRONTMTL. ROOFINGSTL. FRAMINGFAÇADE ARTICULATION AT MAX. 60 FT. INTERVAL59'-11"NORTH IDA AVE.FIRE ACCESS ROADPARKING GARAGEWOOD SIDINGSTANDING SEAM METAL ROOFINGPANEL SIDINGSTANDING SEAM METAL SIDINGWOOD SIDINGWOOD SIDINGPANEL SIDINGRAILING TYPE R1; SEE AS.104WOOD SIDINGPROJECTED METAL WINDOW FRAMEPAINTED WOOD SIDINGBUILDING 6: PUBLIC / COMMON AREAS ALONG SOUTHERN FAÇADE LANDSCAPE BLOCK FRONTAGE WITH GROUND FLOOR NON-RESIDENTIAL USESFAÇADE AREA 295 SFTRANSPARENCY AREA 176 SFREQUIRED TRANSPARENCY 25% @ 4' - 8' ABOVE SIDEWALKPROVIDED TRANSPARENCY 59.8% @ 4' - 8' ABOVE SIDEWALKBUILDING 1: PUBLIC / COMMON AREAS ALONG SOUTHERN FAÇADE LANDSCAPE BLOCK FRONTAGE WITH RESIDENTIAL USESFAÇADE AREA 4125 SFTRANSPARENCY AREA 1014 SFREQUIRED TRANSPARENCY 15%PROVIDED TRANSPARENCY 27.0%BUILDING 2: PUBLIC / COMMON AREAS ALONG SOUTHERN FAÇADE LANDSCAPE BLOCK FRONTAGE WITH RESIDENTIAL USESFAÇADE AREA 2094 SFTRANSPARENCY AREA 506 SFREQUIRED TRANSPARENCY 15%PROVIDED TRANSPARENCY 24.2%FAÇADE ARTICUATION AT30'-1"MAX. 30 FT. INTERVALMAX. 30 FT. INTERVALFAÇADE ARTICULATION AT30'-6"FAÇADE ARTICULATION AT MAX. 60 FT. INTERVAL60'-0"BUILDINGS SHOWN ARE BEYOND & DO NOT ENCROACH; PROPERTY LINE IS ANGLED, SEE SITE KEY PLAN RAIL TYPE R1; SEE AS.104FENCE TYPE F1; SEE AS.104321SCALEISSUE DATEPROJECTPRINTEDSTAMPENSCARCHITECTURE | URBANISM | DESIGNECONSULTANTSSITE PLAN -SP1As indicated1/24/2019 10:19:12 AMAS.20201-21-2019SITEELEVATIONSCOTTONWOOD & IDABOZEMAN, MT 597151707COTTONWOOD+ IDA 1/16" = 1'-0"1SITE ELEVATION - WEST (MISCO MILL) 1/16" = 1'-0"2SITE ELEVATION - EAST BLDGS 5,6 1/16" = 1'-0"3SITE ELEVATION - SOUTH BLDGS 1,2,6SITE KEY PLAN - AS.202BLOCK FRONTAGE ARTICULATION & TRANSPARENCYPER BMC SECTION 38.510.010.B, MIXED BLOCK FRONTAGE DESIGNATIONS HAVE THE OPTION TO COMPLY WITH EITHER STOREFRONT OR LANDSCAPE BLOCK FRONTAGE PROVISIONS WITH ADHERANCE TO MODIFICATIONS PER TABLE 38.510.030.C:STOREFRONT BLOCK FRONTAGE• GROUND FLOOR: NON-RESIDENTIAL USES SPECIFIED IN 38.10.020, EXCEPT FOR LOBBIES ASSOCIATED WITH RESIDENTIAL OR HOTEL/MOTEL USES ON UPPER FLOORS.• FLOOR TO CEILING HEIGHT: 13’ MIN. (NEW BLDGS)• RETAIL SPACE DEPTH: 20’ MIN. (NEW BLDGS)• BUILDING PLACEMENT: REQ. @ FRONT PROPERTY LINE / BACK EDGE OF SIDEWALK ADDN’L SETBACKS ALLOWED FOR WIDENED SIDEWALKS OR PEDESTRIAN ORIENTED SPACE• BUILDING ENTRANCES: MUST FACE STREET. FOR CORNER BUILDINGS, ENTRANCES MAY FACE THE STREET CORNER.• TRANSPARENCY: AT LEAST 60% OF GROUND FLOOR BETWEEN 30" AND 10' ABOVE SIDEWALK FOR PRIMARY FAÇADES AND 40% OF GROUND FLOOR BETWEEN 30" AND 10' ABOVE SIDEWALK FOR SECONDARY FAÇADES.DISPLAY WINDOWS MAY COUNT FOR UP TO 50% OF THE TRANSPARENCY REQUIREMENT PROVIDED THEY ARE AT LEAST 30" IN DEPTH TO ALLOW FOR CHANGEABLE DISPLAYS. TACK-ON DISPLAY CASES DO NOT QUALIFY AS TRANSPARENT WINDOW AREAS.• WEATHER PROTECTION: WEATHER PROTECTION W/ 8-15’ VERTICAL CLEARANCE AT LEAST 5’ IN AVG. DEPTH ALONG T LEAST 60% OF FACADE• PARKING LOCATION: NEW SURFACE AND STRUCTURED PARKING AREAS (GROUND FLOOR) MUST BE PLACED TO THE SIDE OR REAR OF STRUCTURES AND ARE LIMITEDTO 60' OF STREET FRONTAGE. PROVIDE A 6' MINIMUM BUFFER OF LANDSCAPING BETWEEN THE STREET AND OFF STREET PARKING AREAS MEETING THE PERFORMANCE STANDARDS OF DIVISION 38.550.• SIDEWALK WIDTH: 12 FEET MINIMUM BETWEEN CURB EDGE AND STOREFRONT (AREA INCLUDES CLEAR/ BUFFER ZONE WITH STREET TREES). SETBACKS AND UTILITY EASEMENTS MUST ALSO BE CONSIDERED AND MAY RESULT IN A LARGER MINIMUM SIDEWALK WIDTH.LANDSCAPE BLOCK FRONTAGE• GROUND FLOOR: SEE TABLES 38.310.030-.040 FOR PERMITTED USE DETAILS.• BUILDING PLACEMENT: 10' MIN. FRONT SETBACK, EXCEPT WHERE GREATER SETBACKS ARE SPECIFIED IN THE DISTRICT IN DIVISION 38.220.• BUILDING ENTRANCES: BUILDING ENTRANCES MUST BE VISIBLE AND DIRECTLY ACCESSIBLE FROM THE STREET. FOR USES THAT FRONT ON MULTIPLE MIXED DESIGNATED BLOCK FRONTAGES, ENTRY ALONG BOTH STREETS IS ENCOURAGED, BUT NOT REQUIRED.• TRANSPARENCY:FOR BUILDINGS DESIGNED WITH GROUND LEVEL NON-RESIDENTIAL USES, AT LEAST 25% OF THE GROUND FLOOR BETWEEN 4'-8' ABOVE THE SIDEWALK.FOR RESIDENTIAL USES, AT LEAST 15% OF THE ENTIRE FAÇADE (ALL VERTICAL SURFACES GENERALLY FACING THE STREET). WINDOWS MUST BE PROVIDED ON ALL HABITABLE FLOORS OF THE FAÇADE.OTHER BUILDINGS DESIGNED WITH NON-RESIDENTIAL USES ON THE GROUND FLOOR WITHIN 10' OF SIDEWALK, AT LEAST 40% OF THE GROUND FLOOR BETWEEN 4'-8' ABOVE THE GROUND LEVEL SURFACE.• WEATHER PROTECTION: PROVIDE WEATHER PROTECTION AT LEAST 3’ DEEP OVER PRIMARY BUSINESS AND RESIDENTIAL ENTRIES• PARKING LOCATION: PROVIDE 10' MIN. BUFFER OF LANDSCAPING BETWEEN THE STREET AND OFF STREET PARKING AREAS• LANDSCAPING: AREA B/N STREET & BLDG MUST BE LANDSCAPED, PRIVATE PORCH OR PATIO SPACE, AND/OR PEDESTRIAN-ORIENTED SPACE• SIDEWALK WIDTH: 6' MINIMUM SIDEWALKS ARE REQUIRED ADJACENT TO ARTERIAL STREETS AND PUBLIC PARKS AND 5' MINIMUM WIDTH IN OTHER AREAS, EXCEPT THE REVIEW AUTHORITY MAY REQUIRE WIDER SIDEWALKS IN SPECIAL AREAS WHERE CALLED FOR IN ADOPTED PLANS OR WHERE SIGNIFICANT PEDESTRIAN TRAFFIC IS ANTICIPATED.FAÇADE ARTICULATIONSTOREFRONTS AND OTHER BUILDINGS WITH NON-RESIDENTIAL USES ON THEGROUND LEVEL MUST INCLUDE A MINIMUM OF THREE OF THE FOLLOWING ARTICULATION FEATURES EVERY 60 FEET (MAXIMUM) TO CREATE A HUMAN SCALED FAÇADE PATTERN:• WINDOWS• ENTRIES• USE OF WEATHER PROTECTION FEATURES• USE OF STRUCTURAL EXPRESSION• CHANGE IN ROOFLINE PER SUBSECTION F BELOW• CHANGE IN BUILDING MATERIAL OR SIDING STYLE• ARTICULATION OF A SINGLE BUILDING MATERIAL THROUGH VARYING COLORS, TEXTURES, OR INCORPORATING JOINTS OR AN INTEGRATED TRIM PATTERN• OTHER DESIGN TECHNIQUES THAT EFFECTIVELY REINFORCE A HUMAN-SCALED PATTERN COMPATIBLE WITH THE BUILDING'S SURROUNDING CONTEXT• PROVIDING VERTICAL ELEMENTS SUCH AS A TRELLIS WITH PLANTS, GREENWALL, ART ELEMENT• PROVIDING VERTICAL BUILDING MODULATION OF AT LEAST 12 INCHES IN DEPTH IF TIED TO A CHANGE IN ROOFLINE PER SUBSECTION F BELOW OR A CHANGE IN BUILDING MATERIAL, SIDING STYLE, OR COLORRESIDENTIAL BUILDINGS MUST INCLUDE ARTICULATION FEATURES AT APPROPRIATE INTERVALS RELATIVE TO THE SCALE OF THE FAÇADE IN ORDER TO REDUCE THE PERCEIVED MASSING OF THE BUILDING AND ADD VISUAL INTEREST. AT LEAST THREE OF THE FEATURES (LISTED ABOVE) MUST BE EMPLOYED AT INTERVALS RELATIVE TO THE INDIVIDUAL DWELLING UNITS OR AT A MAXIMUM OF EVERY 30 FEET. THE SCALE OF THE FAÇADE ARTICULATION SHOULD BE COMPATIBLE WITH THE SURROUNDING CONTEXT. ADDITIONAL FEATURES MAYINCLUDE:• USE OF VERTICAL PIERS/COLUMNS• OTHER DESIGN TECHNIQUES THAT EFFECTIVELY BREAK UP THE MASSING ATNO MORE THAN 30-FOOT INTERVALSSPECIAL RESIDENTIAL BLOCK FRONTAGE STANDARD COMPLIANCESEE OVERALL FLOOR PLAN SHEET AS.111 FOR COMPLIANCE WITH ONE OF THE PUBLIC/PRIVATE REVISIONSNO. DATE.693 PARKING GARAGEEAST ASPEN ST.EAST COTTONWOOD ST.STANDING SEAM METAL SIDINGSTANDING SEAM METAL ROOFINGSTANDING SEAM METAL SIDINGWOOD SIDINGCORRUGATED METAL SIDINGALUM WINDOW, TYP.RAILING TYPE R2; SEE AS.104ALUM WINDOW, TYP.BUILDING 2: TRANSPARENCY CALCULATIONS & BUILDING MASSING AND ARTICULATIION FOR WESTERN FAÇADE OF BLDG 2 NOT REQUIREDBUILDING 3: PUBLIC / COMMON AREAS ALONG WESTERN FAÇADE LANDSCAPE BLOCK FRONTAGE WITH RESIDENTIAL USESFAÇADE AREA 5192 SFTRANSPARENCY AREA 970 SFREQUIRED TRANSPAENCY 15%PROVIDED TRANSPARENCY 18.7%FAÇADE ARTICULATION AT30'-0"MAX. 30 FT. INTERVALELECT. METERSBIKE RACKSNORTH IDA AVE.FIRE ACCESS ROADPARKING GARAGECORRUGATED METAL SIDINGWOOD SIDINGSTANDING SEAM METAL ROOFINGSTANDING SEAM METAL SIDINGMETAL ROOFINGEXIST'G WOOD WALLRAILING TYPE R3; SEE AS.104ALUM WINDOWLAP SIDING, PTD.ALUM WDWBUILDING 5BUILDING 4: PUBLIC / COMMON AREAS ALONG NORTHERN FAÇADE LANDSCAPE BLOCK FRONTAGE WITH RESIDENTIAL USESFAÇADE AREA 5331 SFTRANSPARENCY AREA 1351 SFREQUIRED TRANSPARECY 15%PROVIDED TRANSPARENCY 25.4%BUILDING 3: PUBLIC / COMMON AREAS ALONG NORTHERN FAÇADE LANDSCAPE BLOCK FRONTAGE WITH RESIDENTIAL USESFAÇADE AREA 1675 SFTRANSPARENCY AREA 207 SFREQUIRED TRANSPARENCY 15%PROVIDED TRANSPARENCY 12.3%MAX. 30 FT. INTERVALFAÇADE ARTICULATION AT31'-6"MAX. 30 FT. INTERVALMAILBOX SHELTER21SCALEISSUE DATEPROJECTPRINTEDSTAMPENSCARCHITECTURE | URBANISM | DESIGNECONSULTANTSSITE PLAN -SP1As indicated1/24/2019 10:19:24 AMAS.20301-21-2019SITEELEVATIONSCOTTONWOOD & IDABOZEMAN, MT 597151707COTTONWOOD+ IDA 1/16" = 1'-0"1SITE ELEVATION - EAST BLDGS 2,3 1/16" = 1'-0"2SITE ELEVATION - NORTH BLDGS 3,4,5SITE KEY PLAN - AS.203BLOCK FRONTAGE ARTICULATION & TRANSPARENCYPER BMC SECTION 38.510.010.B, MIXED BLOCK FRONTAGE DESIGNATIONS HAVE THE OPTION TO COMPLY WITH EITHER STOREFRONT OR LANDSCAPE BLOCK FRONTAGE PROVISIONS WITH ADHERANCE TO MODIFICATIONS PER TABLE 38.510.030.C:STOREFRONT BLOCK FRONTAGE• GROUND FLOOR: NON-RESIDENTIAL USES SPECIFIED IN 38.10.020, EXCEPT FOR LOBBIES ASSOCIATED WITH RESIDENTIAL OR HOTEL/MOTEL USES ON UPPER FLOORS.• FLOOR TO CEILING HEIGHT: 13’ MIN. (NEW BLDGS)• RETAIL SPACE DEPTH: 20’ MIN. (NEW BLDGS)• BUILDING PLACEMENT: REQ. @ FRONT PROPERTY LINE / BACK EDGE OF SIDEWALK ADDN’L SETBACKS ALLOWED FOR WIDENED SIDEWALKS OR PEDESTRIAN ORIENTED SPACE• BUILDING ENTRANCES: MUST FACE STREET. FOR CORNER BUILDINGS, ENTRANCES MAY FACE THE STREET CORNER.• TRANSPARENCY: AT LEAST 60% OF GROUND FLOOR BETWEEN 30" AND 10' ABOVE SIDEWALK FOR PRIMARY FAÇADES AND 40% OF GROUND FLOOR BETWEEN 30" AND 10' ABOVE SIDEWALK FOR SECONDARY FAÇADES.DISPLAY WINDOWS MAY COUNT FOR UP TO 50% OF THE TRANSPARENCY REQUIREMENT PROVIDED THEY ARE AT LEAST 30" IN DEPTH TO ALLOW FOR CHANGEABLE DISPLAYS. TACK-ON DISPLAY CASES DO NOT QUALIFY AS TRANSPARENT WINDOW AREAS.• WEATHER PROTECTION: WEATHER PROTECTION W/ 8-15’ VERTICAL CLEARANCE AT LEAST 5’ IN AVG. DEPTH ALONG T LEAST 60% OF FACADE• PARKING LOCATION: NEW SURFACE AND STRUCTURED PARKING AREAS (GROUND FLOOR) MUST BE PLACED TO THE SIDE OR REAR OF STRUCTURES AND ARE LIMITEDTO 60' OF STREET FRONTAGE. PROVIDE A 6' MINIMUM BUFFER OF LANDSCAPING BETWEEN THE STREET AND OFF STREET PARKING AREAS MEETING THE PERFORMANCE STANDARDS OF DIVISION 38.550.• SIDEWALK WIDTH: 12 FEET MINIMUM BETWEEN CURB EDGE AND STOREFRONT (AREA INCLUDES CLEAR/ BUFFER ZONE WITH STREET TREES). SETBACKS AND UTILITY EASEMENTS MUST ALSO BE CONSIDERED AND MAY RESULT IN A LARGER MINIMUM SIDEWALK WIDTH.LANDSCAPE BLOCK FRONTAGE• GROUND FLOOR: SEE TABLES 38.310.030-.040 FOR PERMITTED USE DETAILS.• BUILDING PLACEMENT: 10' MIN. FRONT SETBACK, EXCEPT WHERE GREATER SETBACKS ARE SPECIFIED IN THE DISTRICT IN DIVISION 38.220.• BUILDING ENTRANCES: BUILDING ENTRANCES MUST BE VISIBLE AND DIRECTLY ACCESSIBLE FROM THE STREET. FOR USES THAT FRONT ON MULTIPLE MIXED DESIGNATED BLOCK FRONTAGES, ENTRY ALONG BOTH STREETS IS ENCOURAGED, BUT NOT REQUIRED.• TRANSPARENCY:FOR BUILDINGS DESIGNED WITH GROUND LEVEL NON-RESIDENTIAL USES, AT LEAST 25% OF THE GROUND FLOOR BETWEEN 4'-8' ABOVE THE SIDEWALK.FOR RESIDENTIAL USES, AT LEAST 15% OF THE ENTIRE FAÇADE (ALL VERTICAL SURFACES GENERALLY FACING THE STREET). WINDOWS MUST BE PROVIDED ON ALL HABITABLE FLOORS OF THE FAÇADE.OTHER BUILDINGS DESIGNED WITH NON-RESIDENTIAL USES ON THE GROUND FLOOR WITHIN 10' OF SIDEWALK, AT LEAST 40% OF THE GROUND FLOOR BETWEEN 4'-8' ABOVE THE GROUND LEVEL SURFACE.• WEATHER PROTECTION: PROVIDE WEATHER PROTECTION AT LEAST 3’ DEEP OVER PRIMARY BUSINESS AND RESIDENTIAL ENTRIES• PARKING LOCATION: PROVIDE 10' MIN. BUFFER OF LANDSCAPING BETWEEN THE STREET AND OFF STREET PARKING AREAS• LANDSCAPING: AREA B/N STREET & BLDG MUST BE LANDSCAPED, PRIVATE PORCH OR PATIO SPACE, AND/OR PEDESTRIAN-ORIENTED SPACE• SIDEWALK WIDTH: 6' MINIMUM SIDEWALKS ARE REQUIRED ADJACENT TO ARTERIAL STREETS AND PUBLIC PARKS AND 5' MINIMUM WIDTH IN OTHER AREAS, EXCEPT THE REVIEW AUTHORITY MAY REQUIRE WIDER SIDEWALKS IN SPECIAL AREAS WHERE CALLED FOR IN ADOPTED PLANS OR WHERE SIGNIFICANT PEDESTRIAN TRAFFIC IS ANTICIPATED.FAÇADE ARTICULATIONSTOREFRONTS AND OTHER BUILDINGS WITH NON-RESIDENTIAL USES ON THEGROUND LEVEL MUST INCLUDE A MINIMUM OF THREE OF THE FOLLOWING ARTICULATION FEATURES EVERY 60 FEET (MAXIMUM) TO CREATE A HUMAN SCALED FAÇADE PATTERN:• WINDOWS• ENTRIES• USE OF WEATHER PROTECTION FEATURES• USE OF STRUCTURAL EXPRESSION• CHANGE IN ROOFLINE PER SUBSECTION F BELOW• CHANGE IN BUILDING MATERIAL OR SIDING STYLE• ARTICULATION OF A SINGLE BUILDING MATERIAL THROUGH VARYING COLORS, TEXTURES, OR INCORPORATING JOINTS OR AN INTEGRATED TRIM PATTERN• OTHER DESIGN TECHNIQUES THAT EFFECTIVELY REINFORCE A HUMAN-SCALED PATTERN COMPATIBLE WITH THE BUILDING'S SURROUNDING CONTEXT• PROVIDING VERTICAL ELEMENTS SUCH AS A TRELLIS WITH PLANTS, GREENWALL, ART ELEMENT• PROVIDING VERTICAL BUILDING MODULATION OF AT LEAST 12 INCHES IN DEPTH IF TIED TO A CHANGE IN ROOFLINE PER SUBSECTION F BELOW OR A CHANGE IN BUILDING MATERIAL, SIDING STYLE, OR COLORRESIDENTIAL BUILDINGS MUST INCLUDE ARTICULATION FEATURES AT APPROPRIATE INTERVALS RELATIVE TO THE SCALE OF THE FAÇADE IN ORDER TO REDUCE THE PERCEIVED MASSING OF THE BUILDING AND ADD VISUAL INTEREST. AT LEAST THREE OF THE FEATURES (LISTED ABOVE) MUST BE EMPLOYED AT INTERVALS RELATIVE TO THE INDIVIDUAL DWELLING UNITS OR AT A MAXIMUM OF EVERY 30 FEET. THE SCALE OF THE FAÇADE ARTICULATION SHOULD BE COMPATIBLE WITH THE SURROUNDING CONTEXT. ADDITIONAL FEATURES MAYINCLUDE:• USE OF VERTICAL PIERS/COLUMNS• OTHER DESIGN TECHNIQUES THAT EFFECTIVELY BREAK UP THE MASSING ATNO MORE THAN 30-FOOT INTERVALSSPECIAL RESIDENTIAL BLOCK FRONTAGE STANDARD COMPLIANCESEE OVERALL FLOOR PLAN SHEET AS.111 FOR COMPLIANCE WITH ONE OF THE PUBLIC/PRIVATE REVISIONSNO. DATE.694 EAST ASPEN ST.BUILDING 1: TRANSPARENCY CALCULATIONS & BUILDING MASSING AND ARTICULATIION FOR EASTERN FAÇADE OF BLDG 1 NOT REQUIREDEAST COTTONWOOD ST.PARKING GARAGEWOOD SIDINGSTANDING SEAM METAL SIDINGWOOD SIDINGPAINTED SIDINGCORRUGATED METAL SIDINGWOOD SIDINGCORRUGATED METAL SIDINGWOOD RAILING, TYPE R3ALUM WINDOWWOOD SLATSBUILDING 4:TRANSPARENCY CALCULATIONS & BUILDING MASSING AND ARTICULATIION FOR EASTERN FAÇADE OF BLDG 4 NOT REQUIREDELECT. METERSELECT. METERSEAST ASPEN ST.EAST COTTONWOOD ST.PARKING GARAGEMTL SIDINGSTANDING SEAM METAL SIDINGWOOD SIDINGCORRUGATED METAL SIDINGWOOD SIDINGWOOD SIDINGRAILING TYPE R3; SEE AS.104BUILDING 1: LANDSCAPE BLOCK FRONTAGE WITH RESIDENTIAL USESFAÇADE AREA6875 SFTRANSPARENCY AREA 1638 SFREQUIRED TRANSPARENCY15%PROVIDED TRANSPARENCY24.8%BUILDING 4:STOREFRONT BLOCK FRONTAGE AT PRIMARY FAÇADEPRIMARY FAÇADE AREA 548 SF.TRANSPARENCY AREA 189 SFREQUIRED TRANSPARENCY60% @ 2'-6" -10'-0" ABOVE SIDEWALKPROVIDED TRANSPARENCY61.8%FAÇADE ARTICULATION AT MAXIMUM 60 FT. INTERVAL59'-11"MAX. 30 FT. INTERVAL21SCALEISSUE DATEPROJECTPRINTEDSTAMPENSCARCHITECTURE | URBANISM | DESIGNECONSULTANTSSITE PLAN -SP1As indicated1/24/2019 10:19:37 AMAS.20401-21-2019SITEELEVATIONSCOTTONWOOD & IDABOZEMAN, MT 597151707COTTONWOOD+ IDA 1/16" = 1'-0"1SITE ELEVATION - EAST BLDGS 1,4 1/16" = 1'-0"2SITE ELEVATION - WEST BLDG 1,4SITE KEY PLAN - AS.204BLOCK FRONTAGE ARTICULATION & TRANSPARENCYPER BMC SECTION 38.510.010.B, MIXED BLOCK FRONTAGE DESIGNATIONS HAVE THE OPTION TO COMPLY WITH EITHER STOREFRONT OR LANDSCAPE BLOCK FRONTAGE PROVISIONS WITH ADHERANCE TO MODIFICATIONS PER TABLE 38.510.030.C:STOREFRONT BLOCK FRONTAGE• GROUND FLOOR: NON-RESIDENTIAL USES SPECIFIED IN 38.10.020, EXCEPT FOR LOBBIES ASSOCIATED WITH RESIDENTIAL OR HOTEL/MOTEL USES ON UPPER FLOORS.• FLOOR TO CEILING HEIGHT: 13’ MIN. (NEW BLDGS)• RETAIL SPACE DEPTH: 20’ MIN. (NEW BLDGS)• BUILDING PLACEMENT: REQ. @ FRONT PROPERTY LINE / BACK EDGE OF SIDEWALK ADDN’L SETBACKS ALLOWED FOR WIDENED SIDEWALKS OR PEDESTRIAN ORIENTED SPACE• BUILDING ENTRANCES: MUST FACE STREET. FOR CORNER BUILDINGS, ENTRANCES MAY FACE THE STREET CORNER.• TRANSPARENCY: AT LEAST 60% OF GROUND FLOOR BETWEEN 30" AND 10' ABOVE SIDEWALK FOR PRIMARY FAÇADES AND 40% OF GROUND FLOOR BETWEEN 30" AND 10' ABOVE SIDEWALK FOR SECONDARY FAÇADES.DISPLAY WINDOWS MAY COUNT FOR UP TO 50% OF THE TRANSPARENCY REQUIREMENT PROVIDED THEY ARE AT LEAST 30" IN DEPTH TO ALLOW FOR CHANGEABLE DISPLAYS. TACK-ON DISPLAY CASES DO NOT QUALIFY AS TRANSPARENT WINDOW AREAS.• WEATHER PROTECTION: WEATHER PROTECTION W/ 8-15’ VERTICAL CLEARANCE AT LEAST 5’ IN AVG. DEPTH ALONG T LEAST 60% OF FACADE• PARKING LOCATION: NEW SURFACE AND STRUCTURED PARKING AREAS (GROUND FLOOR) MUST BE PLACED TO THE SIDE OR REAR OF STRUCTURES AND ARE LIMITEDTO 60' OF STREET FRONTAGE. PROVIDE A 6' MINIMUM BUFFER OF LANDSCAPING BETWEEN THE STREET AND OFF STREET PARKING AREAS MEETING THE PERFORMANCE STANDARDS OF DIVISION 38.550.• SIDEWALK WIDTH: 12 FEET MINIMUM BETWEEN CURB EDGE AND STOREFRONT (AREA INCLUDES CLEAR/ BUFFER ZONE WITH STREET TREES). SETBACKS AND UTILITY EASEMENTS MUST ALSO BE CONSIDERED AND MAY RESULT IN A LARGER MINIMUM SIDEWALK WIDTH.LANDSCAPE BLOCK FRONTAGE• GROUND FLOOR: SEE TABLES 38.310.030-.040 FOR PERMITTED USE DETAILS.• BUILDING PLACEMENT: 10' MIN. FRONT SETBACK, EXCEPT WHERE GREATER SETBACKS ARE SPECIFIED IN THE DISTRICT IN DIVISION 38.220.• BUILDING ENTRANCES: BUILDING ENTRANCES MUST BE VISIBLE AND DIRECTLY ACCESSIBLE FROM THE STREET. FOR USES THAT FRONT ON MULTIPLE MIXED DESIGNATED BLOCK FRONTAGES, ENTRY ALONG BOTH STREETS IS ENCOURAGED, BUT NOT REQUIRED.• TRANSPARENCY:FOR BUILDINGS DESIGNED WITH GROUND LEVEL NON-RESIDENTIAL USES, AT LEAST 25% OF THE GROUND FLOOR BETWEEN 4'-8' ABOVE THE SIDEWALK.FOR RESIDENTIAL USES, AT LEAST 15% OF THE ENTIRE FAÇADE (ALL VERTICAL SURFACES GENERALLY FACING THE STREET). WINDOWS MUST BE PROVIDED ON ALL HABITABLE FLOORS OF THE FAÇADE.OTHER BUILDINGS DESIGNED WITH NON-RESIDENTIAL USES ON THE GROUND FLOOR WITHIN 10' OF SIDEWALK, AT LEAST 40% OF THE GROUND FLOOR BETWEEN 4'-8' ABOVE THE GROUND LEVEL SURFACE.• WEATHER PROTECTION: PROVIDE WEATHER PROTECTION AT LEAST 3’ DEEP OVER PRIMARY BUSINESS AND RESIDENTIAL ENTRIES• PARKING LOCATION: PROVIDE 10' MIN. BUFFER OF LANDSCAPING BETWEEN THE STREET AND OFF STREET PARKING AREAS• LANDSCAPING: AREA B/N STREET & BLDG MUST BE LANDSCAPED, PRIVATE PORCH OR PATIO SPACE, AND/OR PEDESTRIAN-ORIENTED SPACE• SIDEWALK WIDTH: 6' MINIMUM SIDEWALKS ARE REQUIRED ADJACENT TO ARTERIAL STREETS AND PUBLIC PARKS AND 5' MINIMUM WIDTH IN OTHER AREAS, EXCEPT THE REVIEW AUTHORITY MAY REQUIRE WIDER SIDEWALKS IN SPECIAL AREAS WHERE CALLED FOR IN ADOPTED PLANS OR WHERE SIGNIFICANT PEDESTRIAN TRAFFIC IS ANTICIPATED.FAÇADE ARTICULATIONSTOREFRONTS AND OTHER BUILDINGS WITH NON-RESIDENTIAL USES ON THEGROUND LEVEL MUST INCLUDE A MINIMUM OF THREE OF THE FOLLOWING ARTICULATION FEATURES EVERY 60 FEET (MAXIMUM) TO CREATE A HUMAN SCALED FAÇADE PATTERN:• WINDOWS• ENTRIES• USE OF WEATHER PROTECTION FEATURES• USE OF STRUCTURAL EXPRESSION• CHANGE IN ROOFLINE PER SUBSECTION F BELOW• CHANGE IN BUILDING MATERIAL OR SIDING STYLE• ARTICULATION OF A SINGLE BUILDING MATERIAL THROUGH VARYING COLORS, TEXTURES, OR INCORPORATING JOINTS OR AN INTEGRATED TRIM PATTERN• OTHER DESIGN TECHNIQUES THAT EFFECTIVELY REINFORCE A HUMAN-SCALED PATTERN COMPATIBLE WITH THE BUILDING'S SURROUNDING CONTEXT• PROVIDING VERTICAL ELEMENTS SUCH AS A TRELLIS WITH PLANTS, GREENWALL, ART ELEMENT• PROVIDING VERTICAL BUILDING MODULATION OF AT LEAST 12 INCHES IN DEPTH IF TIED TO A CHANGE IN ROOFLINE PER SUBSECTION F BELOW OR A CHANGE IN BUILDING MATERIAL, SIDING STYLE, OR COLORRESIDENTIAL BUILDINGS MUST INCLUDE ARTICULATION FEATURES AT APPROPRIATE INTERVALS RELATIVE TO THE SCALE OF THE FAÇADE IN ORDER TO REDUCE THE PERCEIVED MASSING OF THE BUILDING AND ADD VISUAL INTEREST. AT LEAST THREE OF THE FEATURES (LISTED ABOVE) MUST BE EMPLOYED AT INTERVALS RELATIVE TO THE INDIVIDUAL DWELLING UNITS OR AT A MAXIMUM OF EVERY 30 FEET. THE SCALE OF THE FAÇADE ARTICULATION SHOULD BE COMPATIBLE WITH THE SURROUNDING CONTEXT. ADDITIONAL FEATURES MAYINCLUDE:• USE OF VERTICAL PIERS/COLUMNS• OTHER DESIGN TECHNIQUES THAT EFFECTIVELY BREAK UP THE MASSING ATNO MORE THAN 30-FOOT INTERVALSSPECIAL RESIDENTIAL BLOCK FRONTAGE STANDARD COMPLIANCESEE OVERALL FLOOR PLAN SHEET AS.111 FOR COMPLIANCE WITH ONE OF THE PUBLIC/PRIVATE REVISIONSNO. DATE.695 CP#7CP#4CP#521CP#5ACP#520NORTH023SCALE: 0.044380C1.0LOTS 5-28 COTTON:OO' ,'$ON6,T( BOZEMAN, MONTANA EXISTING TOPOGRAPHY AND DEMOC 2018 ALL RIGHTS RESERVEDFILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTION06020_04_EX_PROD.DWG06020.04JAZ87654321ABCDEF9G-1-22-19PUDP SUBMITTAL------------------NORTHERN PACIFIC ADDITION451123PRELIMINARY - FOR REVIEWNOTE:-EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THEENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER,TELEPHONE & TELEVISION) MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITYCOMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS.-ALL IMPROVEMENTS SHALL BE PERFORMED IN ACCORDANCE WITH MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS 6TH EDITION, APRIL, 2010,AND THE CITY OF BILLINGS STANDARD MODIFICATIONS, DATED FEBRUARY, 2018.-UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LANDSURVEYOR LICENSED IN THE STATE OF MONTANA AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT ANDSTAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED.ELECTRIC JUNCTION BOXTELEPHONESTORM DRAIN MANHOLECATCH BASINSIGNSANITARY SEWERSTORM DRAINPOWER POLEWATER VALVEFIRE HYDRANTFOUND CORNER MONUMENT AS NOTEDLEGENDGASPOWEROVERHEAD POWER LINETYPICALSET CORNER MONUMENT, REBAR WITH CAPBOLLARDBUSHCURB STOPFIRE DEPT. CONNECTIONFIBER OPTIC PEDESTALGAS METERGAS MANHOLEGAS VALVEGUYWIREIRRIGATION VALVEIRRIGATION BOXLIGHT POLEPOWER METERPOWER MANHOLEELECTRIC PEDESTALROOF DRAINSIGNAL POLESANITARY SEWER MANHOLESANITARY SEWER CLEAN OUTTELEPHONE BOXTELEPHONE MANHOLETELEPHONE PEDESTALTRANSFORMERCONIFEROUS TREEDECIDUOUS TREECOMMUNICATIONS BOXCOMMUNICATIONS MANHOLECOMMUNICATIONS PEDESTALEX. WELLEX. YARD HYDRANTFIBER OPTICWATEREXISTING GRADE CONTOURS696 NORTH020SCALE: 1" = 20'C1.1LOTS 5-28 COTTON:OO' ,'$ON6,T( BOZEMAN, MONTANA PROPOSED LOT BOUNDARY ALIGNMENTSC 2018 ALL RIGHTS RESERVEDFILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTION06020_04_LEGAL_EXHIBIT.DWG06020.04JAZ87654321ABCDEF9G-1-22-19PUDP SUBMITTAL------------------NORTHERN PACIFIC ADDITION 401020PRELIMINARY - FOR REVIEW NOTE:-EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN AREINDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THEENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCHINFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER,TELEPHONE & TELEVISION) MAY NOT BE STRAIGHT LINES OR AS INDICATED ONTHE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITYCOMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS.-ALL IMPROVEMENTS SHALL BE PERFORMED IN ACCORDANCE WITH MONTANAPUBLIC WORKS STANDARD SPECIFICATIONS 6TH EDITION, APRIL, 2010, ANDTHE CITY OF BILLINGS STANDARD MODIFICATIONS, DATED FEBRUARY, 2018.-UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKINGSHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LANDSURVEYOR LICENSED IN THE STATE OF MONTANA AND BY A PARTY CHIEF ORENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT ANDSTAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORKBEING PERFORMED.697 BUILDING 6BUILDING 1BUILDING 2BUILDING 3BUILDING 4BUILDING 5NORTH030SCALE: 1" = 30'NOTE:-EXISTING UNDERGROUND INSTALLATIONS &PRIVATE UTILITIES SHOWN ARE INDICATEDACCORDING TO THE BEST INFORMATION AVAILABLETO THE ENGINEER. THE ENGINEER DOES NOTGUARANTEE THE ACCURACY OF SUCH INFORMATION.SERVICE LINES (WATER, POWER, GAS, STORM,SEWER, TELEPHONE & TELEVISION) MAY NOT BESTRAIGHT LINES OR AS INDICATED ON THE PLANS.STATE LAW REQUIRES CONTRACTOR TO CALL ALLUTILITY COMPANIES BEFORE EXCAVATION FOREXACT LOCATIONS.-ALL IMPROVEMENTS SHALL BE PERFORMED INACCORDANCE WITH MONTANA PUBLIC WORKSSTANDARD SPECIFICATIONS 6TH EDITION, APRIL,2010, AND THE CITY OF BILLINGS STANDARDMODIFICATIONS, DATED FEBRUARY, 2018.-UNLESS OTHERWISE SPECIFIED, ALLCONSTRUCTION LAYOUT AND STAKING SHALL BEPERFORMED UNDER THE RESPONSIBLE CHARGE OF ALAND SURVEYOR LICENSED IN THE STATE OFMONTANA AND BY A PARTY CHIEF OR ENGINEERINGTECHNICIAN EXPERIENCED IN CONSTRUCTIONLAYOUT AND STAKING TECHNIQUES AS AREREQUIRED BY THE SPECIFIC TYPE OF WORK BEINGPERFORMED.C2.0LOTS 5-28 COTTON:OO' ,'$ON6,T( BOZEMAN, MONTANA OVERALL IMPROVEMENTS PLANC 2018 ALL RIGHTS RESERVEDFILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTION06020_04_SITE_PROD.DWG06020.04JAZ87654321ABCDEF9G-1-22-19PUDP SUBMITTAL------------------NORTHERN PACIFIC ADDITION 601530PRELIMINARY - FOR REVIEW698 BUILDING 6BUILDING 1BUILDING 2BUILDING 3BUILDING 4BUILDING 5NORTH020SCALE: 1" = 20'NOTE:-EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THEENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER,TELEPHONE & TELEVISION) MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITYCOMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS.-ALL IMPROVEMENTS SHALL BE PERFORMED IN ACCORDANCE WITH MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS 6TH EDITION, APRIL, 2010,AND THE CITY OF BILLINGS STANDARD MODIFICATIONS, DATED FEBRUARY, 2018.-UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LANDSURVEYOR LICENSED IN THE STATE OF MONTANA AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT ANDSTAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED.C2.1LOTS 5-28 COTTON:OO' ,'$ON6,T( BOZEMAN, MONTANA SITE PLANC 2018 ALL RIGHTS RESERVEDFILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTION06020_04_SITE_PROD.DWG06020.04JAZ87654321ABCDEF9G-1-22-19PUDP SUBMITTAL------------------NORTHERN PACIFIC ADDITION401020PRELIMINARY - FOR REVIEW PLAN NOTES NEW CURB & GUTTER1NEW ASPHALT PAVINGNEW CONCRETE WALKNEW ACCESSIBILITY RAMPNEW 4" PAINTED YELLOW STRIPE AT 3' O.C.NEW PAINTED INTERNATIONAL DISABLED SYMBOLNEW 4" PAINTED YELLOW PARKING STRIPENEW CONCRETE DRIVE APPROACH PER CITY STANDARDNEW BOLLARDNEW ADA SIGNAGECLEAR VISION ZONE234567891011ELECTRIC JUNCTION BOXTELEPHONESTORM DRAIN MANHOLECATCH BASINSIGNSANITARY SEWERSTORM DRAINPOWER POLEWATER VALVEFIRE HYDRANTFOUND CORNER MONUMENT AS NOTEDLEGENDGASPOWEROVERHEAD POWER LINETYPICALSET CORNER MONUMENT, REBAR WITH CAPBOLLARDBUSHCURB STOPFIRE DEPT. CONNECTIONFIBER OPTIC PEDESTALGAS METERGAS MANHOLEGAS VALVEGUYWIREIRRIGATION VALVEIRRIGATION BOXLIGHT POLEPOWER METERPOWER MANHOLEELECTRIC PEDESTALROOF DRAINSIGNAL POLESANITARY SEWER MANHOLESANITARY SEWER CLEAN OUTTELEPHONE BOXTELEPHONE MANHOLETELEPHONE PEDESTALTRANSFORMERCONIFEROUS TREEDECIDUOUS TREECOMMUNICATIONS BOXCOMMUNICATIONS MANHOLECOMMUNICATIONS PEDESTALEX. WELLEX. YARD HYDRANTFIBER OPTICWATEREXISTING GRADE CONTOURS699 BUILDING 6BUILDING 1BUILDING 2BUILDING 3BUILDING 4NORTH020SCALE: 1" = 20'C3.0LOTS 5-28 COTTON:OO' ,'$ON6,T( BOZEMAN, MONTANA GRADING PLANC 2018 ALL RIGHTS RESERVEDFILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTION06020_04_GRADING_PROD.DWG06020.04JAZ87654321ABCDEF9G-1-22-19PUDP SUBMITTAL------------------NORTHERN PACIFIC ADDITION401020PRELIMINARY - FOR REVIEWNOTE:-EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THEENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER,TELEPHONE & TELEVISION) MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITYCOMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS.-ALL IMPROVEMENTS SHALL BE PERFORMED IN ACCORDANCE WITH MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS 6TH EDITION, APRIL, 2010,AND THE CITY OF BILLINGS STANDARD MODIFICATIONS, DATED FEBRUARY, 2018.-UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LANDSURVEYOR LICENSED IN THE STATE OF MONTANA AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT ANDSTAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED.ELECTRIC JUNCTION BOXTELEPHONESTORM DRAIN MANHOLECATCH BASINSIGNSANITARY SEWERSTORM DRAINPOWER POLEWATER VALVEFIRE HYDRANTFOUND CORNER MONUMENT AS NOTEDLEGENDGASPOWEROVERHEAD POWER LINETYPICALSET CORNER MONUMENT, REBAR WITH CAPBOLLARDBUSHCURB STOPFIRE DEPT. CONNECTIONFIBER OPTIC PEDESTALGAS METERGAS MANHOLEGAS VALVEGUYWIREIRRIGATION VALVEIRRIGATION BOXLIGHT POLEPOWER METERPOWER MANHOLEELECTRIC PEDESTALROOF DRAINSIGNAL POLESANITARY SEWER MANHOLESANITARY SEWER CLEAN OUTTELEPHONE BOXTELEPHONE MANHOLETELEPHONE PEDESTALTRANSFORMERCONIFEROUS TREEDECIDUOUS TREECOMMUNICATIONS BOXCOMMUNICATIONS MANHOLECOMMUNICATIONS PEDESTALEX. WELLEX. YARD HYDRANTFIBER OPTICWATERTC = FINISHED GRADE AT TOP BACK OF CURBBC = FINISHED GRADE AT BUILDING CORNERAC = FINISHED GRADE AT ASPHALTEA = FINISHED GRADE AT EDGE OF ASPHALTEC = FINISHED GRADE AT EDGE OF CONCRETESDI = STORM DRAIN INLETFL = FINISHED GRADE AT FLOWLINEGR = FINISHED GRADE AT GROUNDEX = APPROXIMATE EXISTING ELEVATIONEW = FINISHED GRADE AT EDGE OF WALKLEGEND:CATCH CURBSPILL CURBTRANSITION FROM CATCHTAPER CURB HEAD 3'TO SPILL CURBTW = FINISHED GRADE AT TOP OF WALLPC = POINT OF CURVATUREPOC = POINT ON CURVESDMH = STORM DRAIN MANHOLETOP OF CURB - 0.58' = LIPTOP OF CURB - 0.50' = FLOWLINESPILL CURB TOP OF CURB - 0.38' = LIPTOP OF CURB - 0.50' = FLOWLINECATCH CURB EXISTING GRADE CONTOURSFINISH GRADE CONTOURS700 BUILDING 6BUILDING 1BUILDING 2BUILDING 3BUILDING 4BUILDING 5NORTH020SCALE: 0.049998C4.0LOTS 5-28 COTTON:OO' ,'$ON6,T( BOZEMAN, MONTANA STORM DRAIN PLANC 2018 ALL RIGHTS RESERVEDFILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTION06020_04_STORM_PROD.DWG06020.04JAZ87654321ABCDEF9G-1-22-19PUDP SUBMITTAL------------------NORTHERN PACIFIC ADDITION401020PRELIMINARY - FOR REVIEWNOTE:-EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THEENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER,TELEPHONE & TELEVISION) MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITYCOMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS.-ALL IMPROVEMENTS SHALL BE PERFORMED IN ACCORDANCE WITH MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS 6TH EDITION, APRIL, 2010,AND THE CITY OF BILLINGS STANDARD MODIFICATIONS, DATED FEBRUARY, 2018.-UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LANDSURVEYOR LICENSED IN THE STATE OF MONTANA AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT ANDSTAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED.ELECTRIC JUNCTION BOXTELEPHONESTORM DRAIN MANHOLECATCH BASINSIGNSANITARY SEWERSTORM DRAINPOWER POLEWATER VALVEFIRE HYDRANTFOUND CORNER MONUMENT AS NOTEDLEGENDGASPOWEROVERHEAD POWER LINETYPICALSET CORNER MONUMENT, REBAR WITH CAPBOLLARDBUSHCURB STOPFIRE DEPT. CONNECTIONFIBER OPTIC PEDESTALGAS METERGAS MANHOLEGAS VALVEGUYWIREIRRIGATION VALVEIRRIGATION BOXLIGHT POLEPOWER METERPOWER MANHOLEELECTRIC PEDESTALROOF DRAINSIGNAL POLESANITARY SEWER MANHOLESANITARY SEWER CLEAN OUTTELEPHONE BOXTELEPHONE MANHOLETELEPHONE PEDESTALTRANSFORMERCONIFEROUS TREEDECIDUOUS TREECOMMUNICATIONS BOXCOMMUNICATIONS MANHOLECOMMUNICATIONS PEDESTALEX. WELLEX. YARD HYDRANTFIBER OPTICWATEREXISTING GRADE CONTOURSFINISH GRADE CONTOURS701 BUILDING 6BUILDING 1BUILDING 2BUILDING 3BUILDING 4BUILDING 5NORTH020SCALE: 1" = 20'C5.0LOTS 5-28 COTTON:OO' ,'$ON6,T( BOZEMAN, MONTANA UTILITY PLANC 2018 ALL RIGHTS RESERVEDFILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTION06020_04_UTILITY_PROD.DWG06020.04JAZ87654321ABCDEF9G-1-22-19PUDP SUBMITTAL------------------NORTHERN PACIFIC ADDITION401020PRELIMINARY - FOR REVIEWNOTE:-EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THEENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER,TELEPHONE & TELEVISION) MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITYCOMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS.-ALL IMPROVEMENTS SHALL BE PERFORMED IN ACCORDANCE WITH MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS 6TH EDITION, APRIL, 2010,AND THE CITY OF BILLINGS STANDARD MODIFICATIONS, DATED FEBRUARY, 2018.-UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LANDSURVEYOR LICENSED IN THE STATE OF MONTANA AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT ANDSTAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED.ELECTRIC JUNCTION BOXTELEPHONESTORM DRAIN MANHOLECATCH BASINSIGNSANITARY SEWERSTORM DRAINPOWER POLEWATER VALVEFIRE HYDRANTFOUND CORNER MONUMENT AS NOTEDLEGENDGASPOWEROVERHEAD POWER LINETYPICALSET CORNER MONUMENT, REBAR WITH CAPBOLLARDBUSHCURB STOPFIRE DEPT. CONNECTIONFIBER OPTIC PEDESTALGAS METERGAS MANHOLEGAS VALVEGUYWIREIRRIGATION VALVEIRRIGATION BOXLIGHT POLEPOWER METERPOWER MANHOLEELECTRIC PEDESTALROOF DRAINSIGNAL POLESANITARY SEWER MANHOLESANITARY SEWER CLEAN OUTTELEPHONE BOXTELEPHONE MANHOLETELEPHONE PEDESTALTRANSFORMERCONIFEROUS TREEDECIDUOUS TREECOMMUNICATIONS BOXCOMMUNICATIONS MANHOLECOMMUNICATIONS PEDESTALEX. WELLEX. YARD HYDRANTFIBER OPTICWATEREXISTING GRADE CONTOURSFINISH GRADE CONTOURS702 ASPEN ST.COTTONWOOD ST.BLDG 1BLDG 4PARKING GARAGEMAKERSPACECOMMON ROOM1-BEDROOMRESIDENT LOBBYROOF DECKRESIDENTIAL CORRIDORRESIDENTIAL CORRIDORRESIDENTIAL CORRIDOR2-BEDROOM2-BEDROOMPROPERTY LINEPROPERTY LINEASPEN ST.COTTONWOOD ST.BLDG 6BLDG 4PARKING GARAGEOFFICE TENANTOFFICE TENANTOFFICE TENANTOFFICE LOBBYMAKERSPACE2-BEDROOM2-BEDROOMPROPERTY LINEPROPERTY LINEASPEN ST.COTTONWOOD ST.BLDG 2BLDG 3PARKING GARAGESTUDIOSTUDIOSTUDIOSTUDIOSTUDIOSTUDIO1-BEDROOM1-BEDROOM1-BEDROOM1-BEDROOM1-BEDROOM1-BEDROOM2-BEDROOMBIKE ROOMPROPERTY LINEPROPERTY LINE2-BEDROOM2-BEDROOM2-BEDROOM2-BEDROOM2-BEDROOMROOF DECKROOF DECKROOF DECKCOMMON ROOMCOMMON ROOMCOMMON ROOM123SCALEISSUE DATEPROJECTPRINTEDSTAMPENSCARCHITECTURE | URBANISM | DESIGNECONSULTANTSSITE PLAN -SP1As indicated1/24/2019 9:50:56 AMAS.30101-21-2019SITESECTIONSNORTH-SOUTHCOTTONWOOD & IDABOZEMAN, MT 597151707COTTONWOOD+ IDA 1/16" = 1'-0"2SITE SECTION - N/S @ APARTMENT BLDG 1/16" = 1'-0"1SITE SECTION - N/S @ OFFICE BLDG 1/16" = 1'-0"3SITE SECTION - N/S @ COLIVING BLDG3SITE KEY PLAN - AS.301REVISIONSNO. DATE.703 IDA AVE.BLDG 6BLDG 1 BLDG 2WALLACE AVE.PARKING GARAGEBRIDGEFIRE ACCESSOFFICE TENANTOFFICE TENANTOFFICE TENANTOFFICE TENANTOFFICE TENANTOFFICE TENANTSTUDIOSTUDIOSTUDIOSTUDIOSTUDIOSTUDIOROOF DECKSTUDIOSTUDIOSTUDIOSTUDIOSTUDIOSTUDIOSTUDIOSTUDIOSTUDIOPROPERTY LINEPROPERTY LINEBUILDINGS SHOWN ARE BEYOND & DO NOT ENCROACH; PROPERTY LINE IS ANGLED, SEE SITE KEY PLAN IDA AVE.BLDG 5BLDG 4BLDG 3WALLACE AVE.MISCO MILLMAKERSPACEMAKERSPACEMAKERSPACEMAKERSPACEMAKERSPACETRASH ROOM2-BEDROOM2-BEDROOM2-BEDROOM2-BEDROOM2-BEDROOM2-BEDROOMFIRE ACCESS1-BEDROOM2-BEDROOMPROPERTY LINEPROPERTY LINEBUILDINGS SHOWN ARE BEYOND & DO NOT ENCROACH; PROPERTY LINE IS ANGLED, SEE SITE KEY PLAN 12SCALEISSUE DATEPROJECTPRINTEDSTAMPENSCARCHITECTURE | URBANISM | DESIGNECONSULTANTSSITE PLAN -SP1As indicated1/24/2019 9:51:07 AMAS.30201-21-2019SITESECTIONSEAST-WESTCOTTONWOOD & IDABOZEMAN, MT 597151707COTTONWOOD+ IDA 1/16" = 1'-0"2SITE SECTION - E/W @ NORTH 1/16" = 1'-0"1SITE SECTION - E/W @ SOUTHSITE KEY PLAN - AS.302REVISIONSNO. DATE.704 SP1 Submittal 01-17-2019 12-20-20181” = 20’-0” OVERALL ILLUSTRATIVE SITE PLAN & SHEETLIST L0.00 1” = 20’-0” LANDSCAPE SHEETLIST L0.00 OVERALL ILLUSTRATIVE SITE PLAN & SHEETLIST L1.00 MATERIALS PLAN L1.01 TAKE-OFF PLAN L2.00 PLANTING PALETTE L2.01 PLANTING PLAN L3.00 IRRIGATION PLAN L4.00 GRADING PLAN L4.01 STORMWATER PLAN L5.00 SNOW STORAGE PLAN L6.00 LIGHTING DIAGRAM L7.00 PERFORMANCE POINTS ASPEN ST. COTTONWOOD ST.IDA ST.5’-00” 17’-6” 5’-0” 14’-0”5’-0” 20’-0” PROJECT NAME: COTTONWOOD-IDA PROJECT ADDRESS: COTTONWOOD & IDA STREETS BOZEMAN, MT 59715 PROPERTY OWNER: IMPERIAL DEVELOPMENT 33 NORTH BLACK AVE. BOZEMAN, MT 59715 CONTACT: JON EVANS, (406) 451-1470 LANDSCAPE PLAN PREPARER: FLETCHER STUDIO 2325 3RD ST. SUITE #413 SAN FRANCISCO, CA 94107 CONTACT: DAVID FLETCHER, (415) 431-7878 SITE DESCRIPTION: THE COTTONWOOD-IDA SITE IS LOCATED IN THE NORTHEAST NEIGHBORHOOD OF BOZEMAN, MONTANA. THE NEIGHBORHOOD IS AN ACTIVE MIXTURE OF CONTEMPORARY WORK SPACES, INDUSTRIAL ARTS AND DISTRIBUTION CENTERS, AS WELL AS SMALL BUSINESSES AND SINGLE- FAMILY RESIDENCES. THE SITE IS BOUNDED BY E COTTONWOOD STREET TO THE SOUTH, N IDA AVENUE TO THE EAST, AND E ASPEN STREET TO THE NORTH. THE DESIGN AIMS TO CONTRIBUTE TO AN ALREADY VIBRANT AND DIVERSE COMMUNITY BY BOTH RESPECTING BOZEMAN AND THE NEIGHBORHOOD’S CULTURAL IDENTITY WHILE ALSO LOOKING TOWARDS THE FUTURE OF THE CITY. SPECIFICALLY, THE DESIGN ACCOMMODATES NEW HOUSING, SMALL BUSINESS SPACES, AND OFFICE SPACE IN AN AFFORDABLE AND CONTEXTUALLY RESPONSIVE MANNER. THE DESIGN ALSO WORKS TO EMBRACE MULTI-MODEL TRANSPORTATION, ESPECIALLY CYCLING. THE SITE INCLUDES A NUMBER OF OPEN SPACES FOR BOTH RESIDENTS AND THE GENERAL PUBLIC, PARTICULARLY A LARGE PUBLIC PLAZA AT THE HEART OF THE SITE. 705 SP1 Submittal 01-17-2019 12-20-2018MATERIALS PLAN L1.00 GABION WALLS COMMUNITY FIREPLACES STEPS/ RAMP ROOFDECK WOOD BENCH SEATING MATERIALS PLAN CITY STANDARD CONC CONCRETE PAVING, INTEGRAL COLOR CONC COLOR: SILVERSMOKE FINISH: TOP CAST NOT USED STONE PAVING 2 TYPE: BASALT RECLAIMED SIDEWALK SLABS, PLACED ON EDGE IN LANDSCAPE CONC UNIT PAVERS, MANUF: BELGARD COLOR: CHAMPAGNE FINISH: GROUND FACE PLANTING AREA COVERED BIKE STORAGE HALVED QUARRIED BOULDER PUBLIC BIKE RACKS VIEW TRIANGLES 1” = 20’-0” PROPERTY LINE PERIMETER OF PARKING STRUCTURE BELOW 1 1 2 2 3 3 4 4 14 14 5 5 5 5 6 6 6 6 6 66 6 6 6 6 6 6 6 10 10 16 16 8 8 8 12 7 7 7 11 11 17 17 18 19 19 19 19 19 20 21 22 24 24 24 25 26 27 2727 27 27 26 26 26 26 26 25 25 25 22 22 22 22 22 22 9 9 22 22 2222 23 A A A A A A B B B B B B C E F E D F GABION CAGE STORMWATER INLETG D D D D E D 9 15 15 13 13 14 SITE LEGEND SITE MATERIALS 1” = 20’-0” 1” = 20’-0” MILL PLAZA/ EVENT PLAZA/ SNOW STORAGE BUILDING PLAZA RESIDENT PLAZA COMMERCIAL ALLEY/ CATENARY LIGHTS SHARED STOOP PRIVATE PATIO PUBLIC STAIRS/ RAMP EVA PASSAGE CAIRN SCULPTURES CRAFTSMAN STONE FLEXIBLE SEATING 4’ PASS THROUGH TO PARKING FIRE TABLE REMOVABLE BOLLARDS LARGE BOX SIZE TREE COMMUNAL SEATING BIKE ROOM ENTRY NOT USED RECLAIMED GABION BENCH WITH WOOD TOP CONCRETE SEAT WALL COLOR: NATURAL GREY FINISH: 4” VERTICAL BOARD FORM HEIGHT: 18” 12 23 23 21 21 12 13 D ASPEN ST. COTTONWOOD ST.IDA ST.12 G G G 706 707 SP1 Submittal 01-17-2019 12-20-2018PLANTING PLAN L2.01 1” = 20’-0” 1” = 20’-0” Name Quantity Size @ Installation Size @ Maturity Spacing Drought Tolerant Native/ Adapted Artemisia tridentata Big Sagebrush n/a 20 gallon 4’ x 4’4’High yes Arctostaphylos uva-ursi Kinnikinnick n/a 5 gallon 18” x 4’2’Med.yes Aquilegia coerulea Blue Columbine n/a 1 galllon 18” x 18”18”High yes Balsomorhiza sagittata Arrowleaf Balsamroot n/a 5 gallon 18” x 18”18”High yes Festuca idahoensis Idaho Fescue n/a 1 gallon 18” x 18”18”Med.yes Fallugia paradoxa Apache Plume n/a 5 gallon 4’ x 4’4’High yes Huechera glabella Alumroot n/a 5 gallon 18” x 18”18”Medium yes Penstemon procerus Littleflower Penstemon n/a 5 gallon 18” x 18”18”Med.yes Saxifraga nivalis Alpine Saxifrage n/a 1 gallon 18” x 18”18”High yes Picea pungens ‘Sester’ Sester’s Dwarf Spruce n/a 20 gallon 6’ x 4’4’High yes Picea abies ‘Repens’ Pumila Norway Spruce n/a 20 gallon 3’ x 6’4’High yes Yucca glauca Soapweed Yucca n/a 5 gallon 3’ x 3’3’High yes Arctostaphylos uva-ursi Kinnikinnick n/a 5 gallon 18” x 4’2’Med.yes Balsomorhiza sagittata Arrowleaf Balsamroot n/a 5 gallon 18” x 18”18”High yes Daphne x burkwoodii Carol Mackie Daphne n/a 5 gallon 4’ x 4’3’Med.yes Festuca idahoensis Idaho Fescue n/a 1 gallon 18” x 18”18”Med.yes Festuca glauca Blue Fescue n/a 1 gallon 18” x 18”18”Med.yes Perovskia atriplicifolia Russian Sage n/a 5 gallon 4’ x 4’4’High.yes L. angustifolia ‘Hidcote’ Hidcote Lavender n/a 5 gallon 18” x 18”18”High yes Picea pungens ‘Sester’ Sester’s Dwarf Spruce n/a 20 gallon 6’ x 4’4’High yes Xerophyllum tenax Bear Grass n/a 5 gallon 3’ x 3’3’High yes Achillea filipendula Coronation Gold Yarrow n/a 1 gallon 18” x 18”18”High yes Achillea millefolium Common Yarrow n/a 1 gallon 18” x 18”18”High yes Aquilegia coerulea Blue Columbine n/a 1 gallon 18” x 18”18”High yes Asclepias incarnata Swamp Milkweed n/a 5 gallon 4’ x 2’2’Low/Med.yes Deschampsia cespitosa Tufted Hairgrass n/a 5 gallon 3’ x 2’2’High yes Echinacea angustifolia Narroweaf Echinacea n/a 1 gallon 18” x 18”18”Med.yes Erigonium umbellatum Sulphur Buckwheat n/a 5 gallon 1’ x 3’2’Med.yes L. angustifolia ‘Hidcote’ Hidcote Lavender n/a 5 gallon 18” x 18”18”Med.yes Penstemon Strictus Rocky Mtn. Penstemon n/a 5 gallon 18” x 18”18”High yes Perovskia atriplicifolia Russian Sage n/a 5 gallon 4’ x 4’3’High yes Psuedorogeneria spicata Bluebunch Wheatgrass n/a 5 gallon 4’ x 3’2’High yes Schizachyrim scoparium Little Bluestem n/a 5 gallon 3’ x 18”18”High yes Sporobolus heterolepsis Praire Dropseed n/a 5 gallon 3’ x 3’2’Med./High yes Spirea betufolia ‘Tor’ Tor Birchleaf Spirea n/a 10 gallon 3’ x 3’2’Med.yes Xerophyllum tenax Bear Grass n/a 5 gallon 3’ x 3’2’High yes Symbol Name Quantity Size @ Installation Size @ Maturity Spacing Drought Tolerant Native/ Adapted Acer freemani Freeman Maplet 6 48” box 50’ x 40’varies Med.yes 1 72” box Tilia cordata Little Leaf Linden 10 48” box 50’ x 40’varies Med.yes Betula utilis var. jacquemonti Himalayan Birch 4 48” box 50’ x 25’varies Med.yes Quercus macrocarpa Bur Oak 5 48” box 60’ x 60’varies Med./High yes Gleditsia triacanthos var. inermis ‘Skycole’ Skyline Honey Locust 16 48” box 45’ x 35’varies Med.yes 708 SP1 Submittal 01-17-2019 12-20-2018TAKE-OFF PLAN L1.01 1” = 20’-0” 1” = 20’-0” 1” = 20’-0” TAKE-OFF PLAN 1. Landscape Area: 25,150 SF 2. Hardscape Area: 33,100 SF • City Standard Concrete: 8,275 SF • Integral Color Concrete Paving: 6,620 SF • Stone Paving: 14,520 SF • Concrete Unit Pavers: 3,685 SF Total Site Area: 58,250 SF 1. Reclaimed Sidewalk: 142’-2”LF (4” wide) 2. Gabion Benches: 190’-9” LF (18” wide, cobble reclaimed onsite) 3. C.I.P. Benches: 90’-10” LF (18” wide, Finish: Light Sandblast) Total Bench Length: 423’-9” LF 1. Concrete: 201’-7” LF (8” wide) 2. Concrete: 33’-6” LF (18” wide) Total Wall Length: 235’-1” LF 709 710